MEGA TOWER 20 KVA

LAMP 8 HPTI

ESTIMASI BUDGET
NO MATERIAL PN / SIZE Q'TY PRICE
1 Lampu HPTI 1000 watt 10 pc Rp. 15.000.000
2 Plate Bordes 3 mm 6 lmb Rp. 7.500.000
3 Plate Biasa 10 mm 2 lmb Rp. 6.000.000
4 Besi Siku 70 X 70 x 6 28 pc Rp. 14.500.000
5 Pipa Black Steel 1" 12 btg Rp. 4.500.000
6 Pipa Black Steel 8" SCH10 2 btg Rp. 12.000.000
7 Pipa Black Steel 3" 2 btg Rp. 3.000.000
8 Besi UNP 10 mm 5 btg Rp. 3.000.000
9 Rantai 15 mm 7 mtr Rp. 1.500.000
10 Cat Besi Merah 10 Kg Rp. 700.000
11 Cat Besi Putih 10 Kg Rp. 700.000
12 Thinner A Special 15 lmb Rp. 400.000
13 Panel Box 40X60X25 1 pc Rp. 600.000
14 MCB 16 Amp 8 pc Rp. 750.000
15 MCB 2 Amp 1 pc Rp. 90.000
16 Capasitor 40 MFD 50-60 hz 8 pc Rp. 1.500.000
17 Cable 4 X 2,5 10 mtr Rp. 200.000
18 Cable 2 X 1,5 10 mtr Rp. 60.000
19 Cable 4 X 2,5 50 mtr Rp. 1.000.000
20 Breaker 3 phase 30 Amp 1 pc Rp. 500.000
21 Shacle 5 ton 2 pc Rp. 300.000
22 Besi Beton 12 mm 4 btg Rp. 400.000
23 Genset 20 kva 1 unit Rp. 135.000.000
Total Rp. 209.200.000
KETERANGAN KONSTRUKSI
LEBAR SKIDDING 4 METER
PANJANG SKIDDING 6 METER
TINGGI TOWER 12 METER
LEBAR KAKI TOWER 4 METER
PANJANG KAKI TOWER 4 METER
LEBAR GENSET 1 METER
PANJANG GENSET 2,2 METER

Di Buat Oleh : Di Ketahui Oleh : Di Setujui oleh :

PLANT SECTION HEAD HSE DEPT HEAD PROJECT MANAGER


Date : Date : Date :
MEGA TOWER 20 KVA
LAMP 8 HPTI

6 Meter

4 Meter

12 Meter

KETERANGAN KONSTRUKSI
LEBAR SKIDDING 4 METER
PANJANG SKIDDING 6 METER
TINGGI TOWER 12 METER
LEBAR KAKI TOWER 4 METER
PANJANG KAKI TOWER 4 METER
LEBAR GENSET 1 METER
PANJANG GENSET 2,2 METER

Di Buat Oleh : Di Ketahui Oleh : Di Setujui oleh :

PLANT SECTION HEAD HSE DEPT HEAD PROJECT MANAGER


Date : Date : Date :
WATERFILL 6 IN

ESTIMASI BUDGET
NO MATERIAL PN / SIZE Q'TY PRICE
1 Engine Eks. Lube Truck PS 120 1 unit -
2 Ebara Centrifugal Pump 150 X 125 FS4KA 1 unit Rp. 35.500.000
4 Pole 1500Rpm
3 Flexible Coupling Pump 1 lmb Rp. 1.850.000
150X125 FSHA
4 Flange Las 6 in Lubang 10K-6" 4 pc Rp. 1.200.000
5 Pipa Elbow 6 in 6" SCH40-90 Derajat 2 pc Rp. 1.500.000
6 Hose Spiral 6 in Selang Spiral 6" 20 mtr Rp. 5.000.000
27WAA Dewatering
7 Selang Layflat 6 in 20 mtr Rp. 6.000.000
Hose
8 Pipa Black Steel 6" SCH10 2 btg Rp. 14.000.000
9 Pipa Black Steel 8" SCH10 1 btg Rp. 6.500.000
10 Cat Besi Merah 5 Kg Rp. 350.000
11 Cat Besi Hitam 5 Kg Rp. 350.000
12 Thinner A Special 15 ltr Rp. 400.000
Foot Valve 6"
13 Foot Valve 6 in 1 pc Rp. 3.500.000
Type Flange

Total Rp. 75.300.000

KETERANGAN KONSTRUKSI

Di Buat Oleh : Di Ketahui Oleh : Di Setujui oleh :

