Professional Documents
Culture Documents
K Y O U R
BO O
COPY!
NOW
A unique, integrated business directory on Cement Industry
Contact: Subscriber@ASAPPinfoGLOBAL.com
Tel: + 91 22 2419 3000
Cement Infobank is a practical database with a wealth of information that includes:
• Database of companies from the cement • A profile of the companies - the areas of
sector comprising –manufacturers, dealers, business, key operating units, subsidiaries, etc
suppliers, cement plant machinery, • Names and complete contact details of key
consultants, cement concrete block, RMC, executives
cement products, cement storage / transport • Vital sector data and statistics
and allied industries • Project opportunities – around 200 projects
• Sector overview where cement requirement exists
®
A-303, Navbharat Estate, Zakaria Bunder Road
Sewri (West), Mumbai-400015.
Tel.: 022-2419 3000. Fax: 022-2417 5734
Email: Subscriber@ASAPPinfoGLOBAL.com
To order online visit : www.ASAPPinfoGLOBAL.com/Subscribe
Highlights
and Munger in Bihar were commissioned for railway traffic, the concessionaire is responsible for financing, constructing and
integrating North and South Bihar. timely completion of the project. Such concessions are different
• Opening of Daniawan – Bihar Sharief (38 Km) for passenger from Engineering, Procurement and Construction (EPC) contracts.
traffic, thereby bringing backward areas of Bihar on Broad As on 01.04.2016, Indian Railways have 458 major ongoing
Gauge. projects including 166 New Line, 39 Gauge Conversion and
• Chhapra-Thawe (107 Km) Gauge conversion has been 253 Doubling projects, that need about `3.86 lakh crore for their
commissioned for goods traffic, thereby completing long completion.
pending Kaptanganj-Tawe-Chhapra Gauge Conversion The construction cost is borne by the concessionaire. The
Project. concessionaire gets compensated by means of pre-agreed
• Opening of Nawadih – Kawar (53 Km) for passenger traffic, percentage of apportioned freight revenue in NGR, JV and BOT
thereby bringing backward areas of Jharkhand on Broad models or fixed quarterly annuity payments under Annuity Model
Gauge. after commissioning of the projects during the concession period.
• Koderma-Hazaribagh (80 km) New Line – bringing Naxal
affected district of Hazaribagh on railway map. FDI IN RAILWAYS
• Bhind-Etawah (36 km) New line – providing direct connectivity
from Etawah to Guna, Gwalior and Bhind benefiting people of
backward areas of Uttar Pradesh and Madhya Pradesh.
• Gauge Conversion of Barhni-Gonda loop (108 km) – providing
much needed Broad Gauge connectivity to the backward
areas of Eastern Uttar Pradesh.
• Agra-Etawah (110 km) New Line – providing rail connectivity
to Bateshwar
• Kasganj-Bareilly (106 Km) section of Kanpur-Kasganj-
Mathura & Kasganj-Bareilly- Lalkuan gauge conversion
commissioned
• Etawah-Mainpuri (58 Km) New Line has been commissioned
for goods traffic, thereby completing a long pending project of
ravines of Chambal.
• Jind – Sonepat New Line (81 Km) – connecting backward
areas of Haryana.
• Sikar – Loharu Broad Gauge (122 Km) – bringing Sikar and Minister of State for Railways Manoj Sinha has informed
Jhunjhunu Districts of Shekhawati region of Rajasthan nearer the Lok Sabha recently about FDI in railway projects. He has
to the National Capital. informated that as per data compiled by Department of Industrial
• Suratpura-Hanumangarh (174 Km) broad gauge line has Policy & Promotion (DIPP), the quantum of Foreign Direct
provided vital missing link to backward region of North Investment (FDI) in Railway related components during the last
Rajasthan. six months (from September, 2015 to February, 2016) is US$
• Bangurgram-Ras (28 km) New line in Rajasthan. 59.81 million. Agreements have been signed between Ministry
• Khurda Road-Begunia-Rajsunakhala (42 km) New line – of Railways and Joint Venture Company for setting up of two
benefiting people of backward areas of Odisha. locomotive factories at Madhepura (Electric) and Marhowra
• Palani – Pollachi – Palakkad (117 Km) Gauge Conversion (Diesel) costing about `2600 crore entailing FDI inflow in Rolling
commissioned thereby completing conversion of Dindigul – stock manufacturing. The potential projects involving FDI include:
Palakkad route in Tamil Nadu and Kerala. Dankuni and Kancharapara rolling stock factories and BOT-
• Completion and commissioning of Mawaikhas – Khajuraho annuity projects of 3rd line between Wardha-Nagpur, Kazipet-
(100 Km) section of Lalitpur-Singrauli New Line for goods Vijaywada and Bhadrak-Nargundi.
traffic. This section will be opened to passenger traffic
shortly. This will provide much needed rail connectivity to the INDO – MYANMAR RAIL NETWORK
backward districts of Bundelkhand region of Madhya Pradesh. Minister of State for Railways Manoj Sinha has informed
• Opening of Yerraguntla-Nossam (47 km) New Line for the Lok Sabha recently about Indo-Myanmar rail network. He
passenger traffic and Nossam – Banganapalli (45 Km) for has informed that Indian Railways have taken up two new line
goods traffic– providing rail connectivity to backward regions projects viz. (i) from Agartala in North Eastern Region of India to
of Andhra Pradesh. Akhaura in Bangladesh sanctioned in Rail Budget 2012-13 and
• Jagtial-Morthad (51 km) New line (part of Peddapally- (ii) Construction of Haldibari (in India) to Bangladesh International
Karimanagar-Nizamabad) in Telangana commissioned. Border (3 Km) included in Rail Budget 2016-17 subject to
requisite Government approvals. A feasibility study was done in
RAILWAY TRACKS CONSTRUCTION BY PRIVATE FIRMS 2005 by Indian through Rail India Technical & Economic Services
Minister of State for Railways Manoj Sinha has informed Ltd. (RITES), a Public Sector Undertaking (PSU) of Ministry of
the Lok Sabha recently about the private sector participation in Railways, for a link from Jiribam in India to Kalay/Mandalay in
Railway Track construction. Myanmar.
Indian Railways has issued a Participative Policy in December The Jiribam-Imphal section (125 Km) which falls within Indian
2012 envisaging four different models through which private firms Territory has since been sanctioned and construction work is
can participate for construction of Railway lines. These models taken up. Remaining portions from Imphal to Moreh (111 Km)
are - Non Governmental Railway (NGR), Joint Venture (JV), Build within India and from Tamu to Kalay (128 Km) in Myanmar have
Operate & Transfer (BOT) and Annuity. Under these models, not been sanctioned.
1 Ministry of Government of India has granted Multiple NA Arun Kumar, Joint Secretary (AK), Airports
Civil in-principle approval for setting up of MCA, B Block, Rajeev Gandhi
Aviation 14 Greenfield airports namely, Mopa Bhavan, New Delhi-110003, Delhi.
in Goa; Navi Mumbai, Shirdi and T: 011-24643246,
Sindhudurg in Maharashtra; Shimoga, arun.kumar63@nic.in
Gulbarga,Hassan and Bijapur in
Karnataka; Kannur in Kerala; Pakyong
in Sikkim; Datia/Gwalior (Cargo) in
Madhya Pradesh; Kushinagar in Uttar
Pradesh; Karaikal in Puducherry; and
Dholera in Gujarat.
2 Airports Plan investment over the next four Nationwide 15000.00 S.Sreekumar, GM (Planing), R.No Airports
Authority of years to develop and upgrade airports 147 C Block, Rajeev Gandhi Bhavan,
India (AAI) across the country. It is estimated to Safdurgunj Airport, New Delhi -
invest Rs 13,000 crore on the 110003, T: 011-24652649,
upgradation, expansion and extension gmplg@aai.aero, (Anil Kumar
of 39 airports. Around Rs 2,000 crore Pathak, Executive Director - Planing)
is to be spent over revival and
upgrade of airports in smaller cities.
The rest is to be spent over installation
of solar power capacity at various
airports.
3 Airports The government is working on an Nationwide 6000.00 S.Sreekumar, GM (Planing), R.No Airports
Authority of investment proposal in the current 147 C Block, Rajeev Gandhi Bhavan,
India (AAI) fiscal to revive and develop 75 Safdurgunj Airport, New Delhi -
regional airports. 110003, T: 011-24652649,
gmplg@aai.aero, (Anil Kumar
Pathak, Executive Director - Planing)
4 Kotak KMB has announced opening of its Gandhina- NA K V S Manian, President (Corporate, Banking
Mahindra IFSC Banking Unit (IBU) at the gar Gujarat Institutional & Investment Banking), and
Bank Gujarat International Finance Tec-City 2nd Floor, 12-BKC, Plot No C-12, G Finance
(GIFT City) to meet the requirements Block, BKC, Bandra (East),
of offshore banking operations from Mumbai-400051, Maharashtra.
