Professional Documents
Culture Documents
Form Perhitungan Simpang
Form Perhitungan Simpang
LABORATORIUM TRANSPORTASI
PERHITUNGAN VOLUME LALU LINTAS
Hari : Rabu
Tanggal : 40653
Supervisor :
waktu sepeda sedan/jeep/ mikrolet bus bus truk sedang truk besar truk besar
motor pickup sedang besar 2 As 2 As 3 As
06:00-06:05 5 1
06:05-06:10 3 1
06:10-06:15 5 5
06:15-06:20 6 4
06:20-06:25 3 3
06:25-06:30 40 6
06:30-06:35 30 7
06:35-06:40 15 5
06:40-06:45 7 3
06:45-06:50 7 1
06:50-06:55 14 3
06:55-07:00 9 2
07:00-07:05 3 1
07:05-07:10 8 3
07:10-07:15 7 2
07:15-07:20 10 0
07:20-07:25 13 2
07:25-07:30 7 1
07:30-07:35 4 4
07:35-07:40 13 4
07:40-07:45 12 5
07:45-07:50 22 6
07:50-07:55 19 5
07:55-08:00 8 5
UNIVERSITAS BRAWIJAYA
LABORATORIUM TRANSPORTASI
PERHITUNGAN VOLUME LALU LINTAS
Hari : Rabu
Tanggal : 40653
Supervisor :
MC (LV) Kendaraan Berat (HV)
jeep/pick up
sedang 2 As
besar 2 As
besar 3 As
da motor
s sedang
s Besar
ikrolet
Jam
sedan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
Truk besar 3 As
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
UNIVERSITAS BRAWIJAYA
LABORATORIUM TRANSPORTASI
PERHITUNGAN VOLUME LALU LINTAS
Hari : Rabu
Tanggal : 40653
Supervisor :
uk sedang 2 As
ruk besar 2 As
ruk besar 3 As
epeda motor
Jam
Bus sedang
Bus Besar
Mikrolet
sedan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
Truk besar 3 As
sepeda motor
Jam
Bus sedang
Bus Besar
Mikrolet
emp 0.4 1 1 1.3 1.3 1.3 1.3 1.3
06.00-07.00 57.6 41 0 0 0 0 0 0
06.05-07.05 56.8 41 0 0 0 0 0 0
06.10-07.10 58.8 43 0 0 0 0 0 0
06.15-07.15 59.6 40 0 0 0 0 0 0
06.20-07.20 61.2 36 0 0 0 0 0 0
06.25-07.25 65.2 35 0 0 0 0 0 0
06.30-07.30 52 30 0 0 0 0 0 0
06.35-07.35 41.6 27 0 0 0 0 0 0
06.40-07.40 40.8 26 0 0 0 0 0 0
06.45-07.45 42.8 28 0 0 0 0 0 0
06.50-07.50 48.8 33 0 0 0 0 0 0
06.55-07.55 50.8 35 0 0 0 0 0 0
07.00-08.00 50.4 38 0 0 0 0 0 0
KODE UNIVERSITAS BRAWIJAYA
NO. FORM LABORATORIUM TRANSPORTASI
PERHITUNGAN VOLUME LALU LINTAS
Lokasi
Arah Timur - Utara (Wr. Supratman - Sutoyo) Hari : Rabu
Shif Tanggal : 40653
Surveyor Supervisor :
sedan/jeep/pick up
6
sepeda motor
Bus sedang
4
Mikrolet
Jam
10
10
6
46
37 06.00-07.00 144 41 0 0
20 07.00-08.00 126 38 0 0
10
8
17
11 MC (LV)
4
sedan/jeep/pick up
11
sepeda motor
Bus sedang
9
Mikrolet
Jam
10
15
8
8
17 emp 0.4 1 1 1.3
17 06.00-07.00 57.6 41 0 0
28 07.00-08.00 50.4 38 0 0
24
13
UNIVERSITAS BRAWIJAYA
KODE LABORATORIUM TRANSPORTASI
NO. FORM PERHITUNGAN VOLUME LALU LINTAS
da motor
s sedang
Jumlah
ikrolet
Jam
kendaraan
sedan/jeep/pick up
Truk Kontainer
Truk Gandeng
sepeda motor
Bus sedang
Jumlah
Mikrolet
Jam
kendaraan
KODE
NO. FORM
Lokasi
Arah Timur - Utara (Wr. Supratman - Sutoyo)
Shif
Surveyor
erat (HV)
Truk Kontainer
Truk Gandeng
MC LV HV Total
1.3 1.3
0 0 57.6 41 0 98.6
0 0 56.8 41 0 97.8
0 0 58.8 43 0 101.8
0 0 59.6 40 0 99.6
0 0 61.2 36 0 97.2
0 0 65.2 35 0 100.2
0 0 52 30 0 82
0 0 41.6 27 0 68.6
0 0 40.8 26 0 66.8
0 0 42.8 28 0 70.8
0 0 48.8 33 0 81.8
0 0 50.8 35 0 85.8
0 0 50.4 38 0 88.4
KODE
NO. FORM
UME LALU LINTAS
Lokasi
Arah Timur - Utara (Wr. Supratman - Sutoyo)
Shif
Surveyor
Persentase Kendaraan
Truk sedang 2 As
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
Bus Besar
Jumlah
kendaraan
0 0 0 0 0 0 185 53.0086
0 0 0 0 0 0 164 46.9914
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
sepeda motor
Bus Besar
Jumlah
kendaraan Jam
KODE
NO. FORM
UME LALU LINTAS
Lokasi
Arah Timur - Utara (Wr. Supratman - Sutoyo)
Shif
Surveyor
Arus (kend/jam)
sedang 2 As
Kontainer
besar 2 As
besar 3 As
Gandeng
s Besar
Jumlah
kendaraan
Arus (kend/jam)
Truk sedang 2 As
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
Bus Besar
Jumlah
kendaraan
MC LV HV
Kendaraan Ringan
sedan/jeep/pick up
Prosenta
Jumlah Prosenta se
Prosenta
Mikrolet
se sepeda se
sedan/jee
motor Mikrolet
p/pick up
(%) (%)
(%)
Total MC LV HV Total
Hari : Rabu
Tanggal : 40653
Supervisor :
sepeda sedan/jeep/ bus bus truk sedang truk besar truk besar
waktu mikrolet
motor pickup sedang besar 2 As 2 As 3 As
06:00-06:05 21 4
06:05-06:10 33 8 1
06:10-06:15 53 2 2
06:15-06:20 52 5 5
06:20-06:25 54 1 5
06:25-06:30 41 2 1
06:30-06:35 48 2 4
06:35-06:40 41 2 1
06:40-06:45 59 4 3
06:45-06:50 64 1 3
06:50-06:55 57 1 3
06:55-07:00 54 1 2
07:00-07:05 57 1 4 1
07:05-07:10 47 1 3
07:10-07:15 56 4 2 1
07:15-07:20 52 5 3
07:20-07:25 60 1 5 1
07:25-07:30 67 2 4
07:30-07:35 65 1 5
07:35-07:40 60 6 3 2
07:40-07:45 46 4 3 2
07:45-07:50 54 3 4
07:50-07:55 54 1 1
07:55-08:00 56 1 1
UNIVERSITAS BRAWIJAYA
LABORATORIUM TRANSPORTASI
PERHITUNGAN VOLUME LALU LINTAS
Hari : Rabu
Tanggal : 40653
Supervisor :
MC (LV) Kendaraan Berat (HV)
/jeep/pick up
sedang 2 As
k besar 2 As
k besar 3 As
eda motor
us sedang
us Besar
ikrolet
Jam
sedan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
Truk besar 3 As
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
UNIVERSITAS BRAWIJAYA
LABORATORIUM TRANSPORTASI
PERHITUNGAN VOLUME LALU LINTAS
Hari : Rabu
Tanggal : 40653
Supervisor :
MC (LV) Kendaraan Berat (HV)
sedan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
Truk besar 3 As
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
sedan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
Truk besar 3 As
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
Jumlah MC (LV)
truk gandeng truk kontainer
Kendaraan
sedan/jeep/pick up
25
sepeda motor
42
Mikrolet
Jam
57
62
60
44
54 06.00-07.00 577 33 29
44 07.00-08.00 674 29 38
66
68
61
57 MC (LV)
63
sedan/jeep/pick up
51 sepeda motor
63
Mikrolet
Jam
60
67
73
71
71 emp 0.4 1 1
55 06.00-07.00 230.8 33 29
61 07.00-08.00 269.6 29 38
56
58
UNIVERSITAS BRAWIJAYA
KODE LABORATORIUM TRANSPORTASI
NO. FORM PERHITUNGAN VOLUME LALU LINTAS
eda motor
Jumlah
ikrolet
Jam
kendaraan
sedan/jeep/pick up
Truk Kontainer
Truk Gandeng
sepeda motor
Jumlah
Mikrolet
Jam
kendaraan
KODE
NO. FORM
Lokasi
Arah Timur - Barat (Wr. Supratman - Kaliurang)
Shif
Surveyor
erat (HV)
1.3 1.3
0 0 230.8 62 1.3 294.1
0 0 245.2 63 2.6 310.8
0 0 250.8 59 1.3 311.1
0 0 252 61 2.6 315.6
0 0 252 59 2.6 313.6
0 0 254.4 59 3.9 317.3
0 0 264.8 62 3.9 330.7
0 0 271.6 62 3.9 337.5
0 0 279.2 68 6.5 353.7
0 0 274 68 9.1 351.1
0 0 270 71 9.1 350.1
0 0 268.8 68 10.4 347.2
0 0 269.6 67 10.4 347
KODE
ANSPORTASI NO. FORM
NGAN VOLUME LALU LINTAS
Lokasi
Arah Timur - Barat (Wr. Supratman - Kaliurang)
Shif
Surveyor
Persentase Kendaraan
Truk sedang 2 As
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
Bus sedang
Bus Besar
Jumlah
kendaraan
0 0 0 1 0 0 0 640 46.07631
0 0 1 7 0 0 0 749 53.92369
