Professional Documents
Culture Documents
HARGA SATUAN
NO. U R A I A N SATUAN
( Rp )
1 2 3 4
A. BAHAN PENGISI
B. BAHAN KAYU
1 Papan Klas III M3 3,750,000.00
2 Papan Kayu klas I tbl. 1.8 cm M3 7,900,000.00
3 Papan Kayu klas II M3 5,700,000.00
4 Kayu Klas II uk. 3/5 - 4/6 M3 4,800,000.00
5 Papan lap Uk. 1/7 M' 12,000.00
6 Kayu Klas II uk. 6/12 - 8/12 M3 5,300,000.00
7 Kayu Klas I Uk. 8/8 cm ketam M3 7,600,000.00
8 Kayu Belian Tidak Ketam 9/9 cm M3 9,850,000.00
C. BAHAN BESI
1 Kawat Semen Kg 36,000.00
2 Kawat ikat beton Kg 41,000.00
3 Besi beton Kg 22,500.00
4 Paku Campuran Kg 32,500.00
5 Paku Spandek Kg 42,500.00
6 Paku Genteng Metal Kg 44,000.00
HARGA SATUAN
NO. U R A I A N SATUAN
( Rp )
1 2 3 4
E. BAHAN ATAP
Dibuat Oleh,
Tim Teknis / Fasilitator
Wilayah IV
DISINDRA DISA, ST
Team Leader
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
A. PEKERJAAN TANAH
1. 1 M3 Galian tanah biasa sedalam 1 meter ( SNI - 4 - 9 )
HARGA BIAYA
NO. U R A I A N SATUAN KUANTITAS
SATUAN (RP) SATUAN (Rp.)
A TENAGA KERJA
1 Pekerja Hari/Orang 0.400 80,000.00 32,000.00
2. Tukang Hari/Orang - 100,000.00 -
3. Kepala Tukang - - 150,000.00 -
4. Mandor Hari/Orang 0.040 100,000.00 4,000.00
Jumlah 36,000.00
B Bahan
1. Tanah Urug M3 1.200 85,000.00 102,000.00
Jumlah 102,000.00
C Jumlah A + B 127,000.00
B. PEKERJAAN PASANGAN BATU
1. 1 M3 Pasang pondasi batu kali 1 Pc : 3 Ps ( SNI - C. 6. 4 )
HARGA BIAYA
NO. U R A I A N SATUAN KUANTITAS
SATUAN (RP) SATUAN (Rp.)
A TENAGA KERJA
1 Pekerja Hari / orang 1.500 80,000.00 120,000.00
2 Tukang Batu Hari / orang 0.600 100,000.00 60,000.00
3 Kepala Tukang Hari / orang 0.060 150,000.00 9,000.00
4 Mandor Hari / orang 0.075 100,000.00 7,500.00
Jumlah 196,500.00
B BAHAN
1 Batu Belah 10/15 cm M3 1.100 350,000.00 385,000.00
2 Semen Portland Kg 202.000 2,300.00 464,600.00
3 Pasir Pasang M3 0.485 200,000.00 97,000.00
Jumlah 946,600.00
C Jumlah A + B 1,143,100.00
HARGA BIAYA
NO. U R A I A N SATUAN KUANTITAS
SATUAN (RP) SATUAN (Rp.)
A TENAGA KERJA
1 Kepala Tukang Hari/ Orang 0.0007 150,000.00 105.00
2 Pekerja Hari/ Orang 0.0070 80,000.00 560.00
3 Tukang Besi Hari/ Orang 0.0070 100,000.00 700.00
4 Mandor Hari/ Orang 0.0003 100,000.00 30.00
Jumlah 1,395.00
faktor koreksi Upah x 0.60 837.00
B BAHAN
1 Besi Beton M3 1.0500 22,500.00 23,625.00
2 Kawat Ikat Beton M3 0.0150 41,000.00 615.00
Jumlah 24,240.00
C Jumlah A + B 25,077.00
HARGA BIAYA
NO. U R A I A N SATUAN KUANTITAS
SATUAN (RP) SATUAN (Rp.)
