You are on page 1of 37

CCC

(Certificate of Completion and Compliance)

Ir Fong Tian Yong


CCC - BACKGROUND
2

• CCC first introduced in 1999 for:


Singly-built detached house only

• Government in 2005 decided to apply CCC to all buildings

• WG under JKT :
- How to trust the professionals
- Questions of Professional Indemnity Insurance (PII) was raised
- should hold all stakeholders responsible and accountable
including COWs.
- follow OSC 2002 : only 6 technical departments clearance
SAMPLE OF CCC IN 2000
CCC FRAMEWORK
4

• CFO by local authorities replaced by CCC to be issued by the


Principal Submitting Person (PSP) on 12 April 2007
• Aim of CCC to cut short the delays caused by Local
Authorities and towards self regulations by the professionals
• CCC can only be issued by PSP after:-
• All certifications by the respective parties (professionals,
contractors, licensed tradesmen) based on prescribed
forms (Form Gs) under the Matrix of Responsibility and
Accountability are secured.
WHO CAN BE THE PRINCIPAL
SUBMITTING PERSON (PSP) ?
Either a Prof. Architect (Ar.) or a Prof. Civil Engineer (Ir.) depending on the
type of projects agreed between Board of Architects and Board of
Engineers.
Refer to the Joint Memorandum by BAM and BEM as per BEM Circular.
Appendix A – Only Ar can be PSP
Appendix B – Only Ir. can be PSP
Appendix C – Either Ar. or Ir. can be PSP

(Currently undergoing amendment between BEM and BAM. )


DUTIES OF PSP

• To prepare and present planning and building plans to PBT for approval.
• Inform PBT of the commencement of construction works on site.
• Supervise construction works at site and ensure that laws and technical
conditions of the PBT are followed.
• Report building breaches, explain reasons of breach and ensure breach is
rectified during construction.
DUTIES OF PSP

• Present work resumption notice to the PBT.


• Ensure Form Gs are duly certified by bona fide Professionals
practising through ACPs/ECPs registered with BAM/BEM, at
various stages of the works and when all the essential services
have been provided.
• Issue CCC upon satisfactory completion of the works and
after all conditions have been complied with, confirming the
building is safe and fit for occupation.
• Deposit a copy of the CCC to the PBT and BAM/BEM within
14 days of issue.
PENALTIES ON PSP IN SECTION 70(27) OF
STREET, DRAINAGE AND BUILDING ACT
• Not a PSP but issues a CCC
• Issues a CCC without all the relevant forms
• Issues CCC in contravention of a direction by PBT
• Make any false or fraudulent declarations
• Uses any forged, altered or counterfeit declaration,
certificate and application
• Occupies or permits to be occupied any building without
a CCC
• Fine not exceeding RM 250K or to imprisonment not
exceeding 10 years or to both.
“UNIFORM BUILDING BY-LAWS 1984
FORM F
CERTIFICATE OF COMPLETION AND COMPLIANCE
[By -Law 25]

Date:……………………..
To:
*………………………………….

I hereby issue the Certificate of Completion and Compliance for the building/s
on Lot/s………........ Section......……… Jalan...................................................
upon being satisfied that it has been completed in accordance with approved
plan No. ................. dated .......................

I have supervised the erection and completion of the building/s and it is to the
best of my knowledge and belief that such work/s is/are in accordance with the
Act, Uniform Building By-laws 1984 and approved plans. I hereby certify that
the building/s is/are safe and fit for occupation.

……………………………………
(Principal submitting person)
1. Particulars of the principal submitting person

Name : …………………………….…………………………………………....
Address: ....……………………..………………………………………………......
**BAM/BEM Registration No.: ………………………………………………

2. Copy to:

(a) Local Authority : ……………………….………………………………


(Name of Local Authority)

(b) **Board of Architects Malaysia(BAM)/Board of Engineers Malaysia (BEM)


“UNIFORM BUILDING BY-LAWS 1984
FORM F1
CERTIFICATE OF COMPLETION AND COMPLIANCE
[By -Law 27]

Date:……………………..
To:
*………………………………….

I hereby issue the Partial Certificate of Completion and Compliance for the building/s
on Lot/s………........ Section......……… Jalan...................................................
upon being satisfied that it has been completed in accordance with approved
plan No. ................. dated .......................

I have supervised the erection and completion of the building/s and it is to the
best of my knowledge and belief that such work/s is/are in accordance with the
Act, Uniform Building By-laws 1984 and approved plans. I hereby certify that
the building/s is/are safe and fit for occupation.

……………………………………
(Principal submitting person)
FORM F1 (PARTIAL COMPLETION)

• Q2 When can Form F1 (Partial Completion) be issued?