TABEL PROSENTA
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
Bus sedang
Bus Besar
Jumlah
kendaraan Jam
KODE
ANSPORTASI NO. FORM
NGAN VOLUME LALU LINTAS
Lokasi
Arah Timur - Barat (Wr. Supratman - Kaliurang)
Shif
Surveyor
Arus (kend/jam)
sedang 2 As
k Kontainer
k besar 2 As
k besar 3 As
k Gandeng
us sedang
us Besar
Jumlah
kendaraan
Arus (kend/jam)
Truk sedang 2 As
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
Bus sedang
Bus Besar
Jumlah
kendaraan
MC LV
Kendaraan Ringan
sedan/jeep/pick up
Prosenta
Jumlah Prosenta Prosenta
sepeda motor
se
Mikrolet
se sepeda se
sedan/jee
motor Mikrolet
p/pick up
(%) (%)
(%)
HV Total MC LV HV Total
Hari : Rabu
Tanggal : 40653
Supervisor :
UNIVERSITAS BRAWIJAYA
LABORATORIUM TRANSPORTASI
PERHITUNGAN VOLUME LALU LINTAS
Hari : Rabu
Tanggal : 40653
Supervisor :
MC (LV) Kendaraan Berat (HV)
/jeep/pick up
sedang 2 As
besar 2 As
eda motor
s sedang
us Besar
ikrolet
Jam
sedan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
UNIVERSITAS BRAWIJAYA
LABORATORIUM TRANSPORTASI
PERHITUNGAN VOLUME LALU LINTAS
Hari : Rabu
Tanggal : 40653
Supervisor :
MC (LV) Kendaraan Berat (HV)
sedan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
sedan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
sedan/jeep/pick up
34
sepeda motor
33
Jam
67
63
70
103
60 06.00-07.00 623 123
73 07.00-08.00 556 123
63
72
100
94 MC (LV)
26
sedan/jeep/pick up
65
sepeda motor
44
Jam
68
86
88
63
42 emp 0.4 1
74 06.00-07.00 249.2 123
97 07.00-08.00 222.4 123
61
36
UNIVERSITAS BRAWIJAYA
KODE LABORATORIUM TRANSPORTASI
NO. FORM PERHITUNGAN VOLUME LA
k Gandeng
eda motor
Jumlah
kendaraa Jam
n
sedan/jeep/pick up
Truk Kontainer
Truk besar 3 As
Truk Gandeng
sepeda motor
Jumlah
kendaraa Jam
n
KODE
NO. FORM
Lokasi
Arah Timur - Selatan (Wr. Supratman - Suprapto)
Shif
Surveyor
Kendaraan Berat (HV)
Truk Gandeng
Truk Kontainer
Truk besar 3 As
Truk Gandeng
MC LV HV Total
Persentase Kendaraan
Truk sedang 2 As
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
Jumlah
Bus sedang
Bus Besar
Mikrolet
kendara
an
85 0 0 1 0 0 0 0 832 52.59166
70 0 1 0 0 0 0 0 750 47.40834
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
Jumlah
Bus sedang
Bus Besar
Mikrolet
kendara
an
Arus (kend/jam
sedang 2 As
Kontainer
besar 2 As
besar 3 As
k Gandeng
s sedang
us Besar
ikrolet
Jumlah
kendara
an
Arus (kend/jam
Truk sedang 2 As
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
Bus sedang
Bus Besar
Mikrolet
Jumlah
kendara
an
MC
Kendaraan Ringan
sedan/jeep/pick up
Prosenta
Jumlah Prosenta Prosenta
sepeda motor
se
Mikrolet
se sepeda se
Jam sedan/jee
motor Mikrolet
p/pick up
(%) (%)
(%)
Supratman - Suprapto)
LV HV Total MC LV HV Total
Hari : Rabu
Tanggal : 40653
Supervisor :
sepeda sedan/jeep/ bus bus truk sedang truk besar truk besar
waktu mikrolet
motor pickup sedang besar 2 As 2 As 3 As
06.00-06.05 25 3
06.05-06.10 34 7
06.10-06.15 50 5 1
06.15-06.20 29 13
06.20-06.25 39 8
06.25-06.30 74 7
06.30-06.35 57 19
06.35-06.40 67 12
06.40-06.45 62 13
06.45-06.50 66 7 1
06.50-06.55 58 14 1
06.55-07.00 50 10
07.00-07.05 43 14
07.05-07.10 50 5 1
07.10-07.15 30 7
07.15-07.20 40 10
07.20-07.25 54 9
07.25-07.30 50 10
07.30-07.35 50 15
07.35-07.40 53 15
07.40-07.45 68 15
07.45-07.50 67 19
07.50-07.55 58 19 1
07.55-08.00 56 23
UNIVERSITAS BRAWIJAYA
LABORATORIUM TRANSPORTASI
PERHITUNGAN VOLUME LALU LINTAS
Hari : Rabu
Tanggal : 40653
Supervisor :
MC (LV) Kendaraan Berat (HV)
Jam
sedan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
Truk besar 3 As
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
UNIVERSITAS BRAWIJAYA
LABORATORIUM TRANSPORTASI
PERHITUNGAN VOLUME LALU LINTAS
Hari : Rabu
Tanggal : 40653
Supervisor :
MC (LV) Kendaraan Berat (HV)
edan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
Truk besar 3 As
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
sedan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
Truk besar 3 As
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
Jumlah MC (LV)
truk gandeng truk kontainer
Kendaraan
sedan/jeep/pick up
28
sepeda motor
Bus sedang
41
Mikrolet
Jam
56
42
47
81
76 06.00-07.00 611 118 2 0
79 07.00-08.00 619 161 2 0
75
74
73
60 MC (LV)
57
sedan/jeep/pick up
56
sepeda motor
Bus sedang
37
Mikrolet
Jam
50
63
60
65
68 emp 0.4 1 1 1.3
83 06.00-07.00 244.4 118 2 0
86 07.00-08.00 247.6 161 2 0
78
79
UNIVERSITAS BRAWIJAYA
KODE LABORATORIUM TRANSPORTASI
NO. FORM PERHITUNGAN VOLUME LALU LINTAS
Jumlah
Jam
sedan/jeep/pick up
Truk Kontainer
Truk Gandeng
sepeda motor
Bus sedang
Jumlah
Mikrolet
Jam
kendaraan
KODE
NO. FORM
Lokasi
Arah Barat - Selatan ( kaliurang-JA Suprapto
Shif
Surveyor
erat (HV)
Truk Kontainer
Truk Gandeng
MC LV HV Total
1.3 1.3
0 0 244.4 120 1.3 365.7
0 0 251.6 131 1.3 383.9
0 0 258 130 1.3 389.3
0 0 250 131 1.3 382.3
0 0 254.4 128 1.3 383.7
0 0 260.4 129 1.3 390.7
0 0 250.8 132 1.3 384.1
0 0 248 128 1.3 377.3
0 0 242.4 131 1.3 374.7
0 0 244.8 133 1.3 379.1
0 0 245.2 145 0 390.2
0 0 245.2 150 0 395.2
0 0 247.6 163 0 410.6
KODE
NO. FORM
UME LALU LINTAS
Lokasi
Arah Barat - Selatan ( kaliurang-JA Suprapto
Shif
Surveyor
Persentase Kendaraan
Truk sedang 2 As
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
Bus Besar
Jumlah
kendaraan
0 1 0 0 0 0 732 48.34875
0 0 0 0 0 0 782 51.65125
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
Bus Besar
sepeda motor
Jumlah
kendaraan Jam
KODE
NO. FORM
UME LALU LINTAS
Lokasi
Arah Barat - Selatan ( kaliurang-JA Suprapto
Shif
Surveyor
Arus (kend/jam)
Jumlah
Arus (kend/jam)
Truk sedang 2 As
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
Bus Besar
Jumlah
kendaraan
MC LV HV
Kendaraan Ringan
sedan/jeep/pick up
Prosenta
Jumlah Prosenta se
Prosenta
Mikrolet
se sepeda se
sedan/jee
motor Mikrolet
p/pick up
(%) (%)
(%)
Total MC LV HV Total
Hari : Rabu
Tanggal : 40653
Supervisor :
UNIVERSITAS BRAWIJAYA
LABORATORIUM TRANSPORTASI
PERHITUNGAN VOLUME LALU LINTAS
Hari : Rabu
Tanggal : 40653
Supervisor :
MC (LV) Kendaraan Berat (HV)
/jeep/pick up
sedang 2 As
besar 2 As
eda motor
s sedang
us Besar
ikrolet
Jam
sedan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
UNIVERSITAS BRAWIJAYA
LABORATORIUM TRANSPORTASI
PERHITUNGAN VOLUME LALU LINTAS
Hari : Rabu
Tanggal : 40653
Supervisor :
MC (LV) Kendaraan Berat (HV)
sedan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
sedan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
sedan/jeep/pick up
10
sepeda motor
17
Jam
55
60
72
87
73 06.00-07.00 615 51
72 07.00-08.00 637 54
63
59
58
68 MC (LV)
67
sedan/jeep/pick up
61
sepeda motor