Cor Beton 1 : 3 : 5 M3 1.0000 1,100,400.00 1,100,400.00
Pembesian Kg 25.0000 25,077.00 626,925.00
Papan mal klas III M3 0.1144 3,750,000.00 429,000.00
Paku Campuran Kg 0.1000 32,500.00 3,250.00
Jumlah 2,159,575.00
HARGA BIAYA
NO. U R A I A N SATUAN KUANTITAS
SATUAN (RP) SATUAN (Rp.)
A TENAGA KERJA
1 Pekerja Hari/Orang 1.650 80,000.00 132,000.00
2 Tukang Batu Hari/Orang 0.250 100,000.00 25,000.00
3. Kepala Tukang Hari/Orang 0.025 150,000.00 3,750.00
4. Mandor Hari/Orang 0.080 100,000.00 8,000.00
Jumlah 168,750.00
B BAHAN
1 Semen Portland Kg 218.000 2,300.00 501,400.00
2 Pasir Pasang M3 0.520 200,000.00 104,000.00
3 Batu / split 3/5 M3 0.870 375,000.00 326,250.00
Jumlah 931,650.00
C Jumlah A + B 1,100,400.00
C Jumlah A + B 52,954.00
HARGA BIAYA
NO. U R A I A N SATUAN KUANTITAS
SATUAN (RP) SATUAN (Rp.)
HARGA BIAYA
NO. U R A I A N SATUAN KUANTITAS
SATUAN (RP) SATUAN (Rp.)
A TENAGA KERJA
1 Pekerja Hari/Orang 0.2700 80,000.00 21,600.00
2 Tukang Batu Hari/Orang 0.1280 100,000.00 12,800.00
3. Kepala Tukang Hari/Orang 0.0140 150,000.00 2,100.00
4. Mandor Hari/Orang 0.0160 100,000.00 1,600.00
Jumlah 38,100.00
B BAHAN
1. Semen Portland Kg 11.5000 2,300.00 26,450.00
2. Pasir Pasang M3 0.0200 200,000.00 4,000.00
3. Batako uk. 7 x 20 x 40 cm Buah 12.5000 3,800.00 47,500.00
Jumlah 77,950.00
C Jumlah A + B 116,050.00
HARGA BIAYA
NO. U R A I A N SATUAN KUANTITAS
SATUAN (RP) SATUAN (Rp.)
A TENAGA KERJA
1 Pekerja Hari / orang 0.4000 80,000.00 32,000.00
2 Tukang Semen Hari / orang 0.2000 105,000.00 21,000.00
3 Kepala Tukang Hari / orang 0.0200 150,000.00 3,000.00
4 Mandor Hari / orang 0.0200 100,000.00 2,000.00
Jumlah 58,000.00
faktor koreksi Upah x 1.00 58,000.00
B BAHAN
1 Semen Portland Zak 0.1630 115,000.00 18,745.00
2 Pasir Pasang M3 0.0194 200,000.00 3,880.00
3 Kawat Semen Kg 0.4000 36,000.00 14,400.00
4 Papan Kayu Klas III M3 0.0120 3,750,000.00 45,000.00
5 Paku Campuran Kg 0.1000 32,500.00 3,250.00
Jumlah 85,275.00
C Jumlah A + B 143,275.00
HARGA BIAYA
NO. U R A I A N SATUAN KUANTITAS
SATUAN (RP) SATUAN (Rp.)
A TENAGA KERJA
1 Pekerja Hari/Orang 0.6200 80,000.00 49,600.00
2 Tukang Batu Hari/Orang 0.3500 100,000.00 35,000.00
3. Kepala Tukang Hari/Orang 0.0350 150,000.00 5,250.00
4. Mandor Hari/Orang 0.0300 100,000.00 3,000.00
Jumlah 92,850.00
B BAHAN
1 Keramik ukuran 40 x 40 cm Bh 6.2500 14,000.00 87,500.00
2 Pasir Pasang M3 0.0420 200,000.00 8,400.00
3 Semen Portland Kg 11.3800 2,300.00 26,174.00
4 Semen Pengisi nat Keramik Kg 0.2000 2,300.00 460.00
Jumlah 122,534.00
C Jumlah A + B 215,384.00
HARGA BIAYA
NO. U R A I A N SATUAN KUANTITAS
SATUAN (RP) SATUAN (Rp.)
