SHIP SHORE
YES NO YES NO
1. Has appropriate information about the cargo to be loaded been
provided to the Master by the shipper to enable its proper stowage
and safe carriage?
5. Has a cargo loading / discharge plan been prepared by the ship and
a copy passed to shore? If cargo is to be worked in two or more
hatches simultaneously, does the plan take this fully into account?
7. Have all ballasting and deballasting systems been checked and does
adequate pumping capacity exist to meet the requirements of the
cargo plan?
8. Has the need to trim the cargo in the holds been discussed and
agreed?
MASTER Name/Position