54
Jam
82
48
67
71
39 emp 0.4 1
54 06.00-07.00 246 51
59 07.00-08.00 254.8 54
52
71
UNIVERSITAS BRAWIJAYA
KODE LABORATORIUM TRANSPORTASI
NO. FORM PERHITUNGAN VOLUME
k Gandeng
eda motor
Jumlah
Jam
kendaraan
sedan/jeep/pick up
Truk Kontainer
Truk besar 3 As
Truk Gandeng
sepeda motor
Jumlah
Jam
kendaraan
KODE
NO. FORM
Lokasi
Arah Barat - Timur ( kaliurang-WR Supratman)
Shif
Surveyor
Kendaraan Berat (HV)
Truk Gandeng
Truk Kontainer
Truk besar 3 As
Truk Gandeng
MC LV HV Total
Persentase Kendaraan
Truk sedang 2 As
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
Jumlah
Bus sedang
Bus Besar
Mikrolet
kendara
an
28 0 0 0 0 0 0 0 694 48.90768
31 0 0 3 0 0 0 0 725 51.09232
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
Jumlah
Bus sedang
Bus Besar
Mikrolet
kendara
an
Arus (kend/jam
sedang 2 As
Kontainer
besar 2 As
besar 3 As
k Gandeng
s sedang
us Besar
ikrolet
Jumlah
kendara
an
Arus (kend/jam
Truk sedang 2 As
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
Bus sedang
Bus Besar
Mikrolet
Jumlah
kendara
an
MC
Kendaraan Ringan
sedan/jeep/pick up
Prosenta
Jumlah Prosenta Prosenta
sepeda motor
se
Mikrolet
se sepeda se
Jam sedan/jee
motor Mikrolet
p/pick up
(%) (%)
(%)
rang-WR Supratman)
LV HV Total MC LV HV Total
Hari : Rabu
Tanggal : 40653
Supervisor :
sepeda sedan/jeep/ bus bus truk sedang truk besar truk besar
waktu mikrolet
motor pickup sedang besar 2 As 2 As 3 As
06:00-06:05 3 2
06:05-06:10 3 1
06:10-06:15 2 0
06:15-06:20 1 0
06:20-06:25 0 1
06:25-06:30 2 0
06:30-06:35 1 2
06:35-06:40 5 0
06:40-06:45 1 0
06:45-06:50 2 1
06:50-06:55 2 1
06:55-07:00 3 4
07:00-07:05 3 0
07:05-07:10 1 0
07:10-07:15 0 1
07:15-07:20 1 1
07:20-07:25 2 0
07:25-07:30 6 0
07:30-07:35 2 2
07:35-07:40 3 0
07:40-07:45 4 1
07:45-07:50 5 1
07:50-07:55 1 2
07:55-08:00 4 2
UNIVERSITAS BRAWIJAYA
LABORATORIUM TRANSPORTASI
PERHITUNGAN VOLUME LALU LINTAS
Hari : Rabu
Tanggal : 40653
Supervisor :
MC (LV) Kendaraan Berat (HV)
/jeep/pick up
sedang 2 As
k besar 2 As
k besar 3 As
eda motor
us sedang
us Besar
ikrolet
Jam
sedan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
Truk besar 3 As
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
UNIVERSITAS BRAWIJAYA
LABORATORIUM TRANSPORTASI
PERHITUNGAN VOLUME LALU LINTAS
Hari : Rabu
Tanggal : 40653
Supervisor :
MC (LV) Kendaraan Berat (HV)
sedan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
Truk besar 3 As
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
sedan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
Truk besar 3 As
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
Jumlah MC (LV)
truk gandeng truk kontainer
Kendaraan
sedan/jeep/pick up
5
sepeda motor
Bus sedang
4
Mikrolet
Jam
2
1
1
2
3 06.00-07.00 25 12 0 0
5 07.00-08.00 32 10 0 0
1
3
3
7 MC (LV)
3
sedan/jeep/pick up
1
sepeda motor
Bus sedang
1
Mikrolet
Jam
2
2
6
4
3 emp 0.4 1 1 1.3
5 06.00-07.00 10 12 0 0
6 07.00-08.00 12.8 10 0 0
3
6
UNIVERSITAS BRAWIJAYA
KODE LABORATORIUM TRANSPORTASI
NO. FORM PERHITUNGAN VOLUME LALU LINTAS
eda motor
us sedang
Jumlah
ikrolet
Jam
kendaraan
sedan/jeep/pick up
Truk Kontainer
Truk Gandeng
sepeda motor
Bus sedang
Jumlah
Mikrolet
Jam
kendaraan
KODE
NO. FORM
Lokasi
Arah Barat - Utara ( kaliurang-Sutoyo)
Shif
Surveyor
erat (HV)
1.3 1.3
0 0 5 12 0 17
0 0 5 10 0 15
0 0 4.6 9 0 13.6
0 0 4.2 10 0 14.2
0 0 4.2 11 0 15.2
0 0 4.6 10 0 14.6
0 0 5.4 10 0 15.4
0 0 5.6 10 0 15.6
0 0 5.2 10 0 15.2
0 0 5.8 11 0 16.8
0 0 6.4 11 0 17.4
0 0 6.2 12 0 18.2
0 0 6.4 10 0 16.4
KODE
NO. FORM
UME LALU LINTAS
Lokasi
Arah Barat - Utara ( kaliurang-Sutoyo)
Shif
Surveyor
Persentase Kendaraan
Truk sedang 2 As
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
Bus Besar
Jumlah
kendaraan
0 0 0 0 0 0 37 46.83544
0 0 0 0 0 0 42 53.16456
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
sepeda motor
Bus Besar
Jumlah
kendaraan Jam
KODE
NO. FORM
UME LALU LINTAS
Lokasi
Arah Barat - Utara ( kaliurang-Sutoyo)
Shif
Surveyor
Arus (kend/jam)
sedang 2 As
k Kontainer
k besar 2 As
k besar 3 As
k Gandeng
us Besar
Jumlah
kendaraan
Arus (kend/jam)
Truk sedang 2 As
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
Bus Besar
Jumlah
kendaraan
MC LV HV
Kendaraan Ringan
sedan/jeep/pick up
Prosenta
Jumlah Prosenta se
Prosenta
Mikrolet
se sepeda se
sedan/jee
motor Mikrolet
p/pick up
(%) (%)
(%)
12 0 37 67.56757 17.76 0
10 0 42 76.19048 13.125 0.0000
Total MC LV HV Total
32 5 12 0 17
30 5 10 0 15
27.4 4.6 9 0 13.6
26.8 4.2 10 0 14.2
27.8 4.2 11 0 15.2
28.4 4.6 10 0 14.6
31.6 5.4 10 0 15.4
32.4 5.6 10 0 15.6
30.8 5.2 10 0 15.2
34.2 5.8 11 0 16.8
36.6 6.4 11 0 17.4
36.8 6.2 12 0 18.2
35.6 6.4 10 0 16.4
UNIVERSITAS BRAWIJAYA
LABORATORIUM TRANSPORTASI
PERHITUNGAN VOLUME LALU LINTAS
Hari : Rabu
Tanggal : 40653
Supervisor :
sepeda sedan/jeep/ bus bus truk sedang truk besar truk besar
waktu mikrolet
motor pickup sedang besar 2 As 2 As 3 As
06.00-06.05 69 35 6 1 0 0 0 0
06.05-06.10 105 27 6 0 0 1 0 0
06.10-06.15 52 36 4 1 0 0 0 0
06.15-06.20 123 57 5 0 0 0 0 0
06.20-06.25 185 70 4 0 0 1 0 0
06.25-06.30 96 48 6 0 0 0 0 0
06.30-06.35 189 88 3 0 0 1 0 0
06.35-06.40 190 84 8 0 0 0 0 0
06.40-06.45 209 67 8 0 0 2 0 0
06.45-06.50 180 69 7 0 0 0 0 0
06.50-06.55 164 72 7 0 0 0 0 0
06.55-07.00 151 62 5 0 1 1 0 0
07.00-07.05 158 60 10 0 0 0 0 0
07.05-07.10 129 68 6 0 0 0 0 0
07.10-07.15 134 61 7 0 0 0 0 0
07.15-07.20 137 66 7 0 0 0 0 0
07.20-07.25 186 91 7 0 0 0 0 0
07.25-07.30 177 59 9 0 0 0 0 0
07.30-07.35 238 104 12 0 0 0 0 0
07.35-07.40 150 56 5 0 0 0 0 0
07.40-07.45 136 67 9 0 0 0 0 0
07.45-07.50 165 91 7 0 0 2 0 0
07.50-07.55 190 96 6 0 0 0 0 0
07.55-08.00 151 50 4 0 0 0 0 0
UNIVERSITAS BRAWIJAYA
LABORATORIUM TRANSPORTASI
PERHITUNGAN VOLUME LALU LINTAS
Hari : Rabu
Tanggal : 40653
Supervisor :
MC (LV) Kendaraan Berat (HV)
Jam
sedan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
Truk besar 3 As
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
UNIVERSITAS BRAWIJAYA
LABORATORIUM TRANSPORTASI
PERHITUNGAN VOLUME LALU LINTAS
Hari : Rabu
Tanggal : 40653
Supervisor :
MC (LV) Kendaraan Berat (HV)
edan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
Truk besar 3 As
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
sedan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
Truk besar 3 As
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
Jumlah MC (LV)
truk gandeng truk kontainer
Kendaraan
sedan/jeep/pick up
0 0 111
sepeda motor
Bus sedang
0 0 139
Mikrolet
Jam
0 0 93
0 0 185
0 0 260
0 0 150
0 0 281 15.00-16.00 1713 715 69 2
