1. STAAD SPACE
INPUT FILE: C:\Users\buce_\Downloads\project\stairs.STD
2. START JOB INFORMATION
3. ENGINEER DATE 27-SEP-23
4. JOB NAME STAIRS
5. END JOB INFORMATION
6. INPUT WIDTH 79
7. UNIT METER KN
8. JOINT COORDINATES
9. 1 0 0 0; 2 2 0 0; 3 0 1 0; 4 2 1 0; 5 0 3.8 0; 6 2 3.8 0; 7 0 6.6 0; 8 2 6.6 0
10. 10 2 0 3; 12 2 1 3; 14 2 3.8 3; 15 0 6.6 3; 16 2 6.6 3; 17 0 1 3; 18 0 0 3
11. 19 0 3.8 3; 20 0 1.75 0; 21 2 2.9 0
12. MEMBER INCIDENCES
13. 1 3 4; 2 5 6; 3 7 8; 4 1 3; 5 2 4; 6 3 20; 7 4 21; 8 5 7; 9 6 8; 12 15 16
14. 14 10 12; 16 12 14; 18 14 16; 20 4 12; 22 6 14; 23 7 15; 24 8 16; 26 18 17
15. 27 3 17; 28 17 12; 29 5 19; 30 19 14; 31 19 15; 32 20 5; 33 21 6; 34 20 21
16. 35 17 20; 36 21 14
17. ELEMENT INCIDENCES SHELL
18. 25 7 8 16 15
19. ELEMENT PROPERTY
20. 25 THICKNESS 0.1
21. DEFINE MATERIAL START
22. ISOTROPIC CONCRETE
23. E 2.17185E+007
24. POISSON 0.17
25. DENSITY 23.5616
26. ALPHA 1E-005
27. DAMP 0.05
28. TYPE CONCRETE
29. STRENGTH FCU 27579
30. END DEFINE MATERIAL
31. MEMBER PROPERTY AMERICAN
32. 1 TO 3 12 20 22 TO 24 27 TO 30 PRIS YD 0.3 ZD 0.2
33. 4 TO 9 14 16 18 26 31 TO 36 PRIS YD 0.2 ZD 0.2
34. CONSTANTS
35. MATERIAL CONCRETE ALL
36. SUPPORTS
37. 1 2 10 18 FIXED
38. DEFINE UBC LOAD
39. ZONE 0.4 I 1 RWX 2.2 RWZ 2.2 STYP 3 NA 1 NV 1
40. SELFWEIGHT 1
41. FLOOR WEIGHT
**NOTE** about Floor/OneWay Loads/Weights.
Please note that depending on the shape of the floor you may
have to break up the FLOOR/ONEWAY LOAD into multiple commands.
For details please refer to Technical Reference Manual
Section 5.32.4.2 Note d and/or "5.32.4.3 Note f.
C:\Users\buce_\Downloads\project\stairs.anl Page 1 of 9
Friday, September 29, 2023, 09:22 PM
45. PERFORM ANALYSIS
P R O B L E M S T A T I S T I C S
-----------------------------------
***********************************************************
* *
* X DIRECTION : Ta = 0.301 Tb = 0.525 Tuser = 0.000 *
* T = 0.301, LOAD FACTOR = 1.000 *
* UBC TYPE = 97 *
* UBC FACTOR V = 0.4545 x 160.03 = 72.74 KN *
* *
***********************************************************
46. CHANGE
47. LOAD 2 LOADTYPE SEISMIC TITLE UBC ALONG Z
48. UBC LOAD Z 1
49. PERFORM ANALYSIS
***********************************************************
* *
* Z DIRECTION : Ta = 0.301 Tb = 0.442 Tuser = 0.000 *
* T = 0.301, LOAD FACTOR = 1.000 *
* UBC TYPE = 97 *
* UBC FACTOR V = 0.4545 x 160.03 = 72.74 KN *
* *
***********************************************************
50. CHANGE
51. LOAD 3 LOADTYPE DEAD TITLE DEADLOAD
52. SELFWEIGHT Y -1 LIST ALL
53. FLOOR LOAD
54. YRANGE 4 14 FLOAD -12.2 XRANGE 0 20 ZRANGE 0 20 GY
55. LOAD 4 LOADTYPE LIVE TITLE LIVELOAD
56. MEMBER LOAD
57. 1 2 30 UNI GY -1.27
58. 20 27 UNI GY -1.62
59. LOAD 5 LOADTYPE LIVE TITLE RLIVELOAD
60. FLOOR LOAD
61. YRANGE 4 10 FLOAD -1 XRANGE 0 20 ZRANGE 0 20 GY
