You are on page 1of 344

PT.

TUNAS JAYA PERKASA


Invoice Rent Mine Closure Fuel Price Period - 01-14 : IDR 7,967.1153
Contract No. 000056/E-CTR/MHE/JBG/JBG/2018 Fuel Price Period - 15-31 : IDR 7,927.0285
Contract Term : 1 January 2019 - 31 Juli 2022 Avg. Fuel Price (Fp) : IDR 7,947.0719
Periode September 2019

No Equipment Type Equipment Name Base Rate Fuel Rate HM Actual Penalty MA Penalty No HM Actual Final Rate/Hour Amount (IDR)
Unit (IDR) (Ltr/Hour) Operator Final

1 Bulldozer D85ESS TJP-D85ESS-802 425,000 28 249.00 0.00 0.00 249.00 647,518.01 161,231,985
2 Bulldozer D85ESS TJP-D85ESS-807 425,000 28 243.00 0.00 0.00 243.00 647,518.01 157,346,877
3 Bulldozer D85ESS TJP-D85ESS-831 425,000 28 132.20 0.00 0.00 132.20 647,518.01 85,601,881
4 Excavator 200 TJP-EX200-816 240,000 20 221.30 0.00 0.00 221.30 398,941.44 88,285,740
5 Excavator 200 TJP-EX200-819 240,000 20 231.20 0.00 0.00 231.20 398,941.44 92,235,260
6 Excavator 200 TJP-EX200-825 240,000 20 264.00 0.00 0.00 264.00 398,941.44 105,320,540
7 Excavator 200 TJP-EX200-826 240,000 20 172.10 0.00 0.00 172.10 398,941.44 68,657,821

Total IDR 758,680,105.65


VAT 10% IDR 834,548,116.21
PT. TUNAS JAYA PERKASA
Invoice Rent Road Maintenance Fuel Price Period - 01-14 : IDR 7,967.1153
Contract No. 000056/E-CTR/MHE/JBG/JBG/2018 Fuel Price Period - 15-31 : IDR 7,927.0285
Contract Term : 1 January 2019 - 31 Juli 2022 Avg. Fuel Price (Fp) : IDR 7,947.0719
Periode September 2019
Base Rate Fuel Rate HM Penalty Penalty No Reward HM Actual
No Equipment Type Equipment Name Unit (IDR) (Ltr/Hour) Actual MA Operator MA Final Final Rate/Hour Amount (IDR)

1 Grader TJP-MG535-872 375,000 16 227.00 0.00 0 0.99 227.99 502,153.15 114,487,403


2 Compact TJP-CP525-875 265,000 13 215.10 0.00 0 0.66 215.76 368,311.93 79,467,111
3 Water Truck TJP-WT-874 280,000 14 311.60 0.00 0 1.52 313.12 391,259.01 122,510,238

Total IDR 316,464,752.05


VAT 10% IDR 348,111,227.26
PT. TUNAS JAYA PERKASA
Invoice Rent Mining Fuel Price Period - 01-14 : IDR 7,967.1153
Contract No. 000056/E-CTR/MHE/JBG/JBG/2018 Fuel Price Period - 15-31 : IDR 7,927.0285
Contract Term : 1 January 2019 - 31 Juli 2022 Avg. Fuel Price (Fp) : IDR 7,947.0719
Periode September 2019
Base Rate Fuel Rate Penalty No HM Actual
No Scope Job Equipment Type Equipment Name Unit (IDR) (Ltr/Hour) HM Actual Penalty MA Operator Final Final Rate/Hour Amount (IDR)

1.1 Water Management Excavator 400 TJP-EX470-853 630,000 47 1.50 1.50 1,003,512.38 1,505,269
Sub Total 1,505,269
2.1 Road Maintenance Excavator 200 TJP-EX200-818 240,000 20 163.50 163.50 398,941.44 65,226,925
2.2 Road Maintenance DT30 Ton TJP-DT30T-932 280,000 15 2.70 2.70 399,206.08 1,077,856
Sub Total 66,304,782
2.3 ComDev Compact TJP-CP525-875 265,000 13 9.40 9.40 368,311.93 3,462,132
Sub Total 3,462,132
3.1 Loading Port Excavator 200 TJP-EX200-826 240,000 20 61.30 61.30 398,941.44 24,455,110
3.2 Loading Port Excavator 300 TJP-EX300-821 425,000 30 43.00 43.00 663,412.16 28,526,723
3.3 Sand Removal Excavator 300 TJP-EX300-821 425,000 30 214.00 214.00 663,412.16 141,970,202
3.4 Sand Removal DT30 Ton TJP-DT30T-974 280,000 15 4.70 4.70 399,206.08 1,876,269
Sub Total 196,828,303
4.1 Coal Processing Excavator 200 TJP-EX200-826 240,000 20 100.00 100.00 398,941.44 39,894,144

Sub Total 39,894,144


Grand Total IDR 307,994,629.15
VAT 10% IDR 338,794,092.06
PT. TUNAS JAYA PERKASA
Invoice Rent Minning Fuel Price Period - 01-14 : IDR 7,967.1153
Contract No. 000056/E-CTR/MHE/JBG/JBG/2018 Fuel Price Period - 15-31 : IDR 7,927.0285
Contract Term : 1 January 2019 - 31 Juli 2022 Avg. Fuel Price (Fp) : IDR 7,947.0719
Periode September 2019
Base Rate Fuel Rate HM Penalty Penalty No Reward HM Actual
No Equipment Type Equipment Name Unit (IDR) (Ltr/Hour) Actual MA Operator MA Final Final Rate/Hour Amount (IDR)

1 Excavator 400 TJP-EX470-851 630,000 47 4.01 0.00 0 0.00 4.01 1,003,512.38 4,024,085
2 Excavator 400 TJP-EX400-810 630,000 47 268.60 0.00 0 0.00 268.60 1,003,512.38 269,543,425
3 Excavator 400 TJP-EX400-815 630,000 47 110.80 0.00 0 0.00 110.80 1,003,512.38 111,189,172
4 Excavator 400 TJP-EX470-854 630,000 47 178 0.00 0 0.00 178.10 1,003,512.38 178,725,555
5 Excavator 400 TJP-EX400-811 630,000 47 41.50 0.00 0 0.00 41.50 1,003,512.38 41,645,764
6 Excavator 400 TJP-EX470-853 630,000 47 46 0.00 0 0.00 46.06 1,003,512.38 46,221,780
7 Excavator 400 TJP-EX470-855 630,000 47 103.40 0.00 0 0.00 103.40 1,003,512.38 103,763,180
8 Excavator 400 TJP-EX349-856 630,000 47 2 0.00 0 0.00 1.70 1,003,512.38 1,705,971
9 Excavator 400 TJP-EX349-858 630,000 47 5 0.00 0 0.00 4.80 1,003,512.38 4,816,859
10 Excavator 300 TJP-EX300-817 425,000 30 17 0.00 0 0.00 16.87 663,412.16 11,191,763
Total IDR 772,827,553.61
VAT 10% IDR 850,110,308.97
No Nama Unit Equipment Type HM Actual MA%

1 1 TJP-D85ESS-802 Bulldozer D85ESS -1.60 100%


2 2 TJP-D85ESS-807 Bulldozer D85ESS 0.00 100%
3 3 TJP-D85ESS-831 Bulldozer D85ESS -4.30 99%
4 4 TJP-EX200-816 Excavator 200 -8.80 97%
5 5 TJP-EX200-819 Excavator 200 0.00 100%
6 6 TJP-EX200-825 Excavator 200 0.00 97%
7 7 TJP-EX200-826 Excavator 200 -0.60 100%
8 8 TJP-DTCWB-943 DT20 Ton 0.00 100%
9 9 TJP-DTCWB-946 DT20 Ton 0.00 100%
10 10 TJP-DTCWB-948 DT20 Ton 0.00 100%
11 11 TJP-MG535-872 Grader 0.00 100%
12 12 TJP-CP525-875 Compact 0.00 97%
13 13 TJP-WT-874 Water Truck 311.60 100%
14 14 TJP-DT30T-974 DT30 Ton 4.70 100%
15 15 TJP-DT30T-932 DT30 Ton 2.70 100%
16 16 TJP-EX200-818 Excavator 200 0.00 90%
18 17 TJP-EX300-821 Excavator 300 -3.00 100%
19 18 TJP-EX300-817 Excavator 300 16.87 0%
20 19 TJP-EX400-810 Excavator 400 268.60 0%
21 20 TJP-EX400-811 Excavator 400 41.50 0%
22 21 TJP-EX400-815 Excavator 400 110.80 0%
26 22 TJP-EX470-851 Excavator 400 4.01 0%
27 23 TJP-EX470-853 Excavator 400 47.56 0%
28 24 TJP-EX470-854 Excavator 400 178.10 0%
29 25 TJP-EX470-855 Excavator 400 103.40 0%
30 26 TJP-EX349-856 Excavator 400 1.70 0%
31 27 TJP-EX349-858 Excavator 400 4.80 0%
32 28 0.00 0%
33 29 0.00 0%
34 30 0.00 0%
35 31 0.00 0%
36 32 0.00 0%
33 0.00 0%
34 0.00 0%
35 0.00 0%
Total 1078.04

300.70
302.20
Penalty due to Low Penalty due to No
MA% (Hours) Operator (Hours)
No Penalty No Penalty
No Penalty No Penalty 2314.54
No Penalty No Penalty
No Penalty No Penalty
No Penalty No Penalty
No Penalty No Penalty
No Penalty No Penalty
No Penalty 31.00
No Penalty 31.00
No Penalty 31.00
No Penalty No Penalty
No Penalty No Penalty
No Penalty No Penalty
No Penalty No Penalty
No Penalty No Penalty
No Penalty No Penalty
No Penalty No Penalty
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Month
Year
Dummy

1
2
3
4
5
6

7
8
9
11
12
Scope Job Cost Center

#VALUE! Mine Closure 81410-0C57-53000-10007106


#VALUE! Reslope 81410-0C57-53000-10007106
#VALUE! Void Barrier 81410-0C57-53000-10007106
Acid leaching 81410-0C57-53000-10007106
January Swampy forest 81410-0C57-53000-10007106
February Cut Channel 81410-0C57-53000-10007106
March Top Soil 81410-0C57-53000-10007106
April Gabion
May Draft structure
June catchment area 81410-0C57-53000-10007106
SetPond
Road Maintenance 81830-0F21-53000-1007212
Coal Loading
July Environment 81222-0H52-53000-10005003
August Operation 81410-0C01-10005003
September Water Management 81840-0C00-10005003-0000
November Loading Port 81620-0G01-53000-10005003
December Coal Processing 81610-0E12-53000-10007205
Base Rate Fuel Rate
Nama Unit Kontraktor Equipment Type Unit (IDR) (Ltr/Hrs)

Excavator 200 Rp 240,000 20


Excavator 300 Rp 425,000 30
Excavator 400 Rp 630,000 47
Bulldozer D85ESS Rp 425,000 28
Bulldozer D65P Rp 425,000 27
Bulldozer D155 Rp 800,000 57
Bulldozer D375 Rp 1,270,000 73
DT30 Ton Rp 280,000 15
DT20 Ton Rp 250,000 15
Grader Rp 350,000 19
water truck Rp 220,000 13

Tower Lamp Rp 58,300


Minimum Charge
(Hrs/Month)