A TENAGA KERJA
1 Pekerja Hari/Orang 0.6200 80,000.00 49,600.00
2 Tukang Batu Hari/Orang 0.3500 100,000.00 35,000.00
3. Kepala Tukang Hari/Orang 0.0350 150,000.00 5,250.00
4. Mandor Hari/Orang 0.0300 100,000.00 3,000.00
Jumlah 92,850.00
B BAHAN
1 Keramik ukuran 20 x 20 cm M2 25.0000 3,600.00 90,000.00
2 Pasir Pasang M3 0.0420 200,000.00 8,400.00
3 Semen Portland Kg 11.3800 2,300.00 26,174.00
4 Semen Pengisi nat Keramik Kg 0.2000 2,300.00 460.00
Jumlah 125,034.00
C Jumlah A + B 217,884.00
HARGA BIAYA
NO. U R A I A N SATUAN KUANTITAS
SATUAN (RP) SATUAN (Rp.)
A TENAGA KERJA
1 Pekerja Hari/Orang 0.6200 80,000.00 49,600.00
2 Tukang Batu Hari/Orang 0.3500 100,000.00 35,000.00
3. Kepala Tukang Hari/Orang 0.0350 150,000.00 5,250.00
4. Mandor Hari/Orang 0.0300 100,000.00 3,000.00
Jumlah 92,850.00
B BAHAN
1 Keramik ukuran 20 x 25 cm Bh 20.0000 4,200.00 84,000.00
2 Pasir Pasang M3 0.0420 200,000.00 8,400.00
3 Semen Portland Kg 11.3800 2,300.00 26,174.00
4 Semen Pengisi nat Keramik Kg 0.2000 2,300.00 460.00
Jumlah 119,034.00
C Jumlah A + B 211,884.00
C. PEKERJAAN KAYU
1. Keep Kayu belian ( BOW - F.3 )
HARGA BIAYA
NO. U R A I A N SATUAN KUANTITAS
SATUAN (RP) SATUAN (Rp.)
A TENAGA KERJA
1 Pekerja Hari/Orang 0.4000 80,000.00 32,000.00
2 Tukang Kayu Hari/Orang 12.0000 105,000.00 1,260,000.00
3. Kepala Tukang Hari/Orang 1.2000 150,000.00 180,000.00
4. Mandor Hari/Orang 0.2000 100,000.00 20,000.00
Jumlah 1,492,000.00
Faktor Koreksi Upah x 0.50 746,000.00
B BAHAN
1 Kayu Belian Tidak Ketam 9/9 cm M3 1.0500 9,850,000.00 10,342,500.00
2 Paku Campuran Kg 3.0000 32,500.00 97,500.00
Jumlah 10,440,000.00
C Jumlah A + B 11,186,000.00
HARGA BIAYA
NO. U R A I A N SATUAN KUANTITAS
SATUAN (RP) SATUAN (Rp.)
A TENAGA KERJA
1 Pekerja Hari/Orang 12.000 80,000.00 960,000.00
2 Tukang Kayu Hari/Orang 36.000 105,000.00 3,780,000.00
3 Kepala Tukang Hari/Orang 3.600 150,000.00 540,000.00
4 Mandor Hari/Orang 0.600 100,000.00 60,000.00
Jumlah 5,340,000.00
Faktor Koreksi Upah x 0.70 3,738,000.00
B BAHAN
1 Kayu Klas I 7/7 cm Ketam M3 1.100 7,600,000.00 8,360,000.00
2. Paku Campuran Kg 6.000 32,500.00 195,000.00
Jumlah 8,555,000.00
C Jumlah A + B 12,293,000.00
3. 1 M3 Pasang Konstruksi Kuda - kuda kayu klas II ( SNI - F.6.27 )
HARGA BIAYA
NO. U R A I A N SATUAN KUANTITAS
SATUAN (RP) SATUAN (Rp.)
A TENAGA KERJA
1 Pekerja Hari / orang 4.000 80,000.00 320,000.00
2 Tukang Kayu Hari / orang 12.000 105,000.00 1,260,000.00
3 Kepala Tukang Hari / orang 1.200 150,000.00 180,000.00
4 Mandor Hari / orang 0.200 100,000.00 20,000.00
Jumlah 1,780,000.00
B BAHAN
1 Kayu Klas II uk. 6/12 - 8/12 M3 1.100 5,300,000.00 5,830,000.00
2. Besi Strip Kg 15.000 30,000.00 450,000.00
3. Paku Campuran Kg 0.800 32,500.00 26,000.00
Jumlah 6,306,000.00
C Jumlah A + B 8,086,000.00
HARGA BIAYA
NO. U R A I A N SATUAN KUANTITAS
SATUAN (RP) SATUAN (Rp.)