62. ********************************************
63. *DESIGN LOADING COMBO - REINFORCED CONCRETE
64. LOAD COMB 6 NSCP 2015 LOAD COMBINATION 1
65. 3 1.4
66. LOAD COMB 7 NSCP 2015 LOAD COMBINATION 2
67. 3 1.2 4 1.6 5 0.5
C:\Users\buce_\Downloads\project\stairs.anl Page 2 of 9
Friday, September 29, 2023, 09:22 PM
68. LOAD COMB 8 NSCP 2015 LOAD COMBINATION 3
69. 3 1.4 4 1.0 1 1.0
70. LOAD COMB 9 NSCP 2015 LOAD COMBINATION 4
71. 3 1.4 4 1.0 1 -1.0
72. LOAD COMB 10 NSCP 2015 LOAD COMBINATION 5
73. 3 1.4 4 1.0 2 1.0
74. LOAD COMB 11 NSCP 2015 LOAD COMBINATION 6
75. 3 1.4 4 1.0 2 -1.0
76. LOAD COMB 12 NSCP 2015 LOAD COMBINATION 7
77. 3 0.9 1 1.0
78. LOAD COMB 13 NSCP 2015 LOAD COMBINATION 8
79. 3 0.9 1 -1.0
80. LOAD COMB 14 NSCP 2015 LOAD COMBINATION 9
81. 3 0.9 2 1.0
82. LOAD COMB 15 NSCP 2015 LOAD COMBINATION 10
83. 3 0.9 2 -1.0
84. **********************************************
85. *SERVICE LOAD COMBINATION - FOR FOOTING DESIGN
86. LOAD COMB 16 1.0 (DL) + 1.0 (LL + RL)
87. 3 1.0 4 1.0 5 1.0
88. LOAD COMB 17 1.0 (DL) + 0.75 (LL + RL) + 0.535 (EX)
89. 3 1.0 4 0.75 5 0.75 1 0.535
90. LOAD COMB 18 1.0 (DL) + 0.75 (LL + RL) - 0.535 (EX)
91. 3 1.0 4 0.75 5 0.75 1 -0.535
92. LOAD COMB 19 1.0 (DL) + 0.75 (LL + RL) + 0.535 (EZ)
93. 3 1.0 4 0.75 5 0.75 2 0.535
94. LOAD COMB 20 1.0 (DL) + 0.75 (LL + RL) - 0.535 (EZ)
95. 3 1.0 4 0.75 5 0.75 2 -0.535
96. LOAD COMB 21 1.0 (DL) + 0.7 (EX)
97. 3 1.0 1 0.7
98. LOAD COMB 22 1.0 (DL) - 0.7 (EX)
99. 3 1.0 1 -0.7
100. LOAD COMB 23 1.0 (DL) + 0.7 (EZ)
101. 3 1.0 2 0.7
102. LOAD COMB 24 1.0 (DL) - 0.7 (EZ)
103. 3 1.0 2 -0.7
104. LOAD COMB 25 1.0 (DL) + 1.0 (LL + RL) + 0.71 (EX)
105. 3 1.0 4 1.0 5 1.0 1 0.71
106. LOAD COMB 26 1.0 (DL) + 1.0 (LL + RL) - 0.71 (EX)
107. 3 1.0 4 1.0 5 1.0 1 -0.71
108. LOAD COMB 27 1.0 (DL) + 1.0 (LL + RL) + 0.71 (EZ)
109. 3 1.0 4 1.0 5 1.0 2 0.71
110. LOAD COMB 28 1.0 (DL) + 1.0 (LL + RL) - 0.71 (EZ)
111. 3 1.0 4 1.0 5 1.0 2 -0.71
112. **********************************************
113. PERFORM ANALYSIS
C:\Users\buce_\Downloads\project\stairs.anl Page 3 of 9
Friday, September 29, 2023, 09:22 PM
13 16.94 251.98 7.63 3.99 0.72 -12.82
14 -0.33 42.08 -15.36 -8.42 0.96 -0.33
15 1.08 91.49 18.55 9.99 -0.72 -0.43
16 0.65 83.52 2.63 1.17 0.15 -0.52
17 -8.27 -17.89 -0.82 -0.62 -0.18 6.16
18 9.45 180.28 5.64 2.82 0.47 -7.15
19 0.21 67.98 -6.66 -3.83 0.59 -0.47
20 0.97 94.41 11.48 6.02 -0.30 -0.52
21 -11.18 -55.44 -2.45 -1.38 -0.29 8.29
22 12.01 203.84 6.00 3.11 0.56 -9.13
23 -0.08 56.91 -10.09 -5.58 0.72 -0.38
24 0.91 91.50 13.64 7.31 -0.45 -0.45
25 -11.11 -47.97 -1.66 -1.11 -0.28 8.32
26 12.41 215.02 6.91 3.45 0.58 -9.35
27 0.15 65.98 -9.41 -5.36 0.74 -0.48
28 1.15 101.06 14.66 7.71 -0.45 -0.55
116. *********************************************
117. START CONCRETE DESIGN
118. CODE ACI
119. FC 21000 ALL
120. FYMAIN 275000 ALL