250

250
Kode Unit Date Shift
43709Shift ITJP-D85ESS-802 TJP-D85ESS-802 Shift I 802 1-Sep-19 D
43709Shift ITJP-D85ESS-831 TJP-D85ESS-831 Shift I 831 1-Sep-19 D
43709Shift ITJP-EX200-819 TJP-EX200-819 Shift I 819 1-Sep-19 D
43709Shift ITJP-EX200-825 TJP-EX200-825 Shift I 825 1-Sep-19 D
43709Shift ITJP-EX200-826 TJP-EX200-826 Shift I 826 1-Sep-19 D
43709Shift ITJP-D85ESS-807 TJP-D85ESS-807 Shift I 807 1-Sep-19 D
43709Shift ITJP-MG535-872 TJP-MG535-872 Shift I 872 1-Sep-19 D
43709Shift ITJP-CP525-875 TJP-CP525-875 Shift I 875 1-Sep-19 D
43709Shift ITJP-WT-874 TJP-WT-874 Shift I 874 1-Sep-19 D
43709Shift ITJP-EX200-818 TJP-EX200-818 Shift I 818 1-Sep-19 D
43710Shift ITJP-D85ESS-802 TJP-D85ESS-802 Shift I 802 2-Sep-19 D
43710Shift ITJP-EX200-816 TJP-EX200-816 Shift I 816 2-Sep-19 D
43710Shift ITJP-EX200-819 TJP-EX200-819 Shift I 819 2-Sep-19 D
43710Shift ITJP-EX200-825 TJP-EX200-825 Shift I 825 2-Sep-19 D
43710Shift ITJP-EX200-826 TJP-EX200-826 Shift I 826 2-Sep-19 D
43710Shift ITJP-D85ESS-807 TJP-D85ESS-807 Shift I 807 2-Sep-19 D
43710Shift ITJP-MG535-872 TJP-MG535-872 Shift I 872 2-Sep-19 D
43710Shift ITJP-CP525-875 TJP-CP525-875 Shift I 875 2-Sep-19 D
43710Shift ITJP-WT-874 TJP-WT-874 Shift I 874 2-Sep-19 D
43710Shift ITJP-EX200-818 TJP-EX200-818 Shift I 818 2-Sep-19 D
43711Shift ITJP-D85ESS-802 TJP-D85ESS-802 Shift I 802 3-Sep-19 D
43711Shift ITJP-EX200-816 TJP-EX200-816 Shift I 816 3-Sep-19 D
43711Shift ITJP-EX200-825 TJP-EX200-825 Shift I 825 3-Sep-19 D
43711Shift ITJP-EX200-826 TJP-EX200-826 Shift I 826 3-Sep-19 D
43711Shift ITJP-D85ESS-807 TJP-D85ESS-807 Shift I 807 3-Sep-19 D
43711Shift ITJP-MG535-872 TJP-MG535-872 Shift I 872 3-Sep-19 D
43711Shift ITJP-CP525-875 TJP-CP525-875 Shift I 875 3-Sep-19 D
43711Shift ITJP-WT-874 TJP-WT-874 Shift I 874 3-Sep-19 D
43711Shift IITJP-WT-874 TJP-WT-874 Shift II 874 3-Sep-19 N
43711Shift ITJP-EX200-818 TJP-EX200-818 Shift I 818 3-Sep-19 D
43712Shift ITJP-D85ESS-802 TJP-D85ESS-802 Shift I 802 4-Sep-19 D
43712Shift ITJP-EX200-816 TJP-EX200-816 Shift I 816 4-Sep-19 D
43712Shift ITJP-EX200-819 TJP-EX200-819 Shift I 819 4-Sep-19 D
43712Shift ITJP-EX200-825 TJP-EX200-825 Shift I 825 4-Sep-19 D
43712Shift IITJP-EX200-825 TJP-EX200-825 Shift II 825 4-Sep-19 N
43712Shift ITJP-EX200-826 TJP-EX200-826 Shift I 826 4-Sep-19 D
43712Shift ITJP-D85ESS-807 TJP-D85ESS-807 Shift I 807 4-Sep-19 D
43712Shift ITJP-MG535-872 TJP-MG535-872 Shift I 872 4-Sep-19 D
43712Shift ITJP-CP525-875 TJP-CP525-875 Shift I 875 4-Sep-19 D
43712Shift ITJP-WT-874 TJP-WT-874 Shift I 874 4-Sep-19 D
43712Shift ITJP-EX200-818 TJP-EX200-818 Shift I 818 4-Sep-19 D
43713Shift ITJP-D85ESS-802 TJP-D85ESS-802 Shift I 802 5-Sep-19 D
43713Shift ITJP-EX200-816 TJP-EX200-816 Shift I 816 5-Sep-19 D
43713Shift ITJP-EX200-819 TJP-EX200-819 Shift I 819 5-Sep-19 D
43713Shift ITJP-EX200-825 TJP-EX200-825 Shift I 825 5-Sep-19 D
43713Shift ITJP-EX200-826 TJP-EX200-826 Shift I 826 5-Sep-19 D
43713Shift ITJP-D85ESS-807 TJP-D85ESS-807 Shift I 807 5-Sep-19 D
43713Shift ITJP-MG535-872 TJP-MG535-872 Shift I 872 5-Sep-19 D
43713Shift ITJP-CP525-875 TJP-CP525-875 Shift I 875 5-Sep-19 D
43713Shift ITJP-WT-874 TJP-WT-874 Shift I 874 5-Sep-19 D
43713Shift ITJP-EX200-818 TJP-EX200-818 Shift I 818 5-Sep-19 D
43714Shift ITJP-D85ESS-802 TJP-D85ESS-802 Shift I 802 6-Sep-19 D
43714Shift ITJP-D85ESS-831 TJP-D85ESS-831 Shift I 831 6-Sep-19 D
43714Shift ITJP-EX200-816 TJP-EX200-816 Shift I 816 6-Sep-19 D
43714Shift ITJP-EX200-819 TJP-EX200-819 Shift I 819 6-Sep-19 D
43714Shift ITJP-EX200-825 TJP-EX200-825 Shift I 825 6-Sep-19 D
43714Shift ITJP-EX200-826 TJP-EX200-826 Shift I 826 6-Sep-19 D
43714Shift ITJP-D85ESS-807 TJP-D85ESS-807 Shift I 807 6-Sep-19 D
43714Shift ITJP-MG535-872 TJP-MG535-872 Shift I 872 6-Sep-19 D
43714Shift ITJP-CP525-875 TJP-CP525-875 Shift I 875 6-Sep-19 D
43714Shift ITJP-WT-874 TJP-WT-874 Shift I 874 6-Sep-19 D
43714Shift ITJP-EX200-818 TJP-EX200-818 Shift I 818 6-Sep-19 D
43715Shift ITJP-D85ESS-802 TJP-D85ESS-802 Shift I 802 7-Sep-19 D
43715Shift ITJP-D85ESS-831 TJP-D85ESS-831 Shift I 831 7-Sep-19 D
43715Shift ITJP-EX200-819 TJP-EX200-819 Shift I 819 7-Sep-19 D
43715Shift ITJP-EX200-825 TJP-EX200-825 Shift I 825 7-Sep-19 D
43715Shift ITJP-EX200-826 TJP-EX200-826 Shift I 826 7-Sep-19 D
43715Shift ITJP-D85ESS-807 TJP-D85ESS-807 Shift I 807 7-Sep-19 D
#N/A #N/A Shift II Err:502 7-Sep-19
43716Shift ITJP-D85ESS-802 TJP-D85ESS-802 Shift I 802 8-Sep-19 D
43716Shift ITJP-D85ESS-831 TJP-D85ESS-831 Shift I 831 8-Sep-19 D
43716Shift ITJP-EX200-816 TJP-EX200-816 Shift I 816 8-Sep-19 D
43716Shift ITJP-EX200-819 TJP-EX200-819 Shift I 819 8-Sep-19 D
43716Shift ITJP-EX200-825 TJP-EX200-825 Shift I 825 8-Sep-19 D
43716Shift ITJP-EX200-826 TJP-EX200-826 Shift I 826 8-Sep-19 D
43716Shift ITJP-D85ESS-807 TJP-D85ESS-807 Shift I 807 8-Sep-19 D
43716Shift ITJP-MG535-872 TJP-MG535-872 Shift I 872 8-Sep-19 D
43716Shift ITJP-CP525-875 TJP-CP525-875 Shift I 875 8-Sep-19 D
43716Shift ITJP-WT-874 TJP-WT-874 Shift I 874 8-Sep-19 D
43716Shift ITJP-EX200-818 TJP-EX200-818 Shift I 818 8-Sep-19 D
43717Shift ITJP-D85ESS-802 TJP-D85ESS-802 Shift I 802 9-Sep-19 D
43717Shift ITJP-EX200-816 TJP-EX200-816 Shift I 816 9-Sep-19 D
43717Shift ITJP-EX200-819 TJP-EX200-819 Shift I 819 9-Sep-19 D
43717Shift ITJP-EX200-825 TJP-EX200-825 Shift I 825 9-Sep-19 D
43717Shift ITJP-EX200-826 TJP-EX200-826 Shift I 826 9-Sep-19 D
43717Shift ITJP-D85ESS-807 TJP-D85ESS-807 Shift I 807 9-Sep-19 D
43717Shift ITJP-MG535-872 TJP-MG535-872 Shift I 872 9-Sep-19 D
43717Shift ITJP-CP525-875 TJP-CP525-875 Shift I 875 9-Sep-19 D
43717Shift ITJP-WT-874 TJP-WT-874 Shift I 874 9-Sep-19 D
43717Shift ITJP-EX200-818 TJP-EX200-818 Shift I 818 9-Sep-19 D
43718Shift ITJP-D85ESS-802 TJP-D85ESS-802 Shift I 802 10-Sep-19 D
43718Shift ITJP-EX200-816 TJP-EX200-816 Shift I 816 10-Sep-19 D
43718Shift ITJP-EX200-819 TJP-EX200-819 Shift I 819 10-Sep-19 D
43718Shift ITJP-EX200-825 TJP-EX200-825 Shift I 825 10-Sep-19 D
43718Shift ITJP-EX200-826 TJP-EX200-826 Shift I 826 10-Sep-19 D
43718Shift ITJP-D85ESS-807 TJP-D85ESS-807 Shift I 807 10-Sep-19 D
43718Shift ITJP-MG535-872 TJP-MG535-872 Shift I 872 10-Sep-19 D
43718Shift ITJP-CP525-875 TJP-CP525-875 Shift I 875 10-Sep-19 D
43718Shift ITJP-WT-874 TJP-WT-874 Shift I 874 10-Sep-19 D
43718Shift ITJP-EX200-818 TJP-EX200-818 Shift I 818 10-Sep-19 D
43719Shift ITJP-D85ESS-802 TJP-D85ESS-802 Shift I 802 11-Sep-19 D
43719Shift ITJP-D85ESS-831 TJP-D85ESS-831 Shift I 831 11-Sep-19 D
43719Shift ITJP-EX200-816 TJP-EX200-816 Shift I 816 11-Sep-19 D
43719Shift ITJP-EX200-819 TJP-EX200-819 Shift I 819 11-Sep-19 D
43719Shift ITJP-EX200-825 TJP-EX200-825 Shift I 825 11-Sep-19 D
43719Shift ITJP-EX200-826 TJP-EX200-826 Shift I 826 11-Sep-19 D
43719Shift ITJP-D85ESS-807 TJP-D85ESS-807 Shift I 807 11-Sep-19 D
43719Shift ITJP-MG535-872 TJP-MG535-872 Shift I 872 11-Sep-19 D
43719Shift ITJP-CP525-875 TJP-CP525-875 Shift I 875 11-Sep-19 D
43719Shift ITJP-WT-874 TJP-WT-874 Shift I 874 11-Sep-19 D
43719Shift ITJP-EX200-818 TJP-EX200-818 Shift I 818 11-Sep-19 D
43720Shift ITJP-D85ESS-802 TJP-D85ESS-802 Shift I 802 12-Sep-19 D
43720Shift ITJP-EX200-819 TJP-EX200-819 Shift I 819 12-Sep-19 D
43720Shift ITJP-EX200-825 TJP-EX200-825 Shift I 825 12-Sep-19 D
43720Shift ITJP-EX200-826 TJP-EX200-826 Shift I 826 12-Sep-19 D
43720Shift ITJP-D85ESS-807 TJP-D85ESS-807 Shift I 807 12-Sep-19 D
43720Shift ITJP-MG535-872 TJP-MG535-872 Shift I 872 12-Sep-19 D
43720Shift ITJP-CP525-875 TJP-CP525-875 Shift I 875 12-Sep-19 D
43720Shift ITJP-WT-874 TJP-WT-874 Shift I 874 12-Sep-19 D
43720Shift ITJP-EX200-818 TJP-EX200-818 Shift I 818 12-Sep-19 D