A TENAGA KERJA
1 Pekerja Hari/Orang 5.0000 80,000.00 400,000.00
2 Tukang Kayu Hari/Orang 15.0000 105,000.00 1,575,000.00
3 Kepala Tukang Hari/Orang 1.5000 150,000.00 225,000.00
4 Mandor Hari/Orang 0.2500 100,000.00 25,000.00
Jumlah 2,225,000.00
faktor koreksi Upah x 0.75 1,668,750.00
B BAHAN
1 Kayu Klas II uk. 6/12 - 8/12 M3 1.1000 5,300,000.00 5,830,000.00
2 Paku Campuran Kg 0.2000 32,500.00 6,500.00
Jumlah 5,836,500.00
C Jumlah A + B 7,505,250.00
HARGA BIAYA
NO. U R A I A N SATUAN KUANTITAS
SATUAN (RP) SATUAN (Rp.)
A TENAGA KERJA
1 Pekerja Hari/Orang 0.1400 80,000.00 11,200.00
2 Mandor Hari/Orang 0.0700 100,000.00 7,000.00
3 Tukang Kayu Hari/Orang 0.4000 105,000.00 42,000.00
4 Kepala Tukang Hari/Orang 0.0400 150,000.00 6,000.00
Jumlah 66,200.00
faktor koreksi Upah x 0.60 39,720.00
B BAHAN
1. Kayu Klas II M3 0.0110 4,800,000.00 52,800.00
2. Kalsiboard / GRC Lembar 0.4000 96,000.00 38,400.00
3. Paku Campuran Kg 0.2000 32,500.00 6,500.00
Jumlah 97,700.00
C Jumlah A + B 137,420.00
HARGA BIAYA
NO. U R A I A N SATUAN KUANTITAS
SATUAN (RP) SATUAN (Rp.)
A TENAGA KERJA
1 Pekerja Hari/Orang 0.021 80,000.00 1,680.00
2 Mandor Hari/Orang 0.001 100,000.00 100.00
3 Tukang Kayu Hari/Orang 0.021 105,000.00 2,205.00
4 Kepala Tukang Hari/Orang 0.002 150,000.00 300.00
Jumlah 4,285.00
B BAHAN
1 Kayu list Profile M' 1.050 12,000.00 12,600.00
Jumlah 12,600.00
C Jumlah A + B 16,885.00
HARGA BIAYA
NO. U R A I A N SATUAN KUANTITAS
SATUAN (RP) SATUAN (Rp.)
A TENAGA KERJA
1 Pekerja Hari / orang 0.1400 80,000.00 11,200.00
2 Tukang kayu Hari / orang 0.4000 105,000.00 42,000.00
3 Kepala Tukang Hari / orang 0.0400 150,000.00 6,000.00
4 Mandor Hari / orang 0.0070 100,000.00 700.00
Jumlah 59,900.00
B BAHAN
1 Papan Kayu klas I M3 0.0250 7,900,000.00 197,500.00
2 Paku Campuran Kg 0.1000 32,500.00 3,250.00
Jumlah 200,750.00
C Jumlah A + B 260,650.00
C Jumlah A + B 239,025.00
HARGA BIAYA
NO. U R A I A N SATUAN KUANTITAS
SATUAN (RP) SATUAN (Rp.)
A TENAGA KERJA
1 Pekerja Hari / orang 0.100 80,000.00 8,000.00
2 Tukang kayu Hari / orang 0.100 105,000.00 10,500.00
3 Kepala Tukang Hari / orang 0.010 150,000.00 1,500.00
4 Mandor Hari / orang 0.005 100,000.00 500.00
Jumlah 20,500.00
B BAHAN
1 Kayu Klas II uk. 3/5 - 4/6 M3 0.013 4,800,000.00 62,400.00
2 Paku campuran Kg 0.150 32,500.00 4,875.00
Jumlah 67,275.00
C Jumlah A + B 87,775.00
D. PEKERJAAN ATAP
1. M2 Atap Spandek 0.25 Colour
HARGA BIAYA
NO. U R A I A N SATUAN KUANTITAS
SATUAN (RP) SATUAN (Rp.)
