Minutes Agendaof 287th JCC Meeting of generation projects granted LTA in SR

Draft mAgendainutes of the 287th Joint Co-ordination Committee meeting of Generation Projects granted
Connectivity/ LTA in Southern Region (SR) held) held on 256.096.2019 at POWERGRID, Gurgaon

1. Confirmations of the Minutes of the 27th meeting of the Joint Co-ordination Committee of IPPs granted LTA in SR held on
25.06.2019 were circulated vide letter ref. no. C/CTU/SR/OA/27JCC dated 02.09.2019.

2. All those generation projects that have achieved COD and their respective dedicated transmission lines have also been
commissioned, may not be required to attend JCC as the coordination work has already been over. Therefore they are not being
called for further JCC meetings (Details of all such generation projects as per Table T1).

3. The 27th Joint Co-ordination Committee meeting of generation projects in Southern Region was held at POWERGRID Office,
Gurgaon on 25th June, 2019. The list of participants of the meeting is enclosed at Annexure-I.

4. CGM (CTU-Plg) welcomed the participants of the 27 th JCC meeting and requested to take-up the agenda.

5. CTU informed that Minutes of the 26 th meeting of the Joint Co-ordination Committee of IPPs granted LTA in SR held on
25.03.2019 were circulated vide letter ref. no. C/CTU/SR/OA/26JCC dated 17.06.2019.

6. Representative of Suzlon Infrastructure Pvt. Ltd. (SIPL) stated that vide email dated 27.05.2019 they have forwarded
observations on the minutes stating that SPIL is a deemed Stage-I grantee in respect of Chandragiri, Kumarapuram and
Kadambur wind farms and they shall not be applying for the stage II connectivity and shall not avail the LTA for all the three
sites. SPIL has submitted that as per the minutes of the 26 th SR JCC, it has been mentioned that SPIL has not attended the
meeting after 21st JCC meeting held on 20.12.2017 and no update has been received. Accordingly it is requested that
remarks may be modified so as to reflect the correct regulatory position with respect to the above LTAs.

CTU representative stated that the JCC forum has been created for co-ordination purpose to attempt matching of generation
schedules with the associated transmission system. Further, all those generation projects that have achieved COD of total
capacity and their respective dedicated transmission lines have also been commissioned, are not called in the JCC meeting
as the coordination work has already been over. In the instant case, neither the generation nor the dedicated line has been
commissioned. Accordingly since there was no representative from Suzlon in the 25th SR JCC meeting, the status has been
correctly mentioned as “Not attended” in the minutes.

It was also informed that the transmission system to effect connectivity and LTA of all the three wind farms of SPIL has been
commissioned on 10.06.2018. Further as per the LTA agreement, CBG is liable to be encashed in case of adverse progress
Page 1 of 30
Minutes Agendaof 287th JCC Meeting of generation projects granted LTA in SR
of generation project or associated works. The matter was referred to CERC in Petition no. 18/MP/2018 with regard to
generators who have been granted LTA but have become deemed Stage-I connectivity grantee in terms of CERC Detailed
Procedure notified on 15.05.2018. However, no specific directions have been issued in the petition with respect to SPIL.

SPIL representative stated that they will approach Hon’ble Commission through petition for directions pertaining to status of
their LTA and treatment of CBG in respect of Chandragiri, Kumarapuram and Kadambur wind farms.

After deliberations, it was decided that the minutes of the 26 th meeting of the Joint Co-ordination Committee of IPPs granted
LTA in SR held on 25.03.2019 are confirmed as circulated and the regulatory aspects pertaining to SPIL may be recorded in
the present meeting.

7. It was re-iterated that JCC forum has been created for co-ordination purpose to attempt matching of generation schedules
with the associated transmission system, and accordingly, the information given by generation developers is being taken into
cognizance for co-ordination purpose which can be achieved only if the applicant/generation developers provide realistic
schedule & other status of generation project /dedicated line. However, for any substantial issue, it may kindly be submitted
to CTU, by clarifying the nature of issue to be dealt therein, as per the Regulatory framework.

8. It was also emphasized that Joint Coordination Committee meetings were institutionalized by the Central Electricity
Regulatory Commission to enable better coordination of generation and transmission projects in terms of the applicable
CERC Regulations, Detailed Procedure and BPTAs/LTAAs. It was also mentioned that the BPTAs/LTAAs executed with the
generation project developers/companies monitored hereunder provides that if any of the developers fail to construct/
complete/ commission the generating station/dedicated transmission line or makes an exit or abandons its project, then
POWERGRID shall have the right to collect the transmission charges and/or damages as the case may be in accordance
with the CERC Regulations, Orders etc. Further, as per the BPTAs/LTAAs, the construction phase bank guarantee submitted
by the project developers/LTA customers is also encashable in case of adverse progress/abandonment of individual
generations project(s)/unit(s) assessed during the Joint Coordination Committee meetings. It was also informed that in light
of a number of recent CERC orders, wherein the Hon’ble Commission has emphasized upon strict implementation of the
various Regulations, Procedures and statutory Agreements, CTU shall assess the progress of various generation projects
and take appropriate actions in terms of the applicable provisions/clauses of the Regulations/Procedure/Agreements.

9. CTU informed that recently in number of cases, generation developers have submitted online additional details in respect of
Connectivity (CON-4) only when the generation projects are on the verge of commissioning. Thus, a very short period of
time is available for processing and issuance of Connection Offer (CON-5) and subsequent signing of Connection
Agreement. As per the CERC Connectivity Regulations/ Detailed Procedure, 2009, the CON-4 details are to be furnished to
CTU at least 2 (two) years prior to physical interconnection which may be adhered to by all the applicants.

Page 2 of 30
Minutes Agendaof 287th JCC Meeting of generation projects granted LTA in SR
10. All information exchanged, discussions/decisions taken in the JCC meeting shall be subject to the CERC Regulations and
Detailed procedure made therein.

11. It was informed that some of the generation developers / applicants have been repetitively not attending the JCC Meetings.
All such generation developers / applicants were requested to attend the future meetings so as to have a better co-ordination
otherwise suitable action may be taken as per CERC Regulations/Detailed Procedure.

12. All those generation projects that have achieved COD of total capacity and their respective dedicated transmission lines
have also been commissioned may not be required to attend JCC meeting as the coordination work has already been over.
Therefore, they are not being called for further JCC meetings (Details of all such generation projects as per Table T1).

13. Regarding execution of TSA, it was informed that under the applicable provisions of CERC (Sharing of Inter State
Transmission Charges and Losses) Regulations, 2010 and CERC Orders pronounced thereupon, TSA notified under
Regulation 13 is the ‘default transmission agreement’ and mandatorily applies to all DICs.

14. It was clarified that in terms of the recent CERC Orders and directions, the liability to pay transmission charges shall
commence irrespective of opening of LC and signing of TSA. In default thereof, necessary action in terms of CERC
Regulations including curtailment of STOA may be taken. Regardless of the said CERC Orders, all DICs are duly bound to
establish payment security mechanism (LC) under Regulation 12 (8) of CERC (Sharing of Inter State Transmission Charges
and Losses) Regulations, 2010 to facilitate smooth transaction of power on LTA basis.