• Only when phased completion of an integrated
development has been submitted for approval by PBT
at Building Plan approval stage.
• There shall be no adhoc decision to issue Form
F1, if the PSP is pressured by the developer or
turnkey contractor near the project end when delay
is anticipated.
• Separate Form F should be issued for each phase of a
housing development or a large integrated factory
project, and not Form F1.
UNIFORM BUILDING BY-LAWS 1984
FORM G 1
STAGE CERTIFICATION : EARTHWORKS
(By-law 25 or 27)
Project Title: .....................................................................

*1. We certify that we have supervised and/or carried out the construction and
completion of the earthworks and that to the best of our knowledge and belief
such works are in accordance with the Approved Earthwork Plans Ref. No. :
……………………….. and that we accept full responsibility for the same.
Name (Individual) #Registration No. Signature

(a) Contractor ............................ ........................... ....................


(CIDB) (Date: )

(b) Submitting person ............................ ........................... .....................


(BEM) (Date: )

( SP : PEPC in Civil or Geotechnical only )


FORM G1 - EARTHWORKS

Q3 For a project with multiple phases, can the SP submit only ONE (1) Form G1 for
all the phases?
• Need to submit Form G1 only once under Phase 1 development. For
subsequent phases, insert Phase 1 EW approval reference no. and PSP to
certify “Not Applicable” on the respective Form G1. The project title shall
be the approved BP title for each phase.
FORM G3 -FOUNDATIONS

Q4 How is Form G3 submitted if there are different Contractors for structural


elements such as piling, raft foundation, pile cap, etc?
• Submit separate Form G3s in accordance with the Contractor’s scope of
work.

( SP : PEPC in Civil or Geotechnical only )


UNIFORM BUILDING BY-LAWS 1984
FORM G 4
STAGE CERTIFICATION : STRUCTURAL
(By-law 25 or 27)

Project Title: .........................................................................

* We certify that we have supervised and/or carried out the erection and
completion of the structural works and that to the best of our knowledge and
belief such works are in accordance with the Deposited Structural Plans Ref.
No. : ................................. and that we accept full responsibility for the same.

Name (Individual) #Registration No. Signature

(a) Contractor ............................ ........................... ....................


(CIDB) (Date: )

(b) Submitting person ............................ ........................... .....................


(BEM) (Date: )

( SP : PEPC in Civil or Strucutral only )


UNIFORM BUILDING BY-LAWS 1984
FORM G 5
STAGE CERTIFICATION : INTERNAL WATER PLUMBING
(By-law 25 or 27)

Project Title: ...................................................................

*1. We certify that we have supervised and/or carried out the erection and
completion of the internal water plumbing works and that to the best of our
knowledge and belief such works are in accordance with the *approved
plans/Deposited Plans Ref. No. : ........................................... and that we
accept full responsibility for the same.

Name (Individual) #Registration No. Signature


(a) Trade contractor ............................ ........................... .....................
(Licensed plumber) +( ) (Date: )

(b) Submitting Person ............................ ................................ .........................


(*BAM/BEM) (Date: )

( SP : PEPC in Mechancial or Civil only )


WHO CAN BE THE SP FOR FORM G
Form G Scope SP
G1 Earthworks PEPC Civil or Geotechnical

G2 Setting out - Licensed land surveyor


- NA for engineering setting
out (PSP)
G3 Foundation PEPC Civil or Geotechnical
G4 Structural PEPC Civil or Structural
G5 Internal cold water PEPC Mechanical or Civil
plumbing
G6 Internal Sanitary PEPC Mechanical or Civil
Plumbing
WHO CAN BE THE SP FOR FORM G
Form G Scope SP
G7 Internal Electrical PEPC Electrical or
NA (ST) if below 60A (competent
person registered under
Suruhanjaya Tenaga signing on
contractor’s signature’s space shall
be responsible for design and
installation of electrical works.
A copy of ST From G & H signed
by same competent person to be
attached with G7.
10/11/2017
WHO CAN BE THE SP FOR FORM G
Form G Scope SP
G8 Fire fighting Passive P. Ar or PEPC Civil

G9 Fire fighting Active PEPC Mechanical

G10 Mechanical PEPC Mechanical


ventilation
G11 Lift/Escalator PEPC Mechanical or Electrical

G12 Building P. Ar or PEPC Civil


(refer to BAM/BEM Memo)
WHO CAN BE THE SP FOR FORM G
Form G Scope SP
G13 External water PEPC Civil
supply
G14 Sewerage PEPC Civil
reticulation
G15 Sewerage PEPC Civil
Treatment Plant
G16 External Electrical PEPC Electrical
G17 Road and Drain PEPC Civil

G18 Street Lighting PEPC Electrical


WHO CAN BE THE SP FOR FORM G
Form G Scope SP
G19 External Main PEPC Civil
Drain
G20 Telecommunication PEPC Electrical