43721Shift ITJP-D85ESS-802 TJP-D85ESS-802 Shift I 802 13-Sep-19 D
43721Shift ITJP-EX200-816 TJP-EX200-816 Shift I 816 13-Sep-19 D
43721Shift ITJP-EX200-819 TJP-EX200-819 Shift I 819 13-Sep-19 D
43721Shift ITJP-EX200-825 TJP-EX200-825 Shift I 825 13-Sep-19 D
43721Shift ITJP-EX200-826 TJP-EX200-826 Shift I 826 13-Sep-19 D
43721Shift ITJP-D85ESS-807 TJP-D85ESS-807 Shift I 807 13-Sep-19 D
43721Shift ITJP-MG535-872 TJP-MG535-872 Shift I 872 13-Sep-19 D
43721Shift ITJP-CP525-875 TJP-CP525-875 Shift I 875 13-Sep-19 D
43721Shift ITJP-WT-874 TJP-WT-874 Shift I 874 13-Sep-19 D
43721Shift ITJP-EX200-818 TJP-EX200-818 Shift I 818 13-Sep-19 D
#N/A #N/A Shift I 853 13-Sep-19 D
43722Shift ITJP-D85ESS-802 TJP-D85ESS-802 Shift I 802 14-Sep-19 D
43722Shift ITJP-EX200-816 TJP-EX200-816 Shift I 816 14-Sep-19 D
43722Shift ITJP-EX200-819 TJP-EX200-819 Shift I 819 14-Sep-19 D
43722Shift ITJP-EX200-825 TJP-EX200-825 Shift I 825 14-Sep-19 D
43722Shift ITJP-EX200-826 TJP-EX200-826 Shift I 826 14-Sep-19 D
43722Shift ITJP-D85ESS-807 TJP-D85ESS-807 Shift I 807 14-Sep-19 D
43722Shift ITJP-MG535-872 TJP-MG535-872 Shift I 872 14-Sep-19 D
43722Shift ITJP-CP525-875 TJP-CP525-875 Shift I 875 14-Sep-19 D
43722Shift ITJP-WT-874 TJP-WT-874 Shift I 874 14-Sep-19 D
43722Shift ITJP-EX200-818 TJP-EX200-818 Shift I 818 14-Sep-19 D
43723Shift ITJP-D85ESS-802 TJP-D85ESS-802 Shift I 802 15-Sep-19 D
43723Shift ITJP-EX200-816 TJP-EX200-816 Shift I 816 15-Sep-19 D
43723Shift ITJP-EX200-819 TJP-EX200-819 Shift I 819 15-Sep-19 D
43723Shift ITJP-EX200-825 TJP-EX200-825 Shift I 825 15-Sep-19 D
43723Shift ITJP-EX200-826 TJP-EX200-826 Shift I 826 15-Sep-19 D
43723Shift ITJP-D85ESS-807 TJP-D85ESS-807 Shift I 807 15-Sep-19 D
43723Shift ITJP-MG535-872 TJP-MG535-872 Shift I 872 15-Sep-19 D
43723Shift ITJP-CP525-875 TJP-CP525-875 Shift I 875 15-Sep-19 D
43723Shift ITJP-WT-874 TJP-WT-874 Shift I 874 15-Sep-19 D
43723Shift ITJP-EX200-818 TJP-EX200-818 Shift I 818 15-Sep-19 D
43724Shift ITJP-D85ESS-802 TJP-D85ESS-802 Shift I 802 16-Sep-19 D
43724Shift ITJP-EX200-816 TJP-EX200-816 Shift I 816 16-Sep-19 D
43724Shift ITJP-EX200-819 TJP-EX200-819 Shift I 819 16-Sep-19 D
43724Shift ITJP-EX200-825 TJP-EX200-825 Shift I 825 16-Sep-19 D
43724Shift ITJP-EX200-826 TJP-EX200-826 Shift I 826 16-Sep-19 D
43724Shift ITJP-D85ESS-807 TJP-D85ESS-807 Shift I 807 16-Sep-19 D
43724Shift ITJP-MG535-872 TJP-MG535-872 Shift I 872 16-Sep-19 D
43724Shift ITJP-CP525-875 TJP-CP525-875 Shift I 875 16-Sep-19 D
43724Shift ITJP-WT-874 TJP-WT-874 Shift I 874 16-Sep-19 D
43725Shift ITJP-EX200-816 TJP-EX200-816 Shift I 816 17-Sep-19 D
43725Shift ITJP-EX200-819 TJP-EX200-819 Shift I 819 17-Sep-19 D
43725Shift ITJP-EX200-825 TJP-EX200-825 Shift I 825 17-Sep-19 D
43725Shift ITJP-EX200-826 TJP-EX200-826 Shift I 826 17-Sep-19 D
43725Shift ITJP-D85ESS-807 TJP-D85ESS-807 Shift I 807 17-Sep-19 D
43725Shift ITJP-MG535-872 TJP-MG535-872 Shift I 872 17-Sep-19 D
43725Shift ITJP-WT-874 TJP-WT-874 Shift I 874 17-Sep-19 D
43725Shift ITJP-EX200-818 TJP-EX200-818 Shift I 818 17-Sep-19 D
43726Shift ITJP-D85ESS-802 TJP-D85ESS-802 Shift I 802 18-Sep-19 D
43726Shift ITJP-D85ESS-831 TJP-D85ESS-831 Shift I 831 18-Sep-19 D
43726Shift ITJP-EX200-816 TJP-EX200-816 Shift I 816 18-Sep-19 D
43726Shift ITJP-EX200-819 TJP-EX200-819 Shift I 819 18-Sep-19 D
43726Shift ITJP-EX200-825 TJP-EX200-825 Shift I 825 18-Sep-19 D
43726Shift ITJP-EX200-826 TJP-EX200-826 Shift I 826 18-Sep-19 D
43726Shift ITJP-D85ESS-807 TJP-D85ESS-807 Shift I 807 18-Sep-19 D
43726Shift ITJP-MG535-872 TJP-MG535-872 Shift I 872 18-Sep-19 D
43726Shift ITJP-CP525-875 TJP-CP525-875 Shift I 875 18-Sep-19 D
43726Shift ITJP-WT-874 TJP-WT-874 Shift I 874 18-Sep-19 D
43726Shift ITJP-EX200-818 TJP-EX200-818 Shift I 818 18-Sep-19 D
43727Shift ITJP-D85ESS-802 TJP-D85ESS-802 Shift I 802 19-Sep-19 D
43727Shift ITJP-D85ESS-831 TJP-D85ESS-831 Shift I 831 19-Sep-19 D
43727Shift ITJP-EX200-816 TJP-EX200-816 Shift I 816 19-Sep-19 D
43727Shift ITJP-EX200-819 TJP-EX200-819 Shift I 819 19-Sep-19 D
43727Shift ITJP-EX200-825 TJP-EX200-825 Shift I 825 19-Sep-19 D
43727Shift ITJP-EX200-826 TJP-EX200-826 Shift I 826 19-Sep-19 D
43727Shift ITJP-MG535-872 TJP-MG535-872 Shift I 872 19-Sep-19 D
43727Shift ITJP-CP525-875 TJP-CP525-875 Shift I 875 19-Sep-19 D
43727Shift ITJP-WT-874 TJP-WT-874 Shift I 874 19-Sep-19 D
43727Shift ITJP-EX200-818 TJP-EX200-818 Shift I 818 19-Sep-19 D
43728Shift ITJP-D85ESS-802 TJP-D85ESS-802 Shift I 802 20-Sep-19 D
43728Shift ITJP-D85ESS-831 TJP-D85ESS-831 Shift I 831 20-Sep-19 D
43728Shift ITJP-EX200-816 TJP-EX200-816 Shift I 816 20-Sep-19 D
43728Shift ITJP-EX200-819 TJP-EX200-819 Shift I 819 20-Sep-19 D
43728Shift ITJP-EX200-825 TJP-EX200-825 Shift I 825 20-Sep-19 D
43728Shift ITJP-EX200-826 TJP-EX200-826 Shift I 826 20-Sep-19 D
43728Shift ITJP-MG535-872 TJP-MG535-872 Shift I 872 20-Sep-19 D
43728Shift ITJP-CP525-875 TJP-CP525-875 Shift I 875 20-Sep-19 D
43728Shift ITJP-WT-874 TJP-WT-874 Shift I 874 20-Sep-19 D
43728Shift ITJP-EX200-818 TJP-EX200-818 Shift I 818 20-Sep-19 D
#N/A #N/A Shift I 932 20-Sep-19 D
43729Shift ITJP-D85ESS-802 TJP-D85ESS-802 Shift I 802 21-Sep-19 D
43729Shift ITJP-D85ESS-831 TJP-D85ESS-831 Shift I 831 21-Sep-19 D
43729Shift ITJP-EX200-816 TJP-EX200-816 Shift I 816 21-Sep-19 D
43729Shift ITJP-EX200-819 TJP-EX200-819 Shift I 819 21-Sep-19 D
43729Shift ITJP-EX200-825 TJP-EX200-825 Shift I 825 21-Sep-19 D
43729Shift ITJP-D85ESS-807 TJP-D85ESS-807 Shift I 807 21-Sep-19 D
43729Shift ITJP-WT-874 TJP-WT-874 Shift I 874 21-Sep-19 D
43730Shift ITJP-D85ESS-802 TJP-D85ESS-802 Shift I 802 22-Sep-19 D
43730Shift ITJP-D85ESS-831 TJP-D85ESS-831 Shift I 831 22-Sep-19 D
43730Shift ITJP-EX200-816 TJP-EX200-816 Shift I 816 22-Sep-19 D
43730Shift ITJP-EX200-819 TJP-EX200-819 Shift I 819 22-Sep-19 D
43730Shift ITJP-EX200-825 TJP-EX200-825 Shift I 825 22-Sep-19 D
43730Shift ITJP-D85ESS-807 TJP-D85ESS-807 Shift I 807 22-Sep-19 D
43730Shift ITJP-MG535-872 TJP-MG535-872 Shift I 872 22-Sep-19 D
43730Shift ITJP-CP525-875 TJP-CP525-875 Shift I 875 22-Sep-19 D
43730Shift ITJP-WT-874 TJP-WT-874 Shift I 874 22-Sep-19 D
43730Shift ITJP-EX200-818 TJP-EX200-818 Shift I 818 22-Sep-19 D
43731Shift ITJP-D85ESS-802 TJP-D85ESS-802 Shift I 802 23-Sep-19 D
43731Shift ITJP-D85ESS-831 TJP-D85ESS-831 Shift I 831 23-Sep-19 D
43731Shift ITJP-EX200-816 TJP-EX200-816 Shift I 816 23-Sep-19 D
43731Shift ITJP-EX200-819 TJP-EX200-819 Shift I 819 23-Sep-19 D
43731Shift ITJP-EX200-825 TJP-EX200-825 Shift I 825 23-Sep-19 D
43731Shift ITJP-D85ESS-807 TJP-D85ESS-807 Shift I 807 23-Sep-19 D
43731Shift ITJP-MG535-872 TJP-MG535-872 Shift I 872 23-Sep-19 D
43731Shift ITJP-CP525-875 TJP-CP525-875 Shift I 875 23-Sep-19 D
43731Shift ITJP-WT-874 TJP-WT-874 Shift I 874 23-Sep-19 D
43731Shift ITJP-EX200-818 TJP-EX200-818 Shift I 818 23-Sep-19 D
43732Shift ITJP-D85ESS-831 TJP-D85ESS-831 Shift I 831 24-Sep-19 D
43732Shift ITJP-EX200-816 TJP-EX200-816 Shift I 816 24-Sep-19 D
43732Shift ITJP-EX200-819 TJP-EX200-819 Shift I 819 24-Sep-19 D
43732Shift ITJP-EX200-825 TJP-EX200-825 Shift I 825 24-Sep-19 D
43732Shift ITJP-D85ESS-807 TJP-D85ESS-807 Shift I 807 24-Sep-19 D
43732Shift ITJP-MG535-872 TJP-MG535-872 Shift I 872 24-Sep-19 D
43732Shift ITJP-CP525-875 TJP-CP525-875 Shift I 875 24-Sep-19 D
43732Shift ITJP-WT-874 TJP-WT-874 Shift I 874 24-Sep-19 D
43732Shift ITJP-EX200-818 TJP-EX200-818 Shift I 818 24-Sep-19 D
43733Shift ITJP-D85ESS-802 TJP-D85ESS-802 Shift I 802 25-Sep-19 D
43733Shift ITJP-D85ESS-831 TJP-D85ESS-831 Shift I 831 25-Sep-19 D
43733Shift ITJP-EX200-816 TJP-EX200-816 Shift I 816 25-Sep-19 D
