GT-1 /HGPI ACTIVITY LIST

Starting system
Diesel engine PM(air filter,lube oil filter & fuel oil filter replacement , Lube oil & coolent replacement/top up )
turbo charger replacement ,Diesel engine idle tuning in presence of service engineer
Diesel engine load tuning in presence of service engineer
Liquid Fuel
Blinding/Deblinding
Liquid fuel HP filter & liquid fuel line Y strainer cleaning work
Flow divider freeness checking work and installation of antivibration pads and leg strengthening
Flow divider tube opening , removal from position
installation of new frame with antivibration pads
Tube refixing
Hydraulic
Auxiliary & GVM comp. accumulator N2 pressure checking and filling if required
GT-01 GVM comp. hydraulic oil accumulator drain needle valve free rotating free (towards gt hall)
All last chance filters replacement

N2
GT-1 HP nitrogen line PCV-6925A u/s and downstream isolation valve passing (Towards Co2 system zone-IV side)

RFG
Blinding/deblinding
GVM RFG Y strainer cleaning
GT-1 FILTER SEP SKID-1 D.P (DPI6809) HIGH (0.51KG/CM2)
Cermic wool removal /refixing of square flange
Inlet RFG piping square flange O rings replacement
GT-1 RFG line SRV passing Observed (C&I v/v removal/re fixing)

Vacuum
Mist eliminator fan A/B discharge line oil dropwise leakage
Mist eliminator fan silencer's housing replacement
Mist eliminator vent piping provision and installation in MOT and LGB , NRV crack testing (MOC)
NRV crack testing
Lube oil
Lube oil cooler -B tube bundle replacement encloser cutting
Encloser cutting & lube oil water box & pipeing removal,bundle removal
New lube oil bundle inserting & water box and piping refixing ,enclosure welding
Bearing bo.2 dresser coupling replacement, rest inspection
PM AOP, EOP, AHOP
GT-1 LGB/AGB : window inspection
GT-1 lube oil cooler equalising valve spindle damage
GT-01 lube oil cooler B view glass dropwise leakage

Inlet Air
GT air inlet filter replacement
GT APU platform Fabrication
GT transition/horzontal duct pocket cutting for humidity sensor
Uprate panel base frame fabrication and installation on position
Sealing Air
GT bearing Seal air line orifice checking front/rear

Atomizing Air
Booster air compressor lube oil replacement & belt checking

Cooling Air
Both BT fan impeller cleaning and damper checking
Both Augmenting air fans cleaning
Both BA fan impeller cleaning
Both GD seal air fan impeller cleaning
Both DD seal air fan impeller cleaning
Both TK fan impeller & silencer cleaning and damper checking
Both VG fan impeller cleaning and damper checking
All compratemet louvers cleaning and freeness checking
Porostone filter cleaning
Flue gas
GT-1 exhaust plenum insulation repair by cutting of plate from LGB side

GT-1 Exhaust flex seal maintainance and repair work/exhaust flex seal ceramic insualtion (anaconda) making and replacement
GT-1 load tunnel flue gas leakage inspection/insulation repair if any

DM Water
DM water pumps jacking bolts welding

Service Water
DMWC cooler cleaning work
Turbine both side leg cooling water line flushing work

Water Injection
Water injection skid commissioning activities

C&I supporting works


HRSG FRS CV 's removal-30 %
HRSG SH Attemperation v/v
RFG gas mass flow meter
GVM RFG GCV-13/14 removal

HRSG -1 defect list


HRSG-1 furnace bottom side structure welding crack condition
Dummy runner replacement
Furance insulation repair work
Drum sample cooler isolation v/v platform fabrication (near miss)
MUH cleaning