Supplier: -
Factory : PT. HOKTONG JAMBI SCL
Date: 23 MARCH 2015
Total 81/100
AUDITOR COMMENTS
Although the factory has Washing Tank in the Breaker Area has
installed the overflow system in been repaired and effective in the
the blanding and Washing Tank, floating contamination.
it was observed that the water
level was slightly below the After Repaired
overflow sceens for it to be
effective in the floating
contaminations
Before repaired
Executive Report Summary (Page 2/2)
FACTORY INFORMATION
Quarter of Audit
AUDIT SCORE