Annexure to Format No 10051

Project : Date:

S.N. Characteristic Method Specified Observed Remarks

1 Releasing of Jack bolts Nuts Verification

2 Tightening of Base Frame Nuts Verification

3 Base Frame Level Water Level

4 Equipments Orientation Verification

5 Pump Master Level Master Level


NOTE:- Pump Shaft level not required. Permissible Limit:-
Pump must be leveled by putting the ± 0.04mm /meter
Master Level on Pump discharge flange
only.
6 Completion of BFP piping supports Verification

7 Removal of all BFP piping temporary Verification


supports
8 Parallelity of BFP flanges with pipe line Verification
flanges

9 Installation of Protective and Safety Verification


guards
10 Completion of Cooling water piping and Verification
Fitting Connection
11 Position of Motor Rotor in case of Measurement
Motors with Shell Bearings / Forced Oil
Lubrication.
NOTE:- During DBSE /alignment
checking, keep motor rotor on its
geometric centre.
12 Distance between shaft Ends (DBSE) / Micrometer
coupling
NOTE:- DBSE must be +1 mm higher as
given in Pump supplier GA drawing.

13 Coupling Alignment Alignment by


Permissible Limit:- ± 0.04 mm using three dial
gauge, two for
axial & one for
radial.