BS ooo
INSPECTION RELEASE Se Bl boweLt
SAIDEM citar consraucrow
PROJECT : TANGGUH EXPANSION PROJECT
REPORT NO. :36IRN-MOI-KH-2019
PURCHASE ORDER NO +27818020 UNPAOKED DATE:-
‘SUPPLIER/VENDORIAGENT "T. KHI PIPE INDUSTRIES PAGE 1 OF 1
jl. AMERIKA 1. KAWASAN PT. KRAKATAU
MATERIAL CURRENT LOCATION “STEEL CIGADING 42435, CILEGON, BANTEN,
INDONESIA
Job Site Location
Person Gontacted
Postion
Inspector's Name
Items Released :
‘TANGGUH EXPANSION PROJECT, BINTUNI BAY, PAPUA, INDONESIA
MEIRI FANTORI
(A & PD MANAGER
HENDA! NASRILIBAMBANG.H
‘SAWH OF STEEL LINE PIPE¢nos
= 1100 mm OD x 19.09 mm WT
Referenced Drawings and Documents =
Order: incomplete Oo Complete iva}
% of tems Released 100% Date Released 08/04/2019
Purpose: Release for Delivery Release to continue Fabrication
Release to another Company [_] _ Release to Non Conformance Report No. [_]
Name:
Note :
«It is understood that nothing contained herein relieves the Vendor of any Purchase’Order commitment.
‘+ Date of release MUST be fioted
REMARKS : . ? :
‘Attachment
| 4. IRN-KHI to MDI
|__2:_ Pipe Tally Sheet
‘QC SUBCONTRACTOR ‘ CONTRACTOR
NAME: HENDRI NASRIL aN z
SIGN:
| ) SIGN:
are06-04-2019 DATE
Form No: McC-TEP-CA.007u ae Sa CSTs of
ve (GREANWEGONSTRUCHON: —SAIPEM Gientoren hans
INSPECTION RELEASE NOTE (IRN)
Projoct Title: IRNNos
‘Tangguh Expansion Project LNG EPC (O15-IRN-KHI-MDI-2018
Contract / Purchase Order No: inspection Date:
27810820 April8, 2018
Manufacturer / Company: inspsadection Place:
PT KHI Pipe Industries PT KHI Pipe Industries
4, Amerika |, Kawasan PT. Krakatau Steel
Cigading 42435
Gilegon, Banten, Indonesia
Customer : ‘Order Status:
PT McConnell Dowell Indonesia Complete order [] Partial order X]_ Balance []
Client: ce Materials 7 Equipment:
PT Saipem Indonesia / CSTS Carbon Steel
The following was accepted:
[nen MATERIAL DESCRIPTION cqucrryeasseo | iiten Compe?
|
| ‘SAWH OF STEEL PIPE with EPOXY 550 Micron
G02 | 1100 mm OD x 19,00 mm WT (4 Pes) eee Comma eTeD
|
The following equipment:
[HAS BEEN INSPECTED AT FACTORY AND ACCEPTED
(1 HAS NOT BEEN INSPECTED AT FACTORY. VENDOR DOCUMENTATION HAS BEEN REVIEWED.
The following document has been attached with:
> Tally Sheet
> Pipe Inspection Certificate \
> Welding Traceability
PT KHI Pipe Industries PT McConnell Dowell Indonesia
Name: HEPDAL ENS Sueva &
Position: Ac Feipecra— VANE WP PAiwtinG ac
Ieee? Ae
eK nape | COMINGLe ei ‘WELDING SUMMARY STEEL PILE JETTY 2 =—_——_
= '
————~
esi>
Form No. FORM-TEP-OAWSSL.Ot
PROJECT: BP MARINE JETTY 2 PROJECT Update: & April 2019
Coil No ‘Check with Mot Blasting Painting
No | Pipe No | Wo Number Heat No | Length (M) & Thickness (mm) IRN No
Date | Resuit | Date No Report Date No Report
7a | on | asa | mur] oer] xaos] eacs | 549,08 7-19.00 osper18 | acc | 24mari9 | oenaccoatingceo2 | 25mer19 | ozceraos | oxsmn-xamol2o19
aaa] oor | 3568 fom) | sss. 145,08 T=19.00 sorebta | acc | 17-Mar-19 | o1FRaccoating ceo | teveri9 | orcesros | osumn-wiwor2019
PT KHI PIPE INDUSTRIES PT MCCONNEL DOWELL INDONESIA STS/PTSI 2p
Af % us. ha
Henom, Pasa
git