PT ADARO INDONESIA
Introduction
Content Mine Water Management
Mine Rehabilitation & Closure
Preparation
Paringin Sustainable Mine Closure Model
Conclusion
1
1/31/2019
Introduction
Project Area
2
1/31/2019
Mining Processes
Ecosystem
Reconstruction
Process
Barge Loading at Kelanis Port
Coal Production
3
1/31/2019
4
1/31/2019
Mine Water
Management
Physical Characteristics
Active area of pits and
disposal/waste dump area (15,000
ha)
5
1/31/2019
Wara
6 major pit catchments with
approximately 67 pump for
Tutupan dewatering activities
Paringin
Existing Pit Lake 1 existing final pit lake in Paringin
pit & Paringin pit will be the first pit
to closure
6
1/31/2019
Sedimen pond
Safety pond
Fas. treatment
Mud pond
Point of compliance
7
1/31/2019
Geotube
Mine Reclamation
&
Mine Closure
Preparation
8
1/31/2019
Mainternance
& Monitoring
Planting
Seeding
Erosion control
Disposal/waste dump
stabilization &
preparation
9
1/31/2019
Goals:
- To create stable waste dump/disposal
- Minimize soil erosion
- Provide appropriate revegetation area
Target :
- Continuous area for reclamation and
rehabilitation each year
Operations:
- Waste dump construction slope 1: 2,8;
height of bench 12 meter; width 24 meter
- Create back slope & cross fall with grade
max 2%
- Create surface grade max 2%
Erosion Control
10
1/31/2019
Nursery area : ± 2 ha
Prod Capacity : + 70.000 – 130.000 seed
Average Capacity : + 10.000 - 30.000
seed/bulan
11
1/31/2019
Revegetation
Maintenance
12
1/31/2019
Year
Location
Planting
Distance
Type of
Trees
Coordinate
13
1/31/2019
Mine Closure
Model at Paringin
14
1/31/2019
15
1/31/2019
16
1/31/2019
Stork-billed Kingfisher
Oriental Dwarf-kingfisher
Little Egret
Purple Heron
Snakebird
Collared Kingfisher Blue-eared Kingfisher
2010
Trial in pond cultivation
Normal growth of BEST tilapia
with used mine water
and shrimp (LIPI research
results)
17
1/31/2019
Water treatment Plant – T300 For Internal Utilization Utilization in communities around the mine
2012-2018
Paringin mine
reclamation area
Research result:
During 2012 - 2018, 2 subgroups were found, all of
which were 34 individuals with increasing
population trends
Proboscis monkeys use the reclamation area as
their habitat and or home range
18
1/31/2019
2011
Paringin mine
Shorea Anisoptera Anthocephalus
reclamation area
selanica marginata cadamba
The openness of the area <5 meters allows to be planted
with climax types such as S.leprosula, S.selanica and
A.marginata.
Openness of area> 10 meters, then the final pioneer
types should be used, such as A. cadamba and
A.trisperma.
19
1/31/2019
CONCLUSION
Conclusion
20
1/31/2019
Terima Kasih
Pemantauan (Laboratorium)
Laboratorium
Laboratorium air
21
1/31/2019
Potensi minyak jelantah yang dapat dimanfaatkan ± 3.000 liter yang berasal dari kantin
karyawan
Adaro memiliki pabrik biodiesel dengan kapasitas 1,1 ton/hari
Saat ini Adaro telah memanfaatkan sekitar 2.100 liter minyak jelatah untuk bahan baku biodiesel,
yang telah digunakan untuk BBM unit LV (mulai April 2016 hingga saat ini ada 4 LV, selanjutnya
akan bertambah) Biodiesel Biodisel Pemanfaatan B20
Plant 100% diunit LV
4 LV
AI
1 LV
22