H 6m
5m
Data Tanah Timbunan
gsat = 1,8 q = 0,5 t/m
g = 1,7 H = 6
f = 25 Sf = 2
q = 50
g' = 0,8
1. Internal Stability
w = A x gt a = 2/3 f
= (0,5 x 4 x ) x 1,7 = 16,67
= 25,5
Pai = (g x ka x H²)/Sf) + q x ka x H
= (1,7 x 0,567232006898157 x 6^2") / 2) + (0,5 x 0,567232006898157 x 6
= 19,059
Cat :
SI = Tultimate (1/Fsid x Fsce x Fscp x Fsro)
Sf Fsid : 1,1 - 2
= 4,6(1/1,5x2,5x1,3x1,2) Fsce : 2 -3
2 Fscp : 1 - 1,5
= 13,455 KN/m Fsrd : 1 - 1,3
Pa11 < Si
Sf
19,059 > 13,455
2
19,059 > 6,7275 TIDAK AMAN !
2. Internal Stability Menggunakan Counter Wight
15
20 m 12
B 5 7 3
4
H 6m
5m
Data Tanah Timbunan
gsat = 1,8 q = 0,5 t/m
g = 1,7 H = 6
f = 25 Sf = 2
q = 50
g' = 0,8
w = A x gt a = 2/3 f
= (0,5 x 4 x 5) + (0,5 x 4 x ( 12 + 15)) x 1,7 = 16,67
= 106,8
Pai = (g x ka x H²)/Sf) + q x ka x H
= (1,7 x 0,567232006898157 x 6^2") / 2) + (0,5 x 0,567232006898157 x 6)
= 19,059
Setelah menggunakan caunter weight timbunan menjadi aman dan tidak mengalami
keruntuhan.
3. Foundation Stability
20 m
B
H 6 m
B
Z B
h= 2 m
A E
A C D E
Data Tanah Timbunan
gsat = 1,8 q = 0,5 t/m
g = 1,7 H = 6
f = 25 L = 30 m
q = 50
A. = ( g' x ha x Ka - 2 C x (ka)^0,5)
= 1,724 × 2 x 0,512061882661457 - 2 x 3,7 x 0,512061882661457^0,5
= -3,841
B. = 2C x (ka)^0,5)
= 2 x 3,7 x 0,512061882661457^0,5
= 5,2953
C = g' x ha x Ka
= 1,724 × 2 x 0,512061882661457
= 1,7656
Pp =
D = 2C x (kp)^0,5)
= 2 x 3,7 x 0,731386424907887^0,5
= 6,3286
E= g' x ha x Kp
= 1,724 × 2 x 0,731386424907887
= 2,4867
Akibat Embankment
1. Pa = qKah + gHKa + ( g'haKa - 2C(ka)^0,5)(h-z)
2
+ 1,724 × 2 x 0,512061882661457 - 2 x 3,7 x 0,512061882661457^0,5" x 2-6,41186628697334"
= 0,5 x 0,512061882661457 x 2 + 2,627 x 6 x 0,512061882661457
2
= 8,5832 + 25,1279
2
= 21,147
2. Pp = g'2h2Kp + 2C(ka)^0,5
2
= 5,0436 + 5,29533
= 10,339
Pa ≤ Pp + 2Su x L
Sf
21,14712 ≤ 10,3389697367156 + 2 x 8 x 30
2
20 m
B
4
H 6m
Ditambah Geotekstil :
T1 = 10,47 meter
T2 = 10,27 meter
T3 = 9,77 meter
T4 = 9,57 meter
T5 = 9,37 meter
T6 = 9,17 meter
T7 = 8,97 meter
T8 = 8,77 meter
T9 = 8,57 meter
T10 = 8,37 meter
T11 = 8,17 meter
Jadi perbaikan tanah dilakukan menggunakan geotekstil, untuk jumlah geotekstil 11 buah dengan
jarak antar geotekstil 0,2 meter.