KEK^D'WͲ:ͲtϬͲ^ͲWZͲsͲϮϬϮϬͲϬϬϵ
37625,.0$5$3,*(27+(50$/32:(5
6&+('8/(352-(&7
3$'$$ 0:($57+:25.
6XEPLWWHG%\ 5HYLHZ%\ $FNQRZOHGJH%\ 'LVWULEXWLRQ
3760*36RIW&RS\
37%&-6RIW&RS\
(FNDQD<HQW\VDUL -KRQQ\ /HQWR6HQWRVD
$GPLQ 3URMHFW&RQWURO 'LUHNWXU8WDPD
5HYQR ,VVXH'DWH %ULHIRI5HYLVLRQ
SORIK MARAPI GEOTHERMAL POWER
POWER PLANT A - WELLPAD AA & 25 MW PLATFORM - EARTHWORK
6&+('8/(352-(&7
A Engineering Work
Geotecknical Work
B Earth Work
B.1 Clearing & Grubbing
Excavation, Hauling Common Borrow (below 1km) ,
Backfilling Compacted to 90% MDD Modified Proctor ASTM D1557
B.2
layer by layer every 500m² / 30cm thick,
Slope 1:2, with Bench 1.5m width every 3m high,
B.3 Supply & Install Geotex (Non Woven Type 250 gr/m2)
C Service Road
C.1 Supply & Install Geotex (Non Woven Type 250 gr/m2)
Supply & Install Split Boulder & Gravel dia.10-20cm, compacted to 30% CBR, thk 30cm Boulder,
C.2
20cm Gravel
C.3 Supply & Install CTB thk 30cm (Ratio : 1 Cement 4 Sand 17 Gravel)
D Drainage Work
Supply & Install Access Road Drainage, Concrete K225 Inside size 40cm x 40cm, 12cm thick,
D.1
Wiremesh M10x150x150 1 Layer
D.1.1 Excavation
D.1.2 Form work
D.1.3 Rebar wire mesh M 10 1 layer
D.1.4 Pouring concrete
Supply & Install Oil Separator, 2 compartement, PVC AW Siphon, Concrete K225, Wiremesh
D.2
M10x150x150x1layer, 12cm thick, 3m³ capacity
D.3 Install Carbon Steel Pipe 24 inch for Drainage Crossing (Include welding work for Pipe)
Total D
E Slope Protection Work
Supply & Install Slope Area Drainage, Half Dia. 30cm Mortar Lined (5cm thick), 3 bench layer,
E.1
vertical every 15m
E.2 Construct Stone Masonry for Slope Protection (Detail I)
E.2.1 Excavation Foundation
E.2.2 Construct Mansory Wall