A TENAGA KERJA
1 Pekerja Hari / orang 0.2000 80,000.00 16,000.00
2. Kepala Tukang Hari / orang 0.0100 150,000.00 1,500.00
3. Tukang Kayu Hari / orang 0.1000 105,000.00 10,500.00
4. Mandor Hari / orang 0.0100 100,000.00 1,000.00
Jumlah 29,000.00
B BAHAN
1 Atap Spandek 0.25 Colour M2 1.1000 82,500.00 90,750.00
2 Paku Spandek Kg 0.1000 42,500.00 4,250.00
Jumlah 95,000.00
C Jumlah A + B 124,000.00
HARGA BIAYA
NO. U R A I A N SATUAN KUANTITAS
SATUAN (RP) SATUAN (Rp.)
A TENAGA KERJA
1 Pekerja Hari / orang 0.2500 80,000.00 20,000.00
2 Tukang kayu Hari / orang 0.2500 105,000.00 26,250.00
3. Kepala Tukang Hari / orang 0.0250 150,000.00 3,750.00
Jumlah 50,000.00
B BAHAN
1 Plat Spandek 0.25 Colour M' 3.5000 85,000.00 297,500.00
2. Papan kayu klas II M3 0.0720 5,700,000.00 410,400.00
3. Paku Campuran Kg 0.1000 32,500.00 3,250.00
Jumlah 711,150.00
C Jumlah A + B 761,150.00
Harga satuan 1 M' 76,115.00
HARGA BIAYA
NO. U R A I A N SATUAN KUANTITAS
SATUAN (RP) SATUAN (Rp.)
A TENAGA KERJA
1 Pekerja Hari / orang 0.2000 80,000.00 16,000.00
2. Kepala Tukang Hari / orang 0.0100 150,000.00 1,500.00
3. Tukang Kayu Hari / orang 0.1000 105,000.00 10,500.00
4. Mandor Hari / orang 0.0100 100,000.00 1,000.00
Jumlah 29,000.00
faktor koreksi Upah x 0.75 21,750.00
B BAHAN
1 Atap Genteng Metal SWG 025 M2 1.6200 62,000.00 100,440.00
2 Paku Genteng Metal Kg 0.1000 44,000.00 4,400.00
Jumlah 104,840.00
C Jumlah A + B 126,590.00
HARGA BIAYA
NO. U R A I A N SATUAN KUANTITAS
SATUAN (RP) SATUAN (Rp.)
A TENAGA KERJA
1 Pekerja Hari / orang 0.2500 80,000.00 20,000.00
2 Tukang kayu Hari / orang 0.2500 105,000.00 26,250.00
3. Kepala Tukang Hari / orang 0.0250 150,000.00 3,750.00
Jumlah 50,000.00
B BAHAN
1 Seng Plat BJLS 0.25 M' 3.5000 55,000.00 192,500.00
2. Papan kayu klas II M3 0.0720 5,700,000.00 410,400.00
3. Paku Campuran Kg 0.1000 32,500.00 3,250.00
Jumlah 606,150.00
C Jumlah A + B 656,150.00
Harga satuan 1 M' 65,615.00
E. PEKERJAAN PENGECATAN
1. 10 M2 Pekerjaan Mendempul& 1 x cat dasar ( 1,5 K 2 + K 23 + K 30 )
HARGA BIAYA
NO. U R A I A N SATUAN KUANTITAS
SATUAN (RP) SATUAN (Rp.)
A TENAGA KERJA
1 Pekerja Hari / orang 0.5000 80,000.00 40,000.00
2 Tukang cat Hari / orang 0.7500 100,000.00 75,000.00
3 Kepala Tukang Hari / orang 0.0750 150,000.00 11,250.00
4 Mandor Hari / orang 0.0250 100,000.00 2,500.00
Jumlah 128,750.00
B BAHAN
1. Cat Dasar Kg 2.2500 49,500.00 111,375.00
2. Dempul Kg 0.8000 39,000.00 31,200.00
3. Minyak Cat Liter 0.5000 29,500.00 14,750.00
4. Amplas Kayu Lembar 2.0000 4,200.00 8,400.00
Jumlah 165,725.00
C Jumlah A + B 294,475.00
Harga satuan 1 M2 29,447.50
HARGA BIAYA
NO. U R A I A N SATUAN KUANTITAS
SATUAN (RP) SATUAN (Rp.)
