Professional Documents
Culture Documents
Balance Work Prepation
Balance Work Prepation
5 Electrical work
i External light wiring
ii DB supply and installation
6 Miscellaneous Item
i Aluminium door fabrication and installation in service lift opening
ii Floor finishing service lift entrance in roof top
Third floor
1 Electrical work
i External light wiring
ii Supply and installation of distribution work
iii Installation of Electrical fittings
2 Plumbing work
i Core cutting
ii Balance plumbing work
iii Installation of sanitary fittings
iv Rain water line laying
3 Concrete work
i Concrete filling in master balcony
ii Concrete filling in bath room area
iii Concreting lintel above duct opening
4 Masonry and finishing
i Brick work in master bath room
ii Brick work in MEP duct
iii Plastering work in bath room area & duct area
iv Dummy wall making
v Floor rendering
5 Water proofing work
i Drop panel water proofing(External)
ii Moulding water proofing (External)
iii Bath room area water proofing
iv Balcony area water proofing work
v Water proofing in roof top entrance porch
6 Capentry
Second floor
1 Electrical work
i External light wiring
ii Supply and installation of distribution work
iii Installation of Electrical fittings
2 Plumbing work
i Core cutting
ii Balance plumbing work
iii Installation of sanitary fittings
iv Rain water line laying
3 Concrete work
i Concrete filling in balcony
ii Concrete filling in bath room area
iii Concreting lintel above duct opening
4 Masonry and finishing
ii Brick work in MEP duct
iii Plastering work in bath room area & duct area
iv Dummy wall making
v Floor rendering
5 Water proofing work
i Drop panel water proofing(External)
ii Moulding water proofing (External)
iii Bath room area water proofing
iv Balcony area water proofing work
6 Miscellaneous Item