15. Further, it was also brought to the attention of all the participants that CERC has pronounced Order in Petition No.
229/RC/2015 wherein inter alia it has been re-emphasized that all Designated ISTS Customers (DICs) are bound to
establish payment security mechanism (LC) and pay transmission charges from the date of commissioning of associated
transmission system or scheduled date under BPTA, whichever is later. In case of default in payment of transmission
charges and/or maintaining LC, the DICs TSA shall be liable for termination/suspension and shall be disabled from
injecting/drawing to/ from the ISTS through any type of access.

16. It was also informed that the stage-II grantee covered under clause 9.2.2 of the Detailed Procedure for grant of Connectivity
to RE projects are required to achieve the milestones given in the clause 9.3.2 of the Procedure and submit the proof to CTU
within 9 months from date of grant of stage-II Connectivity failing which Stage-II Connectivity shall be revoked by the CTU.

The LTA customers were requested to update the progress of their generation projects, dedicated transmission system and the
deliberations are summarised below :

Status of the Generation Projects 

Page 3 of 30
Minutes Agendaof 287th JCC Meeting of generation projects granted LTA in SR
Generation Projects granted Connectivity & LTA

Generation Projects granted LTOA/LTA 

Region Comm. schedule Comm. schedule


(267th JCC) (287th JCC) Dedicated /
LTOA SR WR NR ER
Sl. LTOA / LTA Firm Connectivity line
Quantum Remarks
No. Applicant beneficiary & Status
(MW)

314.79 Provision of 7x167


(LTA MVA (single phase),
reduced U1: synchronized mailU1: 400/220 kV
from 334 TN-50.02 on 28.03.19, COD synchronized on transformers at
Neyveli Lignite MW to AP-49.44 by 31.07.19 28.03.19, COD by NNTPS switchyard; The transmission
Corporation 314.79 : TS-57.78 31.07.19 1x80 MVAR Bus system for
Limited (400 19.2 MW Kar-66.48 U2: Reactor at connectivity has
1 314.79 0 0 0
MW has been Ker-30.52 synchronization by U2: generation been completed.
Replacement) relinquish Pud-4 31.07.19, COD synchronization by switchyard.
(2X500MW) ed on Unallocated expected by 31.07.19, COD LILO of existing
account of -56.55 31.12.19Not expected by Neyveli TS-II –
auxiliary attended 31.12.19 Pondycherry 400 kV
consumpti S/c at NNTPS –
on) Commissioned

RE Generation Projects granted Connectivity & LTA

Status has been updated based on the status submitted by the applicants. Detailed status submitted by
applicants on the CTU project monitoring portal is available at Annexure-II.

Page 4 of 30
Minutes Agendaof 287th JCC Meeting of generation projects granted LTA in SR
Region Comm. schedule Comm. schedule
(27th JCC) (28th JCC)Comm.
SR WR NR ER Dedicated /
LTOA schedule
Sl. LTOA / LTA Firm Connectivity line
Quantum (27th JCC) Remarks
No. Applicant beneficiary & Status
(MW)
Comm. schedule
(26th JCC)
mail
750 MW: 250
MW – Ayena 200
200 MW
MW
commissioned on
commissioned
07.06.2016 and
on 250 MW, 750 MW &
additional 50 MW
07.06.2016 and 500 MW LTA has
on
additional 50 been made
10.08.2016.
MW effective from
on 400/220KV NP 11.07.2016,
750 MW
10.08.2016. Kunta Pooling 04.08.2018 &
Andhra expected by
Station – 01.10.2018
Pradesh Solar 1400 Jul’19/Aug’19
750 MW Commissioned respectively.
1. Power 1500 1500 0 0 0 (APDISCOMS)
expected by through LILO of
Corporation 400 MW
Jul’19/Aug’19 Cuddapah – Kolar Transmission
Pvt. Ltd. commissioned
400 kV S/c line charges shall be
progressively
400 MW applicable from the
from 30.04.18 to
commissioned start date of LTA till
15.08.18
progressively commissioning of
Balance 100 MW,
from 30.04.18 to generation project.
tenders likely
15.08.18
to be issued in
Balance 100
Jul’19Not
MW, tenders
attended
likely
to be issued in
Jul’19
2. Karnataka 2000 2000 0 0 0 1150 600 MW already 1650 MW LILO of 400kV
600 MW LTA has
Solar Power (Karnataka) commissioned on already Gooty – Tumkur
been made
Development 31.01.2018, commissioned (Vasantnarsapur)
effective from
Corporation Balance 400 MW D/c at Tumkur
12.07.2018 and 400
Limited 800 MW – Dec’19 (Pavagada)
MW from
commissioned 600 MW already Pooling station,
28.09.2018.
progressively commissioned 1x500 MVA,
from 20.12.2018 on 31.01.2018, 400/220KV Pooling Transmission
to 28.03.2019, station at Tumkur charges shall be
800 MW (Pavagada), 1x125 applicable from the
Page 5 of 30
Minutes Agendaof 287th JCC Meeting of generation projects granted LTA in SR
LTOA Region Comm. schedule Comm. schedule Dedicated /
Sl. LTOA / LTA Firm
Quantum (27th JCC) (28th JCC)Comm. Connectivity line Remarks
No. Applicant SR WR NR ER beneficiary
(MW) schedule & Status
250 (27th JCC)
MW:10.08.2019,
150 MW:
30.12.2019,
200 MW:
30.12.2019
commissioned
50 MW: MVAR BR at
progressively
20.09.2019 Tumkur
from 20.12.2018
(Pavagada),
to 28.03.2019,
Not attended 220 kV Bays (8
date of start of LTA
(600 MW already Nos.) at Tumkur
250 as per the
commissioned on (Pavagada) PS for
MW:10.08.2019, intimation in case of
31.01.2018, 800 interconnection
150 MW: delay in
MW with Solar project**
30.12.2019, commissioning of
commissioned - Commissioned
200 MW: generation from
progressively **4 nos. 220 kV bays
30.12.2019 schedule.
from 20.12.2018 for Phase-I (1000
50 MW:
to 28.03.2019, MW) and balance 4
20.09.2019
balance 400 MW nos. bays for Phase-
& 200 MW is II (1000 MW)
expected by
Aug’19 & Dec’19
respectively as
informed vide
letter dated
30.03.2019)
Stage-II
Connectivity has
Renew Power already been
400
Ventures Pvt. Ltd – revoked vide CTU
(NR – 250 MW: Jul’20
Pugalur 230kV D/c letter dated
Renew Power 200MW 150 MW:
250 MW: Jul’20 line along with 08.03.2019 due to
3. Ventures Pvt. ER – 0 50 200 150 Nil Mar’21250 MW:
150 MW: Mar’21 bays at Pugalur & failure in
Ltd 150MW Jul’20
Generation submission of
WR – 150 MW: Mar’21
switchyard. requisite
50MW)
documents in terms
of RE detailed
Procedure, 2018.