43733Shift ITJP-EX200-819 TJP-EX200-819 Shift I 819 25-Sep-19 D
43733Shift ITJP-EX200-825 TJP-EX200-825 Shift I 825 25-Sep-19 D
43733Shift ITJP-MG535-872 TJP-MG535-872 Shift I 872 25-Sep-19 D
43733Shift ITJP-CP525-875 TJP-CP525-875 Shift I 875 25-Sep-19 D
43733Shift ITJP-WT-874 TJP-WT-874 Shift I 874 25-Sep-19 D
43733Shift ITJP-EX200-818 TJP-EX200-818 Shift I 818 25-Sep-19 D
43734Shift ITJP-D85ESS-802 TJP-D85ESS-802 Shift I 802 26-Sep-19 D
43734Shift ITJP-D85ESS-831 TJP-D85ESS-831 Shift I 831 26-Sep-19 D
43734Shift ITJP-EX200-816 TJP-EX200-816 Shift I 816 26-Sep-19 D
43734Shift ITJP-EX200-819 TJP-EX200-819 Shift I 819 26-Sep-19 D
43734Shift ITJP-EX200-825 TJP-EX200-825 Shift I 825 26-Sep-19 D
43734Shift ITJP-D85ESS-807 TJP-D85ESS-807 Shift I 807 26-Sep-19 D
43734Shift ITJP-MG535-872 TJP-MG535-872 Shift I 872 26-Sep-19 D
43734Shift ITJP-CP525-875 TJP-CP525-875 Shift I 875 26-Sep-19 D
43734Shift ITJP-WT-874 TJP-WT-874 Shift I 874 26-Sep-19 D
43734Shift ITJP-EX200-818 TJP-EX200-818 Shift I 818 26-Sep-19 D
43735Shift ITJP-D85ESS-802 TJP-D85ESS-802 Shift I 802 27-Sep-19 D
43735Shift ITJP-EX200-816 TJP-EX200-816 Shift I 816 27-Sep-19 D
43735Shift ITJP-EX200-819 TJP-EX200-819 Shift I 819 27-Sep-19 D
43735Shift ITJP-EX200-825 TJP-EX200-825 Shift I 825 27-Sep-19 D
43735Shift ITJP-D85ESS-807 TJP-D85ESS-807 Shift I 807 27-Sep-19 D
43735Shift ITJP-MG535-872 TJP-MG535-872 Shift I 872 27-Sep-19 D
43735Shift ITJP-CP525-875 TJP-CP525-875 Shift I 875 27-Sep-19 D
43735Shift ITJP-WT-874 TJP-WT-874 Shift I 874 27-Sep-19 D
43736Shift ITJP-D85ESS-802 TJP-D85ESS-802 Shift I 802 28-Sep-19 D
43736Shift ITJP-D85ESS-831 TJP-D85ESS-831 Shift I 831 28-Sep-19 D
43736Shift ITJP-EX200-816 TJP-EX200-816 Shift I 816 28-Sep-19 D
43736Shift ITJP-EX200-819 TJP-EX200-819 Shift I 819 28-Sep-19 D
43736Shift ITJP-EX200-825 TJP-EX200-825 Shift I 825 28-Sep-19 D
43736Shift ITJP-D85ESS-807 TJP-D85ESS-807 Shift I 807 28-Sep-19 D
43736Shift ITJP-MG535-872 TJP-MG535-872 Shift I 872 28-Sep-19 D
43736Shift ITJP-CP525-875 TJP-CP525-875 Shift I 875 28-Sep-19 D
43736Shift ITJP-WT-874 TJP-WT-874 Shift I 874 28-Sep-19 D
43736Shift ITJP-EX200-818 TJP-EX200-818 Shift I 818 28-Sep-19 D
43737Shift ITJP-D85ESS-802 TJP-D85ESS-802 Shift I 802 29-Sep-19 D
43737Shift ITJP-D85ESS-831 TJP-D85ESS-831 Shift I 831 29-Sep-19 D
43737Shift ITJP-EX200-816 TJP-EX200-816 Shift I 816 29-Sep-19 D
43737Shift ITJP-EX200-825 TJP-EX200-825 Shift I 825 29-Sep-19 D
43737Shift ITJP-D85ESS-807 TJP-D85ESS-807 Shift I 807 29-Sep-19 D
43737Shift ITJP-MG535-872 TJP-MG535-872 Shift I 872 29-Sep-19 D
43737Shift ITJP-CP525-875 TJP-CP525-875 Shift I 875 29-Sep-19 D
43737Shift ITJP-WT-874 TJP-WT-874 Shift I 874 29-Sep-19 D
43737Shift ITJP-EX200-818 TJP-EX200-818 Shift I 818 29-Sep-19 D
43738Shift ITJP-D85ESS-802 TJP-D85ESS-802 Shift I 802 30-Sep-19 D
43738Shift ITJP-D85ESS-831 TJP-D85ESS-831 Shift I 831 30-Sep-19 D
43738Shift ITJP-EX200-819 TJP-EX200-819 Shift I 819 30-Sep-19 D
43738Shift ITJP-EX200-825 TJP-EX200-825 Shift I 825 30-Sep-19 D
43738Shift ITJP-D85ESS-807 TJP-D85ESS-807 Shift I 807 30-Sep-19 D
43738Shift ITJP-MG535-872 TJP-MG535-872 Shift I 872 30-Sep-19 D
43738Shift ITJP-CP525-875 TJP-CP525-875 Shift I 875 30-Sep-19 D
43738Shift ITJP-WT-874 TJP-WT-874 Shift I 874 30-Sep-19 D
43738Shift ITJP-EX200-818 TJP-EX200-818 Shift I 818 30-Sep-19 D
43709Shift IITJP-EX300-821 TJP-EX300-821 Shift II 821 1-Sep-19 N
43710Shift ITJP-EX300-821 TJP-EX300-821 Shift I 821 2-Sep-19 D
43710Shift ITJP-DT30-974 TJP-DT30-974 Shift I 974 2-Sep-19 D
43710Shift IITJP-EX300-821 TJP-EX300-821 Shift II 821 2-Sep-19 N
43710Shift IITJP-DT30-974 TJP-DT30-974 Shift II 974 2-Sep-19 N
43711Shift ITJP-EX300-821 TJP-EX300-821 Shift I 821 3-Sep-19 D
43711Shift IITJP-EX300-821 TJP-EX300-821 Shift II 821 3-Sep-19 N
43712Shift ITJP-EX300-821 TJP-EX300-821 Shift I 821 4-Sep-19 D
43712Shift IITJP-EX300-821 TJP-EX300-821 Shift II 821 4-Sep-19 N
43713Shift ITJP-EX300-821 TJP-EX300-821 Shift I 821 5-Sep-19 D
43713Shift IITJP-EX300-821 TJP-EX300-821 Shift II 821 5-Sep-19 N
43714Shift ITJP-EX300-821 TJP-EX300-821 Shift I 821 6-Sep-19 D
43714Shift IITJP-EX300-821 TJP-EX300-821 Shift II 821 6-Sep-19 N
43715Shift ITJP-EX300-821 TJP-EX300-821 Shift I 821 7-Sep-19 D
43715Shift IITJP-EX300-821 TJP-EX300-821 Shift II 821 7-Sep-19 N
43716Shift ITJP-EX300-821 TJP-EX300-821 Shift I 821 8-Sep-19 D
43717Shift ITJP-EX300-821 TJP-EX300-821 Shift I 821 9-Sep-19 D
43718Shift ITJP-EX300-821 TJP-EX300-821 Shift I 821 10-Sep-19 D
43718Shift IITJP-EX300-821 TJP-EX300-821 Shift II 821 10-Sep-19 N
43719Shift ITJP-EX300-821 TJP-EX300-821 Shift I 821 11-Sep-19 D
43719Shift IITJP-EX300-821 TJP-EX300-821 Shift II 821 11-Sep-19 N
43720Shift ITJP-EX300-821 TJP-EX300-821 Shift I 821 12-Sep-19 D
43720Shift IITJP-EX300-821 TJP-EX300-821 Shift II 821 12-Sep-19 N
43721Shift ITJP-EX300-821 TJP-EX300-821 Shift I 821 13-Sep-19 D
43721Shift IITJP-EX300-821 TJP-EX300-821 Shift II 821 13-Sep-19 N
43722Shift ITJP-EX300-821 TJP-EX300-821 Shift I 821 14-Sep-19 D
43724Shift ITJP-EX300-821 TJP-EX300-821 Shift I 821 16-Sep-19 D
43724Shift IITJP-EX300-821 TJP-EX300-821 Shift II 821 16-Sep-19 N
43725Shift ITJP-EX300-821 TJP-EX300-821 Shift I 821 17-Sep-19 D
43725Shift IITJP-EX300-821 TJP-EX300-821 Shift II 821 17-Sep-19 N
43726Shift ITJP-EX300-821 TJP-EX300-821 Shift I 821 18-Sep-19 D
43726Shift IITJP-EX300-821 TJP-EX300-821 Shift II 821 18-Sep-19 N
43727Shift ITJP-EX300-821 TJP-EX300-821 Shift I 821 19-Sep-19 D
43728Shift ITJP-EX300-821 TJP-EX300-821 Shift I 821 20-Sep-19 D
43729Shift ITJP-EX200-826 TJP-EX200-826 Shift I 826 21-Sep-19 D
43729Shift IITJP-EX200-826 TJP-EX200-826 Shift II 826 21-Sep-19 N
43730Shift ITJP-EX200-826 TJP-EX200-826 Shift I 826 22-Sep-19 D
43730Shift IITJP-EX200-826 TJP-EX200-826 Shift II 826 22-Sep-19 N
#N/A #N/A Shift II Err:502
43731Shift ITJP-EX300-821 TJP-EX300-821 Shift I 821 23-Sep-19 D
43731Shift IITJP-EX300-821 TJP-EX300-821 Shift II 821 23-Sep-19 N
43731Shift ITJP-EX200-826 TJP-EX200-826 Shift I 826 23-Sep-19 D
43731Shift IITJP-EX200-826 TJP-EX200-826 Shift II 826 23-Sep-19 N
43732Shift ITJP-EX300-821 TJP-EX300-821 Shift I 821 24-Sep-19 D
43732Shift IITJP-EX300-821 TJP-EX300-821 Shift II 821 24-Sep-19 N
43732Shift ITJP-EX200-826 TJP-EX200-826 Shift I 826 24-Sep-19 D
43732Shift IITJP-EX200-826 TJP-EX200-826 Shift II 826 24-Sep-19 N
43733Shift ITJP-EX300-821 TJP-EX300-821 Shift I 821 25-Sep-19 D
43733Shift IITJP-EX300-821 TJP-EX300-821 Shift II 821 25-Sep-19 N
43733Shift ITJP-EX200-826 TJP-EX200-826 Shift I 826 25-Sep-19 D
43733Shift IITJP-EX200-826 TJP-EX200-826 Shift II 826 25-Sep-19 N
43734Shift IITJP-EX300-821 TJP-EX300-821 Shift II 821 26-Sep-19 N
43734Shift ITJP-EX200-826 TJP-EX200-826 Shift I 826 26-Sep-19 D
43734Shift IITJP-EX200-826 TJP-EX200-826 Shift II 826 26-Sep-19 N
43735Shift ITJP-EX300-821 TJP-EX300-821 Shift I 821 27-Sep-19 D
43735Shift IITJP-EX300-821 TJP-EX300-821 Shift II 821 27-Sep-19 N
43735Shift ITJP-EX200-826 TJP-EX200-826 Shift I 826 27-Sep-19 D
43735Shift IITJP-EX200-826 TJP-EX200-826 Shift II 826 27-Sep-19 N
43736Shift ITJP-EX300-821 TJP-EX300-821 Shift I 821 28-Sep-19 D
43736Shift ITJP-EX200-826 TJP-EX200-826 Shift I 826 28-Sep-19 D
#N/A #N/A Shift II Err:502
43736Shift IITJP-EX200-826 TJP-EX200-826 Shift II 826 28-Sep-19 N
43737Shift IITJP-EX300-821 TJP-EX300-821 Shift II 821 29-Sep-19 N
43737Shift ITJP-EX200-826 TJP-EX200-826 Shift I 826 29-Sep-19 D
43737Shift IITJP-EX200-826 TJP-EX200-826 Shift II 826 29-Sep-19 N
43738Shift ITJP-EX300-821 TJP-EX300-821 Shift I 821 30-Sep-19 D
#N/A #N/A Shift II Err:502
