Sub Diplo Bachelor 10-year Experienc Releva - Responsible for site -Site supervision on

Enginee ma in in experien e in site nt survey and measurement. electrification according to


r/Overse Electri Electrica ce in site supervisio trainin - Responsible for drawing and estimates
er cal l supervisi n of assisting on -Assist on preparation of BOQs.
g(Auto
(Electric Engin Engineer on of Multi- CAD preparation of design,
al) eering ing general storey software drawing and
building office )
electrific building estimation of
exceed building
ation electrifica
ing electrification works.
works. tion
works. two
weeks

Comput S.L.C. Intermed 10-year Experienc Releva - As required by the -As required by the office
er iate in experien e in nt office
operator compute ce in preparatio trainin
r science compute n of
g
r reports,
operatin email/inte exceed
g works. rnet ing
two
weeks

9. DEFECT LIABILITY

9.1. Responsibility for survey and design

i. Submission of the final reports does not relieve the consultant from their
responsibility to the design. They shall bear full responsibility for:
ii. Authenticity of all the field data including socio-economic, environmental,
topographic and geological information
iii. Correctness of the design and all the calculations (except for the Standard
Design, if used)
iv. Correctness of the drawings
v. Correctness of any other details related to construction

9.2. Assistance during construction phase

During construction, the consultants shouldvisit the Building and provide necessary
technical assistance. If any changes in the design are required, the consultants
shouldfurnish it free of cost as per the Condition of Contract.

9.3. Acceptance of responsibility

The Consultants may be asked to submit signed Statement of Acceptance of


Responsibility as per DHM.