You are hereby directed to make herein described changes from the plans and specifications of the following described work not included in the plans and specifications:
DEDUCTIVE:
102(2) Surplus Common Excavation - 105.10 cu.m.
104(1)a Embankment from Roadway/Structure Excavation, - 71.00 cu.m.
Common Soil
200(1) Aggregate Subbase Course - 227.72 cu.m.
506(1) Stone Masonry 221.55 cu.m.
ITEMIZED QUANTITIES AND COST OF REVISION IS SHOWN IN THE ATTACHED BILL OF QUANTITIES AND COST ESTIMATE
We the undersigned Contractor/s have given careful consideration to the change proposed and hereby agree, if this proposal Original Contract Cost: 22,534,917.19
is approved that we will provide all equipment, furnish all materials except as maybe otherwise be noted and perform all services Difference in Cost due to this Change: 1,187,417.16
necessary for work above specified and will accept as full payment thereto the prices shown on the second page of the attached Net Cost of Previous Change: -
sheet. Total Cost of Change: 1,187,417.16
Estimated Revised Contract Amount: 23,722,334.35
Percentage Change in Original Contract Value (+) or (-): 5.27%
PIF-12-VO-01A Rev 00
Contract ID : 21ED0106
Contract Name : Concreting of Road, Brgy. Sta. Rosa II, Baco, Oriental Mindoro
Location : Baco, Oriental Mindoro
Contractor : DELROL ENTERPRISES
A.1.4(1) Provision of Progress Photographs mo. 6.03 280.80 1,693.22 - - - 6.03 1,693.22
B.5 Project Billboard/Sign Board ea. 2.00 2,744.82 5,489.64 - - - 2.00 5,489.64
B.7(1) Occupational Safety and Health Program mo. 6.03 16,388.81 98,824.52 - - - 6.03 98,824.52
Conformed:
ALLAN A. ROLDAN
Contractor
PIF-12-VO-02A Rev 00
Contract ID : 21ED0106
Contract Name : Concreting of Road, Brgy. Sta. Rosa II, Baco, Oriental Mindoro
Location : Baco, Oriental Mindoro
Contractor : DELROL ENTERPRISES
500(1)b3 Pipe Culverts, RCPC,910 mm dia., Class IV l.m. 24.00 6,861.35 164,672.40 - - - 24.00 164,672.40
500(1)b5 Pipe Culverts, RCPC, 1220mm dia., Class Iv l.m. 16.00 6,861.35 109,781.60 - - - 16.00 109,781.60
Decrease in
506(1) Stone Masonry m³ 1,278.23 4,065.12 5,196,158.34 - 221.55 900,627.34 - 1,056.68 4,295,531.00
quantity
611(1) Trees Furnishing and Transplating ea. 500.00 5.85 2,925.00 - - - 500.00 2,925.00
Conformed:
ALLAN A. ROLDAN
Contractor
PIF-12-VO-02A Rev 00
Contract ID : 21ED0106
Contract Name : Concreting of Road, Brgy. Sta. Rosa II, Baco, Oriental Mindoro
Location : Baco, Oriental Mindoro
Contractor : DELROL ENTERPRISES
-1,187,417.16
Prepared by: Verified as to Unit Cost: Verified as to Quantities 1,965,082.81
777,665.65
Conformed:
ALLAN A. ROLDAN
Contractor
PIF-12-VO-02A Rev 00
Republic of the Philippines
Department of Public Works and Highways
Mindoro Oriental District Engineer Office
ADDITIVE QUANTITIES
Items Reason
DEDUCTIVE QUANTITIES
Items Reason
NEW ITEMS
Items Reason
Err:509 Err:509
Due to Extra Work
Err:509 Err:509
PIF-12-VO-04 Rev 00
Contract ID: 21ED0106
Contract Name: Concreting of Road, Brgy. Sta. Rosa II, Baco, Oriental Mindoro
Location: Baco, Oriental Mindoro
Contractor : DELROL ENTERPRISES
SUB-TOTAL
LABOR: QUANTITY
