You are on page 1of 8

Department of Public Works and Highways

Contract ID/ : 18FD0031 – Construction/ Maintenance of Flood Mitigation Structures


Contract and Drainage Systems - Construction of Flood Control Structures/River
Name/Location Wall along Bicol River, Brgy. Borongborongan, Milaor, Camarines Sur
of the Contract
----------------------------------------------------------------------------------------------------------------------------

CAMARINES SUR FIRST


DISTRICT ENGINEERING OFFICE
Baras, Canaman, Camarines Sur

SUPPLEMENTAL BULLETIN NO. 33


December 8, 2017

Subject: Revised of Plans and Bill of Quantities (BOQ)

This Supplemental Bulletin No. 33 is issued to notify the bidders/contractors of the revised Plans
and Bill of Quantities (BOQ) for the above-stated Contracts, scheduled for bidding on December
18, 2017.

The said revised Plans and Bill of Quantities (BOQ) are hereto attached or may be obtained from
PhilGEPs website, DPWH website and BAC Office, this district.

This Supplemental Bulletin shall form an integral part of the said Bidding Documents.

For the guidance and information of all concerned.

(Sgd)
SALVACION LORA C. DELEÑA
BAC Chairperson
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Camarines Sur 1st District Engineering Office
Baras, Canaman, Camarines Sur
Contract ID: 18FD0031
Contract Name: Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of
Flood Control Structures/River Wall along Bicol River, Brgy. Borongborongan, Milaor, Camarines
Sur
Location of Contract: Milaor, Camarines Sur

BILL OF QUANTITIES
(Columns (1),(2),(3) and (4) are to be filled by the Procuring Entity) (Columns (5) and (6) are to be filled by the Bidder)
Pay Item Description Unit Quantity Unit Price (Pesos) Amount (Pesos)
No. (2) (3) (4) (5) (6)
(1)
A FACILITIES FOR THE ENGINEER
A.1.1(6) PROVISION OF MO 6.53 In Words: Pesos In Figures: Php
COMBINED FIELD
OFFICE, LABORATORY
AND LIVING QUARTERS
BUILDING FOR THE
ENGINEER (RENTAL
BASIS)
In Figures: Php
B OTHER GENERAL REQUIREMENTS
B.5 PROJECT BILLBOARD/ EA. 2.00 In Words: Pesos In Figures: Php
SIGNBOARD

In Figures: Php
B.7 OCCUPATIONAL MO. 6.53 In Words: Pesos In Figures: Php
SAFETY AND HEALTH
PROGRAM
In Figures: Php
B.9 MOBILIZATION/ LS 1.00 In Words: Pesos In Figures: Php
DEMOBILIZATION

In Figures: Php
C EARTHWORKS
101(1) REMOVAL OF LS 1.00 In Words: Pesos In Figures: Php
STRUCTURES AND
OBSTRUCTION
In Figures: Php
101(3)b2 REMOVAL OF ACTUAL SQ.M. 200.00 In Words: Pesos In Figures: Php
STRUCTURES/
OBSTRUCTION (PCCP,
UNREINFORCED, 0.20M THK) In Figures: Php
105(1)a SUBGRADE SQ.M. 660.00 In Words: Pesos In Figures: Php
PREPARATION
(COMMON MATERIAL)
In Figures: Php
1700(1) CLEARING AND SQ.M. 1,584.00 In Words: Pesos In Figures: Php
GRUBBING

In Figures: Php
1700(3)a2 INDIVIDUAL REMOVAL EA. 10.00 In Words: Pesos In Figures: Php
OF TREES (SMALL, 301-
500MM Ø)
In Figures: Php
1701(1) UNSUITABLE CU.M. 810.00 In Words: Pesos In Figures: Php
EXCAVATION

In Figures: Php
Sub-Total for this Page In Words: Pesos

In Figures: Php
Submitted by:
Date:
Name and Signature of Bidder’s Representative

Position

Name of Bidder
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Camarines Sur 1st District Engineering Office
Baras, Canaman, Camarines Sur
Contract ID: 18FD0031
Contract Name: Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of
Flood Control Structures/River Wall along Bicol River, Brgy. Borongborongan, Milaor, Camarines
Sur
Location of Contract: Milaor, Camarines Sur

BILL OF QUANTITIES
(Columns (1),(2),(3) and (4) are to be filled by the Procuring Entity) (Columns (5) and (6) are to be filled by the Bidder)
Pay Item Description Unit Quantity Unit Price (Pesos) Amount (Pesos)
No. (2) (3) (4) (5) (6)
(1)
D SUBBASE COURSE
200(1) AGGREGATE SUBBASE CU.M. 132.00 In Words: Pesos In Figures: Php
COURSE

In Figures: Php
E SURFACE COURSES
311(1)b PCC PAVEMENT SQ.M. 660.00 In Words: Pesos In Figures: Php
UNREINFORCED,
0.20M THK.)-14 DAYS
In Figures: Php
N BANK AND SLOPE PROTECTION WORKS
900(1)c1 STRUCTURAL CU.M. 210.00 In Words: Pesos In Figures: Php
CONCRETE, CLASS A
(28 DAYS)
In Figures: Php
902(1)a1 REINFORCING STEEL KG 15,166.00 In Words: Pesos In Figures: Php
(DEFORMED, GRADE 40)

In Figures: Php
1711(1) STONE MASONRY CU.M. 1,082.00 In Words: Pesos In Figures: Php

In Figures: Php
1712(1) BED COURSE CU.M. 357.00 In Words: Pesos In Figures: Php
GRANULAR MATERIALS IN
PLACE
In Figures: Php
1712(2) CONCRETE (SLOPE CU.M. 341.00 In Words: Pesos In Figures: Php
PROTECTION) IN
PLACE
In Figures: Php
1717(2)a1 SHEET PILES, STEEL M 5,940.00 In Words: Pesos In Figures: Php
(SLOPE PROTECTION)

In Figures: Php
1717(2)a2 SHEET PILES, STEEL M 1,800.00 In Words: Pesos In Figures: Php
(COFFERDAMMING)

In Figures: Php
Sub-Total for this Page In Words: Pesos

In Figures: Php

Submitted by:

Date:
Name and Signature of Bidder’s Representative

Position

Name of Bidder
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Camarines Sur 1st District Engineering Office
Baras, Canaman, Camarines Sur
Contract ID: 18FD0031
Contract Name: Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of
Flood Control Structures/River Wall along Bicol River, Brgy. Borongborongan, Milaor, Camarines
Sur
Location of Contract: Milaor, Camarines Sur

BILL OF QUANTITIES
(Columns (1),(2),(3) and (4) are to be filled by the Procuring Entity) (Columns (5) and (6) are to be filled by the Bidder)
Pay Item Description Unit Quantity Unit Price (Pesos) Amount (Pesos)
No. (2) (3) (4) (5) (6)
(1)
N BANK AND SLOPE PROTECTION WORKS
1718(1) PIPE CULVERTS LM 14.00 In Words: Pesos In Figures: Php

In Figures: Php
1722(3) RAILINGS LM 263.00 In Words: Pesos In Figures: Php

In Figures: Php
H MISCELLANEOUS STRUCTURES
611(1) TREES (FURNISHING EA. 1,000.00 In Words: Pesos In Figures: Php
AND TRANSPLANTING)

In Figures: Php
Sub-Total for this Page In Words: Pesos

In Figures: Php
GRAND TOTAL In Words: Pesos

In Figures: Php
Submitted by:
Date:
Name and Signature of Bidder’s Representative

Position

Name of Bidder
PROFILE OF UPPER BANK
END OF PROJECT