VWM Watero 1000 LPH (Ranchi)
VWM Watero 1000 LPH (Ranchi)
2020
Respected Sir,
This is with reference to the aforesaid subject. We are very much thankful for showing your keen
interest in Vaishnovi Machinery. We are also thankful for furnishing us an opportunity.
As per your requirement, we are very much pleased to submit our proposal for
Design Basis.
1000 Lph
o Treatment Scheme
Design Basis
The treatment scheme comprises of a Pre-Treatment Module followed by the Reverse Osmosis Module
and any Post Treatment Module as per the quality of water to be treated.
1000 Lph
Treatment Scheme
Modules Required Treatment Scheme SCOPE
Raw Water Storage Tank By Client
Pre- Treatment
RO Control Panel By Us
RO as Skid BY Us
RO Module
RO Transfer Pump By Us
Module
Mixed Bed By Us
0.2 Micron Cartridge Filter By us
U.V System By us
1000 Lph
Equipment’s Specifications& Details
S.No. Description. Mark QTY. Make.
1 Conductivity Meter CM 1. Aster
2 Pressure Gauge PG 6. Guru
3 Lo pressure Switch LPS 1. Aster
4 Logic Controller 1. Unitech
5 Flow Indicators FI 2. Aster
6 High Pressure Switch HPS 1. Aster
7 Level Indicator, Floaty Floaty 1. Aster
8 Control Panel CP 1. Aster
9 UV System 2500 Lit/hr 1. Alpha/Equi.
10 Solenoid Valve SV 1. Flocon/Equi.
1000 Lph
6 Works not specified in our proposal
Battery Limit
1 Raw water at flooded suction at the inlet of Raw Water Pump
2 RO Reject outlet – 1.0mtr
3 RO permeate outlet – 1.0mtr
4 Inlet to all measuring/dosing tanks
5 Power supply to Electrical Panel
Client Scope
Power Supply 230 V AC + 10 Single Phase for L.P.S,
Raw Water 1500 LPH at flooded suction.
Chemicals As per Our specifications
Lab testing facility As per Our specifications
Labour For analysis of water
Price
Bank Details
Our Current A/C. NO. 259911100000973, ( Andhra bank ) RTGS/NEFT IFSC CODE-
Ranchi-834001
1. Installation
Our technician at your unit will do installation & trial. However to and Fro Travel expenses,
boarding
1000 Lph
2. GSTIN No.20AOOPP1689L1ZF
1000 Lph
Caution No oxidising substance like free Chlorine, Ozone etc. should enter the
membranes
Suggestions Operation and Maintenance data/log sheets shall be maintained
With Regards:-
VaishnoviMachinery
Ranchi(kokar)
www.vaishnovimachinery.com