Rate/Hour TOTAL COST
No. of Persons No. of Hours
EQUIPMENT: QUANTITY
Rate/Day TOTAL COST
No. of Units No. of Days
Dump Truck (12 cu. Yd) 2.0 2 1,350.00 2,700.00
Backhoe (0.80 cu. m.) 1.0 1.00 1,350.00 1,350.00
Backhoe w/ Breaker (0.80 cu.m.) 1.0 1.00 1,350.00 1,350.00
Minor Tools (10% of Labor) 22.38
SUB-TOTAL 5,422.38
LABOR: QUANTITY
Rate/Hour TOTAL COST
No. of Persons No. of Hours
Construction Foreman 1 1.00 81.25 81.25
Skilled Labor 4 1.00 71.88 287.50
Laborer 8 1.00 47.50 380.00
Installation/Removal of Formwarks
Skilled Labor 4 1.00 71.88 287.50
Laborer 8 1.00 47.50 380.00
SUB-TOTAL 1,416.25
EQUIPMENT: QUANTITY
Rate/Hour TOTAL COST
No. of Units No. of Hours
One Bagger Mixer 1.0 1.00 160.00 160.00
Concrete Vibrator 1.0 1.00 90.00 90.00
Water Truck/Pump (16000 L) 1.0 1.00 2,200.00 2,200.00
Minor Tools (5% of Labor Cost) 70.81
SUB-TOTAL 2,520.81
A. EQUIPMENT COST
qtty days rate
a. One Bagger Mixer 1 0.25 1,400.00 350.00
b. Concrete Vibrator 1 0.25 750.00 187.50
c. Water Truck 1 0.03 1,960.00 58.80
Minor Tools ( 5% of Labor Cost) 143.75
C. MATERIALS COST
unit unit cost qtty
A. EQUIPMENT COST
qtty hours hourly rate
a. Dump Truck 1 8 1,350.00 10,800.00
b. Backhoe 1 8 1,800.00 14,400.00
Minor Tools ( 5% of Labor Cost) 2692.00
C. MATERIALS COST
A. EQUIPMENT COST
qtty days rate
a. One Bagger Mixer 1 17 1,280.00 21,760.00
b. Concrete Vibrator 1 17 720.00 12,240.00
c. Water Truck 1 1.7 1,960.00 3,332.00
Minor Tools ( 5% of Labor Cost) 9630.50
C. MATERIALS COST
unit unit cost qtty
A. EQUIPMENT COST
qtty days rate
Backhoe (0.80 cu.m.) 1 1 12,296.00 12,296.00
Plate Compactor 1 1 984.00 984.00
Minor Tools (10% of Labor) 660.00 0.00
C. MATERIALS COST
unit unit cost qtty
Portland Cement bags 245.00 4.64 1137.78
Sand cu.m. 700.00 0.26 184.80
RC Pipes (610mm da.), Class IV pc 1,950.00 6.00 11700.00
Sand Bedding cu.m. 700.00 0.53 369.60
You are hereby directed to make herein described changes from the plans and specifications of the following described work not included in the plans and specifications:
ITEMIZED QUANTITIES AND COST OF REVISION IS SHOWN IN THE ATTACHED BILL OF QUANTITIES AND COST ESTIMATE
PIF-12-VO-01A Rev 00
Contract ID : 21ED0106
Contract Name : Concreting of Road, Brgy. Sta. Rosa II, Baco, Oriental Mindoro
Location : Baco, Oriental Mindoro
Contractor : DELROL ENTERPRISES
A.1.4(1) Provision of Progress Photographs mo. 6.03 280.80 1,693.22 6.03 280.80 1,693.22 - - - 6.03 1,693.22
B.5 Project Billboard/Sign Board ea. 2.00 2,744.82 5,489.64 2.00 2,744.82 5,489.64 - - - 2.00 5,489.64
B.7(1) Occupational Safety and Health Program mo. 6.03 16,388.81 98,824.52 6.03 16,388.81 98,824.52 - - - 6.03 98,824.52
B.8(1) Traffic Management mo. 6.03 23,045.31 138,963.22 6.03 23,045.31 138,963.22 - - - 6.03 138,963.22
B.9 Mobilization/Demobilization l.s. 1.00 128,700.00 128,700.00 1.00 128,700.00 128,700.00 - - - 1.00 128,700.00
Individual Removal of Trees, 150-300mm dia.,
100(3)a1 ea. 2.00 709.29 1,418.58 2.00 709.29 1,418.58 - - - 2.00 1,418.58
small
Individual Removal of Trees Small, 301-
100(3)a2 l.m. 3.00 859.93 2,579.79 3.00 859.93 2,579.79 - - - 3.00 2,579.79
500mm dia.