Page 6 of 30
Minutes Agendaof 287th JCC Meeting of generation projects granted LTA in SR
LTOA Region Comm. schedule Comm. schedule Dedicated /
Sl. LTOA / LTA Firm
Quantum (27th JCC) (28th JCC)Comm. Connectivity line Remarks
No. Applicant SR WR NR ER beneficiary
(MW) schedule & Status
4. Betam Wind 250.2 MW 0 0 100 150. 50.2 MW : (27th MW
50.2 JCC): Betam Wind – It was informed to
Energy Private 2 Nil 24.11.2019 25.10.2019 Tuticorin-II PS the applicant that
Limited 200 MW: 200 MW: 230kV S/c line: LTA has been
29.02.2020150 29.02.202050.2 granted on existing
Awarded ,
MW:31.07.2019 MW : 24.11.2019 transmission system
100.2 MW: 200 MW: Expected by with start date as
31.08.2019 29.02.2020 31.07.2019 31.07.2019 for
which letter of
operationalization
(i) Route Survey: has already been
completed issued.
(ii) Section 68 : Transmission
obtained charges shall be
(iii) No. of applicable as per
Foundations the Regulations.
(Total/Complet
Representative of
ed): 73/73 Betam requested for
(iv) No. of Tower aligning the LTA
Erections operationalization
(Total/Complet date as per the PPA
ed): 6733/73 schedules.
(v) Stringing(ckm)
(Total/Complet EPC Award Date:
ed): 16.50/76 Awarded to Vestas
(30.11.2018)
Progress of
Date of FC: End of
generator pooling
December,2018
station erection: -
Expected by Acquisition of
150.1008.19 Land for
renewable
(i) Land for PS: generating station:
Acquired Land
(ii) Switchyard, Required(acres):
Main 560
Transformers Land
& Low Voltage Acquired(acres):

Page 7 of 30
Minutes Agendaof 287th JCC Meeting of generation projects granted LTA in SR
LTOA Region Comm. schedule Comm. schedule Dedicated /
Sl. LTOA / LTA Firm
Quantum (27th JCC) (28th JCC)Comm. Connectivity line Remarks
No. Applicant SR WR NR ER beneficiary
(MW) schedule & Status
(27th JCC) 376

WTGs
Total/Supplied/Erect
ed :Not provided
Switchgear:
2X230/33kV:  Bay
Transformers implementation
installed at ISTS: Signed
and advance paid

 .Connection
Agreement
Status: Not
appliedsigned

5. Sprng 300 MW 300 Nil 102 MW: 51 MW: 31st


Sprng Renewable
Renewable 20.11.2019 Jan’20 Date of FC:
–Pugalur 230kV
Energy Private 102 MW: 51 MW : Feb’20 25.04.2019
S/c line: expected
Limited 31.12.2019 102 : 31st Mar;20
by 20.08.19
96 51: 30th Apr’20 Acquisition of
MW:31.01.2020N 45: 30th (i) Route Survey: Land for
ot attended Jun’20102 MW: Completed renewable
20.11.2019 (ii) Section 68 : generating station:
102 MW: obtained Land
31.12.2019 (iii) No. of Required(acres):
96 600
Foundations
MW:31.01.2020
(Total/Complet Land
ed): 116/44 Acquired(acres):
(iv) No. of Tower 348
Erections WTGs
(Total/Complet Total/Supplied/Erect
ed
ed): 116/26
: 23/3/3
(v) Stringing(ckm)
 Bay
(Total/Complet implementation
ed): 0/30.8 agreement:
signed & advance

Page 8 of 30
Minutes Agendaof 287th JCC Meeting of generation projects granted LTA in SR
LTOA Region Comm. schedule Comm. schedule Dedicated /
Sl. LTOA / LTA Firm
Quantum (27th JCC) (28th JCC)Comm. Connectivity line Remarks
No. Applicant SR WR NR ER beneficiary
(MW) schedule & Status
(27th JCC) Progress of
generator pooling
station erection:
30.09.2019
(awarded on
17.12.18)
(i) Land for PS: 9 paid
Acres (Sale
 .Connection
deed
Agreement
completed) Status: To be
(ii) Switchyard, signed
Main
Transformers
& Low Voltage
Switchgear: 2
nos. of
230/33kV
6. Mytrah Energy 300 300 UP: 150 MW (status submitted 300 MW : Mytrah Energy – (Status as per 26th
(India) Private BYPL, Delhi: through email) 29.02.2020 Palakkad PS SR JCC)
Limited 100 MW (status submitted 220kV S/c line –
(Pallakad) TPDDL, Delhi: 300 MW : through email) not provided EPC Award Date:
50 MW 29.02.2020300 not provided
MW : 29.02.2020 300 MW : (i) Route Survey:
29.02.2020 completed Date of FC:
(ii) Section 68 : 29.02.2020
obtained
(iii) No. of Acquisition of
Land: Land
Foundations
Required (acres):
(Total/Complet 600
ed): Not Land Acquired
provided (acres): 40
(iv) No. of Tower Seeking change in
Erections location of
(Total/Complet generation project
ed): Not
provided WTGs

Page 9 of 30
Minutes Agendaof 287th JCC Meeting of generation projects granted LTA in SR
LTOA Region Comm. schedule Comm. schedule Dedicated /
Sl. LTOA / LTA Firm
Quantum (27th JCC) (28th JCC)Comm. Connectivity line Remarks
No. Applicant SR WR NR ER beneficiary
(MW) schedule & Status
(27th JCC) (v) Stringing(ckm)
Total/Supplied/Erect
(Total/Complet ed : Not provided
ed): 27/0
Progress of  Bay
generator pooling implementation
station erection: agreement:
(i) Land for PS: Signed and
not provided advance paid
(ii) Switchyard,
Main  .Connection
Agreement: not
Transformers
applied
& Low Voltage
Switchgear –
not provided Generation project
yet to be awarded.
Line & PS is yet to
be awarded.
7. Ecoren 175 0 0 0 175 Nil Attending first 175 MW : 22nd Ecoren – Hiriyur
Energy India time Jul’20 220kV S/c line –
Pvt. Ltd.
(vi) Route Survey:
(vii) Section 68 :
(viii)No. of
Foundations
(Total/Complet
ed):
(ix) No. of Tower
Erections
(Total/Complet
ed):
(x) Stringing(ckm)
(Total/Complet
ed): 0/0
Progress of
generator pooling
station erection:
(iii) Land for PS:
Page 10 of 30
Minutes Agendaof 287th JCC Meeting of generation projects granted LTA in SR
LTOA Region Comm. schedule Comm. schedule Dedicated /
Sl. LTOA / LTA Firm
Quantum (27th JCC) (28th JCC)Comm. Connectivity line Remarks
No. Applicant SR WR NR ER beneficiary
(MW) schedule & Status
(27th JCC) (iv) Switchyard,
Main
Transformers
& Low Voltage
Switchgear –