121. FYSEC 230000 ALL
122. MAXMAIN 16 ALL
123. MINMAIN 16 ALL
124. MINSEC 10 ALL
125. **************************************COLUMNS
126. DESIGN COLUMN 4 14
127. ****************************************BEAMS
128. *FTB
129. DESIGN BEAM 1 27
C:\Users\buce_\Downloads\project\stairs.anl Page 4 of 9
Friday, September 29, 2023, 09:22 PM
B E A M N O. 1 D E S I G N R E S U L T S - SHEAR
AT START SUPPORT - Vu= 3.60 KNS Vc= 36.23 KNS Vs= 0.00 KNS
Tu= 3.80 KN-MET Tc= 1.0 KN-MET Ts= 5.1 KN-MET LOAD 10
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 12 MM 2-LEGGED STIRRUPS AT 82. MM C/C FOR 758. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 2.92 SQ.CM.
AT END SUPPORT - Vu= 1.32 KNS Vc= 36.23 KNS Vs= 0.00 KNS
Tu= 3.80 KN-MET Tc= 1.0 KN-MET Ts= 5.1 KN-MET LOAD 10
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 12 MM 2-LEGGED STIRRUPS AT 82. MM C/C FOR 758. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 2.92 SQ.CM.
C:\Users\buce_\Downloads\project\stairs.anl Page 5 of 9
Friday, September 29, 2023, 09:22 PM
B E A M N O. 27 D E S I G N R E S U L T S - SHEAR
AT START SUPPORT - Vu= 5.28 KNS Vc= 68.22 KNS Vs= 0.00 KNS
Tu= 2.06 KN-MET Tc= 1.1 KN-MET Ts= 2.7 KN-MET LOAD 9
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 82. MM C/C FOR 1258. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 1.58 SQ.CM.
AT END SUPPORT - Vu= 3.78 KNS Vc= 68.22 KNS Vs= 0.00 KNS
Tu= 2.06 KN-MET Tc= 1.1 KN-MET Ts= 2.7 KN-MET LOAD 9
STIRRUPS ARE REQUIRED FOR TORSION.
REINFORCEMENT FOR SHEAR IS PER CL.11.5.5.1.
PROVIDE 10 MM 2-LEGGED STIRRUPS AT 82. MM C/C FOR 1258. MM
ADDITIONAL LONGITUDINAL STEEL REQD. FOR TORSIONAL RESISTANCE = 1.58 SQ.CM.
C:\Users\buce_\Downloads\project\stairs.anl Page 6 of 9
Friday, September 29, 2023, 09:22 PM
1 244. 3 - 16MM 626. 2000. NO YES
B E A M N O. 12 D E S I G N R E S U L T S - SHEAR
C:\Users\buce_\Downloads\project\stairs.anl Page 7 of 9
Friday, September 29, 2023, 09:22 PM
134. *SLAB
135. DESIGN ELEMENT 25
C:\Users\buce_\Downloads\project\stairs.anl Page 8 of 9
Friday, September 29, 2023, 09:22 PM
25 BOTT: Longitudinal direction - Only minimum steel required.
25 TOP : Transverse direction - Only minimum steel required.
25 BOTT: Transverse direction - Only minimum steel required.
25 TOP : 0.200 0.82 / 8 0.200 1.48 / 9
BOTT: 0.200 0.00 / 0 0.200 0.00 / 0
************************************************************
* For technical assistance on STAAD.Pro, please visit *
* http://selectservices.bentley.com/en-US/ *
* *
* Details about additional assistance from *
* Bentley and Partners can be found at program menu *
* Help->Technical Support *
* *
* Copyright (c) 1997-2015 Bentley Systems, Inc.
* http://www.bentley.com *
************************************************************
C:\Users\buce_\Downloads\project\stairs.anl Page 9 of 9