India. T: 022-62185000, F: 66384455,
(Uday Kotak, Executive Vice-Chair-
man & MD)
5 Cauvery Plans to undertake modernization of Bengaluru 67.48 Mallikaraul Swami, Executive Canal/
NeeravariI Hebballa Chennaiah main canal from Karnataka Engineer, Surface Water Data, Dam/
Nigam Ltd Ch 0.00 to 40.00 km. Anand Rao Circle, Seshadri Rd, Irrigation
LakshmanPuri, Gandhi Nagar,
Bengaluru - 560001, Karnataka.
T: 080-22352997, 22354900
M: 9448063428, 8231244762
6 Irrigation Plans to assign the widening of Telangana 3.25 P Chandra Shekhar, Deputy Chief Canal/
And Cad existing Seshavataram channel from Engineer, J Block, 6th Floor, Room Dam/
Depart- 0.000 to 5.000 and extension of new No.623, Secretariat Road, Hy- Irrigation
ment Seshavatarm channel from 5000 to derabad - 500022, Telangana.
(I&Cad) 8.925. The completion is targeted in 6 T: 040-23390411, 23391189,
Months. M: 9949993267, 9440814836
(Muralidhar, Chief Engineer)
7 Burnpur Plans expansion of its production West Bengal 500.00 Anirban Chakraborty, Senior Cement
Cement capacity to 3 MTPA in the next 3-4 Manager (Project Sales), Gujarat
Ltd years from the installed capacity of 0.6 Mansion,14, Bentinck Street, 2nd
MTPA. As part of the expansion plan, Floor, Suit No. 7, Kolkata-700001,
a 2 MTPA greenfield plant will be set West Bengal. T: 033-30250826,
up in West Bengal. Location is not yet M: 9051366613, anirban@burn-
finalised. purcement.com, (Ashok Gutgutia,
Managing Director cum Vice
Chairman)
8 Essar Oil The company plans to ramp up Rajmahal NA Anoop Agarwal, Joint General Coal
Ltd coal-based methane (CBM) produc- Jharkhand Manager (Corporate Communica-
tion from 0.85 scmd to a minimum of tions), Essar House, 11, Keshavrao
1.8 million standard cubic metres per Khadye Marg, Mahalaxmi,
day (scmd) by the end of the current Mumbai-400034, Maharashtra.
financial year. T: 022- 66601100, M: 9820315684,
anoop.agrawal@essar.com, (Manish
Maheshwari as CEO – Exploration
& Production)
9 Singareni Plans to float tenders shortly for mine Naini Odisha NA Subraminiam, DGM, Kothagudem Coal
Collieries development operator with regard to Collieries, Khammam
Company the development of the Naini coal Dist,Telangana-507101,
Ltd block in Odisha. The mine is estimat- T: 08744-245601 M: 9491144969
ed to have potential for 450 million
tonnes of coal. The production is
estimated to start within 36 months
after securing all mandatory clear-
ances.
10 Transmis- Plans to assign construction of Anantapur NA M.B Srinivas, Chief Engineer (Civil), Construc-
sion division office building at 220 KV SS Andhra Vidyut Soudha Hyderabad - 500082 tion
Corporation premises Hindupur, Anantapur District. Pradesh Andhra Pradesh T: 040-23396000
of Andhra The work is likely to start in two Extn: 3404, 3202, M: 9440811022
Pradesh months.
Ltd
(AP-
TRANSCO)
11 Roads and Plans to assign the construction of Mehsana 6.00 M Pandya, Executive Engineer, R&B Construc-
Buildings Kavarnataina Station Bldg at Gujarat Division, Rajmahal Compound, tion
Depart- Mehsana. Mehsana-384001, Gujarat
ment T: 079-27912013, M: 9879542706
(V G Patel, Chief Engineer)
12 Military Plans to assign construction of ATC Thoise 9.5 Inder Pal Singh, Chief Engineer, Construc-
Engineer building at AF Stn Thoise. Jammu & Air Force, Udhampur Zone, C/O 39 tion
Services Kashmir WING AF-936839 C/O 56 APO,
Jammu & Kashmir.
T: 0199-2234056, F: 2234040,
dircontcezafu2-mes@nic.in
13 Spices The board will set up India's first spice Cochin NA S Kannan, Director (Marketing), Construc-
Board India museum at Willingdon Island in Kochi Kerala Spices Board, Ministry of Commerce tion
to attract and educate tourists and & Industry, Govt. of India, Sugandha
seafarers about the history and growth Bhavan, N.H.By Pass,
of Indian spices industry. Cochin Port Palarivattom.P.O
Trust has allotted 15 cents of land Cochin - 682025, Kerala.
adjacent to Cochin Heritage museum T: 484-2333605, 2333610 - 616,
at the north end of Willingdon Island F: 2334429, s.kannansb@nic.in
for setting up the spice museum. The (Jayathilak A, Chairman)
land has been leased to the board for
30 years on a yearly rent of Re 1.
14 Govern- Plans to assign the construction of Burla 1.12 Nirman Soudh, (Chief Engineer Construc-
ment Of Academic Building (Second Floor of Odisha Building), Keshari Nagar, Unit -V, tion
Orissa Administrative Building and Extension Bhubaneswar- 751015, Odisha,
to the Environmental Science T: 0674-2391523, M: 9937081865,
Department Building) of Sambalpur cebuildings_Odisha@yahoo.co.in
University, Jyoti Vihar, Burla.
15 Govern- Plans to assign construction of Amritsar NA Gurbax Rai Bains, Chief Engineer Construc-
ment of Judicial Court Complex at Baba Punjab PWD, Project Provincial Division, tion
Punjab Bakala Sahib in District Amritsar. PWD B&R Branch, Amritsar, Punjab,
(PWD T: 0172-2358280, M: 9872446042
Building &
Roads)
*Figures are approximate ( `. Crore)
16 Water Plans to assign the construction of Jhalawar 0.48 Mahendra Jain, EE (Water Resourc- Construc-
Resources Project Office at Parwan Project Dam Rajasthan es), Parwan Project, Dam Division, tion
Depart- site Akwad Kalan Tehsil Khanpur. The Jhalawar, Rajasthan,
ment work is likely to start in a month and M: 9414439537,
complete in 9 months. ewrparwan@gmail.com
17 Public Plans to assign the construction of 9436120160, 4.25 Asit Bhowmick, Chief Engineer R&B, Construc-
Works double storied new School Building for ce, building, Tripura New Secretariat Building New tion
Depart- Anandabazar H.S. School at Ananda- Asit Bhomick Capital Complex Agartala, Tripura
ment bazar, Kanchanpur, North Tripura Tripura West-799006. T: 03812413313,
(Roads F: 03812414073, M: 9436120160
and
Buildings)
18 Uttar Plans to assign the construction of Moradabad 454.00 Shobhit Pathak, EE, House NO 3C/ Construc-
Pradesh Office Complex with G Plus 2 in Uttar 109/ 110/ 111 Buddhi Vihar, Delhi tion
Housing Sector 5 At Majhola Yojna No 4 Phase Pradesh Road Moradabad - 244001,
And II Moradabad. The completion is Uttar Pradesh, M: 8588877109
Develop- targeted in 15 months.
ment
Board
19 Uttar Plans to assign the construction of 8 Sonebhadra 3.10 Umesh Chandra Mishra, SE, Office Construc-
Pradesh nos.double storeyed Type V residenc- Uttar of Superintending Engineer, Electric- tion
Rajya es at ATP Colony, Anpara, Soneb- Pradesh ity Civil Construction Circle II, Anpara
Vidyut hadra. The completion is targeted in DTPP, Anpara, Sonebhadra -
Utpadan 456 days. 231225, Uttar Pradesh.
Nigam Ltd M: 9415900109, (Tribhuvan Tiwari,
(UP- CE, 9415900078)
RVUNL)
20 Gujarat Dairy major plans to raise its milk Kolkata 2500.00 PO Box 10, Amul Dairy Road, Anand Dairy
Co-opera- processing capacity to more than 38 West Bengal 388 001, Gujarat, T: 02692-258506, Products
tive Milk million litres per day in the next four 258507, F: 2692- 240208
Marketing years. As part of this plan, Amul brand (R S Sodhi, MD)
Federation owner plans to set up milk processing
(GCMMF) plant in Kolkata, Mumbai and two
more plants in Gujarat.