Line & PS
Not knownNot Suzlon Power Representative
attended Infrastructure Ltd. stated that SPIL is a
(Chandragiri wind deemed Stage-I
farm)-Tirunelveli grantee in respect
Suzlon Power P.S.(New) 230 kV of Chandragiri,
Infrastructure D/c Line including Kumarapuram and
8. Ltd. 75 0 0 40 Nil Not known line bays at both Kadambur wind
Chandragiri 35
ends (22.4kms – farms and they
Wind Farm 83 towers) – shall not be
Mar’18 applying for the
Route Survey: stage II connectivity
Completed and shall not avail
9. Suzlon Power 75 0 0 40 35 Nil Not knownNot Not known Suzlon Power the LTA for all the
Infrastructure attended Infrastructure Ltd. three sites.
Ltd. (Kumarapuram
Kumarapuram wind farm)-
Wind Farm Tirunelveli SPIL representative
PS(New) 230 kV stated that they will
D/c Line including approach Hon’ble
line bays at both Commission
ends – Dec’18. through petition for
directions
Work has not pertaining to status
started as yet. of their LTA and
Survey work treatment of CBG in
nearing completion respect of
– route & profile Chandragiri,
under finalization. Kumarapuram and

Page 11 of 30
Minutes Agendaof 287th JCC Meeting of generation projects granted LTA in SR
LTOA Region Comm. schedule Comm. schedule Dedicated /
Sl. LTOA / LTA Firm
Quantum (27th JCC) (28th JCC)Comm. Connectivity line Remarks
No. Applicant SR WR NR ER beneficiary
(MW) schedule & Status
(27th JCC) M/s Suzlon Power
Infrastructure Ltd.
(Kadambur wind
farm)-Tirunelveli
P.S.(New) 230 kV
Suzlon Power D/c Line including
Infrastructure line bays at both
Not knownNot
10. Ltd. Kadambur 75 0 0 40 35 Nil Not known ends –
attended Kadambur wind
Wind Farm
farms.
Work has not
started as yet.
Survey work
nearing completion
– route & profile
under finalization.

Page 12 of 30
Minutes Agendaof 287th JCC Meeting of generation projects granted LTA in SR

Generation Projects granted only Connectivity 

Sl. Connectivity Connectivity Comm. Comm. schedule Comm. schedule Dedicated / Connectivity Remarks
No. Applicant Quantum Schedule (267th JCC) (278th JCC) line & Status
(MW) (TA/Intimation)
As informed by the applicant in the
Samalkot-Vemagiri-II (PG) 23rd JCC meeting, generation
400 kV D/c Quad line schedule is dependent on New Gas
M/s Samalkot Not (including line bays at both policy from GOI.
2 2214 Feb-2017 Not attended
Power Limited attendedUncertain ends)
1x125 MVAR bus reactor No update since 23rd JCC held on
at generation switchyard 29.06.2018.

RE Generation Projects granted only Connectivity 

Status has been updated based on the status submitted by the applicants. Detailed status submitted by
applicants on the CTU project monitoring portal is available at Annexure-II.

Page 13 of 30
Minutes Agendaof 287th JCC Meeting of generation projects granted LTA in SR
Sl. Connectivity Connectivity Comm. Comm. schedule Comm. schedule Dedicated / Connectivity Remarks
No. Applicant Quantum Schedule (27th JCC)Comm. (28th JCC)Comm. line & Status
(MW) (TA/Intimation) schedule schedule
(26th JCC) (27th JCC)
LTA grant has been revoked vide
letter dated 04.07.2018 on account
of non-signing of LTA Agreement.

No update since 23rd JCC held on


29.06.2018.
M/s REGEN Wind Farms
(Vagarai) Pvt. Ltd. M/s Regen Wind Farms (Vagarai)
Phase-1 31.03.17
Regen PS – Pugalur 230 Pvt. Ltd. (RWFVPL) has failed in
M/s Regen Wind Phase-2 30.09.17
Not attended Not kV D/c (Twin Moose) line submission of requisite documents in
1 Farms (Vagarai) 600 Phase-3 31.03.18 Not attended
attended (including line bays at both compliance of the Clause 5.1, 9.2.2
Pvt. Ltd. Phase-4 30.09.18
the ends) and 9.3.2 of the RE Detailed
Phase-5 31.03.19
Procedure, 2018. Same has been
communicated vide CTU letter dated
28.02.2019.

M/s RWFVPL has approached


CERC through Petition No.
48/MP/2019 seeking relief in the
matter.
2 Shapoorji Pallonji 250 01.10.2020 250 MW: 25.10.2020 250 MW: Shapoorji – Tuticorin II EPC Award Date: Expected by
Infrastructure (SECI Solar (250 MW to Not attended 25.10.2020250 220kV D/c line: Sept’19
Capital Company ISTS-I) Jharkhand) (Status sent through MW: 25.10.2020 01.09.2020
Pvt Ltd mail) (i) Route Survey: Date of FC: Not aAchieved on
(Tuticorin, Tamil 250 MW: 01.10.2020 completed 156.085.2019 (SECI),
Nadu) (ii) Section 68 : obtained
(iii) No. of Foundations Not achieved 19.03.2020 (NTPC)
(Total/Completed):
Not provided
Acquisition of Land:
(iv) No. of Tower Erections
Land Required(acres): 1100
(Total/Completed): Not
provided

Page 14 of 30
Minutes Agendaof 287th JCC Meeting of generation projects granted LTA in SR
Sl. Connectivity Connectivity Comm. Comm. schedule Comm. schedule Dedicated / Connectivity Remarks
No. Applicant Quantum Schedule (27th JCC)Comm. (28th JCC)Comm. line & Status
(MW) (TA/Intimation) schedule schedule
(26th JCC) (27th JCC)
Land Acquired(acres): Not yet
(v) Stringing(ckm) acquired, land acquisition under
(Total/Completed): Not process394
provided Balance by 28.10.201979
250 MW: Progress of generator
Shapoorji pallonji 15.12.2020Not WTGs Total/Supplied/Erected
pooling station erection: : Not provided
Infrastructure 250 attended (i) Land for PS: 5 acres
250 MW:
3 capital Co. Pvt. Ltd. (NTPC ISTS 15.12.2020 (Status sent through
15.12.2020 (yet to be acquired)  Bay implementation agreement:
(Tuticorin, Tamil SPP) mail)
Nadu) 250 MW: (ii) Switchyard, Main Not signed (to be awarded)
15.12.2020 Transformers & Low
Voltage Switchgear  .Connection Agreement: Not
Line & PS is yet to be applied
awarded. Land acquisition under process.
Status by 27.09.2019
4 Shapoorji Pallonji 250 15.12.2020 250 MW: 250 MW: Shapoorji – NP Kunta EPC Award Date: Not awarded
Infrastructure (NTPC ISTS 15.12.2020Not 15.12.2020 220kV S/c line: 01.11.2020
Capital Co. Pvt. SPP) attended (i) Route Survey: Not Date of FC: 19-03-2020
Ltd. (Status sent through completed
(NP Kunta, Andhra mail) (ii) Section 68 : Not Acquisition of Land:
Pradesh) 250 MW: obtained Land Required(acres): 1100
15.12.2020 (iii) No. of Foundations Land Acquired(acres): Not yet
(Total/Completed): acquired, land acquisition under
Not provided process
(iv) No. of Tower Erections
(Total/Completed): Not WTGs Total/Supplied/Erected
: Not provided
provided
(v) Stringing(ckm)
 Bay implementation agreement:
(Total/Completed): Not
Signed, advance paid
provided
 .Connection Agreement: Not
Progress of generator applied
pooling station erection:
(i) Land for PS: 5 acres
(yet to be acquired) Land acquisition under process.
(ii) Switchyard, Main
Page 15 of 30
Minutes Agendaof 287th JCC Meeting of generation projects granted LTA in SR
Sl. Connectivity Connectivity Comm. Comm. schedule Comm. schedule Dedicated / Connectivity Remarks
No. Applicant Quantum Schedule (27th JCC)Comm. (28th JCC)Comm. line & Status
(MW) (TA/Intimation) schedule schedule
(26th JCC) (27th JCC)