43738Shift ITJP-EX200-826 TJP-EX200-826 Shift I 826 30-Sep-19 D
43738Shift IITJP-EX200-826 TJP-EX200-826 Shift II 826 30-Sep-19 N
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
#N/A #N/A Shift II Err:502
Equipment Name HM Awal HM Akhir Total
DZD85-ESS 802 7318.70 7327.70 9.00 Jam 43709Shift ITJP-EX200-819BD
DZD85-ESS 831 2260.00 2269.00 9.00 Jam 43709Shift ITJP-EX200-816BD
EXCA PC200 819 20039.00 20048.00 9.00 Jam 43709Shift ITJP-CP525-875BD
EXCA PC200 825 10270.00 10279.00 9.00 Jam 43710Shift ITJP-CP525-875BD
EXCA PC200 826 5878.90 5887.90 9.00 Jam 43710Shift ITJP-D85ESS-831BD
DZD85-ESS 807 1039.40 1048.40 9.00 Jam 43711Shift ITJP-D85ESS-831BD
TJP-MG535-872 1937.00 1945.00 8.00 Jam 43711Shift ITJP-EX200-819BD
TJP-CP525-875 1491.50 1499.50 8.00 Jam 43711Shift ITJP-WT-874BD
WT500-874 1282.80 1296.00 13.20 Jam 43712Shift ITJP-D85ESS-831BD
EXCA PC200 818 20939.60 20947.20 7.60 Jam 43713Shift ITJP-D85ESS-831BD
DZD85-ESS 802 7327.70 7336.70 9.00 Jam 43713Shift ITJP-EX200-826BD
EXCA PC200 816 13388.30 13397.40 9.10 Jam 43713Shift ITJP-EX200-819BD
EXCA PC200 819 20048.00 20053.00 5.00 Jam 43714Shift ITJP-D85ESS-831BD
EXCA PC200 825 10279.00 10288.00 9.00 Jam 43716Shift ITJP-MG535-872BD
EXCA PC200 826 5887.90 5896.90 9.00 Jam 43716Shift ITJP-EX200-818BD
DZD85-ESS 807 1048.40 1057.40 9.00 Jam 43717Shift ITJP-D85ESS-831BD
TJP-MG535-872 1945.00 1953.00 8.00 Jam 43718Shift ITJP-D85ESS-831BD
TJP-CP525-875 1499.50 1507.80 8.30 Jam 43718Shift ITJP-EX200-818BD
WT500-874 1296.00 1306.20 10.20 Jam 43719Shift ITJP-D85ESS-831BD
EXCA PC200 818 20947.20 20955.20 8.00 Jam 43720Shift ITJP-D85ESS-831BD
DZD85-ESS 802 7336.70 7344.70 8.00 Jam 43720Shift ITJP-WT-874BD
EXCA PC200 816 13397.40 13406.50 9.10 Jam 43720Shift ITJP-EX200-816BD
EXCA PC200 825 10288.00 10297.00 9.00 Jam 43721Shift ITJP-D85ESS-831BD
EXCA PC200 826 5896.90 5905.90 9.00 Jam 43721Shift ITJP-EX200-819BD
DZD85-ESS 807 1057.40 1066.40 9.00 Jam 43721Shift ITJP-EX200-816BD
TJP-MG535-872 1953.00 1962.00 9.00 Jam 43722Shift ITJP-D85ESS-831BD
TJP-CP525-875 1507.80 1517.70 9.90 Jam 43722Shift ITJP-EX200-825BD
WT500-874 1306.20 1315.90 9.70 Jam 43723Shift ITJP-EX200-825BD
WT500-874 1316.20 1321.10 4.90 Jam 43723Shift ITJP-EX200-818BD
EXCA PC200 818 20955.20 20962.20 7.00 Jam 43724Shift ITJP-D85ESS-831BD
DZD85-ESS 802 7344.70 7354.00 9.30 Jam 43724Shift ITJP-EX200-818BD
EXCA PC200 816 13406.50 13415.70 9.20 Jam 43724Shift ITJP-D85ESS-802BD
EXCA PC200 819 20053.00 20062.00 9.00 Jam 43725Shift ITJP-D85ESS-831BD
EXCA PC200 825 10297.00 10306.00 9.00 Jam 43725Shift ITJP-EX200-818BD
EXCA PC200 825 10306.00 10309.50 3.50 Jam 43727Shift ITJP-D85ESS-807BD
EXCA PC200 826 5905.90 5914.90 9.00 Jam 43728Shift ITJP-D85ESS-807BD
DZD85-ESS 807 1066.40 1075.40 9.0 Jam 43728Shift ITJP-EX200-819BD
TJP-MG535-872 1962.00 1971.00 9.00 Jam 43728Shift ITJP-MG535-872BD
TJP-CP525-875 1517.70 1526.20 8.50 Jam 43731Shift ITJP-EX200-818BD
WT500-874 1321.20 1332.20 11.00 Jam 43732Shift ITJP-MG535-872BD
EXCA PC200 818 20962.20 20969.50 7.30 Jam 43732Shift ITJP-CP525-875BD
DZD85-ESS 802 7354.00 7363.00 9.00 Jam 43733Shift ITJP-CP525-875BD
EXCA PC200 816 13414.50 13423.70 9.20 Jam 43733Shift ITJP-WT-874BD
EXCA PC200 819 20062.00 20063.00 1.00 Jam 43734Shift ITJP-MG535-872BD
EXCA PC200 825 10309.50 10318.50 9.00 Jam 43734Shift ITJP-WT-874BD
EXCA PC200 826 5914.90 5922.90 8.00 Jam 43734Shift ITJP-EX200-818BD
DZD85-ESS 807 1075.40 1084.40 9.00 Jam 43735Shift ITJP-EX200-818BD
TJP-MG535-872 1971.00 1980.00 9.00 Jam 43737Shift ITJP-EX200-816BD
TJP-CP525-875 1526.20 1536.20 10.00 Jam 43737Shift ITJP-EX200-819BD
WT500-874 1332.20 1342.30 10.10 Jam 43738Shift ITJP-EX200-816BD
EXCA PC200 818 20969.50 20978.00 8.50 Jam 43738Shift ITJP-MG535-872BD
DZD85-ESS 802 7363.00 7372.00 9.00 Jam #N/A
DZD85-ESS 831 2270.50 2274.70 4.20 Jam #N/A
EXCA PC200 816 13423.70 13432.90 9.20 Jam #N/A
EXCA PC200 819 20063.00 20072.00 9.00 Jam #N/A
EXCA PC200 825 10318.50 10327.50 9.00 Jam #N/A
EXCA PC200 826 5922.90 5928.00 5.10 Jam #N/A
DZD85-ESS 807 1084.40 1093.40 9.00 Jam #N/A
TJP-MG535-872 1980.00 1988.50 8.50 Jam #N/A
TJP-CP525-875 1536.20 1545.60 9.40 Jam #N/A
WT500-874 1342.30 1350.30 8.00 Jam #N/A
EXCA PC200 818 20978.00 20985.00 7.00 Jam #N/A
DZD85-ESS 802 7372.00 7381.00 9.00 Jam #N/A
DZD85-ESS 831 2275.00 2284.00 9.00 Jam #N/A
EXCA PC200 819 20072.00 20081.00 9.00 Jam #N/A
EXCA PC200 825 10327.50 10336.50 9.00 Jam #N/A
EXCA PC200 826 5928.00 5937.00 9.00 Jam #N/A
DZD85-ESS 807 1093.40 1102.40 9.00 Jam #N/A
0.00 Jam #N/A
DZD85-ESS 802 7381.00 7389.50 8.50 Jam #N/A
DZD85-ESS 831 2284.00 2292.50 8.50 Jam #N/A
EXCA PC200 816 13432.90 13442.20 9.30 Jam #N/A
EXCA PC200 819 20081.00 20090.00 9.00 Jam #N/A
EXCA PC200 825 10336.50 10345.50 9.00 Jam #N/A
EXCA PC200 826 5937.00 5946.00 9.00 Jam #N/A
DZD85-ESS 807 1102.40 1111.40 9.00 Jam #N/A
TJP-MG535-872 1988.50 1997.50 9.00 Jam #N/A
TJP-CP525-875 1545.60 1555.20 9.60 Jam #N/A
WT500-874 1350.30 1358.80 8.50 Jam #N/A
EXCA PC200 818 20985.00 20988.00 3.00 Jam #N/A
DZD85-ESS 802 7389.50 7398.50 9.00 Jam #N/A
EXCA PC200 816 13442.20 13451.20 9.00 Jam #N/A
EXCA PC200 819 20090.00 20099.00 9.00 Jam #N/A
EXCA PC200 825 10345.50 10354.50 9.00 Jam #N/A
EXCA PC200 826 5946.00 5955.00 9.00 Jam #N/A
DZD85-ESS 807 1111.40 1120.40 9.00 Jam #N/A
TJP-MG535-872 1997.50 2006.50 9.00 Jam #N/A
TJP-CP525-875 1555.20 1564.90 9.70 Jam #N/A
WT500-874 1358.80 1369.20 10.40 Jam #N/A
EXCA PC200 818 20988.00 20995.00 7.00 Jam #N/A
DZD85-ESS 802 7397.50 7406.00 8.50 Jam #N/A
EXCA PC200 816 13451.20 13460.20 9.00 Jam #N/A
EXCA PC200 819 20099.00 20108.00 9.00 Jam #N/A
EXCA PC200 825 10354.50 10363.50 9.00 Jam #N/A
EXCA PC200 826 5955.00 5964.00 9.00 Jam #N/A
DZD85-ESS 807 1120.40 1129.40 9.00 Jam #N/A
TJP-MG535-872 2006.50 2015.00 8.50 Jam #N/A
TJP-CP525-875 1564.90 1572.90 8.00 Jam #N/A
WT500-874 1369.20 1381.50 12.30 Jam #N/A
EXCA PC200 818 20995.00 20997.60 2.60 Jam #N/A
DZD85-ESS 802 7406.00 7415.00 9.00 Jam #N/A
DZD85-ESS 831 2293.00 2295.00 2.00 Jam #N/A
EXCA PC200 816 13460.20 13469.20 9.00 Jam #N/A
EXCA PC200 819 20108.00 20117.00 9.00 Jam #N/A
EXCA PC200 825 10363.50 10372.50 9.00 Jam #N/A
EXCA PC200 826 5964.00 5973.00 9.0 Jam #N/A
DZD85-ESS 807 1129.40 1138.40 9.00 Jam #N/A
TJP-MG535-872 2015.00 2023.00 8.00 Jam #N/A
TJP-CP525-875 1572.90 1581.20 8.30 Jam #N/A
WT500-874 1381.50 1391.50 10.00 Jam #N/A
EXCA PC200 818 20997.60 21004.60 7.00 Jam #N/A
DZD85-ESS 802 7415.50 7424.50 9.00 Jam #N/A
EXCA PC200 819 20117.00 20126.00 9.00 Jam #N/A
EXCA PC200 825 10372.50 10380.90 8.40 Jam #N/A
EXCA PC200 826 5973.00 5982.00 9.00 Jam #N/A
DZD85-ESS 807 1138.40 1147.40 9.00 Jam #N/A
TJP-MG535-872 2023.00 2031.00 8.00 Jam #N/A
TJP-CP525-875 1581.20 1588.70 7.50 Jam #N/A
WT500-874 1391.50 1398.20 6.70 Jam #N/A
EXCA PC200 818 21004.60 21011.60 7.00 Jam #N/A
DZD85-ESS 802 7424.50 7433.50 9.00 Jam #N/A
EXCA PC200 816 13474.70 13479.70 5.00 Jam #N/A
EXCA PC200 819 20126.00 20130.50 4.50 Jam #N/A
EXCA PC200 825 10380.90 10389.90 9.00 Jam #N/A
EXCA PC200 826 5982.00 5990.00 8.00 Jam #N/A
DZD85-ESS 807 1147.40 1156.40 9.00 Jam #N/A
TJP-MG535-872 2031.00 2039.00 8.00 Jam #N/A
TJP-CP525-875 1588.70 1596.70 8.00 Jam #N/A
WT500-874 1398.20 1407.70 9.5 Jam #N/A
EXCA PC200 818 21011.60 21015.60 4.00 Jam #N/A
EXCA PC470-853 5138.50 5140.00 1.50 Jam #N/A
DZD85-ESS 802 7433.50 7442.50 9.00 Jam #N/A
EXCA PC200 816 13479.70 13488.70 9.00 Jam #N/A
EXCA PC200 819 20130.50 20139.50 9.00 Jam #N/A
EXCA PC200 825 10389.90 10394.00 4.10 Jam #N/A
EXCA PC200 826 5990.00 5999.00 9.00 Jam #N/A
DZD85-ESS 807 1156.40 1165.40 9.00 Jam #N/A