21 Depart- The Women Industrial Training Patna Bihar NA Vivek Kumar, (Deputy Director),Vikas Education
ment Of Institute (ITI) at Digha (Patna) is being Bhawan, Bailey Road, Punaichak,
Labour upgraded. The completion is targeted Patna, Bihar - 800015 T: 0612 -
Resources soon. Expression of interest is invited 2215142, 2213855, M: 9470010187,
for a private sector partner. (Gopal Meena, Director Employment
& Training), delbihar@gmail.com
22 Indian Plans to assign construction work of Shillong 9.3 R C Saxena, Chief Administrative Education
Institute of the state of the Art Academic-cum- Meghalaya Officer, Mayurbhanj Complex,
Manage- residential campus of RGIIM Shillong Nongthymmai, Shillong-793014,
ment (IIM) at Urnsawli, New Shillong. Meghalaya. T: 0364-230, 8020, 8055,
8000, cao@iimshillong.ac.in, (Dr.
Amitabha De, Director)Nongthymmai,
Shillong-793014, Meghalaya.
T: 0364-230, 8020, 8055, 8000,
cao@iimshillong.ac.in,
(Dr. Amitabha De, Director)
23 CCL Largest instant coffee product makers Chittor 265.00 Rama Rao, Manager (Corp Comm), Food And
Products plans to set up a greenfield freeze District 7-1-24/2/D, Greendale, Ameerpet, Beverages
(India) Ltd dried instant coffee manufacturing Andhra Hyderabad-500016, Telangana,
plant in Chittoor district.The comple- Pradesh T: 040-23732455, F: 040-23732499,
tion is expected by December 2017. rvr@cclproducts.com, (Challa
Rajendra Prasad, Executive
Chairman)
24 MTR Plans investment to scale up its Boma- 200.00 Nalini Rao, Assistant Manager (PR), Food And
Foods Pvt manufacturing capacities. The masandhra No.1, 2nd & 3rd floor, 100 feet inner Beverages
Ltd company plans to increase the initial Karnataka ring road, Ejipura, Bangalore-560047,
capacity of about 45,000 tonnes at Karnataka. T: 080-40812100,
Bommasandra to 72,000 tonnes with nalini.rao@mtrfoods.com,
state-of-the- art equipment and high (Sanjay Sharma, CEO)
quality infrastructure.
25 Andhra Plans to assign construction of 30 Prakasam NA Zonal manager, 3rd floor DM&HS Healthcare
Pradesh bedded hospital at Pamuru in Andhra Campus, Sulthan Bazaar Koti,
Medical Prakasam district. Pradesh Hyderabad - 500095, Telangana.
Services & T: 040-24658702, F: 24619120
Infrastruc-
ture
Develop-
ment
Corpora-
tion
26 Greater Plans to assign the construction of Hyderabad 20.16 Shiva Raj, SE, (Housing), 3rd floor, Housing
Hyderabad 288 houses in stilt + 9 floors at Telangana NTPC Building, Secunderabad,
Municipal Jangammet in Chandrayangutta Andhra Pradesh.
Corpora- constituency in GHMC. The work is M: 9963333741
tion likely to start in two months.
27 Greater Plans to assign the construction of Hyderabad 13.95 Shiva Raj, SE, (Housing), 3rd floor, Housing
Hyderabad 216 houses in stilt + 9 floors at Telangana NTPC Building, Secunderabad,
Municipal Saraladevi nagar in Yakathpura Andhra Pradesh M: 9963333741
Corpora- constituency.
tion
28 Greater Plans to assign construction of 270 Hyderabad 17.44 Shiva Raj, SE, (Housing), 3rd floor, Housing
Hyderabad houses in stilt + 9 floors at Kamgiri Telangana NTPC Building, Secunderabad,
Municipal nagar. Andhra Pradesh
Corpora- M: 9963333741
tion
29 Greater Plans to assign construction of 108 Hyderabad 6.73 Shiva Raj, SE, (Housing), 3rd floor, Housing
Hyderabad houses in stilt + 9 floors at Lambadi Telangana NTPC Building, Secunderabad,
Municipal Thanda in Musheerabad Andhra Pradesh. M: 9963333741
Corpora-
tion
30 Greater Plans to assign construction of 400 Hyderabad 25.96 Shiva Raj, SE, (Housing), 3rd floor, Housing
Hyderabad houses in stilt + 9 floors at Indira Telangana NTPC Building, Secunderabad,
Municipal Nagar, Khairatabad Andhra Pradesh
Corpora- M: 9963333741
tion
31 Greater Plans to assign construction of 288 Hyderabad 18.54 Shiva Raj, SE, (Housing), 3rd floor, Housing
Hyderabad houses in stilt + 9 floors at Hamali Telangana NTPC Building, Secunderabad,
Municipal Basthi in sanath nagar. The comple- Andhra Pradesh
Corpora- tion is likely to take a year. M: 9963333741
tion
32 Infosys Plans to set up an IT/ITeS SEZ in Bengaluru NA Sarah Gideon, PR Manager, IT/Ites
Bengaluru in an area spread over 4 Karnataka Electronics City, Hosur Road,
hectares. The Government has Bangalore-560100, Karnataka.
approved this proposal. T: 080-41563373, 28520261,
Sarah_Gideon@Infosys.com
33 K Raheja Realty firms K Raheja Corp and Gera Pune 1000 Shabbir Kanchwala, Sr. VP, Purchase ITSEZ
Corp Developments have partnered to Maharashtra Contracts & Project Co-Ordination,
construct an IT-SEZ in Pune. The Plot no C-30, Block G, Opp SIDBI,
construction is likely to start by Bandra Kurla Complex, Bandra (E),
August, 2016. Mumbai - 400051, Maharashtra.
T: 022-26564000, F: 26564899
34 Bharat Setting up 3x660 MW North Karan- Jharkhand NA K.Roy Chaudhary, 2nd Floor, Power
Heavy pura, Super Thermal Power Project in Block-Dj, Plot-9/1, Sector-II, Salt
Electricals Jharkhand. Tenders for Civil, Struc- Lake City, Kolkata - 700091,
Ltd tural And Architectural Works are West Bengal. T: 033-23398030,
currently invited. M: 9831134211, papori@bhelpser.co.in
35 Ministry of Plans to set up five domestic coal- Multiple 150000.00 Anoop Singh Bisht, Under Secretary, Power
Power based UMPPs at Banka in Bihar, R.No-26, Shram Shakti Bhavan,
Tilaiya in Jharkhand, Bedabahal in Rafi Marg New Delhi-110001 Delhi,
Odisha, Deoghar in Jharkhand and T: 011-23766236, 23711394,
Surguja in Chhattisgarh. Tenders are anoopsingh.bisht@nic.in,
expected for these projects. (Harpeet Singh Purthi, Director)
36 West Plans to set up proposed 33/11 kv Multiple NA Sudir Das, Divisional Engineer (Civil), Power
Bengal sub-station inside the premises of West Bengal AA-26, Sector-I, Salt Lake, Kolka-
State Vivekananda Yuba Bharati Krirangan ta-700064 State: West Bengal,
Electricity under IPDS under BNDD-I. The T: 033-23371490, F: 23371490,
Distribution completion is targeted in two years. M: 9883325733, c.m.bndc@gmail.com,
Co. Ltd (Rajesh Pandey)
37 Uttar UPRNNL is looking for Contractor of Uttar NA A.K Singh, Additional Project Pre-Engi-
Pradesh Pre-Engineered Light Gauge Steel Pradesh Manager, Lohia Institute, neered
Rajkiya Frame Building System. Visheswaraiya Bhawan, Vibhutikand, Building
Nirman Gomti nagar, Lucknow - 226010,
Nigam Ltd Uttar Pradesh. M: 9415004871
38 Central Plans to set up an advanced polymer Devanhali 87.00 S. Ilangovan, Director (Business R&D
Institute of design and development research Karnataka Development), T.V.K. Industrial
Plastics laboratory (APDDRL). Five acreas of Estate, Guindy, Chennai, Tamil Nadu
Engineer- KIADB land has been allotted in 600032, T: 044-22254780 Extn. 220,
ing and hi-tech, Defence and Hardware Park 22254781, M: 9840348407,
Technol- at Devanhali for APDDRL. The silangovan@cipet.gov.in
ogy's state-level single window clearance
(CIPET) committee in Karnataka has recently
cleared this project.
39 Gamesa Wind turbine maker plans to set up Nellore 300.00 Madhu Kumar Boppana, Head (Corp Renewable
India greenfield manufacturing unit at Iffco Andhra Com), Redhills, Chennai-600066, Energy
Kissan SEZ in Nellore, Andhra Pradesh Tamil Nadu. T: 044-39242424,
Pradesh. In the first phase, the blade 30989898, bmadhukumar@
production unit for manufacturing gamesacorp.com,
G114-2.0 MW wind turbine model will (Ramesh Kymal, CMD)
be set up. The unit is likely to
commission by August, 2016.
40 Gujarat The state government plans to launch Gujarat NA Anil Purohit, Senior Executive Renewable
Energy grid-connected rooftop solar power Project, 4th floor, Block No. 11 & 12, Energy
Develop- units for residential property owners. Udyog Bhavan, Sector -11, Gandhi-
ment GEDA has set a target of generating nagar-382017, Gujarat, T:079-
Agency 50 megawatt (MW) through rooftop 23257264, 23257251, 23257252,
(GEDA) solar photovoltic (SPV) units across adpurohit@geda.org.in
Gujarat.
