Professional Documents
Culture Documents
S No SPECIFICATIONS
D50C-7
No of Cylinders Diesel 4 / 6 cylinders water cooled 4
Piston Displacement 4950 to 5000 cc 3409
1 Engine
Max Torque 280 to 290 Nm at 1600 RPM 335
S No Description Qty
Open end
(i) spanner (6 mm to set 01
32 m)
Ring Spanner (6
(ii) set 01
mm to 32 mm)
Common screw
(iii) Ea 02
driver 6” & 12”
Philips screw
15 Tool Kit (iv) Ea 01
driver 12”
(v) Adjustable 12” Ea 01
(vi) Pliers Ea 01
(vii) Tool box steel Ea 01
Sockets (12, 14 &
(viii) Ea 03
17 mm)
(ix) T- handle Ea 01
(x) Socket extension Ea 01
Wheel hub
(xi) Ea 01
Spanner
(xii) Hammer Ea 01
Supplier will hand over vehicles to PAF at consignee end in fully road worthy
16 Road Worthiness
condition without any extra charges
(a) Provisioning of certificate for availability of spares for next 20 years with
vehicle
(b) Supplier is to provide one set of fast moving spares with each vehicle and
list is to be provided with technical quote
(c) Supplier is to provide with the technical quotes, a list of spares /
components that are expected to be consumed on the vehicle (during fair,
17 Spares support
wear & tear) in 05 years
(d) Supplier is to confirm in country availability of spares of the vehicle and is
to give the name of the firms through which these are available, with the
technical quote
(e) Supplier is to confirm in country availability of maintenance facility of the
vehicle at all major cities of Pakistan.
A warranty period of 02 years is to be affirmed by the supplier for complete
18 Warranty
vehicle without any obligation.
(a) The vehicle should confirm to international safety, workmanship and
functional standards. A copy of related standard be provided to inspection
authority for inspection guidance.
(b) The supplier is to provide a certificate mentioning the standard to which
the vehicle has been manufactured. Copy of standard to be provided for
19 Acceptance criteria inspection.
(c) 100% physical inspection / functional check of complete vehicle will be
carried out by No 303 in the presence of the rep of Dte of Grd Tpt (as per
technical specifications) at consignee end.
(d) OEM is to submit Acceptance Test Procedures (ATPs) for the PAF
inspection team with technical quote.
150mm 190mm
160-205 150-227 150-227
227mm 270mm
Grammer Cushioned
Suspension Vnyl
Yes with armrest. Full
Seat
suspension.
Pneumatic Pneumatic
5.6 L/h