0 0 282 16.00-17.00 1951 869 89 0
0 0 286
0 0 256
0 0 243
0 0 220 MC (LV)
0 0 228
sedan/jeep/pick up
0 0 203
sepeda motor
Bus sedang
0 0 202
Mikrolet
Jam
0 0 210
0 0 284
0 0 245
0 0 354
0 0 211 emp 0.2 1 1 1.3
0 0 212 15.00-16.00 342.6 715 69 2.6
0 0 265 16.00-17.00 390.2 869 89 0
0 0 292
0 0 205
UNIVERSITAS BRAWIJAYA
KODE LABORATORIUM TRANSPORTASI
NO. FORM PERHITUNGAN VOLUME LALU LINTAS
Jumlah
Jam
kendaraan
sedan/jeep/pick up
Truk Kontainer
Truk Gandeng
sepeda motor
Bus sedang
Jumlah
Mikrolet
Jam
kendaraan
KODE
NO. FORM
Lokasi
Arah Utara - Selatan(sutoyo - suprapto)
Shif
Surveyor
erat (HV)
Truk Kontainer
Truk Gandeng
MC LV HV Total
1.3 1.3
0 0 342.6 784 11.7 1138.3
0 0 360.4 813 10.4 1183.8
0 0 365.2 854 9.1 1228.3
0 0 381.6 882 7.8 1271.4
0 0 384.4 893 7.8 1285.2
0 0 384.6 917 6.5 1308.1
0 0 400.8 931 6.5 1338.3
0 0 410.6 956 5.2 1371.8
0 0 402.6 925 5.2 1332.8
0 0 388 926 2.6 1316.6
0 0 385 948 5.2 1338.2
0 0 390.2 971 5.2 1366.4
0 0 390.2 958 2.6 1350.8
KODE
NO. FORM
UME LALU LINTAS
Lokasi
Arah Utara - Selatan(sutoyo - suprapto)
Shif
Surveyor
Persentase Kendaraan
Truk sedang 2 As
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
Bus Besar
Jumlah
kendaraan
1 6 0 0 0 0 2506 46.26177
0 2 0 0 0 0 2911 53.73823
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
sepeda motor
Bus Besar
Jumlah
kendaraan Jam
KODE
NO. FORM
UME LALU LINTAS
Lokasi
Arah Utara - Selatan(sutoyo - suprapto)
Shif
Surveyor
Arus (kend/jam)
Jumlah
Arus (kend/jam)
Truk sedang 2 As
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
Bus Besar
Jumlah
kendaraan
MC LV HV
Kendaraan Ringan
sedan/jeep/pick up
Prosenta
Jumlah Prosenta se
Prosenta
Mikrolet
se sepeda se
sedan/jee
motor Mikrolet
p/pick up
(%) (%)
(%)
Total MC LV HV Total
Hari : Rabu
Tanggal : 40653
Supervisor :
sepeda sedan/jeep/ bus bus truk sedang truk besar truk besar
waktu mikrolet
motor pickup sedang besar 2 As 2 As 3 As
06:00-06:05 1
06:05-06:10 1
06:10-06:15 3
06:15-06:20 1
06:20-06:25
06:25-06:30
06:30-06:35
06:35-06:40 1
06:40-06:45 1
06:45-06:50 3
06:50-06:55 1
06:55-07:00 1
07:00-07:05 1
07:05-07:10 1
07:10-07:15 2 1
07:15-07:20
07:20-07:25 1
07:25-07:30 3
07:30-07:35 4
07:35-07:40 1 2
07:40-07:45 1
07:45-07:50 2
07:50-07:55 4 1
07:55-08:00 1 1
UNIVERSITAS BRAWIJAYA
LABORATORIUM TRANSPORTASI
PERHITUNGAN VOLUME LALU LINTAS
Hari : Rabu
Tanggal : 40653
Supervisor :
MC (LV) Kendaraan Berat (HV)
/jeep/pick up
sedang 2 As
k besar 2 As
k besar 3 As
eda motor
us sedang
us Besar
ikrolet
Jam
sedan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
Truk besar 3 As
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
UNIVERSITAS BRAWIJAYA
LABORATORIUM TRANSPORTASI
PERHITUNGAN VOLUME LALU LINTAS
Hari : Rabu
Tanggal : 40653
Supervisor :
MC (LV) Kendaraan Berat (HV)
sedan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
Truk besar 3 As
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
sedan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
Truk besar 3 As
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
Jumlah MC (LV)
truk gandeng truk kontainer
Kendaraan
sedan/jeep/pick up
1
sepeda motor
Bus sedang
1
Mikrolet
Jam
3
1
0
0
0 06.00-07.00 13 0 0 0
1 07.00-08.00 20 6 0 0
1
3
1
1 MC (LV)
1
sedan/jeep/pick up
1
sepeda motor
Bus sedang
3
Mikrolet
Jam
0
1
3
4
3 emp 0.2 1 1 1.3
1 06.00-07.00 2.6 0 0 0
2 07.00-08.00 4 6 0 0
5
2
UNIVERSITAS BRAWIJAYA
KODE LABORATORIUM TRANSPORTASI
NO. FORM PERHITUNGAN VOLUME LALU LINTAS
eda motor
us sedang
Jumlah
ikrolet
Jam
kendaraan
sedan/jeep/pick up
Truk Kontainer
Truk Gandeng
sepeda motor
Bus sedang
Jumlah
Mikrolet
Jam
kendaraan
KODE
NO. FORM
Lokasi
Arah Utara - Barat(sutoyo-Kaliurang)
Shif
Surveyor
erat (HV)
1.3 1.3
0 0 2.6 0 0 2.6
0 0 2.6 0 0 2.6
0 0 2.4 1 0 3.4
0 0 2.2 2 0 4.2
0 0 2 2 0 4
0 0 2.2 2 0 4.2
0 0 2.8 2 0 4.8
0 0 3.6 2 0 5.6
0 0 3.6 4 0 7.6
0 0 3.6 4 0 7.6
0 0 3.4 4 0 7.4
0 0 4 5 0 9
0 0 4 6 0 10
KODE
NO. FORM
UME LALU LINTAS
Lokasi
Arah Utara - Barat(sutoyo-Kaliurang)
Shif
Surveyor
Persentase Kendaraan
Truk sedang 2 As
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
Bus Besar
Jumlah
kendaraan
0 0 0 0 0 0 13 33.33333
0 0 0 0 0 0 26 66.66667
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
sepeda motor
Bus Besar
Jumlah
kendaraan Jam
KODE
NO. FORM
UME LALU LINTAS
Lokasi
Arah Utara - Barat(sutoyo-Kaliurang)
Shif
Surveyor
Arus (kend/jam)
sedang 2 As
k Kontainer
k besar 2 As
k besar 3 As
k Gandeng
us Besar
Jumlah
kendaraan
Arus (kend/jam)
Truk sedang 2 As
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
Bus Besar
Jumlah
kendaraan
MC LV HV
Kendaraan Ringan
sedan/jeep/pick up
Prosenta
Jumlah Prosenta se
Prosenta
Mikrolet
se sepeda se
sedan/jee
motor Mikrolet
p/pick up
(%) (%)
(%)
0 0 13 100 0 #DIV/0!
6 0 26 76.92308 7.8 0.0000
Total MC LV HV Total
Hari : Rabu
Tanggal : 40653
Supervisor :
sepeda sedan/jeep/ bus bus truk sedang truk besar truk besar
waktu mikrolet
motor pickup sedang besar 2 As 2 As 3 As
06.00-06.05 19 3 3 0 0 0 0 0
06.05-06.10 20 2 3 0 0 0 0 0
06.10-06.15 28 3 1 0 0 0 0 0
06.15-06.20 20 5 5 0 0 0 0 0
06.20-06.25 20 9 3 0 0 0 0 0
06.25-06.30 17 8 3 0 0 0 0 0
06.30-06.35 21 4 3 0 0 0 0 0
06.35-06.40 14 4 3 0 0 0 0 0
06.40-06.45 18 6 4 0 0 0 0 0
06.45-06.50 27 3 3 0 0 0 0 0
06.50-06.55 28 4 3 0 0 0 0 0
06.55-07.00 18 9 2 0 0 0 0 0
07.00-07.05 11 11 2 0 0 0 0 0
07.05-07.10 7 4 4 0 0 0 0 0
07.10-07.15 14 6 6 0 0 0 0 0
07.15-07.20 26 4 2 0 0 1 0 0
07.20-07.25 19 6 4 0 0 0 0 0
07.25-07.30 21 4 5 0 0 0 0 0
07.30-07.35 19 5 5 0 0 0 0 0
07.35-07.40 17 4 1 0 0 0 0 0
07.40-07.45 22 3 5 0 0 1 0 0
07.45-07.50 28 9 4 0 0 0 0 0
07.50-07.55 23 5 5 0 0 0 0 0
07.55-08.00 14 9 3 0 0 1 0 0
UNIVERSITAS BRAWIJAYA
LABORATORIUM TRANSPORTASI
PERHITUNGAN VOLUME LALU LINTAS
Hari : Rabu
Tanggal : 40653
Supervisor :
MC (LV) Kendaraan Berat (HV)
Jam
sedan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
Truk besar 3 As
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
UNIVERSITAS BRAWIJAYA
LABORATORIUM TRANSPORTASI
PERHITUNGAN VOLUME LALU LINTAS
Hari : Rabu
Tanggal : 40653
Supervisor :
MC (LV) Kendaraan Berat (HV)
edan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
Truk besar 3 As
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
sedan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
Truk besar 3 As
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
Jumlah MC (LV)
truk gandeng truk kontainer
Kendaraan
sedan/jeep/pick up
0 0 25
sepeda motor
Bus sedang
0 0 25
Mikrolet
Jam
0 0 32
0 0 30
0 0 32
0 0 28
0 0 28 06.00-07.00 250 60 36 0