Transformers & Low


Voltage Switchgear
Line & PS is yet to be
awarded.

Renew – Hiriyur 220kV S/c


line: Expected by
20.03.2020
(i) Route Survey:
completed
EPC Award Date: Awarded
(ii) Section 68 : Not
obtained Date of FC: 30.08.2019
(iii) No. of Foundations
(Total/Completed): Acquisition of Land:
approx. 200/0 Land Required(acres): 500 acres
(iv) No. of Tower Erections Land Acquired(acres): 112 acres
(Total/Completed): Not
provided WTGs Total/Supplied/Erected
ReNew Power 300 MW : (v) Stringing(ckm) : Not provided
300 MW:
5 Limited 300 01.04.2020 25.09.2020300 (Total/Completed): Not
25.09.20Sept’ 20
(Hiriyur) MW: 25.09.20 provided  Bay implementation agreement:
Agreement signed, advance not
paid
Progress of generator
pooling station erection:  .Connection Agreement: Not
applied
Expected by 20.03.2020
(i) Land for PS: 9 acres
(yet to be acquired) 3 masts installed at site
(ii) Switchyard, Main
Transformers & Low
Voltage Switchgear:
2X150 MVA,
220/33kV

Page 16 of 30
Minutes Agendaof 287th JCC Meeting of generation projects granted LTA in SR
Sl. Connectivity Connectivity Comm. Comm. schedule Comm. schedule Dedicated / Connectivity Remarks
No. Applicant Quantum Schedule (27th JCC)Comm. (28th JCC)Comm. line & Status
(MW) (TA/Intimation) schedule schedule
(26th JCC) (27th JCC)
SBE – Trichy 400kV S/c
line: Expected by Dec’20
(vi) Route Survey:
completed
(vii) Section 68 : obtained
SBE Renewables (viii)No. of Foundations
6 450 01.09.2020 Attending first time 450 MW: Dec’20 (Total/Completed):
Ten pvt. Ltd.
approx.
(ix) No. of Tower Erections
(Total/Completed):
Stringing(ckm)
(Total/Completed):

Page 17 of 30
Minutes Agendaof 287th JCC Meeting of generation projects granted LTA in SR

Table T1
List of generation projects commissioned along with the dedicated/connectivity lines and further
coordination not required

HIGH CAPACITY TRANSMISSION CORRIDOR – VI


(Transmission System Associated with IPPs in Krishnapatnam Area, Andhra Pradesh)
Sl. No. LTOA / LTA LTOA Region Firm Last updated status Dedicated / Remarks
Applicant Quantu beneficiar Connectivity line &
m (MW) SR WR NR y Status

Meenakshi Energy
1 Private Limited 546 186 177 183
(2x150 + 2x350)
U-1/2:
commissioned Entire LTA of 910 MW has
SEPL/MEPL-Nellore
NIL U-3: been relinquished vide
400kV quad D/c line -
Sync on 24th Mar’18 letter dated 30.06.2018.
commissioned
Sep’18 (COD)
Meenakshi Energy Pvt. U-4: Sept’18 (COD)
2 364 364 0 0
Ltd.

Commissioned LTA of 146 MW has been


Simhapuri Energy Private (as per 12th JCC) SEPL/MEPL-Nellore relinquished vide letter
546 411 135
3 Limited 0 NIL 400kV quad D/c line – dated 26.06.2018.
400 400 0
(4x150 MW) commissioned 400 MW LTA revoked and
TSA terminated
Thermal Powertech Andhra U-1: Mar’15
(COD) TPCIL-Nellore PS
Corpn. India Ltd (Now Pradesh :
U-2: Sep’15 400kV quad D/c line by
4 Sembcorp Energy India 1240 1125 115 0 230.55 MW
(COD) POWERGRID &
Ltd) Telangana :
(as per 13th JCC) commissioned
(2x660 MW) 839.45 MW

Page 18 of 30
Minutes Agendaof 287th JCC Meeting of generation projects granted LTA in SR
Sl. No. LTOA / LTA LTOA Region Firm Last updated status Dedicated / Remarks
Applicant Quantu beneficiar Connectivity line &
m (MW) SR WR NR y Status
NCC Power Projects As per 20th JCC
NCC-Nellore PS 400kV
Limited U-1: Commissioned
quad D/c line by
5 (2x660 MW) 740 740 0 0 NIL U-2: Commissioned
POWERGRID &
(Sembcorp Energy India on Feb’17
commissioned
Ltd) (COD 17.02.17)

HIGH CAPACITY TRANSMISSION CORRIDOR – VII


(Transmission System Associated with IPP projects in Tuticorin Area, Tamil Nadu)
Sl. LTOA / LTA LTOA Region Firm Last updated Dedicated / Remarks
No. Applicant Quantu beneficiary status Connectivity line &
m (MW)
SR WR NR Status
As per CERC directions in
Coastal Energen CEPL-Tuticorin PS
1100 820 280 Tamil Nadu : (U1 & 2: IA no 1/2018 in Petition
1 Private Limited 0 400kV quad D/c line
558 558 0 558 MW Commissioned) no.246/MP/2016, LTA of 542 MW
(2x600 MW) (27km) – Oct’ 16
has been relinquished.
Ind Barath informed that the
Ind-Barath Power Ind-Barath-Tuticorin generation project has been
2 (Madras) Limited 900 225 270 405 NIL Not attended PS 400kV (quad) D/c abandoned.
(2x660 MW) line - Uncertain DIC status has been ceased and
LTA has also been revoked.

