In this code, no mention about this concern. So, we can repeat in some special
case.
2) ASME IX:
+ QW-407.1: mention for WPS have or no have PWHT ( add / delete PWHT is essential
).
+ QW-407.2: temperature and time range ( see above ) a change in the postweld heat
treatment temperature and time range. The PWHT total time(s) at temperature(s)
may be applied in one heating cycle.
It’s mean when carry out repeat PWHT – you must be strictly follow PWHT
procedure for one cycle.
+ EXP:
Document refer:
+ https://amarineblog.wordpress.com/2017/09/13/welding-inspector-wps-part-
5/
+ https://amarineblog.wordpress.com/2017/09/04/welding-inspection-part-9/