A TENAGA KERJA
1 Pekerja Hari / orang 0.5000 80,000.00 40,000.00
2 Tukang Cat Hari / orang 0.7000 100,000.00 70,000.00
3 Kepala Tukang Hari / orang 0.0750 150,000.00 11,250.00
4 Mandor Hari / orang 0.0250 100,000.00 2,500.00
Jumlah 123,750.00
B BAHAN
1. Cat Kilat Kg 2.6000 65,000.00 169,000.00
2. Minyak cat Liter 0.5000 29,500.00 14,750.00
3. Amplas Kayu Lembar 1.0000 4,200.00 4,200.00
Jumlah 187,950.00
C Jumlah A + B 311,700.00
Harga Satuan 1 M2 31,170.00
HARGA BIAYA
NO. U R A I A N SATUAN KUANTITAS
SATUAN (RP) SATUAN (Rp.)
A TENAGA KERJA
1 Pekerja Hari / orang 0.5000 80,000.00 40,000.00
2 Tukang Cat Hari / orang 0.7500 100,000.00 75,000.00
3 Kepala Tukang Hari / orang 0.0750 150,000.00 11,250.00
4 Mandor Hari / orang 0.0250 100,000.00 2,500.00
Jumlah 128,750.00
B BAHAN
1. Plamur Kg 0.8000 38,000.00 30,400.00
2. Amplas kayu Lembar 2.0000 4,200.00 8,400.00
Jumlah 38,800.00
C Jumlah A + B 167,550.00
Harga Satuan 1 M2 16,755.00
HARGA BIAYA
NO. U R A I A N SATUAN KUANTITAS
SATUAN (RP) SATUAN (Rp.)
A TENAGA KERJA
1 Pekerja Hari / orang 0.5000 80,000.00 40,000.00
2 Tukang cat Hari / orang 0.7500 100,000.00 75,000.00
3 Kepala Tukang Hari / orang 0.0750 150,000.00 11,250.00
4 Mandor Hari / orang 0.0250 100,000.00 2,500.00
Jumlah 128,750.00
B BAHAN
1. Cat tembok Kg 2.6000 14,550.00 37,830.00
2. Amplas Lembar 1.0000 4,200.00 4,200.00
Jumlah 42,030.00
C Jumlah A + B 170,780.00
Harga Satuan 1 M2 17,078.00
DISINDRA DISA, ST
Team Leader
RENCANA ANGGARAN BIAYA ( RAB )
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN (Rp.)
(Rp.)
1 2 3 4 5
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN (Rp.)
(Rp.)
1 2 3 4 5
Dibuat Oleh;
Tim Teknis / Fasilitator
Wilayah V
SUPRIANUS , S.T
Team Leader
REKAPITULASI
JUMLAH
NO. URAIAN PEKERJAAN
(Rp.)
I PEKERJAAN PONDASI + LANTAI 105,355,191.00
TERBILANG : TIGA RATUS EMPAT PULUH SEMBILAN JUTA ENAM RATUS SEMBILAN
PULUH DELAPAN RIBU DUA RATUS SEMBILAN PULUH SATU RUPIAH
II PEKERJAAN RANGKA BADAN + DINDING 2.43 0.485 0.485 0.485 0.485 0.485
III PEKERJAAN ATAP + RANGKA / KAP 13.44 2.241 2.241 2.241 2.241 2.241 2.241
V PEKERJAAN PINTU / JENDELA / VENTILASI 6.23 1.039 1.039 1.039 1.039 1.039 1.039
VII PEKERJAAN INSTALASI LISTRIK 5.31 0.885 0.885 0.885 0.885 0.885 0.885
Jumlah 100.00
a. Rencana Mingguan 7.532 7.532 8.017 8.017 0.485 4.253 5.292 8.629 8.945 8.945 10.477 7.352 6.313
b. Recana Komulatif 7.532 15.064 23.081 31.098 31.584 35.837 41.129 49.758 58.703 67.648 78.125 85.477 91.789
Mingguan )
14 15 16
1.688