Professional Documents
Culture Documents
Ep Block
Ep Block
15002066
4 Design FMEA R R S * R N
5 Process Flow Diagram R R S * R Y
6 Process FMEA R R S * R Y
7 Dimensional Results R S S * R N
8A Material Test Results # R S S * R Y
8B Performance Test Results R S S * R Y
9 Initial Process Study R R S * R N
10 Measurement System Analysis Study R R S * R N
11 Qualified Laboratory Documentation R S S * R N
12 Control Plan R R S * R Y
13 Part Submission Warrant (PSW) S S S S S Y
Appearance Approval Report (AAR)
14 S S S S N
if applicable *
Bulk Material Requirements Checklist
15 R R R * R N
(for bulk material PPAP only)
16 Sample Product (Qty. as asked by Cust) R S S * R Y
17 Master Sample (02 sets) R R R * R N
18 Checking Aids R R R * R Y
Records of Compliance
19 With Customer-Specific R R S * R N
Requirements
LEGENDS R = Retain REMARKS: - A copy of PPAP & master samples shall be retained with supplier
S = Submit to Customer - for Plastic material, Test Certificate from Supplier or Photograph of bag giving Name and Batch Code details shall be provided
* = Submit to Customer on request
QA-F0218-01 REV:01 DATE: 19/07/19
PROCESS FLOW DIAGRAM
PART NO. 15002066 SUPPLIER NAME: M/s. J.P. Enterprises DOC NO:-QA-F0212 PFD.NO:-LIL-PFD-BDC-15002066
ISSUED BY NAME & SIGN. OF SQR NAME & SIGN. OF SPOC PRODUCTION ENGINEERING
COMPONENTS PARTS SOURCING LIST
10 S.NO. DRG. NO. PART NAME MATERIAL SOURCE SUB-SUPPLIER NAME
RM Incoming & Inspection
BOP IN
1 15002066 EP BLOCK FOAM Paramount
20
RM Storage
30
Cutting (Hydraulic Machine)
30
40 Paper Guming
50
Final Inspection
60 Packing
70
Storage
& Despatch
PROCESSING QUALITY INSPECTION CHANGE DESCRIPTION CHANGE ISSUE NO. ISSUE DATE ISSUED BY APPROVED BY
LEVEL
STORAGE /
DISPATCH PROCESS ORDER
CONTROL PLAN
SUPPLIER NAME M/s. J.P.Enterprises APPROVED BY (SPOC) CHECKED BY (SQR) PREPARED BY
LUMAX
PANT NAGAR
INDUSTRIES
SUPPLIER CODE 502003 JAI PAL RAHUL SINGH SHUBHAM SINGH
PART NAME EP BLOCK PERSON IN CHARGE RAHUL SINGH DRAWING NO. DOC.NO:- QA-F0214
REV.NO:- 01
PART NO 15002066 CORE TEAM Mr.Rahul Singh,Mr.Shubham Singh,Mr,satbir CONTROL PLAN NO:-LIL-CP-BDC-15002066 DATE:-07.01.2020
//PROTOTTPE //PRELAUNCH// PRODUCTION// :
100% By Operator
Appearance No cut grip ,folded or old bag Allow Visual
Operator / 5 Times
Packing 60 Engineer-
Quality 100% By Operator
Quantity 200 parts per polybag/polyBag Visual
5 Times
Each Parts should be kept at own Supervisor
Appearance Visual Store Incharge
location Store
Quantity should be verified by
Storage of Finished Supervisor
70 Quantity Despatch Supervisor before Counting Store Incharge
Goods and Despatch Despatch
Despatch.
Supervisor
Packing Packing of Part should be OK Visual Store Incharge
Despatch
Prepared by:- Approved By:- -165-
Dt. Of Origin 7/1/2020
PREPARED BY : APPROVED BY :
J.P. ENTERPRISES FORMAT NO:-QA-F1001
REV NO:-00
SAMPLE INSPECTION REPORT DATE:-07.01.2020
PART NO.:-15002066
SPECIFICATIO
S.NO PARAMETER 1 2 3 4 5 OK / NOT REMARKS
N
1 Length 70± 5 mm
2 width 70± 5 mm
3 Thk. 15±0.5mm
5 colour WHITE
6 material FOAM
prep.by appROVEd.by