TJP-MG535-872 2039.00 2047.00 8.00 Jam #N/A
TJP-CP525-875 1596.70 1605.50 8.80 Jam #N/A
WT500-874 1407.70 1417.70 10.00 Jam #N/A
EXCA PC200 818 21015.60 21022.60 7.00 Jam #N/A
DZD85-ESS 802 7442.50 7452.00 9.50 Jam #N/A
EXCA PC200 816 13488.70 13497.90 9.20 Jam #N/A
EXCA PC200 819 20139.50 20148.50 9.00 Jam #N/A
EXCA PC200 825 10394.00 10399.00 5.00 Jam #N/A
EXCA PC200 826 5999.00 6008.00 9.00 Jam #N/A
DZD85-ESS 807 1165.40 1174.40 9.00 Jam #N/A
TJP-MG535-872 2047.00 2054.00 7.00 Jam #N/A
TJP-CP525-875 1605.50 1613.50 8.00 Jam #N/A
WT500-874 1417.70 1430.60 12.90 Jam #N/A
EXCA PC200 818 21022.60 21028.20 5.60 Jam #N/A
DZD85-ESS 802 7452.00 7461.00 9.00 Jam #N/A
EXCA PC200 816 13497.90 13507.20 9.30 Jam #N/A
EXCA PC200 819 20148.50 20157.50 9.0 Jam #N/A
EXCA PC200 825 10399.00 10408.00 9.00 Jam #N/A
EXCA PC200 826 6008.00 6017.00 9.00 Jam #N/A
DZD85-ESS 807 1174.40 1183.40 9.00 Jam #N/A
TJP-MG535-872 2054.00 2062.00 8.00 Jam #N/A
TJP-CP525-875 1613.50 1622.00 8.50 Jam #N/A
WT500-874 1430.60 1441.10 10.50 Jam #N/A
EXCA PC200 816 13507.20 13516.40 9.20 Jam #N/A
EXCA PC200 819 20157.50 20166.50 9.00 Jam #N/A
EXCA PC200 825 10408.00 10417.00 9.00 Jam #N/A
EXCA PC200 826 6017.10 6026.10 9.00 Jam #N/A
DZD85-ESS 807 1183.40 1192.40 9.00 Jam #N/A
TJP-MG535-872 2062.00 2069.50 7.50 Jam #N/A
WT500-874 1441.10 1451.30 10.20 Jam #N/A
EXCA PC200 818 21028.20 21032.20 4.00 Jam #N/A
DZD85-ESS 802 7461.00 7470.30 9.30 Jam #N/A
DZD85-ESS 831 2297.00 2306.00 9.00 Jam #N/A
EXCA PC200 816 13516.40 13525.40 9.00 Jam #N/A
EXCA PC200 819 20166.50 20175.50 9.00 Jam #N/A
EXCA PC200 825 10417.00 10426.00 9.00 Jam #N/A
EXCA PC200 826 6026.10 6034.10 8.00 Jam #N/A
DZD85-ESS 807 1192.40 1201.40 9.00 Jam #N/A
TJP-MG535-872 2069.50 2077.50 8.00 Jam #N/A
TJP-CP525-875 1622.00 1630.00 8.00 Jam #N/A
WT500-874 1451.30 1464.80 13.50 Jam #N/A
EXCA PC200 818 21032.20 21039.20 7.00 Jam #N/A
DZD85-ESS 802 7470.30 7479.30 9.00 Jam #N/A
DZD85-ESS 831 2306.00 2315.00 9.00 Jam #N/A
EXCA PC200 816 13525.40 13534.60 9.20 Jam #N/A
EXCA PC200 819 20175.50 20184.50 9.00 Jam #N/A
EXCA PC200 825 10426.00 10435.00 9.00 Jam #N/A
EXCA PC200 826 6034.10 6043.10 9.00 Jam #N/A
TJP-MG535-872 2077.50 2086.00 8.50 Jam #N/A
TJP-CP525-875 1630.00 1639.00 9.00 Jam #N/A
WT500-874 1464.80 1474.90 10.10 Jam #N/A
EXCA PC200 818 21039.20 21046.20 7.00 Jam #N/A
DZD85-ESS 802 7479.30 7488.30 9.00 Jam #N/A
DZD85-ESS 831 2315.00 2324.00 9.00 Jam #N/A
EXCA PC200 816 13534.80 13543.90 9.10 Jam #N/A
EXCA PC200 819 20184.50 20189.20 4.70 Jam #N/A
EXCA PC200 825 10435.00 10444.00 9.00 Jam #N/A
EXCA PC200 826 6043.10 6051.10 8.00 Jam #N/A
TJP-MG535-872 2086.00 2093.50 7.50 Jam #N/A
TJP-CP525-875 1639.00 1648.10 9.10 Jam #N/A
WT500-874 1474.90 1484.90 10.00 Jam #N/A
EXCA PC200 818 21046.20 21053.20 7.00 Jam #N/A
DT CWE 370 932 8724.55 8727.25 2.70 Jam #N/A
DZD85-ESS 802 7488.30 7497.30 9.00 Jam #N/A
DZD85-ESS 831 2324.00 2333.00 9.00 Jam #N/A
EXCA PC200 816 13544.00 13553.00 9.00 Jam #N/A
EXCA PC200 819 20189.20 20198.20 9.00 Jam #N/A
EXCA PC200 825 10444.00 10453.00 9.00 Jam #N/A
DZD85-ESS 807 1201.40 1210.40 9.00 Jam #N/A
WT500-874 1484.90 1488.40 3.50 Jam #N/A
DZD85-ESS 802 7497.30 7506.30 9.00 Jam #N/A
DZD85-ESS 831 2333.00 2342.00 9.00 Jam #N/A
EXCA PC200 816 13553.00 13562.00 9.00 Jam #N/A
EXCA PC200 819 20198.20 20207.20 9.00 Jam #N/A
EXCA PC200 825 10453.00 10462.00 9.00 Jam #N/A
DZD85-ESS 807 1210.40 1219.40 9.00 Jam #N/A
TJP-MG535-872 2093.50 2102.50 9.00 Jam #N/A
TJP-CP525-875 1648.10 1657.30 9.20 Jam #N/A
WT500-874 1488.40 1501.40 13.00 Jam #N/A
EXCA PC200 818 21053.20 21060.20 7.00 Jam #N/A
DZD85-ESS 802 7506.30 7515.30 9.00 Jam #N/A
DZD85-ESS 831 2342.00 2351.00 9.00 Jam #N/A
EXCA PC200 816 13562.60 13571.90 9.30 Jam #N/A
EXCA PC200 819 20207.20 20216.20 9.00 Jam #N/A
EXCA PC200 825 10462.00 10471.00 9.00 Jam #N/A
DZD85-ESS 807 1219.40 1228.40 9.00 Jam #N/A
TJP-MG535-872 2102.50 2111.50 9.00 Jam #N/A
TJP-CP525-875 1657.30 1666.80 9.50 Jam #N/A
WT500-874 1501.40 1512.70 11.3 Jam #N/A
EXCA PC200 818 21060.20 21063.90 3.70 Jam #N/A
DZD85-ESS 831 2351.00 2360.00 9.00 Jam #N/A
EXCA PC200 816 13571.90 13581.10 9.20 Jam #N/A
EXCA PC200 819 20216.20 20225.20 9.00 Jam #N/A
EXCA PC200 825 10471.00 10480.00 9.00 Jam #N/A
DZD85-ESS 807 1228.40 1237.40 9.00 Jam #N/A
TJP-MG535-872 2111.50 2120.00 8.50 Jam #N/A
TJP-CP525-875 1666.80 1674.60 7.80 Jam #N/A
WT500-874 1512.70 1522.30 9.60 Jam #N/A
EXCA PC200 818 21063.90 21069.90 6.00 Jam #N/A
DZD85-ESS 802 7515.30 7524.30 9.00 Jam #N/A
DZD85-ESS 831 2360.00 2369.00 9.00 Jam #N/A
EXCA PC200 816 13581.10 13590.10 9.00 Jam #N/A
EXCA PC200 819 20225.20 20234.20 9.00 Jam #N/A
EXCA PC200 825 10480.00 10489.00 9.00 Jam #N/A
TJP-MG535-872 2120.00 2128.00 8.00 Jam #N/A
TJP-CP525-875 1674.60 1677.60 3.00 Jam #N/A
WT500-874 1522.30 1533.40 11.10 Jam #N/A
EXCA PC200 818 21069.90 21076.90 7.00 Jam #N/A
DZD85-ESS 802 7524.30 7533.30 9.00 Jam #N/A
DZD85-ESS 831 2369.00 2378.00 9.00 Jam #N/A
EXCA PC200 816 13590.10 13599.30 9.2 Jam #N/A
EXCA PC200 819 20234.20 20243.20 9.00 Jam #N/A
EXCA PC200 825 10489.00 10498.00 9.00 Jam #N/A
DZD85-ESS 807 1237.40 1246.40 9.00 Jam #N/A
TJP-MG535-872 2128.00 2134.50 6.50 Jam #N/A
TJP-CP525-875 1677.60 1686.00 8.40 Jam #N/A
WT500-874 1533.40 1541.60 8.20 Jam #N/A
EXCA PC200 818 21076.90 21081.10 4.20 Jam #N/A
DZD85-ESS 802 7533.30 7542.30 9.00 Jam #N/A
EXCA PC200 816 13599.30 13608.50 9.20 Jam #N/A
EXCA PC200 819 20243.20 20252.20 9.00 Jam #N/A
EXCA PC200 825 10498.00 10507.00 9.00 Jam #N/A
DZD85-ESS 807 1246.40 1255.40 9.00 Jam #N/A
TJP-MG535-872 2134.50 2143.00 8.50 Jam #N/A
TJP-CP525-875 1686.00 1695.00 9.00 Jam #N/A
WT500-874 1541.60 1555.20 13.60 Jam #N/A
DZD85-ESS 802 7542.30 7551.30 9.00 Jam #N/A
DZD85-ESS 831 2378.00 2387.00 9.00 Jam #N/A
EXCA PC200 816 13608.50 13617.50 9.00 Jam #N/A
EXCA PC200 819 20252.20 20261.20 9.00 Jam #N/A
EXCA PC200 825 10507.00 10516.00 9.00 Jam #N/A
DZD85-ESS 807 1255.40 1264.40 9.00 Jam #N/A
TJP-MG535-872 2143.00 2148.00 5.00 Jam #N/A
TJP-CP525-875 1695.00 1700.00 5.00 Jam #N/A
WT500-874 1555.20 1569.30 14.10 Jam #N/A
EXCA PC200 818 21081.10 21088.10 7.00 Jam #N/A
DZD85-ESS 802 7551.30 7560.30 9.00 Jam #N/A
DZD85-ESS 831 2387.00 2395.50 8.50 Jam #N/A
EXCA PC200 816 13617.50 13618.40 0.90 Jam #N/A
EXCA PC200 825 10516.00 10525.00 9.00 Jam #N/A
DZD85-ESS 807 1264.40 1273.40 9.00 Jam #N/A
TJP-MG535-872 2148.00 2156.00 8.00 Jam #N/A
TJP-CP525-875 1700.00 1707.00 7.00 Jam #N/A
WT500-874 1569.30 1582.40 13.10 Jam #N/A
EXCA PC200 818 21088.10 21095.10 7.00 Jam #N/A
DZD85-ESS 802 7560.30 7569.30 9.00 Jam #N/A
DZD85-ESS 831 2395.50 2396.50 1.0 Jam #N/A
EXCA PC200 819 20261.20 20270.20 9.00 Jam #N/A
EXCA PC200 825 10525.00 10534.00 9.00 Jam #N/A
DZD85-ESS 807 1273.40 1282.40 9.00 Jam #N/A
TJP-MG535-872 2156.00 2164.00 8.00 Jam #N/A
TJP-CP525-875 1707.00 1716.00 9.00 Jam #N/A
WT500-874 1582.40 1594.80 12.40 Jam #N/A
EXCA PC200 818 21095.10 21103.10 8.00 Jam #N/A
EXCA PC300 821 18344.00 18352.00 8.00 Jam #N/A
EXCA PC300 821 18352.00 18362.00 10.00 Jam #N/A
DTCWE 370-974 3928.65 3932.70 4.05 Jam #N/A
EXCA PC300 821 18362.00 18370.00 8.00 Jam #N/A
DTCWE 370-974 3932.90 3933.55 0.65 Jam #N/A
EXCA PC300 821 18370.00 18379.00 9.00 Jam #N/A
EXCA PC300 821 18379.00 18386.00 7.00 Jam #N/A
EXCA PC300 821 18386.00 18394.00 8.0 Jam #N/A
EXCA PC300 821 18394.00 18398.00 4.00 Jam #N/A
EXCA PC300 821 18398.00 18403.00 5.00 Jam #N/A
EXCA PC300 821 18403.00 18406.00 3.00 Jam #N/A
EXCA PC300 821 18406.00 18410.00 4.00 Jam #N/A
EXCA PC300 821 18410.00 18413.00 3.00 Jam #N/A
EXCA PC300 821 18413.00 18420.00 7.00 Jam #N/A