G21 Landscape Landscape architect or


PEPC Civil if permitted by
local authority to submit
plan
10/11/2017

Under Registration of Engineers Act:

•Signing SP must be a Professional Engineer with


Practicing Certificate registered with BEM in the correct
discipline

•SP must be attached to an ECP registered with BEM to


practise in the correct discipline/s
10/11/2017
GUIDE TO FILLING UP FORMS F & F1 (Version 1 - May 2008)
Form Date Address To * Details of Building 1. PSP 2. Local Forms G-1 to G-21
Authority

F Insert 1) Insert name of Developer 1) Insert Address of Building - Lot 1) Insert full name of PSP 2) Insert Name Attach Forms G-1 to G-
date of if it is for development other No/Nos, Section, and Road 2) Insert Insert Name of ACP/ECP of Local 21 together with other
CCC than individually built description of project as per Building and address 3) Insert Authority required enclosures
building 2) Insert name of Plan Approval adjacent or below or in BAM/BEM Registration no. before forwarding to
place of item 1) 3) Insert BP Approval of PSP Local Authority and
owner for an individually
Ref and Date 4) PSP to sign off BAM/BEM
built building

F1 Insert 1) Insert name of Developer 1) Insert Address of Building - Lot 1) Insert full name of PSP 2) Insert Name Attach Forms G-1 to G-
date of if it is for development other No/Nos, Section, and Road 2) Insert Insert Name of ACP/ECP of Local 21 together with other
CCC than individually built description of project as per Building and address 3) Insert Authority required enclosures
building 2) Insert name of Plan Approval adjacent or below or in BAM/BEM Registration no. before forwarding to
place of item 1) 3) Insert BP Approval of PSP Local Authority and
owner for an individually
Ref and Date 4) PSP to sign off BAM/BEM
built building

Notes:

1) PSP shall notify the local authority through OSC (in writing or using prescribed form) after
Forms G1-G3 are certified (i.e. after completion of Earthwork, Setting Out and Foundations)
2) Form F/F1 and Form G-1 to G-21 shall be forwarded to the Local Authority and BAM/BEM
within 14 days of the issuance of Form F/F1
GUIDE TO FILLING UP FORMS G-1 TO G-21 (Version 1 - May 2008)
10/11/2017
FORM Project Title Item *1 Item *1 (a) Item *1 (b) Item *1(c) Item *2

G-1 Insert If this item is 1) Insert name (individual) of proprietor / 1) Fill in SP's name 2) Fill in BEM If Item *1 is
Earthwork description applicable, insert partner / director of Contractor's registration no. 3) Sign and date applicable, strike
of project as LA's Approval Ref Company & attach certified copy of 4) SP must be a Civil Engineer out Item *2. If
per BP No. If not Company's Form 49 to authenticate this or Geotechnical engineer item *1 is not
approval applicable, strike individual (Contractor) 2) Insert applicable, PSP to
out Item*1 Contractor's NRIC 3) Contractor to sign sign declaration
and date 4) Attach copy of CIDB
registration of Company

G-2 Insert If this item is 1) Insert name (individual) of proprietor / 1) Fill in Licensed Land 1) Fill in PSP's If Item *1 is
Setting Out description applicable, insert partner / director of Contractor's Surveyor's name 2) Fill in name 2) Fill in applicable, strike
of project as LA's Approval Ref Company & attach certified copy of Surveyor Board's registration BAM/BEM out Item *2. If
per BP No. If not Company's Form 49 to authenticate this no. 3) Sign and date registration no. item *1 is not
approval applicable, strike individual (Contractor) 2) Insert 3) Sign and applicable, PSP to
out Item*1 Contractor's NRIC 3) Contractor to sign date sign declaration
and date 4) Attach copy of CIDB
registration of Company

G-3 Insert If this item is 1) Insert name (individual) of proprietor / 1) Fill in SP's name 2) Fill in BEM If Item *1 is
Foundation description applicable, insert partner / director of Contractor's registration no. 3) Sign and date applicable, strike
of project as SP's Deposited Company & attach certified copy of 4) SP must be a Civil Engineer out Item *2. If
per BP Plans Ref No. to Company's Form 49 to authenticate this or Geotechnical engineer item *1 is not
approval LA. If not individual (Contractor) 2) Insert applicable, PSP to
applicable, strike Contractor's NRIC 3) Contractor to sign sign declaration
out Item*1 and date 4) Attach copy of CIDB
registration of Company
FORM Project Title Item *1 Item *1 (a) Item *1 (b) Item Item *2
10/11/2017
*1(c)

