Professional Documents
Culture Documents
1 (Site Decommissioning)
This document contains explanatory information and examples which are shown in this font.
Also, embedded comments are provided to assist with completion of the implementation
plan.
2. Under the “Tracking” group, select the drop box “Display for Review” and
select “Final Showing Markup”.
1. Document Control
Update this section each time a new version of implementation plan for this change is issued or released.
1.0
Acronym Definition
3. Summary of Change
The purpose of this section is to provide a summary of the change. All questions must be answered. Do not
refer to other sections, but instead, provide a summary of the detailed information.
3.3 Reason for Change To remove the below sites as per the VHA request
200248_SydFootballStdm
200251_SydFootballStdW
404012_Burbank
(Site Decommission)
4. Information Security
4.1. Is this change part of a larger project? If so who is the security resource assigned? If not please
complete questions 4.2 to 4.9.
Comment: No
Comment: No
Comment: No
4.4. Does this change affect who and how systems are accessed?
Comment: No
Comment: No
4.6. Does this change implement any new computer or network systems?
Comment: No
Comment: No
Comment: No
Comment: No
5.2. Dependencies
This section should describe all dependencies on the successful deployment of this implementation.
<NA>
6.1.1. N/A
6.1.2.
6.2.2.
6.3.1. NA
6.3.2.
7. Testing
This section provides a summary of the planned testing related to the deployment i.e. pre-deployment,
deployment and post-deployment testing. If an additional type of testing is planned, such as Billing
Verification Testing (BVT), additional sections can be added.
<NA>
This criteria should form the input into any decision to continue with a change or to initiate a rollback.
11. Implementation
11.1. Implementation Strategy
This section should provide details of the overall strategy of the implementation.
<implementation_strategy>
13.2.Rollback Strategy
This section should provide details of the rollback strategy, or strategies, of the implementation.
Note that for any deployment with an Extreme risk (as identified in section 10.2), the approval from General
Manager, Technology Operations must be obtained prior to any rollback. This engagement must be pre-
arranged and documented in the Deployment Communication Plan (section 11.2).
< If during the soft decomm process, it is determined that further modifications are required prior to
the site being decommissioned, This determination would be made on the basis of the Performance
Reports and Team Feedback>
14.1.Issues
14.1.1. No issues
14.1.2.
14.2.Risks
RS-XXXX No risks
RS-YYYY
<NA>
<NA>
16. Escalations
Provide the name of the person(s) who will be contacted to escalate issues.
VHA On-call Service Manager - Contact should be established via the Nokia on-
call SM (+61 450 929 170) for Networks changes or TechM Service Desk (+91
7875757371 or 1800 153 580 option 1) for IT changes.
<other_escalation_names>
VHA On-call Service Manager - Contact should be established via the Nokia on-
call SM (+61 450 929 170) for Networks changes or TechM Service Desk (+91
7875757371 or 1800 153 580 option 1) for IT changes.
<additional_post-deployment_communications>
1 Technical Support
This section provides the contact details for technical support staff who are involved in the deployment.
2 Business Support
This section provides the contact details for the business support who are involved in the deployment.
VHA On-call VHA Service Contact via VHA Service Escalation for
Service Management +61 450 Manager Go/No decisions
Manager – 929 170 and major
Networks & (Networks/ issues.
IT Nokia) or
+91 7875
757371
(IT/TechM).
<VHA_Proje Project VHA Project Managing the
ct_ Manager project
Manager>
<Deployment Deployment Deployment Managing the
_Manager_N Manager deployment
ame>
<Vendor_Pro <Vendor> Vendor Managing the
ject_ Project project
Manager> Manager
GNOC The GNOC operates 24x7. 1800 683 683 Option 1 nmc.vha@nsn.com
It is mandatory to telephone or
the GNOC: +61 2 9429 9988 Option 1
at least 15 minutes prior to
commencement of a
Have the CR number ready for
Networks change.
reference.
Depending on the stability of
the VHA Network, the GNOC
will provide approval to Please note:
proceed and a start receipt In the event you are unable to
number log in via the contact number
for any variations to the provided above, please email
implementation steps the GNOC (nmc.vha@nsn.com)
documented in this plan or - seeking login (stating CR no.
unexpected impacts and contact details).
at the conclusion of the Further escalation can be made
change to provide the status to the GNOC Duty manager: ph:
(successful or unsuccessful). 02 94299196 or email: nsn-vha-
GNOC will provide an end gdc-duty-managers@mlist.nsn-
receipt number. inter.net
VHA VHA Mumbai Call Centre +91 9820 810 176 Servicedesk.Aus@3gl
Mumbai serves VHA customers and is obalservices.com
Call open 24x7.
Have the CR number ready for
Centre The centre must be For email
reference.
telephoned if a change has an correspondence,
expected impact to the include:
centre’s ability to serve VHA the CR number
customers: the start and end
at least 15 minutes prior to time of change
commencement of the the systems affected
change
the
for any unexpected impacts Project/Deployment
at the conclusion of the Manager contact
change to provide the status details
(successful or unsuccessful). any other contacts
The centre must be emailed if for the change
a change has an expected
impact to the centre’s ability to
serve VHA customers:
at least 15 minutes prior to
commencement of the
change
at the conclusion of the
change to provide the status
(successful or unsuccessful).
TCM The TCM team can assist with 1800 683 683 tcm.au@vodafone.co
Team Change Management issues, or m
such as CR issues. The team
+61 2 9429 9988
operates Monday to Friday
09:00 AEST/AEDT to 17:00 IVR option: option 3
AEST/AEDT.
Have the CR number ready for
reference.
1 CMDB Updates
1.1.1 Is this Change creating a new application or deploying new N/A YES NO
hardware?
Comments:
Note: If any of the above responses have been answered ‘Yes’ then the ITSM CMDB Support team
need to be formally engaged for this Change and the Templates in the ITSM Help VHA Process
Documents mentioned below under the name ITSM CI ADDM Template v1.0.xlsm