41 Ministry of Plans to set up solar power plants on Mulitple NA Anil Kumar Saxena, Addl. DG (PR), Renewable
Railway Railway/private land and on rooftop of Rail Bhavan, Raisina Road, Energy
Railway buildings with Viability Gap New Delhi-110001, T: 011-23381332,
Funding (VGF) support from Ministry F: 23385215, M: 9810046241,
of New & Renewable Energy (MNRE) dpr.railways@gmail.com
through developer mode.
42 The Green The nodal agency for implementation Odisha NA Sanjiv Tripathi, General Manager, Renewable
Energy of renewable energy projects plans to OSPH&W Corporation Building. Energy
Develop- develop 10 MW canal top solar power Janpath, Bhoinagar, Bhubane-
ment project on pilot basis. swar-751022, Odisha.
Corpora- T: 0674-2542922, 2547061,
tion of info@gedcol.com
Odisha Ltd
(Gedcol)
*Figures are approximate ( `. Crore)
43 The Green Plans to set up a solar park at Balasore NA Sanjiv Tripathi, General Manager, Renewable
Energy Balasore district spreading over 3,000 district OSPH&W Corporation Building. Energy
Develop- acres of land. Odisha Janpath, Bhoinagar, Bhubane-
ment swar-751022, Odisha.
Corpora- T: 0674-2542922, 2547061,
tion of info@gedcol.com
Odisha Ltd
(Gedcol)
44 The Green Gedcol is executing 4 MW of roof top Bhubane- 40.00 Sanjiv Tripathi, General Manager, Renewable
Energy solar power project on 136 govern- swar Odisha OSPH&W Corporation Building. Energy
Develop- ment buildings in Cuttack and Janpath, Bhoinagar, Bhubane-
ment Bhubaneswar on pilot basis at a cost swar-751022, Odisha.
Corpora- of Rs 30 to Rs 40 crore. T: 0674-2542922, 2547061,
tion of info@gedcol.com
Odisha Ltd
(Gedcol)
45 Raymond Textile major plans to set up 75 new Nationwide 250.00 Rohit Khanna Head (Corp Commu), Retail
Ltd stores and renovate 50 existing stores Mahindra Towers, 2nd Floor, B Wing,
in a year. Pandurang Budhkar Marg, Worli,
Mumbai - 400018.
T: 022-40349999, 61527624,
M: 9320499499,
rohit.khanna@raymond.in
46 Steel Plans to assign the construction of Bhilai Chhat- 1.50 R K Panigrahi, Bhilai Steel Plant, Roads/
Authority road & storm water drainage network tisgarh Room No.342, 3rd Floor, Ispat Highways/
Of India at Bhilai Steel Plant. Bhawan, Bhilai, Chhattisgarh. Bridges
Limited T: 0788-2864849, 09407980168,
(SAIL) 0788-2221197,
rkpanigrahi@sail-bhilaisteel.com
47 Public Plans to assign construction of Delhi NA Bans Raj, Executive Engineer, Roads/
Works proposed foot over bridges and their Bhairon Road T- Junction Near Highways/
Depart- maintenance on PPP Mode in Delhi. Pragati Power Station New Delhi- Bridges
ment 110002 Delhi, T: 9968345618,
(Delhi) eepwddelhif51@gmail.com
48 National Plans to assign the Six laning from Gujarat NA Sunil Jindal General Manager (T), Roads/
Highways existing km 494.410 (design chainage G-5 & 6 Sector-10 Dwarka, Highways/
Authority 540.595 ) to existing km 509.550 New Delhi, Delhi 110075, Bridges
Of India (design chainage 555.905) of NH-8 in T: 011-25074100, 25074200,
(NHAI) the state of Gujarat( Length 15.310 Ext-1343/2475, F: 25093507,
Km) on EPC Mode under NHDP 25093514, suniljindal@nhai.org
Phase-V (pkg VII)
49 NHAI The Cabinet Committee on Economic Shimla 1583.00 Satish Kaul, Project Director, 20A, Roads/
Affairs has approved two-laning with Himachal Jhakhu Housing Board Colony, Highways/
construction of four-lane highway of Pradesh Near- Ram Chandra Chowk, Bridges
the Shimla bypass project, which is Shimla-171002, Himachal Pradesh,
between Kaithlighat and Shimla on T: 0177-2629419, M: 9418030067,
NH-22. pdpiushimla@nhai.org
50 National Four laning of Chikhali - Tarsod Maharashtra NA Ashish Asati, General Manager Roads/
Highways (Package-II A) section of NH-6 from (Tech) G-5 & G-6, Sec-10, Dwarka, Highways/
Authority km. 360.000 to km. 422.700 in the Delhi - 110075. 011-25074100, Bridges
Of India State of Maharashtra to be executed 200 Extn-1102, 2447,
(NHAI) on Hybrid Annuity pattern under ashishasati@nhai.org,
NHDP Phase IV. (Raghav Chandra, IAS, Chairman)
51 Public Plans to assign the construction of Achalpur NA Sachin Chiwate, Under Secretary Roads/
Works major High Level Bridge across Maharashtra (Buildings), P.W. Division, Achalpur, Highways/
Depart- Bichhan river. Achalpur Road, Achalpur, Maharashtra, Bridges
ment T: 022-22826922, 22025057,
(Maharash- usbld.pwd@maharashtra.gov.in,
tra) dsrd.pwd@maharashtra.gov.in,
*Figures are approximate ( `. Crore)
52 Pune Plans to construct the internal ring Pune NA Yuvraj Deshmukh, Superintendent Roads/
Municipal road. The proposed road is 35.74 km Maharashtra Engineer, PMC Building, Near Highways/
Corpora- long and 24 metre wide with the total Mangla Theatre, Shivajinagar, Bridges
tion (PMC) area of 68.03 hectare. The civic body Pune-411005. T: 020-25501000,
has proposed to appoint STUP 25501141, F: 25501104,
Consultants to prepare the DPR for M: 9689931491, 9689931141,
the project. sanjay.more@punecorporation.org
53 RIICO Plans to assign the construction of Bundi 1.92 P.K Sharma, Regional Manager, Roads/
cement concrete road and RCC box Rajasthan Bypass Behind Birla Petrolpump, Highways/
culverts at industrial area BPR Bundi. Bhundi - 323001, Rajasthan, Bridges
The work is likely to start after a T: 0747-2444650, M: 941404047
month.
54 Road and Construction of Sircilla bye-pass road Karimnagar 20.98 P.Satish, Superintending Engineer Roads/
Building from km.0/0 to 11/0 in Karimnagar District (R&B) Circle, Karimnagar, Telangana, Highways/
Depart- dist. The work is likely to start in a Telangana M: 9440818036, 9440818005, Bridges
ment month and completion is targeted in dceroadstelangana@gmail.com
15 months.
55 Irrigation Construction of check dam/anicut Karimnagar NA Rajashekar Tarigopula, Superintend- Roads/
and CAD across Shambhunipally Vagu near District ing Engineer, Karimnagar, Telangana Highways/
Depart- Shambhunipally(v), Kamalapur(m) in Telangana T: 040-23390411, M: 8019038490, Bridges
ment Karimnagar district. 8782242016
56 Public Plans to assign the widening and Etawah 4.69 A.K Gupta, SE PWD, Etawah Circle, Roads/
Work strengthening of Etawah Mainpuri Uttar PWD, Civil Line Etawah - 206001, Highways/
Depart- SH-83 to Mitthanpur link road and Pradesh Uttar Pradesh , M: 9410677460, Bridges
ment (Uttar construction of cycle track and anilgupta.se@gmail.com
Pradesh) footpath under Saifai Master Plan. The
completion is targeted in two months.
57 NHAI The Cabinet Committee on Economic Lucknow 2844.72 P. Shiv Shankar, Project Director, Roads/
Affairs approved 128-km long Uttar 1/73G, Vineet Khand, Gomti Nagar Highways/
highway project in Himachal Pradesh Pradesh Lucknow - 226010, Uttar Pradesh. Bridges
under NHDP. It's a four-lane highway T: 0522-2726167, luc@nhai.org
of the Lucknow-Sultanpur section on
NH-56 under Phase IV.
58 Depart- Plans to assign establishment of Tirunelvi NA L.PremlataIsro, Officer (Purchase Science &
ment Of integrated Cryogenic Engine and Tamilnadu and Store), Propulsion Complex, Technol-
Space Stage Test (ICET) facility on EPC Mahandra Gri P.O., Tirunelve- ogy
(DOS) Mode. The work is likely to start in 6 li-627133, Tamilnadu,
months and take one year to com- T: 04637-281552, 1553, 1554,
plete. spsoiprc@iprc.gov.in
59 Ahmedabad Plans to set up up a secondary Ahmedabad 97.34 Amit Patel, Additional City Engineer Sewerage
Municipal sewage treatment plant at Chandrab- Gujarat (New Central Zone), Rajmata Treatment
Corporation haga stream in Sabarmati area. Vijyaraje Sindhiya Bhavan, Judges Plant
(AMC) Bunglow Road, Bodakdev, Gujarat.