EXCA PC300 821 18420.00 18422.00 2.00 Jam #N/A
EXCA PC300 821 18422.00 18428.00 6.00 Jam #N/A
EXCA PC300 821 18428.00 18433.00 5.00 Jam #N/A
EXCA PC300 821 18434.00 18435.00 1.00 Jam #N/A
EXCA PC300 821 18435.00 18438.00 3.00 Jam #N/A
EXCA PC300 821 18438.00 18443.00 5.00 Jam #N/A
EXCA PC300 821 18443.00 18447.00 4.00 Jam #N/A
EXCA PC300 821 18447.00 18451.00 4.00 Jam #N/A
EXCA PC300 821 18451.00 18455.00 4.00 Jam #N/A
EXCA PC300 821 18455.00 18463.00 8.00 Jam #N/A
EXCA PC300 821 18463.00 18466.00 3.00 Jam #N/A
EXCA PC300 821 18466.00 18469.00 3.00 Jam #N/A
EXCA PC300 821 18469.00 18473.00 4.00 Jam #N/A
EXCA PC300 821 18473.00 18482.00 9.00 Jam #N/A
EXCA PC300 821 18482.00 18489.00 7.00 Jam #N/A
EXCA PC300 821 18489.00 18492.00 3.00 Jam #N/A
EXCA PC300 821 18492.00 18499.00 7.00 Jam #N/A
EXCA PC300 821 18499.00 18503.00 4.00 Jam #N/A
EXCA PC300 821 18503.00 18508.00 5.00 Jam #N/A
EXCA PC300 821 18508.00 18512.00 4.00 Jam #N/A
EXCA PC200 826 6051.10 6056.70 5.60 Jam #N/A
EXCA PC200 826 6056.70 6064.70 8.00 Jam #N/A
EXCA PC200 826 6064.80 6073.00 8.20 Jam #N/A
EXCA PC200 826 6073.00 6083.00 10.00 Jam #N/A
Jam #N/A
EXCA PC300 821 18514.00 18519.00 5.00 Jam #N/A
EXCA PC300 821 18519.00 18528.00 9.00 Jam #N/A
EXCA PC200 826 6083.00 6092.50 9.50 Jam #N/A
EXCA PC200 826 6092.50 6102.50 10.00 Jam #N/A
EXCA PC300 821 18528.00 18538.00 10.00 Jam #N/A
EXCA PC300 821 18538.00 18549.00 11.00 Jam #N/A
EXCA PC200 826 6102.50 6112.50 10.00 Jam #N/A
EXCA PC200 826 6112.50 6121.60 9.10 Jam #N/A
EXCA PC300 821 18549.00 18558.00 9.00 Jam #N/A
EXCA PC300 821 18558.00 18561.00 3.00 Jam #N/A
EXCA PC200 826 6121.60 6131.40 9.80 Jam #N/A
EXCA PC200 826 6131.50 6138.00 6.50 Jam #N/A
EXCA PC300 821 18561.00 18564.00 3.00 Jam #N/A
EXCA PC200 826 6138.00 6148.00 10.00 Jam #N/A
EXCA PC200 826 6148.10 6157.10 9.00 Jam #N/A
EXCA PC300 821 18564.00 18574.00 10.00 Jam #N/A
EXCA PC300 821 18574.00 18579.00 5.00 Jam #N/A
EXCA PC200 826 6157.10 6165.60 8.50 Jam #N/A
EXCA PC200 826 6165.60 6170.60 5.00 Jam #N/A
EXCA PC300 821 18579.00 18587.00 8.00 Jam #N/A
EXCA PC200 826 6170.60 6180.50 9.90 Jam #N/A
Jam #N/A
EXCA PC200 826 6180.60 6187.80 7.20 Jam #N/A
EXCA PC300 821 18590.00 18596.00 6.00 Jam #N/A
EXCA PC200 826 6187.80 6190.20 2.40 Jam #N/A
EXCA PC200 826 6190.30 6199.70 9.40 Jam #N/A
EXCA PC300 821 18596.00 18604.00 8.00 Jam #N/A
#N/A
EXCA PC200 826 6199.70 6209.30 9.60 Jam #N/A
EXCA PC200 826 6209.30 6212.90 3.60 Jam #N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
Jam #N/A
Unit Number shift DateDown TimeDown DateUp TimeUp
TJP-EX200-819 Shift I EXCA PC200 819 1 1-Sep 18:00 1-Sep 19:00
TJP-EX200-816 Shift I EXCA PC200 816 1 1-Sep 7:00 1-Sep 19:00
TJP-CP525-875 Shift I TJP-CP525-875 1 1-Sep 10:30 1-Sep 11:15
TJP-CP525-875 Shift I TJP-CP525-875 1 2-Sep 17:00 2-Sep 19:00
TJP-D85ESS-831 Shift I DZD85-ESS 831 1 2-Sep 7:00 2-Sep 19:00
TJP-D85ESS-831 Shift I DZD85-ESS 831 1 3-Sep 7:00 3-Sep 19:00
TJP-EX200-819 Shift I EXCA PC200 819 1 3-Sep 7:00 3-Sep 19:00
TJP-WT-874 Shift I WT500-874 1 3-Sep 17:30 3-Sep 19:00
TJP-D85ESS-831 Shift I DZD85-ESS 831 1 4-Sep 7:00 4-Sep 19:00
TJP-D85ESS-831 Shift I DZD85-ESS 831 1 5-Sep 7:00 5-Sep 19:00
TJP-EX200-826 Shift I EXCA PC200 826 1 5-Sep 17:00 5-Sep 18:00
TJP-EX200-819 Shift I EXCA PC200 819 1 5-Sep 9:00 5-Sep 19:00
TJP-D85ESS-831 Shift I DZD85-ESS 831 1 6-Sep 11:30 6-Sep 19:00
TJP-MG535-872 Shift I TJP-MG535-872 1 8-Sep 7:00 8-Sep 8:30
TJP-EX200-818 Shift I EXCA PC200 818 1 8-Sep 7:00 8-Sep 14:30
TJP-D85ESS-831 Shift I DZD85-ESS 831 1 9-Sep 7:00 9-Sep 13:00
TJP-D85ESS-831 Shift I DZD85-ESS 831 1 10-Sep 7:00 10-Sep 19:00
TJP-EX200-818 Shift I EXCA PC200 818 1 10-Sep 11:00 10-Sep 19:00
TJP-D85ESS-831 Shift I DZD85-ESS 831 1 11-Sep 15:00 11-Sep 19:00
TJP-D85ESS-831 Shift I DZD85-ESS 831 1 12-Sep 7:00 12-Sep 19:00
TJP-WT-874 Shift I WT500-874 1 12-Sep 14:00 12-Sep 16:30
TJP-EX200-816 Shift I EXCA PC200 816 1 12-Sep 7:00 12-Sep 19:00
TJP-D85ESS-831 Shift I DZD85-ESS 831 1 13-Sep 7:00 13-Sep 19:00
TJP-EX200-819 Shift I EXCA PC200 819 1 13-Sep 12:00 13-Sep 19:00
TJP-EX200-816 Shift I EXCA PC200 816 1 13-Sep 7:00 13-Sep 11:00
TJP-D85ESS-831 Shift I DZD85-ESS 831 1 14-Sep 7:00 14-Sep 19:00
TJP-EX200-825 Shift I EXCA PC200 825 1 14-Sep 12:00 14-Sep 19:00
TJP-EX200-825 Shift I EXCA PC200 825 1 15-Sep 7:00 15-Sep 12:00
TJP-EX200-818 Shift I EXCA PC200 818 1 15-Sep 14:30 15-Sep 19:00
TJP-D85ESS-831 Shift I DZD85-ESS 831 1 16-Sep 7:00 16-Sep 19:00
TJP-EX200-818 Shift I EXCA PC200 818 1 16-Sep 7:00 16-Sep 19:00
TJP-D85ESS-802 Shift I DZD85-ESS 802 1 16-Sep 18:00 16-Sep 19:00
TJP-D85ESS-831 Shift I DZD85-ESS 831 1 17-Sep 7:00 17-Sep 19:00
TJP-EX200-818 Shift I EXCA PC200 818 1 17-Sep 7:00 17-Sep 14:00
TJP-D85ESS-807 Shift I DZD85-ESS 807 1 19-Sep 7:00 19-Sep 19:00
TJP-D85ESS-807 Shift I DZD85-ESS 807 1 20-Sep 7:00 20-Sep 12:00
TJP-EX200-819 Shift I EXCA PC200 819 1 20-Sep 13:30 20-Sep 19:00
TJP-MG535-872 Shift I TJP-MG535-872 1 20-Sep 16:00 20-Sep 19:00
TJP-EX200-818 Shift I EXCA PC200 818 1 23-Sep 7:00 23-Sep 14:00
TJP-MG535-872 Shift I TJP-MG535-872 1 24-Sep 8:00 24-Sep 9:00
TJP-CP525-875 Shift I TJP-CP525-875 1 24-Sep 15:30 24-Sep 19:00
TJP-CP525-875 Shift I TJP-CP525-875 1 25-Sep 7:00 25-Sep 15:00
TJP-WT-874 Shift I WT500-874 1 25-Sep 7:30 25-Sep 8:30
TJP-MG535-872 Shift I TJP-MG535-872 1 26-Sep 16:00 26-Sep 19:00
TJP-WT-874 Shift I WT500-874 1 26-Sep 7:00 26-Sep 13:00
TJP-EX200-818 Shift I EXCA PC200 818 1 26-Sep 13:30 26-Sep 19:00
TJP-EX200-818 Shift I EXCA PC200 818 1 27-Sep 7:00 27-Sep 19:00
TJP-EX200-816 Shift I EXCA PC200 816 1 29-Sep 9:30 29-Sep 19:00
TJP-EX200-819 Shift I EXCA PC200 819 1 29-Sep 7:00 29-Sep 19:00
TJP-EX200-816 Shift I EXCA PC200 816 1 30-Sep 7:00 30-Sep 19:00
TJP-MG535-872 Shift I TJP-MG535-872 1 30-Sep 15:30 30-Sep 16:45
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
#N/A Shift II
TotalHoursReportFault Code
1.00 Tidak Bisa Start BD
10.00 Waiting Part ( Hose ) BD
0.75 Oli Filter Mesin Rembes BD
2.00 Radio Rusak BD
10.00 Low Power Engine BD
10.00 Oli Hydraulic masuk ke TransmiBD
10.00 Low Power BD
1.50 Kebocoran Oli BD
10.00 Oli Hydraulic masuk ke TransmiBD
10.00 Waiting Part BD
1.00 Service UT BD
10.00 Low Power BD
7.50 Kebocoran Oli Hydraulic BD
1.50 Rotary Mati BD
7.50 Kebocoran Oli Hydraulic + TamBD
6.00 Kebocoran Oli BD
10.00 Blade Ngejim BD
8.00 Kebocoran Hose BD
4.00 Trable Blite BD
10.00 Perbaikan Blite BD
2.50 Repair Seal Pompa BD
10.00 Ganti Bushing Bucket BD
10.00 Perbaikan Blite BD
7.00 Cylinder Boom Mau Lepas BD
4.00 Bushing Bucket BD
10.00 Perbaikan Blite BD
7.00 Low Power ( Trouble Engine ser
BD
5.00 Trouble Low Hydraulic BD
4.50 Over Heat Hydraulic BD
10.00 Cylinder Blitz LH BD
10.00 Over Heat Hydraulic BD
1.00 Oring Pipa Filter Engine BD
10.00 Cylinder Blitz BD
7.00 Over Heat Hydraulic BD
10.00 Perbaikan Cuter dan Pompa HdBD
5.00 Pasang Pompa Hydraulic BD
5.50 Seal Adjuster Bocor BD
3.00 Blade Tumpul BD
7.00 Waiting Oli Hydraulic BD
1.00 Repair Penutup Rotary BD
3.50 Tyre Sebelah Kanan Bocor BD
8.00 Repair Tyre BD
1.00 Spray Putus BD
3.00 Repair Pintu Kiri Engine BD
6.00 Repair Pompa Pengisian BD
5.50 Dynamo Start BD
10.00 Waiting Part Dynamo Start BD
9.50 Gear Sproket Rusak BD
10.00 Perbaikan Turbo + Muring BD
10.00 Undercarriage L/H BD
1.25 Repair Rotary BD
DZD375 800 DZD375 800 TJP-D375-800
DZD85-ESS 801 DZD85-ESS 801 TJP-D85ESS-801
DZD85-ESS 802 DZD85-ESS 802 TJP-D85ESS-802
DZD85-ESS 804 DZD85-ESS 804 TJP-D85ESS-804
DZD85-ESS 805 DZD85-ESS 805 TJP-D85ESS-805
DZD85-ESS 807 DZD85-ESS 807 TJP-D85ESS-807
DZD85-ESS 831 DZD85-ESS 831 TJP-D85ESS-831
DZD65-P 808 TJP-D865P-808