G-8 Insert If this item is 1) Insert name (individual) of 1) Fill in PSP's name 2) If Item *1 is
Passive description applicable, proprietor / partner / Fill in BAM/BEM applicable,
Fire of project as insert director of Contractor's registration no. 3) Sign strike out
per BP Bomba's Company & attach certified and date 4) If an Item *2. If
approval Approval Ref copy of Company's Form 49 engineer, PSP must be a item *1 is
No. or PSP's to authenticate this Civil Engineer 5) Attach not
Deposited individual (Contractor) 2) Letter of Clearance from applicable,
Plans Ref No. Insert Contractor's NRIC 3) Bomba (except for PSP to sign
If not Contractor to sign and date 4) residential buildings not declaration
applicable, Attach copy of CIDB exceeding 18 meters
strike out registration of Company height)
Item*1

G-9 Insert If this item is 1) Insert name (individual) of 1) Fill in SP's name 2) If Item *1 is
Active description applicable, proprietor / partner / Fill in BEM registration applicable,
Fire of project as insert director of Trade no. 3) Sign and date 4) strike out
per BP Bomba's Contractor's company & SP must be a Item *2. If
approval Approval Ref attach certified copy of Mechanical Engineer 5) item *1 is
No. or PSP's Company's Form 49 to Attach Letter of not
Deposited authenticate this individual Clearance from Bomba applicable,
Plans Ref No. (Contractor) 2) Insert (except for residential PSP to sign
If not Contractor's NRIC 3) buildings not exceeding declaration
applicable, Contractor to sign and date 4) 18 meters height)
strike out Attach copy of CIDB
Item*1 registration of Company
FAQS 10/11/2017

• www.acem.com.my
• www.bem.org.my
• www.iem.org.my
• www.lam.gov.my
• www.pam.org.my
BEM CIRCULAR NO.1 10/11/2017

(WWW.BEM.ORG.MY UNDER “SERVICES” TAB)

Submission of Plans classified under


APPENDICES A, B & C
Appendix A:
No person shall submit any Building Plans, reports
and specifications for the underlisted works and or
services, unless he is an Architect, except for any
engineering works required (excluding any
standard engineering works), such engineering
plans and specifications shall be submitted by a
Professional Engineer.
WHAT IS THE STATE OF CCC
CERTIFICATION AFTER 7
YEARS OF OPERATION?
WORKING VERY WELL
AND WE HAVE MADE MANY DISCOVERIES!
CCC SUBMISSIONS
• As of Sept 2017
• BEM have received 4,695 CCC submissions
• Late Submissions: 334
• Wrong Endorsements: 300
• Submission not through an ECP: 168
• Submission without Form G: 114
• Cases investigated under IC: 19
• Engineers deregistered: 2
• Engineers suspended: -
• Engineers reprimanded: 4
• Engineers reprimanded: and fine: 7
• Fine, reprimand & suspension : 1
SECTION 7A(1) OF REA

• Notwithstanding section 7(1), a sole proprietorship,


partnership or body corporate may practise as an
Engineering consultancy practice and recover in any court
any fee, charge, remuneration or other form of
consideration for any professional engineering services
rendered by it pursuant to its practice as an Engineering
consultancy practice carried on by virtue of this section, if
it is registered with the Board as an Engineering
consultancy practice and has been issued with a certificate
of registration.
SECTION 15(1) OF REA

• Sec 15 (1) The Disciplinary Committee may make any


order (sub section 1A) against a registered person if :

(m) if he causes or suffers any sole proprietorship,


partnership or body corporate in which he is a sole
proprietor, partner, director or shareholder to
practice as an Engineering Consultancy Practice prior
to its registration by the board.
FIRST CASE OF ENGINEER
DEREGISTERED FOR FOLLOWING
REASONS:-

• Failure to deposit copies of CCC to PBT and BEM.


• Allowed the building to be occupied without CCC.
• Falsified the receipt date stamp of PBT OSC for Form G13 to
G21 in order to mislead the developer.
DISCOVERIES FROM CCC
SUBMISSIONS
• Sole proprietor firms or individual PEs operating
without ECPs registered with BEM.
• Use of forged PE stamp to sign Form Gs.
• Fraudulent engineers - names not on BEM list.
• Engineers signing Form Gs under wrong disciplines.
• Engineers still not knowing or bother to get
information from BEM website on CCC process
resulting in a lot of mistakes in their submissions.
• Engineers not responding in timely manner to BEM's
notifications for explanations or clarifications.
FUTURE DIRECTION FOR CCC

• The amendment to Registration of Engineers Act in 2015 has


introduced Inspector of Works (IOW) and BEM is in the
process of registering them.
• BEM will seek the revision of Form Gs to include another
space for the SP’s site supervision staff to sign for greater
accountability.
TERIMA KASIH