0 0 21 07.00-08.00 221 70 46 0
0 0 28
0 0 33
0 0 35
0 0 29 MC (LV)
0 0 24
sedan/jeep/pick up
0 0 15
sepeda motor
Bus sedang
0 0 26
Mikrolet
Jam
0 0 33
0 0 29
0 0 30
0 0 29
0 0 22 emp 0.2 1 1 1.3
0 0 31 06.00-07.00 50 60 36 0
0 0 41 07.00-08.00 44.2 70 46 0
0 0 33
0 0 27
UNIVERSITAS BRAWIJAYA
KODE LABORATORIUM TRANSPORTASI
NO. FORM PERHITUNGAN VOLUME LALU LINTAS
Jumlah
Jam
sedan/jeep/pick up
Truk Kontainer
Truk Gandeng
sepeda motor
Bus sedang
Jumlah
Mikrolet
Jam
kendaraan
KODE
NO. FORM
Lokasi
Arah Utara - Timur(sutoyo-S.Parman)
Shif
Surveyor
erat (HV)
Truk Kontainer
Truk Gandeng
MC LV HV Total
1.3 1.3
0 0 50 96 0 146
0 0 48.4 103 0 151.4
0 0 45.8 106 0 151.8
0 0 43 114 0 157
0 0 44.2 110 1.3 155.5
0 0 44 108 1.3 153.3
0 0 44.8 106 1.3 152.1
0 0 44.4 109 1.3 154.7
0 0 45 107 1.3 153.3
0 0 45.8 105 2.6 153.4
0 0 46 112 2.6 160.6
0 0 45 115 2.6 162.6
0 0 44.2 116 3.9 164.1
KODE
NO. FORM
UME LALU LINTAS
Lokasi
Arah Utara - Timur(sutoyo-S.Parman)
Shif
Surveyor
Persentase Kendaraan
Truk sedang 2 As
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
Bus Besar
Jumlah
kendaraan
0 0 0 0 0 0 346 50.43732
0 3 0 0 0 0 340 49.56268
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
Bus Besar
sepeda motor
Jumlah
kendaraan Jam
KODE
NO. FORM
UME LALU LINTAS
Lokasi
Arah Utara - Timur(sutoyo-S.Parman)
Shif
Surveyor
Arus (kend/jam)
Jumlah
Arus (kend/jam)
Truk sedang 2 As
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
Bus Besar
Jumlah
kendaraan
MC LV HV
Kendaraan Ringan
sedan/jeep/pick up
Prosenta
Jumlah Prosenta se
Prosenta
Mikrolet
se sepeda se
sedan/jee
motor Mikrolet
p/pick up
(%) (%)
(%)
Total MC LV HV Total
296 50 96 0 146
296.6 48.4 103 0 151.4
289.2 45.8 106 0 151.8
286 43 114 0 157
287.8 44.2 110 1.3 155.5
285 44 108 1.3 153.3
286.2 44.8 106 1.3 152.1
287.6 44.4 109 1.3 154.7
288 45 107 1.3 153.3
290.2 45.8 105 2.6 153.4
298 46 112 2.6 160.6
297 45 115 2.6 162.6
295.8 44.2 116 3.9 164.1
UNIVERSITAS BRAWIJAYA
LABORATORIUM TRANSPORTASI
PERHITUNGAN VOLUME LALU LINTAS
Hari : Rabu
Tanggal : 40653
Supervisor :
sepeda sedan/jeep/ bus bus truk sedang truk besar truk besar
waktu mikrolet
motor pickup sedang besar 2 As 2 As 3 As
06.00-06.05 8 1
06.05-06.10 13 1
06.10-06.15 12 0
06.15-06.20 17 6
06.20-06.25 18 5 1
06.25-06.30 25 4
06.30-06.35 28 2
06.35-06.40 39 8
06.40-06.45 33 7
06.45-06.50 21 7 1
06.50-06.55 30 10
06.55-07.00 36 8
07.00-07.05 27 1 1
07.05-07.10 34 10 1
07.10-07.15 26 10
07.15-07.20 39 5
07.20-07.25 39 7
07.25-07.30 49 12
07.30-07.35 42 9
07.35-07.40 37 6 1
07.40-07.45 41 8
07.45-07.50 26 7
07.50-07.55 38 8
07.55-08.00 33 6
UNIVERSITAS BRAWIJAYA
LABORATORIUM TRANSPORTASI
PERHITUNGAN VOLUME LALU LINTAS
Hari : Rabu
Tanggal : 40653
Supervisor :
MC (LV) Kendaraan Berat (HV)
Jam
sedan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
Truk besar 3 As
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
UNIVERSITAS BRAWIJAYA
LABORATORIUM TRANSPORTASI
PERHITUNGAN VOLUME LALU LINTAS
Hari : Rabu
Tanggal : 40653
Supervisor :
MC (LV) Kendaraan Berat (HV)
edan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
Truk besar 3 As
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
sedan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
Truk besar 3 As
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
Jumlah MC (LV)
truk gandeng truk kontainer
Kendaraan
sedan/jeep/pick up
9
sepeda motor
Bus sedang
14
Mikrolet
Jam
12
23
24
29
30 06.00-07.00 280 59 0 0
47 07.00-08.00 431 89 0 0
40
29
40
44 MC (LV)
29
sedan/jeep/pick up
45
sepeda motor
Bus sedang
36
Mikrolet
Jam
44
46
61
51
44 emp 0.2 1 1 1.3
49 06.00-07.00 56 59 0 0
33 07.00-08.00 86.2 89 0 0
46
39
UNIVERSITAS BRAWIJAYA
KODE LABORATORIUM TRANSPORTASI
NO. FORM PERHITUNGAN VOLUME LALU LINTAS
Jumlah
Jam
sedan/jeep/pick up
Truk Kontainer
Truk Gandeng
sepeda motor
Bus sedang
Jumlah
Mikrolet
Jam
kendaraan
KODE
NO. FORM
Lokasi
Arah Selatan - Barat (Suprapto-kaliurang)
Shif
Surveyor
erat (HV)
Truk Kontainer
Truk Gandeng
MC LV HV Total
1.3 1.3
0 0 56 59 2.6 117.6
0 0 59.8 59 3.9 122.7
0 0 64 68 5.2 137.2
0 0 66.8 78 5.2 150
0 0 71.2 77 5.2 153.4
0 0 75.4 79 3.9 158.3
0 0 80.2 87 3.9 171.1
0 0 83 94 3.9 180.9
0 0 82.6 92 5.2 179.8
0 0 84.2 93 5.2 182.4
0 0 85.2 93 3.9 182.1
0 0 86.8 91 3.9 181.7
0 0 86.2 89 3.9 179.1
KODE
NO. FORM
UME LALU LINTAS
Lokasi
Arah Selatan - Barat (Suprapto-kaliurang)
Shif
Surveyor
Persentase Kendaraan
Truk sedang 2 As
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
Bus Besar
Jumlah
kendaraan
0 2 0 0 0 0 341 39.46759
0 3 0 0 0 0 523 60.53241
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
Bus Besar
sepeda motor
Jumlah
kendaraan Jam
KODE
NO. FORM
UME LALU LINTAS
Lokasi
Arah Selatan - Barat (Suprapto-kaliurang)
Shif
Surveyor
Arus (kend/jam)
Jumlah
Arus (kend/jam)
Truk sedang 2 As
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
Bus Besar
Jumlah
kendaraan
MC LV HV
Kendaraan Ringan
sedan/jeep/pick up
Prosenta
Jumlah Prosenta se
Prosenta
Mikrolet
se sepeda se
sedan/jee
motor Mikrolet
p/pick up
(%) (%)
(%)
Total MC LV HV Total
sedang 2 As
k besar 2 As
k besar 3 As
k Gandeng
eda motor
us sedang
us Besar
ikrolet
Jam
sedan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
Truk sedang 2 As
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
sedan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
Selatan-timur(suprapto-supratmHari : Rabu
Tanggal : 40653
Supervisor :
sedan/jeep/pick up
Truk sedang 2 As
18
sepeda motor
Bus sedang
Bus Besar
19
Mikrolet
Jam
15
39
16
45
32 06.00-07.00 280 144 0 3 0 1
35 07.00-08.00 349 171 1 0 0 2
35
51
63
60 MC (LV) Kendaraan Berat (H
45
sedan/jeep/pick up
Truk sedang 2 As
35
sepeda motor
Bus sedang
Bus Besar
34
Mikrolet
Jam
47
45
42
38
36 emp 0.2 1 1 1.3 1.3 1.3
46 06.00-07.00 56 144 0 3.9 0 1.3
65 07.00-08.00 69.8 171 1 0 0 2.6
49
41
UNIVERSITAS BRAWIJAYA
LABORATORIUM TRANSPORTASI
NO. FORM PERHITUNGAN VOLUME LALU LINTAS
Hari : Rabu
Selatan-timur(suprapto-supratmTanggal : 40653
Supervisor :
sedang 2 As
k Kontainer
eda motor
Jumlah
us sedang
us Besar
ikrolet
kendara Jam
an
sedan/jeep/pick up
Truk sedang 2 As
Truk Kontainer
sepeda motor
Jumlah
Bus sedang
Bus Besar
Mikrolet
kendara Jam
an
NO. FORM
Selatan-timur(suprapto-supratman)
1.3
0 56 144 5.2 205.2
0 59.6 154 3.9 217.5
0 61.6 160 3.9 225.5
0 64.2 166 3.9 234.1
0 65.2 168 5.2 238.4
0 68.6 180 5.2 253.8
0 70.6 169 2.6 242.2
0 71.6 170 2.6 244.2
0 72 168 3.9 243.9
0 73.2 173 3.9 250.1
0 75 178 3.9 256.9
0 72.6 176 3.9 252.5
0 69.8 172 2.6 244.4
KODE
NO. FORM