HIGH CAPACITY TRANSMISSION CORRIDOR – XI


(Transmission System Associated with IPP projects in Nagapattinam / Cuddalore Area, TN)
Sl. LTOA / LTA LTOA Region Firm Last updated status Dedicated / Remarks
No. Applicant Quantum beneficiary Connectivity line &
SR WR NR
(MW) Status
1 PEL Power 987 700 0 287 NIL Project uncertain. PEL-Nagapattinam PS CERC has pronounced order in
Limited 400kV quad D/c line Petition No. 315/MP/2013 filed by
(3x350 MW) PELPL wherein CERC has inter
alia declined the relief under force
majeure clause of BPTA to PELPL
and has held that PELPL has
sought relinquishment of LTA
which shall be effective from
26.7.2013 and subject to

Page 19 of 30
Minutes Agendaof 287th JCC Meeting of generation projects granted LTA in SR
relinquishment charges as per
decision in CERC Petition No.
92/MP/2015. PEL has filed appeal
against order of CERC in APTEL.

DIC status has been ceased and


LTA has also been revoked.
IL & FS Tamil
Nadu Power 1150 575 Tamil Nadu: U-1: Sep’15 (COD) IL&FS-Nagapattinam LTA of 540 MW has been
2 Company 1080 540 540 0 540 MW U-2: Apr’16 (COD) PS 400kV quad D/c relinquished vide letter
Limited 540 0 line Commissioned dated 22.05.2017
(2x600 MW)

HIGH CAPACITY TRANSMISSION CORRIDOR – VIII

(Transmission System Associated with IPP projects in Srikakulam Area, Andhra Pradesh)
Sl. LTOA / LTA LTOA Region Firm Comm. Dedicated / Remarks
No. Applicant Quantum beneficiary schedule Connectivity
(MW)
SR WR NR (25th JCC) line & Status
Not attended
East Coast AP: 300 MW ECEPL-
(As per 19th LTA revoked vide letter dated
Energy Kerala : 100 MW Srikakulam PS
1 1240.8 1240.8 0 0 JCC : 18.02.2019 after cessation of DIC status
Private AP RFQ short list : 400kV quad D/c
U-1: Sep’18 vide letter dated 21.01.2019
Limited 488.55 MW line
U-2: Mar’19)
(2x660 MW)

OTHER GENERATION PROJECTS

Sl. LTOA / LTA LTOA Region Firm beneficiary Last updated status in Dedicated / Remarks
No. Applicant Quantum Connectivity line &
(MW) Status
SR NR ER
1 Green Infra 249.9 0 149.9 100 249.9 MW : 08.10.2018
Green Infra – Project has been
Renewable Energy UP: 99.9 MW
Tuticorin-II PS commissioned.
Limited Bihar: 50 MW
230kV S/c line – Therefore, coordination
Jharkhand: 50 MW
Commissioned not required
Delhi: 50 MW
Page 20 of 30
Minutes Agendaof 287th JCC Meeting of generation projects granted LTA in SR
Sl. LTOA / LTA LTOA Region Firm beneficiary Last updated status in Dedicated / Remarks
No. Applicant Quantum Connectivity line &
(MW) Status
SR NR ER

Orange Sironj –
Project has been
100 MW : 07.03.2019 Tuticorin-II PS
Orange Sironj Wind 200 Haryana : 100 MW, commissioned.
2 0 100 100 50 MW : 30.03.2019 230kV S/c line -
Power Pvt. Ltd. Bihar : 100 MW Therefore, coordination
50 MW : 14.04.2019 commissioned
not required

128.79 MW :
Commissioned on Mytrah wind farms
UP: 100 MW Project has been
Mytrah 30.01.2019 –Tirunelveli PS
Bihar: 50 MW commissioned.
3 Energy(India) Ltd 250 0 100 100 58.32 MW : 230kV D/c line –
Jharkhand: 50 MW Therefore, coordination
(300MW) 16.04.2019 Commissioned
Assam: 50 MW not required
62.89 MW :
11.05.2019

Status of the Associated Transmission System 

HIGH CAPACITY TRANSMISSION CORRIDOR – VI


(Transmission System Associated with IPPs in Krishnapatnam Area, Andhra Pradesh)

 Common System Associated with ISGS Projects in Krishnapatnam Area of Andhra Pradesh: All elements have been
commissioned. The details of elements are as below :

Sl. Scope of Transmission System


No.
Establishment of 765/400 kV, 2x1500 MVA pooling station at Nellore by LILO of Simhapuri-Nellore 400 kV D/c
1 quad line

2 Nellore Pooling station – Kurnool 765 kV D/c line

3 Kurnool – Raichur 2nd 765 kV S/c line

Page 21 of 30
Minutes Agendaof 287th JCC Meeting of generation projects granted LTA in SR

4 Associated 765 kV & 400 kV bays at Nellore Pooling station, Kurnool and Raichur stations

HIGH CAPACITY TRANSMISSION CORRIDOR – VII


(Transmission System Associated with IPP projects in Tuticorin Area, Tamil Nadu)

 Common system associated with Coastal Energen Pvt. Ltd. (CEPL) and Ind-Bharat Power (Madras) Ltd. LTOA generation
projects in Tuticorin Area – Part-A : All elements of Part-A have been commissioned. The details of elements are as below :

Sl. Scope of Transmission System


No.
1 Establishment of 765 kV pooling station in Tuticorin (Initially charged at 400 kV) including 1x80 MVAR bus reactor

2 LILO of both circuits of Tuticorin JV – Madurai 400 kV D/c (quad) line at Tuticorin Pooling Station

 Common system associated with Coastal Energen Pvt Ltd.(CEPL) and Ind-Bharat Power (Madras) Ltd. LTOA generation projects in
Tuticorin Area – Part-B : All elements commissioned
Sl. Scope of Transmission System
No.
1 Establishment of 765/400 kV Pooling Station at Salem (Initially charged at 400 kV).

2 Tuticorin Pooling station – Salem Pooling station 765 kV D/c line initially charged at 400 kV.
Interconnection of Salem pooling station with existing Salem 400/230 kV substation through 400 kV D/c (quad)
3 line.

4 Salem pooling station – Madhugiri pooling station 765 kV S/c initially charged at 400 kV.

HIGH CAPACITY TRANSMISSION CORRIDOR – VIII


(Transmission System Associated with IPP projects in Srikakulam Area, Andhra Pradesh)

Page 22 of 30
Minutes Agendaof 287th JCC Meeting of generation projects granted LTA in SR
 Common System Associated with East Coast Energy Private Limited And NCC Power Projects Limited LTOA Generation Projects
In Srikakulam Area – Part-A&C: All elements commissioned

Sl. Scope of Transmission System


No.
1 Establishment of 765/400 kV Pooling Station at Srikakulam with 2x1500 MVA transformation capacity

2 Srikakulam Pooling Station – Angul 765 kV D/c line

 Common System Associated With East Coast Energy Private Limited And NCC Power Projects Limited LTOA Generation Projects
In Srikakulam Area – Part-B : All elements commissioned

Sl. Scope of Transmission System


No.
1 2nd Angul – Jharsuguda 765 kV D/c line

2 2nd Jharsuguda – Dharamjaigarh 765 kV D/c line

3 Associated 400kV & 765 kV bays at Angul, Jharsuguda & Dharamjaigarh substations.

HIGH CAPACITY TRANSMISSION CORRIDOR – XI


(Transmission System Associated with IPP projects in Nagapattinam / Cuddalore Area, Tamil Nadu)

