For CONTRACTOR’S use VOR No. : VOR-0037673 Date Initiated : 7-Aug-19

Contract Number BFSO2-MOFT-CMG-CTM-1002-0003


To be completed by CONTRACTOR Recipient:

MMHE MOFT
From To Location: MOFT – Client Office No.3
[NAME] [NAME]

Attention: Rameses Gustar Al-Hadj


Subject : VARIATION ORDER REQUISITION
Description of VARIATION ORDER REQUEST (Define all attachments)

RLE - AIR COMPRESSOR

Reasons for VARIATION ORDER REQUEST (Define all attachments)

ADDITIONAL WORK ON DEMOLISH & MODIFY BLACK & GREY WATER PIPE LINE

Description of VARIATION Work proposed: AS MENTION ABOVE

Reasons for proposal: AS MENTION ABOVE

Documents attached:
Drawings
Specifications
Others (please specify):

Effect on Schedule:

Effect on Contract Price : USD -

(CONTRACTOR is reminded to include all relevant considerations, eventualities and contingencies in the proposed lump sum. Any extra payments
accrued by the CONTRACTOR shall not be reimbursed from MOFT)
Supporting Documents:
Cost Estimate
Milestone Payment and Work Schedules
Others (please specify):

Issued By : MOHD ARIFF BIN JUMAAT Designation : Project Manager

Signature: Date:

Acknowledged Receipt By: MOFT REPRESENTATIVE Designation : Project Manager

Signature: Date:
THE ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING(EPCC) FOR
THE REPAIR, LIFE EXTENSION AND CONVERSION(RLEC) OF MT BUNGA KELANA 5 INTO FSO BENCHAMAS 2

COST ESTIMATION
CONTRACT NO : BFSO2-MOFT-CMG-CTM-1002-0003 V.O.R. NO. : VOR-0037673
CONTRACTOR : MALAYSIA MARINE AND HEAVY ENGINEERING SDN BHD (Co. Reg.No. 14558-P) DATE : 7-Aug-19

SUBJECT : COST ESTIMATION

TITLE OF VOR / VARIATION WORK PROPOSED :


RLE - AIR COMPRESSOR

COST ESTIMATION :

UNIT RATE LUMP SUM TOTAL COST


NO DESCRIPTION OF WORK QTY UOM
(USD) (USD) (USD)
A Under original base scope of work (2.7.5) :
- No allocation
B) Additional work to rigging new air compressor
1 New main air compressor no 1
2 New working air compressor -
3 To arrange transportation to transfer new air compressor from wharehouse -
to shore x 2 nos 2.0 nos -
4 To arrange rigging activity to lift up and arrange new compressor
from shore into engine room and respective foundation x 2 nos 2.0 nos -
5 To arrange manpower x 4 pax to tight in with existing foundation x 2 nos 2.0 nos -
Installed new air compressor on position with accordance torque.

Note :
i) Any other works / accessories works which are not mention in above shall
charge under separate AWO / VOR.

TOTAL AMOUNT (USD) -

NOTES :
1. THE ABOVE QUOTED PRICE IS STRICTLY BASED ON THE DESCRIBED WORK SCOPE AND OUR FINAL INVOICE SHALL BE ADJUSTED IN
ACCORDANCE TO ACTUAL WORK CARRIED OUT. THE QUOTE IS VALID FOR FIVE(5) DAYS ONLY FROM THE SUBMITTED DATE.
2. QUOTATION IS BASED ON WORK TO BE CARRIED OUT IN OUR SHIPYARD PREMISES, EXCLUDING GENERAL SERVICES, ANY CLASSIFICATION
APPROVAL OR WITNESS AND OTHER WORKS WHICH IS NOT MENTION ABOVE.

SCHEDULE IMPACT
ADDITIONAL TIME REQUIRED SHALL BE MUTUALLY DISCUSSED AND AGREED BETWEEN YOUR GOOD SELF AND THE PROJECT MANAGER.
THE ABOVE ADDITONAL WORK SHALL EXTEND THE ORIGINAL SCHEDULE BY - DAY(S)