Invitation For Pre-Qualification PDF
Invitation For Pre-Qualification PDF
Involving following;
Page 1
Note:
i. Installation & commissioning and Final Acceptance Test of the plant & Machinery
mentioned above will be carried out under the supervision of OEM experts. The
buyer will provide the required number of technicians/ workforce for this purpose.
ii. After successful installation and commissioning, OEM will be responsible for
continuous/ round the clock (one week) operation of the plant and machinery for
confirmation of quantity and quality of the product(s).
3. The request must clearly state “Request for Pre-qualification Documents” for execution of
work mentioned at Para # 2 above.
4. POF reserves the right to conduct inspections of the completed / in hand projects of the
shortlisted firm(s) in order to physically verify the information provided in the pre-
qualification proposal. The firm(s) found having conveyed incorrect / erroneous information
and the firms performing unsatisfactorily on the inspected projects shall not be considered.
5. Applicants will be informed, in due course, of the final result of the evaluation of
applications.
6. Invitation to Bids shall be issued separately as per following to the successful prequalified
bidders only;
7. INSTRUCTIONS TO APPLICANTS
“Bid Center (Rabita Hall), CR Section, C-04 Building, POF Wah Cantt,
PAKISTAN”
7.1.2 The name and mailing address of the Applicant shall be clearly marked on the
envelope.
Page 2
7.1.4 The Applicants must respond to all questions and provide complete information as
advised in this document. Any lapse to provide essential information may result in
disqualification of the Applicant.
7.1.5 The Applicants may request clarifications (if any) through email / fax addressed to
following;
Managing Director
Explosives Factory
Pakistan Ordnance Factories
Gate # 6, Quaid Avenue Wah Cantt
Tel +92 51 9055 29201, 29206
Fax +92 51 9271400, 9314100
Email: mdexp@pof.gov.pk
Such query must be received in the as per above address at least five (05) working
days prior to Pre-qualification Proposal Submission Date. Queries received after
this time may not be responded.
8. QUALIFICATION CRITERIA
8.1 General
Weight-age /
Sr. # Category
Marks
i. Work Experience of relevant field 40
ii. Personnel & Equipment / Plant Capabilities 25
iii. Financial Soundness 25
iv. Confirmation of export licence 10
Total 100
Note:
The applicant must secure at least 70% score in each category. In every Category,
marks shall be awarded based upon the certain qualification parameters as stated
below:
Page 3
8.2 Work Experience
Marks for experience shall be awarded on the basis of following qualifications:
Maximum
Sr. # Description
Points
i. List of similar projects completed and in hand. Details
i.e. names and addresses of the Clients may also be 10
provided.
ii. Design of Explosives manufacturing plant 10
iii. Explosives Processing & handling experience 10
iv. Details of refurbishment/up gradation of explosives
manufacturing plant (preferably TNT production plant) 10
till date.
Total 40
Weight-age /
Sr. # Category
Marks
Experience personnel for designing of Explosive
i. 5
Manufacturing plant
Experience personnel for installation & commissioning
ii. 5
of Explosive Manufacturing plant
Experience personnel for manufacturing & handling of
iii. 5
Explosive
Experience personnel / facility for civil workshop
iv. drawings for construction of buildings/ infrastructure for 5
explosives plants.
v. Facilities for fabrication of Plant Equipment 5
Total 25
Weight-age /
Sr. # Category
Marks
Confirmation that the firm is not Blacklisted/involved in
i. 10
arbitration/litigation with any client during last 5 years.
ii. Bankers Certificate showing credit worthiness 10
Total 25
Page 4
9. Bidders shall be required to update the financial, personnel and equipment information
used for prequalification at the time of submitting their bids, to confirm their continued
compliance with the qualification criteria and verification of the information provided at the
time of prequalification. A bid shall be rejected if the Applicant’s qualification thresholds
are no longer met at the time of bidding and the bidder’s prequalification shall be
discontinued till the firm again attains the qualification criteria.
Applicants meeting the requirements mentioned in Para 8 shall be considered for pre-
qualification.
ii. Confirmation regarding availability of export permit from the respective government
for supply of such type of plants and machinery.