 Common Transmission System Associated with ISGS Projects in Nagapattinam/Cuddalore Area of Tamil Nadu – Part-A1(a) :
All elements of Part-A1(a) have been commissioned. The details of elements are as below :
Sl. Scope of Transmission System
No.
1 Establishment of 765/400kV GIS Pooling station at Nagapattinam (initially charged at 400 kV)
LILO of Neyveli – Trichy 400kV S/c line at Nagapattinam Pooling Station for interim arrangement which later shall
2
be bypassed

Transmission System under the Scope of Private Sector: All the elements commissioned.
Sl. Scope of Transmission System
No.
1 Nagapattinam Pooling Station – Salem 765kV D/c line

Page 23 of 30
Minutes Agendaof 287th JCC Meeting of generation projects granted LTA in SR
2 Salem – Madhugiri 765 kV S/c line (TBCB)

Status of other Transmission System associated with LTA customers

Sl. LTA Applicant Transmission System Comm. schedule Comm. schedule Remarks
No (276th JCC) (287th JCC)
1 Neyveli Lignite  LILO of Neyveli – Pondicherry at NNTPS Commissioned Commissioned
Corporation Limited
(Replacement)  NNTPS switchyard –Ariyalur (Villupuram) Sept’19 Sept’19
400kV D/c line
Ariyalur (Villupuram) 400kV S/S 2x500 MVA Sept’19 Sept’19 Under
TANTRANSCO
scope
2 Andhra Pradesh Solar Phase-I (250 MW)
Power Corporation Pvt Establishment of 3x500 MVA, 400/220KV Commissioned Commissioned
Ltd Substation at NP Kunta Pooling Station
LILO of 400KV Kadapa(Cuddapah) - Kolar S/c
line at NP Kunta Pooling Station
2 nos. 220kV line bays at NP Kunta Pooling
Station
1x125 MVAR Bus Reactor at NP Kunta
Pooling Station
±100 MVAR STATCOM at 400kV NP Kunta
Pooling Station
Phase-II (750 MW)
LILO of Kadapa(Cuddapah) – Hindupur 400kV Commissioned Commissioned
D/c (Quad) line at NP Kunta Pooling Station
6 nos. 220kV line bays at NP Kunta Pooling
Station
Phase-III(500 MW)
Augmentation of transformation capacity at NP
Kunta station with 4th, 1x500 MVA, 400/220kV
transformer
4 nos. 220kV line bays at NP Kunta Pooling
Station

Page 24 of 30
Minutes Agendaof 287th JCC Meeting of generation projects granted LTA in SR
Sl. LTA Applicant Transmission System Comm. schedule Comm. schedule Remarks
No (276th JCC) (287th JCC)
3 Karnataka Solar Power Phase-I (1000 MW)
Development a.Tumkur (Pavagada) Pooling station-Hiriyur
Corporation Limited 400 kV D/c (as part of Tumkur(Pavagada)
Pooling station – Mysore line)
b.LILO of 400kV Bellary Pool – Tumkur
(Vasantnarsapur) D/c (Quad)(both circuits) Commissioned Commissioned
[KPTCL line] at Tumkur Pooling station*
c.Augmentation of 2x500 MVA, 400/220 kV
transformer at Tumkur (Pavagada) Pooling
station
*KPTCL would complete Bellary pooling station –Tumkur
(Vasantnarsapur) line D/c(Quad) by December- 2016

Page 25 of 30
Minutes Agendaof 287th JCC Meeting of generation projects granted LTA in SR
Sl. LTA Applicant Transmission System Comm. schedule Comm. schedule Remarks
No (276th JCC) (287th JCC)
Phase-II (1000 MW)
a.Hiriyur – Mysore 400 kV D/c line $ Sept’19 Sept’19
b. Fixed series capacitor (40%) on Sept’19
400kV Tumkur (Pavagada) - Tumkur Sept’19
(Vasantnarsapura) D/c (Quad) line at
Tumkur(Pavagada) PS end 1st ICT
st
c.Augmentation of 2x500 MVA, 400/220KV 1 ICT commissioned commissioned in
transformer at Tumkur (Pavagada) Pooling in Mar’19 & 2nd in Mar’19 & 2nd in
station Apr’19 Apr’19
d.1x125MVAR bus reactor (2nd) at Tumkur
(Pavagada) Pooling Station May’19
e.Third 400/220 kV, 1x500 MVA transformer at May’19
Tumkur (Vasantnarsapur) May’19
f.1x80 MVAR switchable Line reactor at Commissioned
Mysore end of Hiriyur- Mysore D/c line for (June’19) Sept’19
each circuit May’19

$ (after completion of this line, one circuit of this line Sept’19


would be connected with one ckt of Tumkur –Hiriyur line
so as to makeTumkur-Mysore direct line) Dec’19
**For additional ATS for Tumkur(Pavagada): 400kV
Tumkur (Pavagada) – Devanhalli D/c (Quad) line with
some portion on multi-circuit towers was agreed.

Dec’19

Dec’19
4 Mytrah Energy(India) Ltd Establishment of 2x500 MVA, 400/230 kV
(GIS) S/s at Tirunelveli Pooling Station.
Tirunelveli pooling station-Tuticorin pooling
Commissioned Commissioned
station 400 kV 2xD/c (Quad) lines
2x125 MVAR Bus Reactors at 400kV
Tirunelveli Pooling Station

Page 26 of 30
Minutes Agendaof 287th JCC Meeting of generation projects granted LTA in SR

Annexure-I

List of Participants in the 27th Joint Co-ordination Committee meeting of Generation projects granted LTA in SR held on 25.06.2019

Sl. No. Name Designation Organization E-mail


1. Shri G Bhimsha CEO Karnataka Solar Power Development ceokspdcl@gmail.com
Corporation Limited
2. Shri Sachidanand Bhujade Consultant Shapoorji Pallonji Infrastructure sibhujade@gmail.com
3. Shri Pradeep Kumar DGM Suzlon Energy Pvt. Ltd. p.kumar@suzlon.com
4. Shri Purnendu Kumar GM S B Energy purnendu@sbenergy.com
Choubey
5. Shri Thyagaranjan.s DGM Sprng Energy Pvt.Ltd thyagaranjan.s@sprngenergy.com
6. Shri S. Vinod AVP Renew Power Ltd vinod@renewpower.in
7. Shri K.A. Vishwanath Sr. Manager Renew Power Ltd k.vishwanath@renewpower.in
8. Shri P.Tamilselvan Chief Manager NLC India Ltd. tamilselvan.p@nlcindia.in
9. Shri Peeyush Razdan DGM Sindphal Power peeyushrazdan@hotmail.com
10. Shri P.Sunil Kumar Manager Sindphal Power sunil.kumar@vwinfrastrukture.com
11. Shri Monil Mathure DGM Sindphal Power Monil.m@yahoo.com

