Professional Documents
Culture Documents
5/23/2019
Rehearsal: 4 Start Time: 9:30am 1:00pm 6:00pm
Location: Dir. Studio Dnc. Stud. Dir. Stud End Time: 12:00pm 4:24pm 9:01
Called:
Absent: None Late:
We are adding people into A1:S4 as Patrons of the theater. Everyone will keep costumes of their
recent scenes:
o Ethan Kleekamp – Policeman Uniform
o Bart Williams – Variation of Wiesel Costume
o Ries Lundstrom – Variation of Seitz Costume
o Isaah Williams – Passerby Costume
o Peighton Robinson – Passerby Costume
o AJ Cook – Passerby Costume
Will the upper level be strong enough for Jack to lay down on?
We will be dancing on the countertop in Act 2 Scene 1 so the countertop should be able to attach
Will the braces on the railings be far enough apart that the audience can see through them while
the actors are sitting on the edge?
We will be tap dancing on the crates. They need to be slightly larger than rehearsal blocks
Do we think we can do this with just area mics or will we need to use body mics?