ISSUANCE OF RFI FORM PROCEDURE Tet Responsity References C=) ‘Generate RFIForm Teques contracior to prepare standardized RF when Dey completes preparation fora certain portion ofthe permanent work cow art Submit RFLForm Upon receiving the AF Form, le the WHITE and BLUE colour copy according to the sequence a determined by the serial numbers and upated in Log book. Ensure Contractor retain the PINK colour copy fr his follow up reference during submission cow ae aritog i Receiving RFI Form Foxed appointment for joint inspection with the Contractor usualy as per his request but he must comply tothe 24 hours notice stipulated, Joint Inspection Carry out joint inspections per the attached checklist or as spied inthe Drawings and Speciation cow le orawing Contractorto carry out remedial work Is work done ‘Approval of inspection peal the inspection status on 3s detined below cow ae Passed Fale Endorsement of RFIForm [isibate endorsed Form a olows PINK colour copy return tthe Contrector. cow aes YELLOW colour copy send tothe 5.0 \WHITE & BLUE colour retain byCo.w as record

You might also like