Page 27 of 30
Minutes Agendaof 287th JCC Meeting of generation projects granted LTA in SR
Sl. No. Name Designation Organization E-mail
12. Shri M.Krishna Kumar Sr. Advisor Sindhpal Power mmkkpgrid@gmail.com
13. Shri Ankush Rao Dhane AGM Orange Sironj Wind Power Pvt. Ltd. ankushraodhane@orangerenewable.net
14. Shri Manu Shukla Manager Betam Wind Energy Pvt. Ltd. Manu.shukla@engie.com
15. Shri Swapnil Bhardwaj Business Developer Betam Wind Energy Pvt. Ltd. Swapnil.bhardwaj@engie.com
16. Shri J.S. Gulati Sr. Advisor Ecoren Energy jsgulati@gmail.com
17. Shri Mukesh Khanna CGM (CTU-Plg.) Power Grid Corporation of India Ltd. mkhanna@powergridindia.com
18. Shri Vikash Narwal Sr. DGM (CMG) Power Grid Corporation of India Ltd. vikas@powergridindia.com
19. Dr. V.N. Paranjape Sr. DGM (CTU-Plg) Power Grid Corporation of India Ltd vnparanjape@powergridindia.com
20. Smt. Jyoti Prasad GM (CTU-Plg.) Power Grid Corporation of India Ltd. nishantjyoti@yahoo.com
21. Shri Anil Kumar Meena DGM (CTU-Plg.) Power Grid Corporation of India Ltd. anilsehra@powergridindia.com
22. Shri Parijat Mgr (BDD) Power Grid Corporation of India Ltd. p.parijat@powergridindia.com
23. Shri Ajay Dahiya Mgr (CTU-Plg) Power Grid Corporation of India Ltd ajay.dahiya@powergridindia.com
24. Shri Swapnil Verma Dy. Mgr (Law) Power Grid Corporation of India Ltd swapnilverma@powergridindia.com
25. Shri Ankush Patel Dy. Mgr (CTU-Plg) Power Grid Corporation of India Ltd. ankush.patel@powergridindia.com
26. Shri Ranjeet Singh Rajput ET(CTU-Plg.) Power Grid Corporation of India Ltd ranjetrajput@powergridindia.com

Page 28 of 30
Minutes Agendaof 287th JCC Meeting of generation projects granted LTA in SR

Annexure-II
Stage - II Status Report on CTU Monitoring Portal (as per information filled by applicants*)
Quant
Date of No. of Land
um of S/s at 1st Phase No. of Stringing Land
grant of Status of Last Phase Route Tower Acquired Date of award
Applicant Stage- which commissi Section Foundations (ckm) Status of Date of FC Required for Status of Main
App No Stage-II Connection commission survey for Erections for of Pooling
Name II Stage-II oning 68 (Total/Compl (Total/Co Financial closure (Date/Target) generation Transformers
connectivit Agreement ing date DTL (Total/Comp generation Station
grante granted Date eted) mpleted) (Acres)
y leted) (Acres)
d
Orange Connection
Sironj Agreement
120000
Wind executed
1274
Power 400/230kV on 7-Mar- Commissioned
Pvt. Ltd. 200 Tuticorin-II 13-Jul-2018 21.02.2019 2019 14-Apr-2019 Completed Obtained 101/101 101/101 101/101 Achieved 1-Mar-2018 472.61 472.61 22-Nov-2017 on 23.02.2019

Sprng
120000 Renewab 400/230kV
1434 le Energy Existing
Private Pugalur To be 30-Nov- Sanction Letter
Limited 300 Substation 13-Jul-2018 signed 2019 31-Jan-2020 Completed Obtained 116/44 116/26 116/26 received from REC 25-Apr-2019 600 348 27-Dec-2018 Order placed
Shapoorji Sanction from
Pallonji IREDA obtaining
Infrastruc for part financing
120000 ture for the project.
1607 Capital Shall be However, FC
Company executed Shall be Shall be Shall be compliance as per
Private after grant 1-Oct- provided provided provided PPA submitted to
Limited 250 Tuticorin II 8-Oct-2018 of LTOA 2020 1-Oct-2020 Completed Obtained later later later SECI. 16-Aug-2019 1100 330 11-Nov-2019 Not awarded

120000 Renew Detailed


1733 Power Yet to be 25-Sep- Not engineering in
Limited 300 Hiriyur SS 7-Jan-2019 signed 2020 25-Sep-2020 Completed Applied Nil Nil Nil Under Process 30-Aug-2019 500 112 15-May-2019 progress

Shapoorji
Pallonji
Infrastruc
120000 ture
1740 Capital Shall be
Company executed Shall be Shall be Shall be Under progress. As
Private 17-Jan- after grant 15-Dec- provided provided provided per PPA, FC date is
Limited 250 Tuticorin II 2019 of LTOA 2020 15-Dec-2020 Completed Obtained later later later 19th Mar 2020. 19-Mar-2020 1100 49 15-Jan-2020 Not awarded

Shapoorji
Pallonji
Infrastruc
120000 ture
1741 Capital Shall be Under progress. As
Company executed Shall be Shall be Shall be per PPA, FC to be
Private 17-Jan- after grant 15-Dec- Not Not provided provided provided obtained by 19th
Limited 250 N P Kunta 2019 of LTOA 2020 15-Dec-2020 Completed Applied later later later Mar 2020 19-Mar-2020 1100 0 15-Jan-2020 Not awarded

Page 29 of 30
Minutes Agendaof 287th JCC Meeting of generation projects granted LTA in SR
Quant
Date of No. of Land
um of S/s at 1st Phase No. of Stringing Land
grant of Status of Last Phase Route Tower Acquired Date of award
Applicant Stage- which commissi Section Foundations (ckm) Status of Date of FC Required for Status of Main
App No Stage-II Connection commission survey for Erections for of Pooling
Name II Stage-II oning 68 (Total/Compl (Total/Co Financial closure (Date/Target) generation Transformers
connectivit Agreement ing date DTL (Total/Comp generation Station
grante granted Date eted) mpleted) (Acres)
y leted) (Acres)
d

Ecoren
120000 Energy
1773 India
Private Hiriyur 12-Mar- 22-Jul- Not
Limited 175 PGCIL SS 2019 yet to sign 2020 22-Jul-2020 Completed Applied 324 0 0 In-progress 22-Aug-2019

Connection
Agreement
will be Financial Closure 2 x 33/220 kV
120000 Sindphal signed at will be achieved by Main
2004 Power the time on 28th Feb 2020 as transformers,
Develop Palakkad Start of the per the CERC Contract for
ment (exisiting) constructio Procedure for material supply
Private PGCIL 29-May- n activities 31-Oct- Grant of given 20th Sep
Limited 276 Substation 2019 on ground 2020 30-Apr-2021 Completed Applied 86/0 86/0 86/0 Connectivity 28-Feb-2020 460 acres 230 acres 20-Sep-2018 2018.

Page 30 of 30