You are on page 1of 3

Ramasamy.

G Mobile:+971503216671(AbuDhabi)
Address:#21,VellalarStreet,+917299806639(India)
NathamKovilpatty,Natham,DindigulDistrict.Email:gramasamy2001@gmail.com
Tamilnadu,India.Pin:624401.

PipingEngineerhaving15yearsexperienceinDesignandEngineeringofPiping/Pipeline/Mechanical
system in the field of Oil and Gas brown & green fields. Hands on experience in FEED and Detailed
EngineeringOnshore/OffshoreprojectswithPDO,QatarPetroleumandADOCetc.

EducationalDetails
CompletedB.E(Mechanical)onApril2001atBharathiyarUniversityCoimbatore.

ComputerKnowledge
AutoCad2013,Microstation,CaesarII,PDMS,MicrosoftOffice

OffshoreTrainingCertificates(UAEBased)
HelicopterUnderwaterEscapeTraining(H.U.E.T)ValiduptoJuly2020
SeaSurvivalValiduptoJuly2020
H2STrainingValidupto08.08.2018

KEYQUALIFICATIONS

Roles&ResponsibilitiesundertakenasaPipingEngineer
Preparing/CheckingofFeedVerification,DesignBasis,EPICscope
Preparing/Checking of Piping and Pipeline Material Specification, Piping and Pipeline Wall
thickness Report, Valve Specification & Data sheets, Specification and Data Sheet for Oil Pig
Launcher/Receiver, Specification and Data sheet for Gas Injection Launcher/Receiver,
SpecificationandDatasheetforOilSlugCatcher,SpecificationandDatasheetforProduction
Separator, Reciprocating and Centrifugal Pump Data Sheet, Data sheet for isolation joints,
specification & Data sheet for Hot Induction Bends, Data sheets for MOV, ON/OFF, Control
Valve,PRV,materialtakeoff(MTO),Valvelist,tieinscheduleandEquipmentList.
Coordinatewithdifferentdisciplinesofengineeringteam.
CoordinationforVendoractivity.
Checking&ofOverallLayout,PlotPlan,AlignmentSheets,Piping/PipelineRouteLayoutsand
PipingGeneralArrangementDrawings.
ExperiencedinFEEDandDetailedEngineeringofOnshoreandoffshoreprojects.
PreparationofFeedVerification,DesignBasisMemorandum,EPICscope.
Preparation/Checking of Piping and Pipeline Material Specification, Piping and Pipeline Wall
thickness, Valve Specification & Data sheets, specification & Data sheet for Hot Induction
Bends,PigSignallerdatasheet,PressureVesselDatasheet,DatasheetsforMOV,ROV,EOV,
materialtakeoff(MTO),Valvelist,tieinscheduleandpressuredropcalculation.
PreparationofCompressor,Dryer,AirreceiverDatasheets
Coordinatewithdifferentdisciplinesofengineeringteam
CheckingofPipingLayoutsand3DmodelreviewinPDMS
Preparation/CheckingofMaterialtakeoff/BillofmaterialsandPiperackloadingcalculation
Preparing/CheckingofoverallLayout,PlotPlan,AreaKeyPlan,EquipmentLayout,Alignment
sheet,RouteLayout&PipingGAdrawings.
Incorporating the Client/end user comments on the documents/drawings till the document
issuedasApprovedforConstruction(AFC)/Finalissue.
WellconversantwithANSI/ASME/ASTM/NACE/MSS/BS/APICodes/Standards.Familiar
withQP&ShellDEPstandards/Specifications.
PreparationofpipesupportspecificationsandPipesupportdrawings

Page 1 of 3
QualityAssuranceResponsibleforworkingwithintheprovisionsandguidelinesoftheQuality
Assurancesystems.
AttendingDesignreviewmeetingsforHAZID,HAZOPwithclients.
PreparationofTopographicalSurveyScopeofworkasperCompanyandprojectrequirements
andreviewingofTopographicalsurveyreportanddrawingsreceivedfromtheTopographical
SurveyContractoragainstprojectrequirements.
Incorporating the Client/end user comments on the documents/drawings till the document
issuedasApprovedforConstruction/Finalissue.
ApprovalsforProcess625and825CRA(InternalCoating),ControllingpipingSpoolLimitations
forCladding,ROTOMoulding&HDPELining
TK236andTK216DesignCoordination(Internallining)
Knowledgeoffield&shopconstructionactivities.
GoodExposureinPMCprojects(EngineeringandConstruction).
ExcellentknowledgeinBrown/GreenfieldEngineering/Constructionactivities.
EngineeringConstructionCoordinationinbrownfieldactivities.
1.MottMacDonald,AbuDhabiAug2014TillDate