T: 079-32981396, M:9327038808
60 Mumbai Plans to assign improvement of Raigad 51.55 J.R.Dhane, Executive Engineer, Tourism
Metropoli- Dasturi to Matheran pathway with district Bandra-Kurla Complex, Bandra
tan Region beautification work. The work is likely Maharashtra (East), Mumbai-400051, Maharash-
Develop- to start in October, 2016. tra. T: 022-26595933/4044, jaywant.
ment dhane@mailmmrda.maharashtra.
Authority gov.in, (P D Mamdabure,
Engineer-in-Chief)
61 Indian Plans to develop a multi-modal Surat NA S K Lohiya, C.E.O, 4th, Floor, Palika Transport
Railways transportation hub at Surat railway Gujarat Bhawan, Sector XIII, R.K.Puram,
Station station through SPV on DBOFT basis. New Delhi - 110066. T: 011-
Develop- The transport hub will be developed in 24672718, 2467219, 24672723,
ment association with Gujarat State Road info@irsdc.co.in
Corpora- Transport Corp (GSRTC) and Surat
tion Municipal Corporation. Expression of
(IRSDC) interest is invited in this regard.
*Figures are approximate ( `. Crore)
62 ACME Bagged 150 MW solar power projects Andhra NA Prashant Pandya, Business Develop- Renewable
under the Solar Energy Corporation of Pradesh ment Manager, D.No.14/13, Tulasina- Energy
India (SECI) JNNSM Phase II tender gar, 5th Lane, Kanur, Vijayawada,
in Andhra Pradesh. The commission- Andhra Pradesh - 520007,
ing is targeted in 13 months from the M: 8790611134, (Manoj Kumar
date of signing of the PPA with SECI. Upadhyay, Founder & Chairman)
The project will generate approximate-
ly 7,500 million units during its 25
years tenure and supply power to AP
Discom through SECI.
63 ACME Bagged a 50 MW Solar Power project Telangana NA Prashant Pandya, Business Develop- Renewable
under the NTPC JNNSM Phase II ment Manager, D.No.14/13, Tulasina- Energy
tender in Telangana. The projects are gar, 5th Lane, Kanur, Vijayawada,
likely to get commissioned within 13 Andhra Pradesh - 520007,
months from the date of signing of M: 8790611134, (Manoj Kumar
PPA with NTPC. Upadhyay, Founder & Chairman)
64 PNC Bagged contract for the Lucknow 140.00 S V Singh, Consultant, 3/22-D, Civil Airports
Infratech extension and resurfacing of runway Uttar Lines, Bypass Road NH-2, (Near
Ltd at Air Force Station, Bakshi Ka Talab, Pradesh Omaxe SRK Mall), Agra-282002,
near Lucknow. Uttar Pradesh. T: 0562-4054400,
F: 4070000, ho@pncinfratech.com,
(Chakresh Kumar Jain, MD)
65 Sterlite The company has won the Jaipur Jaipur NA Sumedha Mahorey, Manager – Construc-
Technolo- Smart City Phase-II project under the Rajasthan Corporate Communications, Godrej tion
gies Smart City Mission of Ministry of Millennium, 9 Koregaon Road,
Urban Development. The scope of the Pune-411001, Maharashtra.
project includes setting up citizen T: 020-30514000, F: 30514113,
services kiosks with environmental M: 9820192152,
sensors and Interactive Information sumedha.mahorey@sterlite.com,
Kiosks, Wi-Fi network extension, video www.sterlitetechnologies.com
surveillance for public safety and
security at key locations, enabling
remote expert government services,
and provisioning of bandwidth.
66 AT Capital Wholly owned subsidiary of AT Maharashtra NA Naresh Mansukhani,CEO, Experion Renewable
Group Holdings Pte Ltd, Singapore, bagged Developers , Vatika First India Place, Energy
the 100 MW bid at the latest auction 1st Floor, MG Road, Shushant Lok ,
by Solar Energy Corporation of India Phase 1, Gurgaon, Haryana.
(SECI), the nodal agency for imple- M: 9958793050, nareshmansukha-
mentation of MNRE schemes for ni@orangerenewable.net, (Deepak
developing grid connected solar power Mawandia, Chief investment officer
capacity through Variable Gap and Director-AT Capital Group)
Funding (VGF) mode in the country.
*Figures are approximate ( `. Crore)
India’s Projec
t Database
Email: Sandeep@ASAPPinfoGLOBAL.com
®
67 City and The financial bids for the proposed Navi 14573.00 M.B. Ninave, PRO, CIDCO Bhavan, Airports
Industrial Navi Mumbai airport was recently Mumbai CBD-Belapur, Navi Mumbai-400614,
Develop- invited. Request for Proposals (RFPs) Maharashtra Maharashtra. T: 08286-67918286,
ment were issued to GMR Infrastructure, 022-67918100, F: 67918166,
Corpora- Mumbai International Airport (MIAL) M: 9920217511
tion (Cidco) and Mia Infrastructure.
68 Hindustan The company has completed Kumud- Bengaluru 4.77 Uday Kumar, GM (CSR), Old Airport Infrastruc-
Aeronaut- vathi river rejuvenation project under Karnataka Road, Hal Post Office, ture
ics Limited Corporate Social Responsibility (CSR) Bangalore - 560017, Karnataka,
(HAL) by joining hands with International T: 080-22323364, 22311514,
Association for Human Values (IAHV) gmcsr-sd@hal-india.com,
near Nelamangala in Bengaluru rural (T Suvarna Raju, CMD)
district.
69 Bharat The company has commissioned a Bokaro NA Rohit Singh, DGM-Corp Comm, Power
Heavy 500 MW thermal unit at Bokaro Jharkhand BHEL House, Siri Fort, New Del-
Electricals Thermal Power-A Station of Damodar hi-110049. T: 011-23365669,
Ltd Valley Corporation (DVC) on engineer- 23742017-20, F: 26493021,
ing, procurement and construction M: 9910997301, bhelrohit@gmail.
(EPC) basis. In Jharkhand, BHEL com, (Atal Saraya, Director-Power)
aims to contribute a significant 87 per
cent to the total installed power
generating capacity of the state.
70 Rays The company has commissioned a Mehboob 77.00 Piyush Gupta, Project Director, Renewable
Power Infra 11.5 MW solar PV project spread over nagar Village-Boinapally, Jadcherla - Energy
Pvt Ltd 46 acre of land in Mahbubnagar District Kalwakurthy Rd, Midjil, Telangana
district. Telangana 509357, T: 0141-4038767,
M: 8875354333, 9587134999
71 Mumbai Mumbai Trans Harbour Link (MTHL) Mumbai 17500.00 P.D.Mamdapure, Engineer-in-Chief, Roads/
Metropoli- will be of 22-km with total of six lanes, Maharashtra Engineering Division, Bandra Kurla Highways/
tan Region three in either direction. Out of this, Complex, Bandra (East), Mumbai - Bridges
Develop- 16.5-km will be bridge component and 400051, Maharashtra.
ment the balance would be on coast at T: 022-26591239, 26594000,
Authority Sewri and Nhava. F: 26594179, ce.mmrda@gmail.com
(MMRDA) Bidding process for the project has
started.It is likely that the contract will
be awarded in next 5-6 months. JICA
funding request is approved.
72 Municipal The coastal road project would cover Mumbai 14000.00 C.D. Chaudhari, Asst. Eng. (D.P.) Roads/
Corpora- distance of 34-km and execution is Maharashtra City-I, CH.E. (D.P.)'s Office, Head Highways/
tion of planned in eight phases. The first Office, 5th floor, C.S.T. Mumbai - Bridges
Greater phase of this project is likely to start by 400001. T: 022-22620251
Mumbai the end of this year and includes a
road from Priyadarshani Park to
Bandra. Expression of interest is
currently invited.
73 Mumbai Plans to implement Kalanagar flyover Mumbai 227.00 M.Y Patil, Executive Engineer, Roads/
Metropoli- in Bandra. Tenders will be finalised Maharashtra M.M.R.D.A. Office Building, Bandra- Highways/
tan Region soon.MMRDA has received six Kurla Complex, C-14 & 15, E Block, Bridges
Develop- tenders, from Supreme Infrastructure, Bandra (E), Mumbai - 400051,
ment J Kumar, JMC, NCC, Simplex T: 022-26594049, F: 022-26591264
Authority Infrastructure and Relcon.
