ISSUANCE OF RFI FORM PROCEDURE
Tet Responsity References
C=)
‘Generate RFIForm
Teques contracior to prepare standardized RF when Dey
completes preparation fora certain portion ofthe permanent
work cow art
Submit RFLForm
Upon receiving the AF Form, le the WHITE and BLUE colour
copy according to the sequence a determined by the serial
numbers and upated in Log book. Ensure Contractor retain the
PINK colour copy fr his follow up reference during submission
cow ae
aritog
i
Receiving RFI Form
Foxed appointment for joint inspection with the Contractor
usualy as per his request but he must comply tothe 24 hours
notice stipulated,
Joint Inspection
Carry out joint inspections per the attached checklist or as
spied inthe Drawings and Speciation
cow le
orawing
Contractorto carry
out remedial work
Is work done
‘Approval of inspection
peal the inspection status on 3s detined below cow ae
Passed
Fale
Endorsement of RFIForm
[isibate endorsed Form a olows
PINK colour copy return tthe Contrector. cow aes
YELLOW colour copy send tothe 5.0
\WHITE & BLUE colour retain byCo.w as record