Balance work of proposed residential project No,104,Chithra lane Colombo 05

Item Description Remarks


Roof Top
1 Masonry and finishing work
i Preparation of damage plaster area in parapet wall
2 Concrete work
i Concrete filling above service lift cover slab
ii Concrete plinth preparation to place water tanks shop drawing was
submitted
iii Concreting extension concrete plinth to fix AC out door unit Decision not finalized
iv Concrete cover slab preparation to cover Plumbing and AC ducts shop drawing was
submitted
3 Water proofing work
i Water proofing work for external moulding
ii Water proofing work on service lift cover slab
iii Water proofing work on top of parapet wall
v Water proofing work in drop panel
vi Expansion joint filling material from airow
4 Plumbing work
i Preparation of water supply line in and out from water tank to
relevant floors
ii Supply and installation of water tank
iii Balance plumbing work such as vent pipes

5 Electrical work
i External light wiring
ii DB supply and installation
6 Miscellaneous Item
i Aluminium door fabrication and installation in service lift opening
ii Floor finishing service lift entrance in roof top
Third floor
1 Electrical work
i External light wiring
ii Supply and installation of distribution work
iii Installation of Electrical fittings

2 Plumbing work
i Core cutting
ii Balance plumbing work
iii Installation of sanitary fittings
iv Rain water line laying

3 Concrete work
i Concrete filling in master balcony
ii Concrete filling in bath room area
iii Concreting lintel above duct opening
4 Masonry and finishing
i Brick work in master bath room
ii Brick work in MEP duct
iii Plastering work in bath room area & duct area
iv Dummy wall making
v Floor rendering
5 Water proofing work
i Drop panel water proofing(External)
ii Moulding water proofing (External)
iii Bath room area water proofing
iv Balcony area water proofing work
v Water proofing in roof top entrance porch

6 Capentry

Second floor
1 Electrical work
i External light wiring
ii Supply and installation of distribution work
iii Installation of Electrical fittings

2 Plumbing work
i Core cutting
ii Balance plumbing work
iii Installation of sanitary fittings
iv Rain water line laying

3 Concrete work
i Concrete filling in balcony
ii Concrete filling in bath room area
iii Concreting lintel above duct opening
4 Masonry and finishing
ii Brick work in MEP duct
iii Plastering work in bath room area & duct area
iv Dummy wall making
v Floor rendering
5 Water proofing work
i Drop panel water proofing(External)
ii Moulding water proofing (External)
iii Bath room area water proofing
iv Balcony area water proofing work

6 Miscellaneous Item