Lokasi
Arah Selatan-timur(suprapto-supratman)
Shif
Surveyor
Persentase Kendaraan
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
Jumlah
kendara
an
0 0 0 0 428 45.00526
0 0 0 0 523 54.99474
Truk besar 3 As
sedan/jeep/pick up
Truk Gandeng
Jumlah
sepeda motor
kendara
Mikrolet
Jam
an
KODE
NO. FORM
Lokasi
Arah Selatan-timur(suprapto-supratman)
Shif
Surveyor
k besar 3 As
k Gandeng
Jumlah
kendara
an
Arus (kend/jam) Arus (smp/jam)
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
Jumlah
kendara
an
MC LV HV Total MC
Prosenta
Jumlah Prosenta se
Prosenta
se sepeda se
sedan/jee
motor Mikrolet
p/pick up
(%) (%)
(%)
Arus (smp/jam)
Arus (smp/jam)
LV HV Total
Hari : Rabu
Tanggal : 40653
Supervisor :
sepeda sedan/jeep/ bus bus truk sedang truk besar truk besar
waktu mikrolet
motor pickup sedang besar 2 As 2 As 3 As
06.00-06.05 54 17 4 1
06.05-06.10 85 15 5
06.10-06.15 90 42 4 1
06.15-06.20 127 38 4
06.20-06.25 117 40 5 1 1
06.25-06.30 170 32 5 1
06.30-06.35 125 41 7
06.35-06.40 171 52 6
06.40-06.45 151 51 5
06.45-06.50 143 40 8 2
06.50-06.55 143 51 4
06.55-07.00 149 50 8
07.00-07.05 133 39 8 1
07.05-07.10 178 58 10 1
07.10-07.15 148 61 8 1
07.15-07.20 139 38 6 1 1
07.20-07.25 129 41 8
07.25-07.30 185 54 11
07.30-07.35 194 49 6
07.35-07.40 175 43 5
07.40-07.45 170 38 12
07.45-07.50 183 57 10
07.50-07.55 176 61 9
07.55-08.00 33 48 8
TOTAL 3368 1056 166 3 3 6 0 0
UNIVERSITAS BRAWIJAYA
LABORATORIUM TRANSPORTASI
PERHITUNGAN VOLUME LALU LINTAS
Hari : Rabu
Tanggal : 40653
Supervisor :
MC (LV) Kendaraan Berat (HV)
Jam
sedan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
Truk besar 3 As
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
UNIVERSITAS BRAWIJAYA
LABORATORIUM TRANSPORTASI
PERHITUNGAN VOLUME LALU LINTAS
Hari : Rabu
Tanggal : 40653
Supervisor :
MC (LV) Kendaraan Berat (HV)
edan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
Truk besar 3 As
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
sedan/jeep/pick up
Truk sedang 2 As
Truk besar 2 As
Truk besar 3 As
sepeda motor
Bus sedang
Bus Besar
Mikrolet
Jam
Jumlah MC (LV)
truk gandeng truk kontainer
Kendaraan
sedan/jeep/pick up
76
sepeda motor
Bus sedang
105
Mikrolet
Jam
137
169
164
208
173 06.00-07.00 1525 469 65 2
229 07.00-08.00 1843 587 101 1
207
193
198
207 MC (LV)
181
sedan/jeep/pick up
247
sepeda motor
Bus sedang
218
Mikrolet
Jam
185
178
250
249
223 emp 0.2 1 1 1.3
220 06.00-07.00 305 469 65 2.6
250 07.00-08.00 368.6 587 101 1.3
246
89
0 0 UNIVERSITAS BRAWIJAYA
KODE LABORATORIUM TRANSPORTASI
NO. FORM PERHITUNGAN VOLUME LALU LINTAS
Jumlah
Jam
sedan/jeep/pick up
Truk Kontainer
Truk Gandeng
sepeda motor
Bus sedang
Jumlah
Mikrolet
Jam
kendaraan
KODE
NO. FORM
Lokasi
Arah Selatan - Utara (suprapto-sutoyo)
Shif
Surveyor
erat (HV)
Truk Kontainer
Truk Gandeng
MC LV HV Total
1.3 1.3
0 0 305 534 9.1 848.1
0 0 320.8 560 9.1 889.9
0 0 339.4 608 10.4 957.8
0 0 351 631 10.4 992.4
0 0 353.4 633 13 999.4
0 0 355.8 637 10.4 1003.2
0 0 358.8 665 9.1 1032.9
0 0 372.6 672 9.1 1053.7
0 0 373.4 662 9.1 1044.5
0 0 377.2 656 9.1 1042.3
0 0 385.2 675 6.5 1066.7
0 0 391.8 690 6.5 1088.3
0 0 368.6 688 6.5 1063.1
KODE
NO. FORM
UME LALU LINTAS
Lokasi
Arah Selatan - Utara (suprapto-sutoyo)
Shif
Surveyor
Persentase Kendaraan
Truk sedang 2 As
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
Bus Besar
Jumlah
kendaraan
1 4 0 0 0 0 2066 44.89352
2 2 0 0 0 0 2536 55.10648
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
Bus Besar
sepeda motor
Jumlah
kendaraan Jam
KODE
NO. FORM
UME LALU LINTAS
Lokasi
Arah Selatan - Utara (suprapto-sutoyo)
Shif
Surveyor
Arus (kend/jam)
Jumlah
Arus (kend/jam)
Truk sedang 2 As
Truk Kontainer
Truk besar 2 As
Truk besar 3 As
Truk Gandeng
Bus Besar
Jumlah
kendaraan
MC LV HV
Kendaraan Ringan
sedan/jeep/pick up
Prosenta
Jumlah Prosenta se
Prosenta
Mikrolet
se sepeda se
sedan/jee
motor Mikrolet
p/pick up
(%) (%)
(%)
Total MC LV HV Total
MC LV HV Total MC LV HV Total
230.4 41 0 271.4 57.6 41 0 98.6
227.2 41 0 268.2 56.8 41 0 97.8
235.2 43 0 278.2 58.8 43 0 101.8
238.4 40 0 278.4 59.6 40 0 99.6
244.8 36 0 280.8 61.2 36 0 97.2
260.8 35 0 295.8 65.2 35 0 100.2
208 30 0 238 52 30 0 82
166.4 27 0 193.4 41.6 27 0 68.6
163.2 26 0 189.2 40.8 26 0 66.8
171.2 28 0 199.2 42.8 28 0 70.8
195.2 33 0 228.2 48.8 33 0 81.8
203.2 35 0 238.2 50.8 35 0 85.8
201.6 38 0 239.6 50.4 38 0 88.4
T-B
MC LV HV Total MC LV HV Total
923.2 62 1 986.2 230.8 62 1.3 294.1
980.8 63 2 1045.8 245.2 63 2.6 310.8
1003.2 59 1 1063.2 250.8 59 1.3 311.1
1008 61 2 1071 252 61 2.6 315.6
1008 59 2 1069 252 59 2.6 313.6
1017.6 59 3 1079.6 254.4 59 3.9 317.3
1059.2 62 3 1124.2 264.8 62 3.9 330.7
1086.4 62 3 1151.4 271.6 62 3.9 337.5
1116.8 68 5 1189.8 279.2 68 6.5 353.7
1096 68 7 1171 274 68 9.1 351.1
1080 71 7 1158 270 71 9.1 350.1
1075.2 68 8 1151.2 268.8 68 10.4 347.2
1078.4 67 8 1153.4 269.6 67 10.4 347
U-T
MC LV HV Total MC LV HV Total
200 96 0 296 50 96 0 146
193.6 103 0 296.6 48.4 103 0 151.4
183.2 106 0 289.2 45.8 106 0 151.8
172 114 0 286 43 114 0 157
176.8 110 1 287.8 44.2 110 1.3 155.5
176 108 1 285 44 108 1.3 153.3
179.2 106 1 286.2 44.8 106 1.3 152.1
177.6 109 1 287.6 44.4 109 1.3 154.7
180 107 1 288 45 107 1.3 153.3
183.2 105 2 290.2 45.8 105 2.6 153.4
184 112 2 298 46 112 2.6 160.6
180 115 2 297 45 115 2.6 162.6
176.8 116 3 295.8 44.2 116 3.9 164.1
B-U
MC LV HV Total MC LV HV Total
20 12 0 32 5 12 0 17
20 10 0 30 5 10 0 15
18.4 9 0 27.4 4.6 9 0 13.6
16.8 10 0 26.8 4.2 10 0 14.2
16.8 11 0 27.8 4.2 11 0 15.2
18.4 10 0 28.4 4.6 10 0 14.6
21.6 10 0 31.6 5.4 10 0 15.4
22.4 10 0 32.4 5.6 10 0 15.6
20.8 10 0 30.8 5.2 10 0 15.2
23.2 11 0 34.2 5.8 11 0 16.8
25.6 11 0 36.6 6.4 11 0 17.4
24.8 12 0 36.8 6.2 12 0 18.2
25.6 10 0 35.6 6.4 10 0 16.4
B-T
U-S
S-B
B-S
Jam MC LV HV Total MC LV HV
15.00-16.00 498.4 208 1 707.4 124.6 208 1.3
15.05-16.05 492 209 0 701 123 209 0
15.10-16.10 513.6 214 0 727.6 128.4 214 0
15.15-16.15 495.2 214 0 709.2 123.8 214 0
15.20-16.20 502.4 210 0 712.4 125.6 210 0
15.25-16.25 503.2 225 0 728.2 125.8 225 0
15.30-16.30 500 214 0 714 125 214 0
15.35-16.35 510.4 203 1 714.4 127.6 203 1.3
15.40-16.40 491.2 196 1 688.2 122.8 196 1.3
15.45-16.45 500.8 195 1 696.8 125.2 195 1.3
15.50-16.50 516.8 200 1 717.8 129.2 200 1.3
15.55-16.55 492 192 1 685 123 192 1.3
16.00-17.00 444.8 193 1 638.8 111.2 193 1.3
U-B
Jam MC LV HV Total MC LV HV
15.00-16.00 10.4 0 0 10.4 2.6 0 0
15.05-16.05 10.4 0 0 10.4 2.6 0 0
15.10-16.10 9.6 1 0 10.6 2.4 1 0
15.15-16.15 8.8 2 0 10.8 2.2 2 0
15.20-16.20 8 2 0 10 2 2 0