Roles&ResponsibilityundertakenasaPipingDesignEngineer
EPICContractNo:HD2015CR008
EPICContractTitle:EPICofEarlyProductionScheme(EPS)forSurfacefacilitiesofHail
DevelopmentProjectatMubarrazSite(OffShoreProject)
FEEDContractNo :HD2014CR002
FEEDContractTitle :FEEDofEarlyProductionScheme(EPS)forSurfacefacilitiesofHail
DevelopmentProjectatMubarrazSite(OffShoreProject)
Client :AbuDhabiOilCo.,Ltd(Japan)
Contractor :MottMacDonald,AbuDhabi.

2.RSNEngineering&ConstructionCoPvtLtdIndia,Feb2013July2014
ContractNo :GC13106400
ContractTitle :EPICofinternalliningof16DiyabJalehapipelinewithinDukhanfields
Client :QatarPetroleum
MainContractor :GalfarAlMisnadEngineeringContractingW.L.L&QatarDesign
Consortium,Qatar

ContractNo :GC11109200
ContractTitle :EPICforUpgradeofInstrumentAirCompressorsatGDSB&Ein
MesaieedArea
Client :QatarPetroleum,Qatar
MainContractor :NECONAutomation&QatarDesignConsortium,Qatar

ContractNo :4600000426
ContractTitle :EPCfortheInstallationofCompressedAirSystemtoactasan
AlternativeToGTCompressorAirSupplytoPulseAirSystem
Client :QatarAluminiumLimited(Q.S.C)
MainContractor :PetroservLimited&QatarDesignConsortium,Qatar

ContractNo :LC13103600
ContractTitle :EarlyTieinforReplacementof30inchONSAGPipelinefromStation
BtoS
Client :QatarPetroleum
MainContractor :GalfarAlMisnadEngineeringContractingW.L.L&QatarDesign
Consortium,Qatar
3.GalfarALMISNADEngg.&ContractingW.L.LQatar,June2011Feb2013
Page 2 of 3
GalfarEngineering&ContractingSAOGOman,May2009February2011
ContractNo :GC11114400
ContractTitle :EPICforButaneSupplytoQAFAC&QCHEMMesaieed&NewSurge
TankatMesaieed.
Client :QatarPetroleum

ContractNo :GC12105600
ContractTitle :EPICofConversionofCondensateTankT13forGasolineService,
Mesaieed.
Client :QatarPetroleum

ContractNo :GC10102100
ContractTitle :EPICofNewKhuffWellDKG31FlowlineConnections,Dukhan
Client :QatarPetroleum

ContractNo :GC09113400
ContractTitle :EPICforRouteSurvey,Design,Construction,Installation&Hookupof
OilFlowlines,GasLiftFlowlinesandPWISpurLinesinDukhanFields
Client :QatarPetroleum

ContractNo :C310904
ContractTitle :QarnAlamSteamProjectSurfaceFacilities,OffPlot
Client :PetroleumDevelopmentofOman(PDO)Oman
4.VheerasDesignCenterChennai(India),July2008toApril2009
5.GuruBrothersChennai(India),November2004toJune2008
6.SuperAutoForgeLtdChennai(India),April2002toOctober2004

Reference:
Mr.SatoKazuo Mr.NasserSharkawy
Interfacemanager ProjectManager
HailFieldDevelopment(HDDepartment) MottMacDonaldLimited
AbuDhabiOilCompany(ADOC) Email:AbdelNasser.AlSharkawy@mottmac.com
Email:k_sato@adoc.ae D:+971(0)24015379
M:+971566886583 M:+971501611098

PersonalDetails
Father'sName :Ganesan PassportNo :K8611415
DateofBirth :14021980 PlaceofIssue :Madurai
Maritalstatus :Married DateofIssue :08112012
LanguagesKnown :English&Tamil DateofExpiry :07112022

Declaration

Iherebydeclaredthatallthedetailsfurnishedabovearetruetothebestofmyknowledgeandbelief.

YoursTruly
Ramasamy.G

Page 3 of 3

You might also like