(MMRDA)
74 Jaipur The Gopalpura bypass-Mansarovar Jaipur 36.50 V M Johari, Executive Engineer- Roads/
Develop- area bridge is likely to be completed Rajasthan ROB/RUB II, Room No.CCC-TF-301, Highways/
ment soon. The work on three lanes of the CCC Building, Ram Kishore Vyas Bridges
Authority bridge has almost been completed Bhavan, Indira Circle, Jawaharlal
(JDA) while work at starting points is Nehru Marg, Jaipur-302004,
underway. Rajasthan. T: 0141-2575151,
2575252, M: 9929099416
*Figures are approximate ( `. Crore)
75 Emami Ltd Kolkata-based FMCG major plans to Guwahati 300.00 Sweta Sen, Head (Corp Comm), FMCG
set up a greenfield facility in Guwahati. Assam Emami Tower, 687, Anandapur,
The unit will be operational by E M Bypass, Kolkata -700107, West
FY2017. Bengal. T: 033-66136264, 66136702,
corpcomm@emamigroup.com,
corporate.communication@emami-
group.com
76 Kalyan Kerala-based Kalyan Jewellers is Multiple NA Ramesh Kalyanaraman, Executive Gems &
Jewellers eyeing a turnover of `13,000 crore this Director, Plot No.19,Proxima Jewellery
fiscal. Plans retail expansion through Building, Next To Raghuleela Mall,
20 stores in India. Three stores have Swami Pranavanandji Marg,
come up in Rajasthan in April and Sector 30 A, Vashi, Navi Mumbai,
another three are expected in Kolkata. Maharashtra 400705,
While five stores are in the works in T: 022-27812833
Uttar Pradesh and Madhya Pradesh,
the rest nine will be in South India.
Expansion plans funding would be
mostly through own resources.
77 Vital Paper Singapore-based company is setting Sri City 60.00 Pradeep Deshpande, GM Packaging
Products up new packaging division in Sri City, Andhra (Packaging) 1820,Portia Road,Sector
Andhra Pradesh.The highly automated Pradesh 35,Sricity SEZ,Satyavedu mandal,
plant with a four-colour printing facility Andhra Pradesh, M: 7775997720,
is expected to be ready by April, 2017. jdpradeep@vitalpaper.com,
(Sishi Rao, MD, L.Kesavulu,
Commercial Manager, 9963475705)
78 Punjab Setting up a 2nd 100MVA T/F Abohar 40.00 Nandlal, Addl SE (Civil Works), Power
State 220/66KV Sub Station of Abohar. So Punjab Shakti Sadan, Jhalandar - 144001,
Transmis- far around 90% of the work is Punjab, M: 9646117918, srxen-cw-
sion completed. jal@pstcl.org
Corpora-
tion Limited
(PSTCL)
79 NTPC Ltd The company is coming up with Karimnagar NA Deepna Mehta, DGM, NTPC Power
Telangana Super Thermal Power District Bhawan, Core-7, Scope Complex,
(TSTP) project stage-I of 2x800 (1600) Telangana 7 Institutional Area, Lodhi Road,
MW at Ramagundam, in Karimnagar New Delhi-110003, T: 011-24387195,
district. 24360100, M: 9650990565,
deepna.mehta@gmail.com
80 Depart- Setting up Turga Pumped Storage Purulia 11000.00 Surujit Chakravarthy, CE, Depart- Power
ment of Project (4x250 MW) on Turga nala is District West ment of Power & NES, Bidyut
Energy/ located in Purulia district of West Bengal Unnayan Bhaban, 5th Floor 3/C LA
Power, Bengal. Block Sector-III, Bidhanagar,
West Kolkata-700098, West Bengal.
Bengal T: 033-23197246, M: 9433012398,
(Rajesh Pandey, CMD)
81 NTPC Ltd Setting up 2,250 MW solar power Anantapur NA Deepna Mehta, DGM-Corp Comm, Renewable
plant in Andhra Pradesh. The Andhra NTPC Bhawan, Scope Complex, 7, Energy
completion is targeted in 1.5 years. Pradesh Institutional Area, Lodi Road, New
Delhi- 110003. Delhi. T: 011-
24387195, , 24368283, 24360100,
F: 24361018, M: 9650990565,
deepna.mehta@gmail.com,
82 Chhattis- Plans to set up a 100 MW Solar Rajnand- NA Rajeev Gyani, Executive Engineer, Renewable
garh State Energy Park in Rajnandgaon district. gaon V.I.P. Road (Airport Road), Energy
Renewable Detailed Project Report (DPR) will Chhattisgarh Near Energy Education Park,
Energy soon be prepared for taking up Phase Raipur - 492001, Chhattisgarh,
Develop- I development work for the project. M: 8370008627, rajivgyani@gmail.
ment The completion of this project is com, (Purander Mishra, Chairman)
Agency targeted in 8-9 months.
(CREDA)
*Figures are approximate ( `. Crore)
83 Haryana Plans to install 3,050 solar water Haryana 3.78 K.S Sandhu, Project Officer, Akshay Renewable
Renewable pumps for the implementation under Urja Bhawan, Institutional Plot No.1, Energy
Energy Solar Water Pumping Scheme. Sector 17, Panchkula - 134109,
Depart- Haryana. M: 9416686907,
ment drehareda@gmail.com,
(HAREDA) (Vivek Atray, Director)
84 New The Port Trust is setting up 4 MW Mangalore NA K Aleshappa, Superintending Renewable
Mangalore solar power plant. The commissioning Karnataka Engineer (Electrical & Electronics), Energy
Port Trust is targeted by December 2016. Panambur, D.K. District, Manga-
lore-575010, Karnataka.
T: 0824-2407259, 2408200,
M: 9880079309, eee2@nmpt.in
(P C Parida, Chairman)
85 Kerala Setting up 650 KW solar power plant Kozhikode 4.68 Suku. R, CE (Renewable Energy and Renewable
State at Thalakkulathur under its Renewable Kerala Energy Savings), Vydyuthi Energy
Electricity Purchase Obligation (RPO) project. Bhavanam, Pattom, Thiruvanan-
Board The completion is targeted by July, thapuram-695004, Kerala.
(KSEB) 2016. T: 0471-2447404, 2514424,
F: 2558340, M: 9446008007,
srsuku@gmail.com,
(M. Sivasankar IAS, CMD)
86 RattanIndia The company is implementing order Nagpur NA Sushil Paliwal, Vice President Renewable
Power Ltd from Solar Energy Corporation Ltd Maharashtra (Solar), 5th Floor, Tower-B, World- Energy
(SECI) for 40 MW Solar Project in mark 1 Aerocity, New Delhi -110037,
Maharashtra at a tariff of Rs 4.43 per Delhi. T: 011-66612666, F: 66612777,
kWh. sushil.paliwal@rattanIndia.com
87 Azure Leading independent power producer Punjab NA Samitla Subba, Marketing Head, Renewable
Power in the solar power sector is implement- 8, Local Shopping Complex, Energy
India Pvt ing 150 MW of solar power projects for Madangir, Gr Flr, Pushp Vihar,
Ltd Punjab Energy Development Agency's New Delhi–110062. T: 011-49409800,
(PEDA) under its Solar Policy Phase F: 49409807, pr@azurepower.
III. The company could win the bid at com,(Inderpreet Wadhwa,
INR 5.63/KWh in 2015.The power will Founder & CEO)
be procured by the Punjab Power
Corporation.
88 Minister of The central government has approved Multiple 16680.00 Sudip Chaudhury, Chief Engineer Roads/
State for a plan for constructing 1,000 km of (Planning), Transport Bhawan, Highways/
Road expressways under the NHDP Phase 1, Parliament Street, Bridges
Transport VI on design, build, finance, operate New Delhi-110001,
and and transfer (DBFOT) basis. The high T: 011-23739027,
Highways density corridors approved under sudip.chaudhury@nic.in
NHDP phase VI are Vadodara-Mum-
bai stretch (400 km) in Gujarat and
Maharashtra, Delhi-Meerut (66 km) on
NH 58 in Delhi/UP and Bengaluru-
Chennai (334 km) on NH 4 in
Karnataka-Tamil Nadu
89 Ghaziabad Hindon elevated road project work is Ghaziabad 1147.00 Sushil Chandra Dwivedi, Chief Roads/
Develop- on. The construction of pillars is nearing Uttar Engineer, Bulandshahr Road Highways/
ment completion and the six-lane corridor Pradesh Industrial Area, Ghaziabad, Bridges
Authority from UP Gate to Kanawani is expected Uttar Pradesh, T: 0120-6450580,
to be ready by December 2016. 2703888, 0522-2613978
90 National The automated multi level car parking New Delhi NA Vaibhav Saxena, Corporate Commu- Transport
Highways lot project is coming up at Transport Delhi nication Manager, 3rd Floor, PTI
and Bhawan in New Delhi. The facility Building, 4-Parliament Street, New
Infrastruc- comprises ground plus seven floors Delhi, Delhi 110001, T: 011-
ture and would spread over an area of 314 23461600, 23711102, 23711252,
Develop- sq mtr and with a height of 22 mtr.The 23710121, info@nhidcl.com, (Sanjay
ment foundation stone was recently laid. Mitra, Managing Director)
Corporation
*Figures are approximate ( `. Crore)
91 | 2 laning of Hunli Anini road 94 | Industrial base kitchen on Contact Address: Chief Engineer (Civil),
NHIDCL/AE/H-A/92.5to131.92 /2016 | Indian Railway stations Vydyuthi bhavanam, Pattom,
Tenders are invited for consultancy Expression of intrest are invited for hiring Thiruvananthapuram – 695004, Kerala.