15.25-16.25 8.8 2 0 10.8 2.2 2 0
15.30-16.30 11.2 2 0 13.2 2.8 2 0
15.35-16.35 14.4 2 0 16.4 3.6 2 0
15.40-16.40 14.4 4 0 18.4 3.6 4 0
15.45-16.45 14.4 4 0 18.4 3.6 4 0
15.50-16.50 13.6 4 0 17.6 3.4 4 0
15.55-16.55 16 5 0 21 4 5 0
16.00-17.00 16 6 0 22 4 6 0
S-U
Jam MC LV HV Total MC LV HV
15.00-16.00 1220 534 7 1761 305 534 9.1
15.05-16.05 1283.2 560 7 1850.2 320.8 560 9.1
15.10-16.10 1357.6 608 8 1973.6 339.4 608 10.4
15.15-16.15 1404 631 8 2043 351 631 10.4
15.20-16.20 1413.6 633 10 2056.6 353.4 633 13
15.25-16.25 1423.2 637 8 2068.2 355.8 637 10.4
15.30-16.30 1435.2 665 7 2107.2 358.8 665 9.1
15.35-16.35 1490.4 672 7 2169.4 372.6 672 9.1
15.40-16.40 1493.6 662 7 2162.6 373.4 662 9.1
15.45-16.45 1508.8 656 7 2171.8 377.2 656 9.1
15.50-16.50 1540.8 675 5 2220.8 385.2 675 6.5
15.55-16.55 1567.2 690 5 2262.2 391.8 690 6.5
16.00-17.00 1474.4 688 5 2167.4 368.6 688 6.5
S-T
Jam MC LV HV Total MC LV HV
15.00-16.00 224 144 4 372 56 144 5.2
15.05-16.05 238.4 154 3 395.4 59.6 154 3.9
15.10-16.10 246.4 160 3 409.4 61.6 160 3.9
15.15-16.15 256.8 166 3 425.8 64.2 166 3.9
15.20-16.20 260.8 168 4 432.8 65.2 168 5.2
15.25-16.25 274.4 180 4 458.4 68.6 180 5.2
15.30-16.30 282.4 169 2 453.4 70.6 169 2.6
15.35-16.35 286.4 170 2 458.4 71.6 170 2.6
15.40-16.40 288 168 3 459 72 168 3.9
15.45-16.45 292.8 173 3 468.8 73.2 173 3.9
15.50-16.50 300 178 3 481 75 178 3.9
15.55-16.55 290.4 176 3 469.4 72.6 176 3.9
16.00-17.00 279.2 172 2 453.2 69.8 172 2.6
Total
333.9
332
342.4
337.8
335.6
350.8
339
331.9
320.1
321.5
330.5
316.3
305.5
Total
2.6
2.6
3.4
4.2
4
4.2
4.8
5.6
7.6
7.6
7.4
9
10
Total
848.1
889.9
957.8
992.4
999.4
1003.2
1032.9
1053.7
1044.5
1042.3
1066.7
1088.3
1063.1
Total
205.2
217.5
225.5
234.1
238.4
253.8
242.2
244.2
243.9
250.1
256.9
252.5
244.4
kend/jam
Utara
waktu Lurus Belok kiri Belok kanan
MC LV HV MC LV HV MC LV
06.00-07.00 1370.4 784 9 200 96 0 10.4 0
06.05-07.05 1441.6 813 8 193.6 103 0 10.4 0
06.10-07.10 1460.8 854 7 183.2 106 0 9.6 1
06.15-07.15 1526.4 882 6 172 114 0 8.8 2
06.20-07.20 1537.6 893 6 176.8 110 1 8 2
06.25-07.25 1538.4 917 5 176 108 1 8.8 2
06.30-07.30 1603.2 931 5 179.2 106 1 11.2 2
06.35-07.35 1642.4 956 4 177.6 109 1 14.4 2
06.40-07.40 1610.4 925 4 180 107 1 14.4 4
06.45-07.45 1552 926 2 183.2 105 2 14.4 4
06.50-07.50 1540 948 4 184 112 2 13.6 4
06.55-07.55 1560.8 971 4 180 115 2 16 5
07.00-08.00 1560.8 958 2 176.8 116 3 16 6
smp/jam
Utara
waktu
Lurus Belok kiri Belok kanan
MC LV HV MC LV HV MC LV
06.00-07.00 342.6 784 11.7 50 96 0 2.6 0
06.05-07.05 360.4 813 10.4 48.4 103 0 2.6 0
06.10-07.10 365.2 854 9.1 45.8 106 0 2.4 1
06.15-07.15 381.6 882 7.8 43 114 0 2.2 2
06.20-07.20 384.4 893 7.8 44.2 110 1.3 2 2
06.25-07.25 384.6 917 6.5 44 108 1.3 2.2 2
06.30-07.30 400.8 931 6.5 44.8 106 1.3 2.8 2
06.35-07.35 410.6 956 5.2 44.4 109 1.3 3.6 2
06.40-07.40 402.6 925 5.2 45 107 1.3 3.6 4
06.45-07.45 388 926 2.6 45.8 105 2.6 3.6 4
06.50-07.50 385 948 5.2 46 112 2.6 3.4 4
06.55-07.55 390.2 971 5.2 45 115 2.6 4 5
07.00-08.00 390.2 958 2.6 44.2 116 3.9 4 6
waktu MC LV HV Total
06.00-07.00 1308 1828 32.5 3168.1 Volume Ken
06.05-07.05 1374 1916 31.2 3321.4 to
06.10-07.10 1422 2029 31.2 3482
4500
06.15-07.15 1446 2101 31.2 3578
06.20-07.20 1469 2113 36.4 3618.4 4000
06.25-07.25 1478 2148 33.8 3659.4 3500
06.30-07.30 1489 2184 32.5 3705.5
3000
06.35-07.35 1512 2227 32.5 3771.3
06.40-07.40 1487 2182 37.7 3706.9 2500
06.45-07.45 1479 2185 39 3703
2000
06.50-07.50 1487 2252 36.4 3775.4
06.55-07.55 1497 2292 37.7 3826.3 1500
07.00-08.00 1472 2287 35.1 3793.9 1000
jumlah 18918.4 27744 447.2 47109.6
500
Prosentase 40.15827 58.89246 0.949276
0
1 2 3 4
Pendekat
Selatan
Belok kanan JUMLAH Lurus Belok kiri belok kanan
HV MC LV HV MC LV HV MC LV
0 2469.8 1220 534 7 224 59 2 224 144
0 2569.6 1283.2 560 7 239.2 59 3 238.4 154
0 2621.6 1357.6 608 8 256 68 4 246.4 160
0 2711.2 1404 631 8 267.2 78 4 256.8 166
0 2734.4 1413.6 633 10 284.8 77 4 260.8 168
0 2756.2 1423.2 637 8 301.6 79 3 274.4 180
0 2838.6 1435.2 665 7 320.8 87 3 282.4 169
0 2906.4 1490.4 672 7 332 94 3 286.4 170
0 2845.8 1493.6 662 7 330.4 92 4 288 168
0 2788.6 1508.8 656 7 336.8 93 4 292.8 173
0 2807.6 1540.8 675 5 340.8 93 3 300 178
0 2853.8 1567.2 690 5 347.2 91 3 290.4 176
0 2838.6 1474.4 688 5 344.8 89 3 279.2 172
Pen
Selatan
Belok kanan JUMLAH Lurus Belok kiri belok kanan
HV MC LV HV MC LV HV MC LV
0 1286.9 305 534 9.1 56 59 2.6 56 144
0 1337.8 320.8 560 9.1 59.8 59 3.9 59.6 154
0 1383.5 339.4 608 10.4 64 68 5.2 61.6 160
0 1432.6 351 631 10.4 66.8 78 5.2 64.2 166
0 1444.7 353.4 633 13 71.2 77 5.2 65.2 168
0 1465.6 355.8 637 10.4 75.4 79 3.9 68.6 180
0 1495.2 358.8 665 9.1 80.2 87 3.9 70.6 169
0 1532.1 372.6 672 9.1 83 94 3.9 71.6 170
0 1493.7 373.4 662 9.1 82.6 92 5.2 72 168
0 1477.6 377.2 656 9.1 84.2 93 5.2 73.2 173
0 1506.2 385.2 675 6.5 85.2 93 3.9 75 178
0 1538 391.8 690 6.5 86.8 91 3.9 72.6 176
0 1524.9 368.6 688 6.5 86.2 89 3.9 69.8 172
Volume Kendaraan per Arah pada Simpang
total 12 arah (smp/jam)
00
00
00
00
00 mc
HV
00
TOTAL
00
00
00
0
1 2 3 4 5 6 7 8 9 10 11 12 13
Pendekat
Barat
JUMLAH Lurus Belok kiri Belok kanan
HV MC LV HV MC LV HV MC LV
4 2418 984 79 0 20 12 0 977.6 120
3 2546.8 1064 86 0 20 10 0 1006.4 131
3 2711 1123.2 93 0 18.4 9 0 1032 130
3 2818 1131.2 87 0 16.8 10 0 1000 131
4 2855.2 1160 91 0 16.8 11 0 1017.6 128
4 2910.2 1128 86 1 18.4 10 0 1041.6 129
2 2971.4 1099.2 82 3 21.6 10 0 1003.2 132
2 3056.8 1089.6 86 3 22.4 10 0 992 128
3 3048 1041.6 83 3 20.8 10 0 969.6 131
3 3074.4 1025.6 84 3 23.2 11 0 979.2 133
3 3138.6 1022.4 86 3 25.6 11 0 980.8 145
3 3172.8 1019.2 82 3 24.8 12 0 980.8 150
2 3057.4 1019.2 85 3 25.6 10 0 990.4 163
Pendekat
Barat
belok kanan JUMLAH Lurus Belok kiri Belok kanan
HV MC LV HV MC LV HV MC LV
5.2 1170.9 246 79 0 5 12 0 244.4 120
3.9 1230.1 266 86 0 5 10 0 251.6 131
3.9 1320.5 280.8 93 0 4.6 9 0 258 130
3.9 1376.5 282.8 87 0 4.2 10 0 250 131
5.2 1391.2 290 91 0 4.2 11 0 254.4 128
5.2 1415.3 282 86 1.3 4.6 10 0 260.4 129
2.6 1446.2 274.8 82 3.9 5.4 10 0 250.8 132
2.6 1478.8 272.4 86 3.9 5.6 10 0 248 128
3.9 1468.2 260.4 83 3.9 5.2 10 0 242.4 131
3.9 1474.8 256.4 84 3.9 5.8 11 0 244.8 133
3.9 1505.7 255.6 86 3.9 6.4 11 0 245.2 145
3.9 1522.5 254.8 82 3.9 6.2 12 0 245.2 150
2.6 1486.6 254.8 85 3.9 6.4 10 0 247.6 163
Timur
JUMLAH Lurus Belok kiri Belok kanan
HV MC LV HV MC LV HV MC LV
1 2193.6 923.2 62 1 498.4 208 1 230.4 41
1 2318.4 980.8 63 2 492 209 0 227.2 41
1 2406.6 1003.2 59 1 513.6 214 0 235.2 43