Removal of Actual Structures/Obstruction,
101(3)b1 m² 132.00 88.43 11,672.76 132.00 88.43 11,672.76 - - - 132.00 11,672.76
0.15m thick,PCCP (Unreinforced)
SUBTOTAL 742,432.50 742,432.50 - - - 742,432.50
Conformed:
ALLAN A. ROLDAN
Contractor
PIF-12-VO-02A Rev 00
Contract ID : 21ED0106
Contract Name : Concreting of Road, Brgy. Sta. Rosa II, Baco, Oriental Mindoro
Location : Baco, Oriental Mindoro
Contractor : DELROL ENTERPRISES
Conformed:
ALLAN A. ROLDAN
Contractor
PIF-12-VO-02A Rev 00
Contract ID : 21ED0106
Contract Name : Concreting of Road, Brgy. Sta. Rosa II, Baco, Oriental Mindoro
Location : Baco, Oriental Mindoro
Contractor : DELROL ENTERPRISES
0.78
Prepared by: Verified as to Unit Cost: Verified as to Quantities 1,965,082.81
1,965,083.59
Conformed:
PIF-12-VO-02A Rev 00
Republic of the Philippines
Department of Public Works and Highways
Mindoro Oriental District Engineer Office
ADDITIVE QUANTITIES
Items Reason
DEDUCTIVE QUANTITIES
Items Reason
DELETED ITEM
Items Reason
PIF-12-VO-04 Rev 00
Republic of the Philippines
Department of Public Works and Highways
Implementing Office
PROPOSED VARIATION ORDER NO.: __________
Contract ID :
Contract Name & Location :
Name of Contractor:
You are hereby directed to make herein described changes from the plans and specifications of the following described work not included in the plans
and specifications:
DESCRIPTION OF WORK TO BE DONE :____________________________________________________________________________________________
REASON FOR CHANGE : ___________________________________________________________________________________________________________
CHANGE REQUESTED BY : ______________________________________
ITEMIZED QUANTITIES AND COST OF REVISION IS SHOWN IN THE ATTACHED BILL OF QUANTITIES AND COST ESTIMATE
NAME & SIGNATURE NAME & SIGNATURE NAME & SIGNATURE NAME & SIGNATURE
Project Engineer Project Manager Project/Bureau Director Undersecretary
DPWH & Consultant, if any DPWH & Consultant, if any Date : _________________________
PIF-12-VO-01B Rev 00
Contract ID :
Contract Name :
Location :
Contractor :
Prepared by: Checked by: Submitted by : Verified as to Unit Cost: Verified as to Quantities
NAME & SIGNATURE NAME & SIGNATURE NAME & SIGNATURE NAME & SIGNATURE NAME & SIGNATURE
BOC
Project Engineer Project Manager Project Director BOD Director
Director
DPWH & Consultant, if any DPWH & Consultant, if any (if BOC is not the IO)
Conformed:
PIF-12-VO-02B Rev 00
Republic of the Philippines
Department of Public Works and Highways
(IMPLEMENTING OFFICE)
(Adress)
PROJECT/LOCATION :
TO:
You are hereby directed to make herein described changes from the plans and specifications of the following described work not included in the plans and specifications:
CHANGE REQUESTED BY :
ITEMIZED QUANTITIES AND COST OF REVISION IS SHOWN ON THE ATTACHED BILL OF QUANTITIES
We the undersigned Contractor/s have given careful consirderation to the change proposed and hereby agree, if Original Contract Amount : :
this proposal is approved that we will provide all equipment, furnish all materials except as maybe otherwise be Revised Contract Amount :
noted and perform all service necessary for work above specified and will accept as full payment thereto the (+) Additive :
prices shown on the attached sheet. (-) Deductive :
Difference of Cost to this Change: :
Net Cost of Previous Change :
Total Cost of Change :
Estimated Revised Contract Amount :
ACCEPTED BY: Percentage of Change in Original Contract :
Original Contract Time :
NAME & SIGNATURE Approved additional Contract Time due to V.O. :
Contractor Revised Contract Time :
DATE: Effectivity of Contract :
Original Expiry Date :
Revised Expiry Date :
PROJECT/LOCATION :
TO:
You are hereby directed to make herein described changes from the plans and specifications of the following described work not included in the plans and specifications:
CHANGE REQUESTED BY :
ITEMIZED QUANTITIES AND COST OF REVISION IS SHOWN ON THE ATTACHED BILL OF QUANTITIES
We the undersigned Contractor/s have given careful consirderation to the change proposed and hereby agree, if this proposal is approved Original Contract Amount : :
that we will provide all equipment, furnish all materials except as maybe otherwise be noted and perform all service necessary for work Revised Contract Amount :
above specified and will accept as full payment thereto the prices shown on the attached sheet. (+) Additive :
(-) Deductive :
Difference of Cost to this Change: :
Net Cost of Previous Change :
Total Cost of Change :
Estimated Revised Contract Amount :
ACCEPTED BY: Percentage of Change in Original Contract :
Original Contract Time :
NAME & SIGNATURE Approved additional Contract Time due to V.O. :
Contractor Revised Contract Time :
Effectivity of Contract :
Original Expiry Date :
Revised Expiry Date :
RECOMMENDING APPROVAL:
PREPARED BY:
SUBMITTED BY APPROVED:
Concurred:
PIF-12-VO-03A Rev 00
Contract ID :
Contract Nam:
Location :
Contractor :
Prepared by: Checked and Submitted by : Submitted by : Verified as to Unit Cost: Verified as to Quantities
NAME & SIGNATURE NAME & SIGNATURE NAME & SIGNATURE NAME & SIGNATURE NAME & SIGNATURE
Project Engineer Project Manager Project Director BOC Director BOD Director