service for authority engineer for project of of consultant for setting up of industrial M: 9446008005, 9446008492,
2 laning of Hunli Anini road from km 92.5 base kitchen on Indian Railway stations. dirropim2@gmail.com
to km 131.92 on EPC mode in the state Submission Date: 25/05/2016
of Arunachal Pradesh. Location: Delhi 98 | City sanitization plant works
Submission Date: 16/06/2016 Indian Railway Catering and in Kopargaon
Location: Valley district Tourism Corporation Ltd KMC E-Notice HD -1 2016
Arunachal Pradesh Contact Address: Group General ID:2016_DMA_123882_1
National Highways and Infrastructure Manager, Wing A, 11th Floor, Statesman Tenders are invited for project
Development Corporation House, B – 148, Barakhamba Road, management consultancy services for
Contact Address: Yogesh Chandra New Delhi-110001, T: 9717645625, city sanitization plant works in
Srivastava, GM, HQ, 3rd Floor, tourism@irctc.com Kopargaon Municipal Council.
PTI Building, 4 Parliament Street, Submission Date: 27/05/2016
New Delhi-110001, Delhi. 95 | Supervision works of WTP, Location: Ahmednagar Maharashtra
T: 011-23461600, STP & CETP Directorate of Municipal
info@nhidcl.com DICDL/DSIR/CNSL/EE/02 | Tenders are Administration, Kopargaon
invited for consultancy services of Contact Address: Chief Officer,
92 | Construction of expressway employer’s engineer for supervision works Kopargaon Municipal Council,
with BRTS corridor of WTP, STP & CETP packages in Kopargaon, Maharashtra.
24/16-17/CGRDC/2016 | Request for DSIR on EPC basis. T: 0241-2343622, 2340522
proposal are invited for preparation of Submission Date: 07/07/2016
DPR, including project management Location: Gujarat 99 | Construction of flyovers
consultancy for construction of road/ Dholera Industrial City Development Ltd at Kalanagar Junction
expressway with BRTS corridor on Contact Address: Abhishek Chaudhry, MMRDA/ENG1/000498
existing Fafadih-Telibandha-Naya Raipur Director, Block No.1 And 2, Tenders are invited for project
narrow gauge railway track. 6Th Floor, Udhyog Bhavan, management consultancy services
Submission Date: 28/05/2016 Gandhinagar, Gujarat. for the construction of flyovers at
Location: Naya Raipur Chhattisgarh T: 079-23226015 Kalanagar Junction.
Chhattisgarh Road Development Submission Date: 27/05/2016
Corporation Ltd 96 | Development of underground coal Location: Mumbai Maharashtra
Contact Address: Managing Director, gasification Mumbai Metropolitan Region
3rd Floor, Sirpur Bhavan, Civil lines, CMPDI/CBMC/UCG/71(T)/883 | Tenders Development Authority
Raipur-492001, Chhattisgarh. are invited for selection of consultant for Contact Address: Executive Engineer,
T: 0771-4043395 formulation of bid document and model C-14 & 15, E Block, Bandra (E),
contract document for development of Mumbai-400051, Maharashtra.
93 | Authority Engineer for underground coal gasification (UCG). T: 022-26590001, 4000
rehabilitation and upgradation Submission Date: 25/05/2016
of NH-200 Location: Jharkhand 100 | Widening to 2 lane with
02/CE/NHDP/44-01/2016/27064 | RFP Central Mine Planning and geometries improvement of NH-87
are invited for consultancy services for Design Institute Ltd 1479/127 Date: 03.05.2016NH-
authority’s engineer for supervision of Contact Address: Deputy General 12014/74/2013-UR/NH-II | RFP
rehabilitation and upgradation of NH-200 Manager, Gondwana place, are invited for consultancy service for
(New NH-49) from Km 127.500 to Karke road, Ranchi, Jharkhand. authority engineer with regard to
Km.178.944 (Theka/Darrighat to Banari T: 0651-2230011, widening to 2-lane with geometries
section) package-I to 4-lane/2-lane with hodcbm.cmpd@coalindia.in improvement of NH-87 extn. (New
paved shoulder in the state of NH-109) from Km. 35.00 to 45.00
Chhattisgarh under NHDP-IV on 97 | Dam rehabilitation and (Khairna to Kakrighat) in the State of
EPC basis contract basis. improvement project Uttarakhand on engineering,
Submission Date: 06/06/2016 KL KSEB DRIP CE-2R1/2016-17 | procurement & construction (EPC) mode.
Tender Value (`): 32512500000 Expression of interest are invited for dam Submission Date: 07/06/2016
Location: Bilaspur District Chhattisgarh rehabilitation and improvement project Location: Almora district Uttarakhand
Ministry of Road Transport (DRIP) consultancy on preparation of Public Works Department (PWD)
and Highways emergency action plan (EAP) for Contact Address: Superintending
Contact Address: Chief Engineer, Idamalayar, Sholayar & Engineer, National Highway
Transport Bhawan, 1, Parliament Street, Poringalkuthu dams. Vth Circle, P.W.D,
New Delhi-110001, Delhi. Submission Date: 31/05/2016 Haldwani- 263139,
T: 011-23739027, Location: Kerala Distt. Nainital, Uttarakhand.
cenhr@rediffmail.com, Kerala State Electricity Board Ltd T: 05946-221182, 220194
Skipper Limited
T&D investment is high on government priority and power
evacuation constraints and high transmission losses have
attracted the attention of policy makers for more investments in
the transmission infrastructure space to match the investment in
power generation. The government has launched initiative like
‘Power for All’ and several schemes to catalyse the growth of power
sector such as dedicated green energy transmission corridors are
planned to generate power through renewable sources.
Sharan Bansal, Director, Skipper Limited shares his views with Sandeep Sharma about his company,
core competencies, products/solutions offered, manufacturing base, capex planned, achievements in
FY2015-16, major clientele, projects, power transmission and distribution business potential, challenges
before the power sector and the way forward to boost power sector growth. Edited Excerpts...
Tell us about your company, objectives and core has the largest Monopole designing & manufacturing unit in
competencies? India of application upto 400kV in Transmission sector & rising
Established in 1981 as ‘Skipper Investments Limited’, is a up to 40 mtrs in Telecom.
leading manufacturer for Transmission & Distribution After achieving leadership and manufacturing excellence
Structures (Towers & Poles) and Plastic Water Pipes. The in Towers, Fasteners and its accessories, the Company is
company was renamed Skipper Limited in 2009. With more currently involved in inculcating superior project management
than 30 years of domain knowledge in power, it is a crucial and execution expertise in its EPC business for clients and
player to support infrastructure and power projects. provides value-added turnkey solutions.
Skipper Limited is one of the world’s largest Integrated
Transmission Tower manufacturing companies with Angle Could you provide us some insight about your
Rolling, Tower, Accessories & Fastener manufacturing and manufacturing base and capex for the future?
EPC line construction. Our manufacturing capacity is among Skipper Limited owns three Power Grid approved
the top 3 in India and among the top 10 in the world. It is the manufacturing plants with an installed capacity of
only company in India which has a control over the complete 2,00,000 MT per annum. The manufacturing base of
value chain, resulting in control of 80% of costs for any tower Skipper can be outlined as:
line project. The global market reach spans across 20 countries • 7 in-house galvanizing plants up to 12 m length, 2.5 m
some of which are from South America, Europe, Africa, the width and 3 m depth
Middle East, South and Southeast Asia and Australia. • 35 Angle and Plate CNC lines
The objective has always been to support the current Govt. • Zero machine downtime with 3 units back-up
policy of ‘Make In India’, which aims to promote products • Nut bolt capacity of 600 MT per month i.e. 7200 MT
manufactured within India in the global market place. We look per year
forward to produce world – class quality products ensuring • In-house MS & HT Angle Rolling (upto 200 X 200 X 25) that
robust National Infrastructure development and making India guarantee all time availability
the preferred sourcing hub for Global Infrastructure needs. • Machinery and latest technology of manufacture is
imported from Italy and China
What kind of products and solutions do you offer for the • In-house Engineering and Drawing department to provide
Power sector? Optimized Design solutions for all client requirements
At Skipper Limited, we offer a full-range-cum-diverse The company has added up incremental capacity of about
product basket ranging from 66KV to 800KV Towers (Single 15-20%. Since the basic infrastructure is already available
Circuit, Double Circuit, Multi-Circuit Towers suitable for Twin, with the company the additional capex cost will be around
Quad and Hex Conductor configurations). The company also `8000-10,000/MT totalling `20-25 Crore.
www.Proj
ectReporter.c
India’s Pro
ject Datab
ase
(IEM) was filed with Department of Location: NA, Gujarat Location: Mysore, Karnataka
Industrial Policy & Promotion on Contact: Manojkumar Karshanbhai Contact: Chikkayana Chatra, P.O.