1 2377 1008 61 2 495.2 214 0 238.4 40
1 2425.4 1008 59 2 502.4 210 0 244.8 36
1 2415 1017.6 59 3 503.2 225 0 260.8 35
1 2352 1059.2 62 3 500 214 0 208 30
1 2332 1086.4 62 3 510.4 203 1 166.4 27
1 2260 1116.8 68 5 491.2 196 1 163.2 26
1 2260 1096 68 7 500.8 195 1 171.2 28
0 2273.8 1080 71 7 516.8 200 1 195.2 33
0 2271.8 1075.2 68 8 492 192 1 203.2 35
0 2296.2 1078.4 67 8 444.8 193 1 201.6 38
Timur
Belok kanan JUMLAH Lurus Belok kiri Belok kanan
HV MC LV HV MC LV HV MC LV
1.3 707.7 230.8 62 1.3 124.6 208 1.3 57.6 41
1.3 750.9 245.2 63 2.6 123 209 0 56.8 41
1.3 776.7 250.8 59 1.3 128.4 214 0 58.8 43
1.3 766.3 252 61 2.6 123.8 214 0 59.6 40
1.3 779.9 252 59 2.6 125.6 210 0 61.2 36
1.3 774.6 254.4 59 3.9 125.8 225 0 65.2 35
1.3 760.2 264.8 62 3.9 125 214 0 52 30
1.3 755.2 271.6 62 3.9 127.6 203 1.3 41.6 27
1.3 737.2 279.2 68 6.5 122.8 196 1.3 40.8 26
1.3 740.2 274 68 9.1 125.2 195 1.3 42.8 28
0 753.1 270 71 9.1 129.2 200 1.3 48.8 33
0 754.1 268.8 68 10.4 123 192 1.3 50.8 35
0 770.7 269.6 67 10.4 111.2 193 1.3 50.4 38
JUMLAH
HV
0 1965 9046.4
0 2015 9449.8
0 2069 9808.2
0 2058.6 9964.8
0 2062.2 10077.2
0 2103.6 10185
0 2076.2 10238.2
0 2059.2 10354.4
0 2067.2 10221
0 2067 10190
0 2104 10324
0 2074.4 10372.8
0 2031.8 10224
IG = 3
Simpang
Denah :
Jl. J. A Soeprapto
J l. W .R S u p ra tm a n
J l. K a liu ra n g
1
Jl. Letjen Soetoyo
1
2 ,5 4
3 ,8
6
3 ,8
6
1 ,2
Keterangan :
1. Ruko
2. Gunung Saritan
3. Rumah Makan
4. Trotoar 1
5. Taman
6. Jalan
7. Median
8. Pos Polisi
9. Pohon
2. Gunung Saritan
3. Rumah Makan
4. Trotoar 1
5. Taman
6. Jalan
7. Median
8. Pos Polisi
9. Pohon
KONDISI LAPANGAN
Tipe
Kode Pendekat Lingkungan
Jalan
(1) (2)
U COM
S COM
T COM
B COM
U-Rt COM
S-Rt COM
Tanggal :20April 2011 Ditangani oleh: Kelompok I
Kota : Malang
Simpang : Kaliurang
Ukuran Kota : 895.500 penduduk
Perihal :
Periode PAGI
g= 10 g = 36 Waktu siklus :
c=
IG = 3 IG =3
9
5
7
4 6 6 6 6 6 4 2
1
5
2 ,5 4
3 ,4
6 6
4 ,6
6 6
1 ,6 5
3 1
5
9
4 4
6 6 7
6 6 9 6
1 1
Kelandaian
Hambatan Median
+/- %
Belok-kiri Jarak ke Lebar pendekat (m)
samping Ya/Tidak langsung kendaraan Pendekat WA Masuk
Tinggi/Rendah Ya/Tidak parkir (m) Wmasuk
Waktu siklus :
79
(11)
1 6.4
1 11.7
1 3.4
1 3.8
0 3.4
0 3.8
FORMULIR SIG - II
SIMPANG BERSINYAL Tanggal : 20 April 2011
Formulir SIG-II : Kota : Malang
ARUS LALU LINTAS Simpang : Kaliurang
ARUS LALU LINTAS KENDARAAN BERMOTOR (MV)
Kode Kendaraan Ringan (LV) Kendaraan Berat (HV) Sepeda Motor (MC)
emp terlindung = 1.0 emp terlindung = 1.3 emp terlindung =
Arah
emp terlawan = 1.0 emp terlawan = 1.3 emp terlawan =
Pendekat Kend/ smp/jam Kend/ smp/jam Kend/ smp/jam
Jam terlindung terlawan Jam terlindung terlawan Jam terlindung
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
LT/LTOR 115 115 2 2.6 225 45
ST 971 971 4 5.2 1951 390.2
U
RT
Total 1086 1086 0 6 7.8 0 2176 435.2
LT/LTOR 91 91 3 3.9 434 86.8
ST 690 690 5 6.5 1959 391.8
S
RT
Total 781 781 0 8 10.4 0 2393 478.6
LT/LTOR 12 12 0 0 31 6.2
ST 82 82 3 3.9 637
B
RT 150 150 0 0 1226
Total 244 12 232 3 0 3.9 1894 6.2
LT/LTOR 192 192 1 1.3 615 123
ST 68 68 8 10.4 672
T
RT 35 35 0 0 127
Total 295 192 103 9 1.3 10.4 1414 123
LT/LTOR
ST
U-Rt
RT 10 10 0 0 0 0 100 20
Total 10 10 0 0 0 0 100 20
LT/LTOR
ST
S-Rt
RT 176 176 0 3 3.9 0 363 72.6
Total 176 176 0 3 3.9 0 363 72.6
LIR SIG - II
Ditangani Oleh : Kelompok I
Soal : 3 - Fase
Periode : Jam Puncak Pagi
DARAAN BERMOTOR (MV) KEND. TAK BERMOTOR
peda Motor (MC) Kendaraan Bermotor Rasio Arus Rasio
0.2 Total Berbelok UM UM/MV
0.4 MV
smp/jam Kend/ smp/jam p LT p RT Kend/ (17)/(12)
terlawan Jam terlindung terlawan jam
(11) (12) (13) (14) (15) (16) (17) (18)
342 162.6 0.106344 7 0.020468
2926 1366.4 0 0
0 3182 1270 0 0 0
43 18.2 1 3 0.069767
254.8 722 340.7 14 0.019391
245.2 1376 395.2 0.537029 0 0
500 2141 18.2 735.9 17 0.00794
808 316.3 1 14 0.017327
268.8 748 347.2 18 0.024064
50.8 162 85.8 0.198152 0 0
319.6 1718 316.3 433 32 0.018626
0 110 30 0 1 2 0.018182
0 110 30 0 2 0.018182
0 542 252.5 0 1 0 0
0 542 252.5 0 0 0
-5
FORMULIR SIG - III
SIMPANG BERSINYAL
Formulir SIG-III : Ditangani Oleh : Kelompok XII
WAKTU ANTAR HIJAU Kota : Malang
WAKTU HILANG Simpang : Kaliurang
Soal : 3 - Fase
LALU LINTAS
LALU LINTAS DATANG
BERANGKAT
Kecepatan Pendekat U S
Pendekat
VE m/det Kecepatan 10 10
Jarak Berangkat (m)*)
U 10
Waktu Berangkat-Datang (det)**)
Jarak Berangkat (m)
S 10
Waktu Berangkat-Datang (det)
Jarak Berangkat (m) 19.4+5-7.3
T 10
Waktu Berangkat-Datang (det) 2.44-0.73
Jarak Berangkat (m) 22.7+5-10.1
B 10
Waktu Berangkat-Datang (det) 2.77-1.01
Penentuan Waktu Merah Semua
Fase 1 ® Fase 2
Fase 2 ® Fase 3
Fase 3 ® Fase 1
Waktu Kuning Total (3 det/fase)
Waktu hilang total (LTI) = Merah semua total + Waktu kuning (det/si
Catatan :
Waktu Datang = L AV /V AV
Untuk Penentuan waktu merah semua diambil sebesar 3 detik dikarenakan kondisi simpang yang tidak
sebesar 1 detik sesuai perhitungan.
SIG - III
Waktu merah
AS DATANG
semua (det)
T B
10 10
13.8+5-12.4
1.88-1.24 0.64
11+5-15.7
1.6-1.57 0.03
1.71
1.76
2
1
2
9
otal + Waktu kuning (det/siklus) 14
kondisi simpang yang tidak memungkinkan untuk diterapkan waktu merah semua
FORMULIR SIG - IV
SIMPANG BERSINYAL Tanggal : 20 April 2011
Formulir SIG - IV : PENENTUAN WAKTU SINYAL DAN Kota : Malang
KAPASITAS Simpang : Kaliurang
Distribusi arus lalu lintas (smp/jam) Fase 1
79.442 IFR =
0.76713
79 S FRcrit
Ditangani Oleh : Kelompok I
Soal : 3 - Fase
Periode : Jam Puncak Pagi
g C Q/C
(21) (22) (23)
36 1660.3 0.9209
36 2929.94 0.4335
24 781.318 0.9419
24 618.544 0.7000
10 367.871 0.0816
10 521.15 0.4845
SIMPANG BERSINYAL Tanggal : 20 April 2011
Formulir SIG-V : PANJANG ANTRIAN Kota : Malang
(perbaikan) JUMLAH KENDARAAN TERHENTI Simpang : Kaliurang
TUNDAAN Waktu Siklus :
Kode Arus Kapasitas Derajat Rasio Jumlah kendaraan antri (smp) Panjang
pendekat Lalu smp/jam Kejenuhan hijau antrian
lintas DS GR NQ 1
NQ 2 Total NQ MAX QL
smp/jam = = NQ1+NQ2 =
Q C Q/C g/c NQ (m)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
U 1529.00 1660 0.92 0.46 4.95 31.5 36.42 50.71746 149.17
S 1270.00 2930 0.43 0.46 -0.12 18.9 18.79 27.24793 45.41
T 433.00 619 0.70 0.30 0.66 8.4 9.06 14.30853 59.62
B 735.90 781 0.94 0.30 6.01 15.7 21.76 31.20646 164.24
U-Rt 30.00 368 0.08 0.13 -0.46 0.6 0.12 2.409254 20.08
S-Rt 252.50 521 0.48 0.13 -0.03 5.2 5.13 9.066335 53.33
LTOR (semua)
4250.40
Arus total. Kendaraan terhenti rata-rata stop/smp :
0.11
0.14 21.5072097
1.00
1.00
0.106344
0.143071
FORMULIR SIG - V
Ditangani Oleh : kelompok 1
Prihal :3 fase
Periode : Jam Puncak Pagi