You are on page 1of 4

PROJECT TITLE: EPC FOR THE PROVISION AND

INSTALLATION OF NEW BYPASS SYSTEM AT


MP-21 AND REMOVAL OF REDUNDANT LINES AT
OLD MP-21 STATION

Contract Ref No : GEC/CD/291/21 Project Code : W667

EQUIPMENT MOBILIZATION CERTIFICATE


1) Contractor : GALFAR ENGINEERING AND CONTRACTING WLL
EMIRATES
2) Location : Habshan, Abu Dhabi
3) Sub-Contractor : M/s. Trans Asia Pipeline Specialty Services LLC.
4) Milestone Description : Mobilization of Equipment for Nitrogen Purging Works
5) Work Element Description : Nitrogen Purging Works
6) Mobilization Date : 11th Nov-2022
7) No.of Trailer Mobilized : 1x Trailer with CICPA pass
Equipment Details:

SN DESCRIPTION MOB. DATE QTY

Nitrogen Equipment Spread

1. Nitrogen Pump-180K 11-11-2022 1

2. Cargo Basket 11-11-2022 1


Contractor on receipt of this report is entitled to submit its corresponding application for payment, with
respect of the above description.

Signed by Sub-contractor Rep. Signed by Contractor Rep.

By______________ By______________
M/s. Trans Asia Pipeline Specialty Services M/s. Galfar Engineering & Contracting WLL
Emirates

EQUIPMENT DE-MOBILIZATION CERTIFICATE


1) Contractor : GALFAR ENGINEERING AND CONTRACTING WLL
EMIRATES
2) Location : Habshan, Abu Dhabi
3) Sub-Contractor : M/s. Trans Asia Pipeline Specialty Services LLC.
Distribution: Original On Site Job File Page 1 of 4 Document No.: FP-OP-37.

Iss No: 03 TRANS ASIA Office Revision No.: 03

© TRANS ASIA. All Rights Reserved. Revision Date: 21.12.2020


PROJECT TITLE: EPC FOR THE PROVISION AND
INSTALLATION OF NEW BYPASS SYSTEM AT
MP-21 AND REMOVAL OF REDUNDANT LINES AT
OLD MP-21 STATION

Contract Ref No : GEC/CD/291/21 Project Code : W667

4) Milestone Description : De-mobilization of Equipment for Nitrogen Purging Works


5) Work Element Description : Nitrogen Purging Works
6) De-mobilization Date : 09th Nov-2022
7) No.of Trailer Mobilized : 1x Trailer with CICPA pass
Equipment Details:

SN DESCRIPTION MOB. DATE QTY

Nitrogen Equipment Spread

1. Nitrogen Pump-180K 09.11.2022 1

2. Cargo Basket 09.11.2022 1

3. Wilden Pump 09.11.2022 1


Contractor on receipt of this report is entitled to submit its corresponding application for payment, with
respect of the above description.

Signed by Sub-contractor Rep. Signed by Contractor Rep.

By______________ By______________
M/s. Trans Asia Pipeline Specialty Services M/s. Galfar Engineering & Contracting WLL
Emirates

EQUIPMENT DE-MOBILIZATION CERTIFICATE


1) Contractor : GALFAR ENGINEERING AND CONTRACTING WLL
EMIRATES
2) Location : Habshan, Abu Dhabi
3) Sub-Contractor : M/s. Trans Asia Pipeline Specialty Services LLC.
4) Milestone Description : De-mobilization of Equipment for Nitrogen Purging Works
5) Work Element Description : Nitrogen Purging Works
6) De-mobilization Date : 12th Nov-2022
7) No.of Trailer Mobilized : 1x Trailer with CICPA pass
Distribution: Original On Site Job File Page 2 of 4 Document No.: FP-OP-37.

Iss No: 03 TRANS ASIA Office Revision No.: 03

© TRANS ASIA. All Rights Reserved. Revision Date: 21.12.2020


PROJECT TITLE: EPC FOR THE PROVISION AND
INSTALLATION OF NEW BYPASS SYSTEM AT
MP-21 AND REMOVAL OF REDUNDANT LINES AT
OLD MP-21 STATION

Contract Ref No : GEC/CD/291/21 Project Code : W667

Equipment Details:

SN DESCRIPTION MOB. DATE QTY

Nitrogen Equipment Spread

1. Nitrogen Pump-180K 12.11.2022 1

2. Cargo Basket 12.11.2022 1

3. Storage Tank with Hoses & Fittings 12.11.2022 1


Contractor on receipt of this report is entitled to submit its corresponding application for payment, with
respect of the above description.

Signed by Sub-contractor Rep. Signed by Contractor Rep.

By______________ By______________
M/s. Trans Asia Pipeline Specialty Services M/s. Galfar Engineering & Contracting WLL
Emirates

CONSUMABLE MOBILIZATION CERTIFICATE


8) Contractor : GALFAR ENGINEERING AND CONTRACTING WLL
EMIRATES
9) Location : Habshan, Abu Dhabi
10) Sub-Contractor : M/s. Trans Asia Pipeline Specialty Services LLC.
11) Milestone Description : Consumable Mobilization of Liquid Nitrogen to site for 24” Spur
Line-2 Decommissioning activities.
12) Work Element Description : Station piping & Non-piggable pipeline Nitrogen Purging Works
13) Mobilization Date : 26th July 2022
Equipment Details:

Distribution: Original On Site Job File Page 3 of 4 Document No.: FP-OP-37.

Iss No: 03 TRANS ASIA Office Revision No.: 03

© TRANS ASIA. All Rights Reserved. Revision Date: 21.12.2020


PROJECT TITLE: EPC FOR THE PROVISION AND
INSTALLATION OF NEW BYPASS SYSTEM AT
MP-21 AND REMOVAL OF REDUNDANT LINES AT
OLD MP-21 STATION

Contract Ref No : GEC/CD/291/21 Project Code : W667

SN DESCRIPTION MOB. DATE QTY

Nitrogen Equipment Spread

1 Liquid Nitrogen 4000 Gallons 08-10-2022 4000 Gallons


Contractor on receipt of this report is entitled to submit its corresponding application for payment, with
respect of the above description.

Signed by Sub-contractor Rep. Signed by Contractor Rep.

By______________ By______________
M/s. Trans Asia Pipeline Specialty Services M/s. Galfar Engineering & Contracting WLL
Emirates

Distribution: Original On Site Job File Page 4 of 4 Document No.: FP-OP-37.

Iss No: 03 TRANS ASIA Office Revision No.: 03

© TRANS ASIA. All Rights Reserved. Revision Date: 21.12.2020