18/03/2016 for the manufacture of Vilpara, Director, Sr.No.55p1, 55p2 Nanjangud, Mysore-571302, Karnataka.
tin containers. & 56p1, Dhua-Matel Road, Nr.Matel T: 08221-228264, 228265, 228266,
Location: East Godavari, Andhra Pradesh Village, At-Matel, Wankaner, 228267, F: 228270
Contact: Ruchi House, Royal Palms, Morbi-363622, Gujarat.
Sy No.169, Aarey Milk Colony, Near stefinavitrified@gmail.com 185-186 | Tirumala Cotton And
Mayur Nagar, Goregaon (East) Agro Products Pvt Ltd
Mumbai-400065, Maharashtra. 182 | Sudamo Impex Pvt Ltd Industrial Entrepreneurs Memorandum
T: 022-39388200, F: 39388257, Industrial Entrepreneurs Memorandum (IEM) was filed with Department of
ruchisoya@ruchigroup.com (IEM) was filed with Department of Industrial Policy & Promotion on
Industrial Policy & Promotion on 02/03/2016 for electric power
179 | SEZ Vitrified Pvt Ltd 14/03/2016 to set up cotton and generation using other non
Industrial Entrepreneurs Memorandum blended cotton fabrics unit. conventional sources.
(IEM) was filed with Department of Location: Surat, Gujarat Location: Anantappur,
Industrial Policy & Promotion on Contact: Block No.281-283, Plot No. Andhra Pradesh
16/03/2016 for the manufacture of 111-130, Laxminarayan Industrial
vitrified tiles/ walls/floor etc. Estate, Palsana, Baleshwar, Industrial Entrepreneurs Memorandum
Location: NA, Gujarat Surat-394317, Gujarat. (IEM) was filed with Department of
Contact: Sy No.327, Rangpar, Pipli T: 0262-2291113, M: 7624015001 Industrial Policy & Promotion on
Road, Opp.Somnath Petrol Pump, 09/03/2016 for electric power
Bela, Morbi-363641, Gujarat. 183 | TCPL Packaging Ltd generation using other non
sezvitrified@gmail.com Industrial Entrepreneurs Memorandum conventional sources.
(IEM) was filed with Department of Location: Anantappur, Andhra Pradesh
180 | SRG Apparels Pvt Ltd Industrial Policy & Promotion on Contact: 240c, Nh5, Thimmapuram,
Industrial Entrepreneurs Memorandum 07/03/2016 to set up flexible packaging Edlapadu Mandal,
(IEM) was filed with Department of material unit. Guntur-522233, Andhra Pradesh.
Industrial Policy & Promotion on Location: Dadra & Nagar Haveli, Dadra M: 9885454394
09/03/2016 for the manufacturing of & Nagar Haveli
cotton hosiery yarn. Contact: Empire Mills Complex 414, 187 | Vanu India Pvt Ltd
Location: Tirupur, Tamil Nadu Senapati Bapat Marg, Lower Parel, Industrial Entrepreneurs Memorandum
Contact: 10-B, Padmavathipuram, Mumbai-400013, Maharashtra. (IEM) was filed with Department of
Near Mahaliamman Kovil, Gandhinagar, T: 022-66606006 Industrial Policy & Promotion on
Tirupur-641603, Tamil Nadu. 04/03/2016 for the manufacture of
T: 0421-4343100, F: 2474526 184 | The South India Paper Mills Ltd mobile communication equipment.
Industrial Entrepreneurs Memorandum Location: Bengaluru (Urban),
181 | Stefina Vitrified Pvt Ltd (IEM) was filed with Department of Karnataka
Industrial Entrepreneurs Memorandum Industrial Policy & Promotion on Contact: Level 4, Augusta Point,
(IEM) was filed with Department of 16/03/2016 for electric power Dlf Golf Course Road, Sector-53,
Industrial Policy & Promotion on generation using other non Gurgaon-122002, Haryana.
17/03/2016 for the manufacturing conventional sources. T: 0124-4354229, F: 4354001
of vitrified tiles.
4th INDIAN
CONFERENCE 2016
SUPPORTED BY
2nd INDIAN
AWARDS 2016
5000
4500
4321
4000
3500 2393
ckms
3000
2500
2000
1500
1000
500
0
March ‘15 March ‘16
Transmission Lines Added during April ‘14 to Mar ‘15 & April ‘15 to Mar ‘16 (Ckms)
Voltage Level Apr ‘14 - Mar ‘15 Apr ‘15 - Mar ‘16
+/- 500 KV HVDC 0 0
+/- 800 KV HVDC 0 3506
765 KV 7548 5601
400 KV 9992 11181
220 KV 4561 7826
All India 22101 28114
30000 28114
25000
22101
20000
ckms
15000
10000
5000
State Sector 0 0 0 0 0
Total 0 0 0 0 3506
Central Sector 0 0 0 0 0
JV/Private Sector 0 0 0 0 0
Total 0 0 0 0 0
765 kV
State Sector 0 0 0 0 0
400 kV
220kV
JV/Private Sector 0 0 0 0 0
4 LANING OF KRISHNAGAR TO
BAHARAMPORE SECTION
Four laning of Krishnagar to Baharampore section of NH-34 from Km. 115.000
Project Details to Km. 193.000 in the state of West Bengal under NHDP Phase-III on DBFOT
(Annuity) basis (Package No. NHDP-III/BOT/WB/02).
Ajit Kumar Singh, Project Director, P.O. & Vill.- Bhatjangla, Krishnagar,
Contacts Nadia district-741102, West bengal. T: 03472-271713, M: 9434208662,
krishnagar@nhai.org
Four Laning of Kiratpur - 21 84.32 November November 2016 IL & FS Transportation Networks
Ner Chowk Section 2013 Ltd / Getinsa Ingenieria S.L.Spain
Km. 73.20 to Km. 186.50 in Asso. with Segmental Cons. &
Himanchal Pradesh Supp. Pvt. Ltd
BOT
Quazigund-Banihal 1A 15.25 June 2011 June 2016 Navyuga Engineering Co. Ltd /
Km.220 to Km.188 SMEC International Pvt. Ltd. In
Jammu Kashmir Assoc. with SMEC Pvt. Ltd. And
Annuity RODIC Cons.
Under Implementation
NHDP Phase II
4-Laning of Khed - Sinnar 50 137.946 February August 2016 IL&FS Transportation Networks
Section 2014 Ltd / SA Infrastructure
Km 42.00 to Km 177.00 Consultants Pvt Ltd - Dhruv
Maharashtra Construction Pvt Ltd
BOT
Under Implementation
NHDP Phase IV
MH/ KNT Border 9 145 April 2014 September 2016 L&T Infrasructure Developement
Sangareddy Projects Ltd / CDM Smith JV with
Karnataka Willbur Smith
BOT
Under Implementation
NHDP Phase III
4-Laning of Goa/Karnataka 17 187.24 March 2014 August 2016 IRB Infrastructure Developers Ltd
Border-Kundapur Section / AECOM Asian CO Ltd - M/s
Km 93.7 to Km 283.30 Roadiac Consulatants Pvt Ltd
Karnataka
BOT
Under Implementation
NHDP Phase IV
Source: NHAI
FOCUS
Green materials
Innovative building designs
Advanced construction methods
Energy and water-efficient systems
Building performance management
CONTACT
ABHAY KHARAT
Email: abhay@ASAPPinfoGLOBAL.com
M: 9833102014 | T: 022- 24193000
ISSN 2277-6532 Date of Publication: 1st & 15th of Every Month.
Over
panies
1500 com
ss
listed acro
gories
56+ cate
The time is just ripe for manufacturers, suppliers and service providers to construction & design décor
industry, to exert a pull on the attention of key buyers.
Advertising within C & D Infobank will provide suppliers with high visibility for their brand,
and sure-shot entrance to consideration set of key buyers.
e
k th
Boo t
Bes ow
sN
o s ition
P
Contact
Abhijit Oak
Email: Abhijit@ASAPPinfoGLOBAL.com
Tel: +91 20 2605 2987
®
www.ASAPPInfoGLOBAL.com