PLANT SECTION HEAD PLANT DEPT HEAD PENANGGUNG JAWAB OPERASIONAL


Date : Date : Date :
MEGA TOWER 20 KVA

ESTIMASI BUDGET
NO MATERIAL PN / SIZE Q'TY PRICE
1 Lampu HPTI 1000 watt 10 pc Rp.
2 Plate Kembang/Bordes 3 mm 6 lmb Rp.
3 Plate Biasa 10 mm 2 lmb Rp.
4 Besi Siku 70 X 70 x 6 28 pc Rp.
5 Pipa Black Steel 1" 12 btg Rp.
6 Pipa Black Steel 8" SCH10 2 btg Rp.
7 Pipa Black Steel 3" 2 btg Rp.
8 Besi UNP 10 mm 5 btg Rp.
9 Rantai 15 mm 7 mtr Rp.
10 Cat Besi Merah 10 Kg Rp.
11 Cat Besi Putih 10 Kg Rp.
12 Thinner A Special 10 ltr Rp.
13 Panel Box 40X60X25 1 pc Rp.
14 MCB 16 Amp 8 pc Rp.
15 MCB 2 Amp 1 pc Rp.
16 MCB 3 PHASE (100 A) 1 pc Rp.
17 Capasitor 40 MFD 50-60 hz 10 pc Rp.
18 Cable NYY 4 X 2,5 10 mtr Rp.
19 Cable NYY 2 X 1,5 10 mtr Rp.
20 Cable NYY 4 X 2,5 50 mtr Rp.
21 Breaker 3 phase 30 Amp 1 pc Rp.
22 Lampu Philips 18 watt 1 pc Rp.
23 Fitting Lampu std 1 pc Rp.
24 Pipa Paralon 1 inci 5 btg Rp.
25 Ballast Philips 1000 watt 10 pc Rp.
26 Shacle 5 ton 2 pc Rp.
27 Besi Beton 12 mm 4 btg Rp.
28 Genset 20 kva 1 unit Rp.
Total Rp.
KETERANGAN KONSTRUKSI
LEBAR SKIDDING 4 METER
PANJANG SKIDDING 6 METER
TINGGI TOWER 12 METER
LEBAR KAKI TOWER 4 METER
PANJANG KAKI TOWER 4 METER
LEBAR GENSET 1 METER
PANJANG GENSET 2,2 METER

Di Buat Oleh : Di Ketahui Oleh : Di Setujui oleh :

PLANT SECTION HEAD HSE DEPT HEAD PROJECT MANAGER


Date : Date : Date :
MEGA TOWER 20 KVA

ESTIMASI BUDGET
NO MATERIAL PN / SIZE Q'TY PRICE
1 Lampu HPTI 1000 watt 10 pc Rp.
2 Plate Kembang/Bordes 3 mm 6 lmb Rp.
3 Plate Biasa 10 mm 2 lmb Rp.
4 Besi Siku 7 x 70 X 70 x 6000 40 pc Kurang 14 Btg
5 Besi Siku 7 X 100 x 100 x 6000 12 pc Kebutuhan 12 Btg
6 Besi Siku 5 X 50 x 50 x 6000 24 pc Kebutuhan 24 Btg
7 Pipa Black Steel 1" 12 btg Rp.
8 Pipa Black Steel 8" SCH10 2 btg Kekurangan 2 Btg
9 Pipa Black Steel 3" 2 btg Rp.
10 Besi UNP 10 mm 5 btg Rp.
11 Rantai 20 mm 12 mtr Kebutuhan 12 mtr
12 Plate Strip Galvanis 3 x 50 x 6000 10 btg Kebutuhan 10 Btg
13 Cat Besi Merah 10 Kg Rp.
14 Cat Besi Putih 10 Kg Rp.
15 Thinner A Special 10 ltr Rp.
16 Panel Box 40X60X25 1 pc Rp.
17 MCB 16 Amp 8 pc Rp.
18 MCB 2 Amp 1 pc Rp.
19 MCB 3 PHASE (100 A) 1 pc Rp.
20 Capasitor 40 MFD 50-60 hz 10 pc Rp.
21 Cable NYY 4 X 2,5 10 mtr Rp.
22 Cable NYY 2 X 1,5 10 mtr Rp.
23 Cable NYY 4 X 2,5 50 mtr Rp.
24 Breaker 3 phase 30 Amp 1 pc Rp.
25 Lampu Philips 18 watt 1 pc Rp.
26 Fitting Lampu std 1 pc Rp.
27 Pipa Paralon 1 inci 5 btg Rp.
28 Ballast Philips 1000 watt 10 pc Rp.
29 Shacle 5 ton 2 pc Rp.
30 Shacle 10 ton 2 pc Kebutukan Size 10 Ton
31 Besi Beton 12 mm 4 btg Rp.
32 Genset 20 kva 1 unit Rp.
Total Rp.
KETERANGAN KONSTRUKSI
LEBAR SKIDDING
PANJANG SKIDDING
TINGGI TOWER
LEBAR KAKI TOWER
PANJANG KAKI TOWER
LEBAR GENSET
PANJANG GENSET

Di Buat Oleh : Di Ketahui Oleh : Di Setujui oleh :

PLANT DEPT HEAD HSE DEPT HEAD PROJECT MANAGER


Date : Date : Date :

You might also like