EXCA PC200 816 TJP-EX200-816


EXCA PC200 818 TJP-EX200-818
EXCA PC200 819 TJP-EX200-819
EXCA PC200 816 EXCA PC200 820 TJP-EX200-820
EXCA PC200 818 EXCA PC200 825 TJP-EX200-825
EXCA PC200 819 EXCA PC200 826 TJP-EX200-826
EXCA PC200 825 TJP-EX200-829 TJP-EX200-829
EXCA PC200 826 EXCA PC300 821 TJP-EX300-821
EXCA PC200 829 TJP-CP525-875 TJP-CP525-875
TJP-CP525-875 TJP-MG535-872 TJP-MG535-872
TJP-MG535-872 WT500-874 TJP-WT-874
WT500-874
DTCWB 45A 929 TJP-DTCWB-929
DTCWB 45A 943 TJP-DTCWB-943
DTCWB 45A 946 TJP-DTCWB-946
DTCWB 45A-923 TJP-DTCWB-923
DTCWE 370 980 DTCWE 370 980 TJP-DT30-980
DTCWE 370-974 TJP-DT30-974
TJP-DT45A-948 TJP-DTCWB-948
TL 21 TL 21 TJP-TL-21
SCOPE JOB Equipment Type Unit Sum - Total HM
Coal Loading Excavator 400 TJP-EX470-851 4.01
TJP-EX400-810 268.6
TJP-EX400-815 110.8
TJP-EX470-854 178.1
TJP-EX400-811 41.5
TJP-EX470-853 46.06
TJP-EX470-855 103.4
TJP-EX349-856 1.7
TJP-EX349-858 4.8
Excavator 300 TJP-EX300-817 16.87
Coal Loading Result 775.84
Cut Channel Excavator 200 TJP-EX200-826 155.1
TJP-EX200-819 231.2
Cut Channel Result 386.3
Road Maintenance Compact TJP-CP525-875 224.5
Excavator 200 TJP-EX200-818 163.5
Grader TJP-MG535-872 227
Water Truck TJP-WT-874 311.6
DT30 Ton TJP-DT30T-932 2.7
Road Maintenance Result 929.3
Water Management Excavator 400 TJP-EX470-853 1.5
Water Management Result 1.5
Reslope Bulldozer D85ESS TJP-D85ESS-802 249
TJP-D85ESS-807 243
TJP-D85ESS-831 30.7
Excavator 200 TJP-EX200-816 184.4
Reslope Result 707.1
Loading Port Excavator 200 TJP-EX200-826 61.3
Excavator 300 TJP-EX300-821 43
Loading Port Result 104.3
Swampy forest Bulldozer D85ESS TJP-D85ESS-831 101.5
Excavator 200 TJP-EX200-826 17
Swampy forest Result 118.5
Coal Processing Excavator 200 TJP-EX200-826 100
Coal Processing Result 100
Top Soil Excavator 200 TJP-EX200-816 36.9
Top Soil Result 36.9
catchment area Excavator 200 TJP-EX200-825 264
catchment area Result 264
Sand Removal Excavator 300 TJP-EX300-821 214
DT30 Ton TJP-DT30T-974 4.7
Sand Removal Result 218.7
Total Result 3642.44
SCOPE JOB - multiple -

Equipment Type Unit Sum - Total HM


Bulldozer D85ESS TJP-D85ESS-802 249
TJP-D85ESS-807 243
TJP-D85ESS-831 132.2
Excavator 200 TJP-EX200-816 221.3
TJP-EX200-819 231.2
TJP-EX200-825 264
TJP-EX200-826 172.1
Total Result 1512.8
AA10 J10 N10 Q10 V10 W10 1
AA12 J12 N12 Q12 V12 W12 1
AA14 J14 N14 Q14 V14 W14 1
AA16 J16 N16 Q16 V16 W16 1
AA18 J18 N18 Q18 V18 W18 1
AA20 J20 N20 Q20 V20 W20 1
AA22 J22 N22 Q22 V22 W22 1
AA24 J24 N24 Q24 V24 W24 1
AA26 J26 N26 Q26 V26 W26 1
AA28 J28 N28 Q28 V28 W28 1
AA30 J30 N30 Q30 V30 W30 1
AA32 J32 N32 Q32 V32 W32 1
AA34 J34 N34 Q34 V34 W34 1
AA36 J36 N36 Q36 V36 W36 1
AA38 J38 N38 Q38 V38 W38 1
AA40 J40 N40 Q40 V40 W40 1
AA44 J44 N44 Q44 V44 W44 1
AA46 J46 N46 Q46 V46 W46 1
AA48 J48 N48 Q48 V48 W48 1
AA50 J50 N50 Q50 V50 W50 1
AA52 J52 N52 Q52 V52 W52 1
AA54 J54 N54 Q54 V54 W54 1
AA58 J58 N58 Q58 V58 W58 1
AA60 J60 N60 Q60 V60 W60 1
AA62 J62 N62 Q62 V62 W62 1
AA64 J64 N64 Q64 V64 W64 1
AA66 J66 N66 Q66 V66 W66 1
AA68 J68 N68 Q68 V68 W68 1
AA10 J10 N10 Q10 V10 W10 2
AA12 J12 N12 Q12 V12 W12 2
AA14 J14 N14 Q14 V14 W14 2
AA16 J16 N16 Q16 V16 W16 2
AA18 J18 N18 Q18 V18 W18 2
AA20 J20 N20 Q20 V20 W20 2
AA22 J22 N22 Q22 V22 W22 2
AA24 J24 N24 Q24 V24 W24 2
AA26 J26 N26 Q26 V26 W26 2
AA28 J28 N28 Q28 V28 W28 2
AA30 J30 N30 Q30 V30 W30 2
AA32 J32 N32 Q32 V32 W32 2
AA34 J34 N34 Q34 V34 W34 2
AA36 J36 N36 Q36 V36 W36 2
AA38 J38 N38 Q38 V38 W38 2
AA40 J40 N40 Q40 V40 W40 2
AA42 J42 N42 Q42 V42 W42 2
AA44 J44 N44 Q44 V44 W44 2
AA50 J50 N50 Q50 V50 W50 2
AA52 J52 N52 Q52 V52 W52 2
AA54 J54 N54 Q54 V54 W54 2
AA56 J56 N56 Q56 V56 W56 2
AA60 J60 N60 Q60 V60 W60 2
AA62 J62 N62 Q62 V62 W62 2
AA64 J64 N64 Q64 V64 W64 2
AA66 J66 N66 Q66 V66 W66 2
AA68 J68 N68 Q68 V68 W68 2
AA10 J10 N10 Q10 V10 W10 3
AA20 J20 N20 Q20 V20 W20 3
AA22 J22 N22 Q22 V22 W22 3
AA24 J24 N24 Q24 V24 W24 3
AA30 J30 N30 Q30 V30 W30 3
AA44 J44 N44 Q44 V44 W44 3
AA46 J46 N46 Q46 V46 W46 3
AA48 J48 N48 Q48 V48 W48 3
AA50 J50 N50 Q50 V50 W50 3
AA52 J52 N52 Q52 V52 W52 3
AA54 J54 N54 Q54 V54 W54 3
AA56 J56 N56 Q56 V56 W56 3
AA58 J58 N58 Q58 V58 W58 3
AA60 J60 N60 Q60 V60 W60 3
AA64 J64 N64 Q64 V64 W64 3
AA66 J66 N66 Q66 V66 W66 3
AA68 J68 N68 Q68 V68 W68 3
AA12 J12 N12 Q12 V12 W12 4
AA14 J14 N14 Q14 V14 W14 4
AA16 J16 N16 Q16 V16 W16 4
AA18 J18 N18 Q18 V18 W18 4
AA20 J20 N20 Q20 V20 W20 4
AA24 J24 N24 Q24 V24 W24 4
AA26 J26 N26 Q26 V26 W26 4
AA28 J28 N28 Q28 V28 W28 4
AA30 J30 N30 Q30 V30 W30 4
AA34 J34 N34 Q34 V34 W34 4
AA36 J36 N36 Q36 V36 W36 4
AA38 J38 N38 Q38 V38 W38 4
AA40 J40 N40 Q40 V40 W40 4
AA42 J42 N42 Q42 V42 W42 4
AA44 J44 N44 Q44 V44 W44 4
AA46 J46 N46 Q46 V46 W46 4
AA48 J48 N48 Q48 V48 W48 4
AA50 J50 N50 Q50 V50 W50 4
AA52 J52 N52 Q52 V52 W52 4
AA54 J54 N54 Q54 V54 W54 4
AA56 J56 N56 Q56 V56 W56 4
AA58 J58 N58 Q58 V58 W58 4
AA60 J60 N60 Q60 V60 W60 4
AA62 J62 N62 Q62 V62 W62 4
AA64 J64 N64 Q64 V64 W64 4
AA66 J66 N66 Q66 V66 W66 4
AA10 J10 N10 Q10 V10 W10 5
AA12 J12 N12 Q12 V12 W12 5
AA16 J16 N16 Q16 V16 W16 5
AA18 J18 N18 Q18 V18 W18 5
AA20 J20 N20 Q20 V20 W20 5
AA22 J22 N22 Q22 V22 W22 5
AA24 J24 N24 Q24 V24 W24 5
AA26 J26 N26 Q26 V26 W26 5
AA28 J28 N28 Q28 V28 W28 5
AA30 J30 N30 Q30 V30 W30 5
AA32 J32 N32 Q32 V32 W32 5
AA34 J34 N34 Q34 V34 W34 5
AA36 J36 N36 Q36 V36 W36 5
AA38 J38 N38 Q38 V38 W38 5
AA40 J40 N40 Q40 V40 W40 5
AA42 J42 N42 Q42 V42 W42 5
AA44 J44 N44 Q44 V44 W44 5
AA46 J46 N46 Q46 V46 W46 5
AA48 J48 N48 Q48 V48 W48 5
AA50 J50 N50 Q50 V50 W50 5
AA52 J52 N52 Q52 V52 W52 5
AA54 J54 N54 Q54 V54 W54 5
AA56 J56 N56 Q56 V56 W56 5
AA58 J58 N58 Q58 V58 W58 5
AA60 J60 N60 Q60 V60 W60 5
AA62 J62 N62 Q62 V62 W62 5
AA64 J64 N64 Q64 V64 W64 5
AA68 J68 N68 Q68 V68 W68 5
AA10 J10 N10 Q10 V10 W10 6
AA12 J12 N12 Q12 V12 W12 6
AA14 J14 N14 Q14 V14 W14 6
AA16 J16 N16 Q16 V16 W16 6
AA17 J17 N17 Q17 V17 W17 6
AA18 J18 N18 Q18 V18 W18 6
AA20 J20 N20 Q20 V20 W20 6
AA22 J22 N22 Q22 V22 W22 6
AA24 J24 N24 Q24 V24 W24 6
AA26 J26 N26 Q26 V26 W26 6
AA28 J28 N28 Q28 V28 W28 6
AA30 J30 N30 Q30 V30 W30 6
AA32 J32 N32 Q32 V32 W32 6
AA34 J34 N34 Q34 V34 W34 6
AA36 J36 N36 Q36 V36 W36 6
AA38 J38 N38 Q38 V38 W38 6
AA40 J40 N40 Q40 V40 W40 6
AA42 J42 N42 Q42 V42 W42 6
AA44 J44 N44 Q44 V44 W44 6
AA46 J46 N46 Q46 V46 W46 6
AA48 J48 N48 Q48 V48 W48 6
AA50 J50 N50 Q50 V50 W50 6
AA52 J52 N52 Q52 V52 W52 6
AA54 J54 N54 Q54 V54 W54 6
AA56 J56 N56 Q56 V56 W56 6
AA58 J58 N58 Q58 V58 W58 6
AA60 J60 N60 Q60 V60 W60 6
AA62 J62 N62 Q62 V62 W62 6
AA64 J64 N64 Q64 V64 W64 6
AA66 J66 N66 Q66 V66 W66 6
AA68 J68 N68 Q68 V68 W68 6
AA10 J10 N10 Q10 V10 W10 7
AA12 J12 N12 Q12 V12 W12 7
AA14 J14 N14 Q14 V14 W14 7
AA16 J16 N16 Q16 V16 W16 7
AA18 J18 N18 Q18 V18 W18 7
AA20 J20 N20 Q20 V20 W20 7
AA22 J22 N22 Q22 V22 W22 7
AA24 J24 N24 Q24 V24 W24 7
AA26 J26 N26 Q26 V26 W26 7
AA28 J28 N28 Q28 V28 W28 7
AA30 J30 N30 Q30 V30 W30 7
AA32 J32 N32 Q32 V32 W32 7
AA34 J34 N34 Q34 V34 W34 7
AA36 J36 N36 Q36 V36 W36 7
AA38 J38 N38 Q38 V38 W38 7
AA40 J40 N40 Q40 V40 W40 7
AA42 J42 N42 Q42 V42 W42 7
AA44 J44 N44 Q44 V44 W44 7
AA46 J46 N46 Q46 V46 W46 7
AA48 J48 N48 Q48 V48 W48 7
AA50 J50 N50 Q50 V50 W50 7
AA51 J51 N51 Q51 V51 W51 7
AA52 J52 N52 Q52 V52 W52 7
AA53 J53 N53 Q53 V53 W53 7
AA54 J54 N54 Q54 V54 W54 7
AA55 J55 N55 Q55 V55 W55 7
AA56 J56 N56 Q56 V56 W56 7
AA57 J57 N57 Q57 V57 W57 7
AA58 J58 N58 Q58 V58 W58 7
AA59 J59 N59 Q59 V59 W59 7
AA60 J60 N60 Q60 V60 W60 7
AA61 J61 N61 Q61 V61 W61 7
AA62 J62 N62 Q62 V62 W62 7
AA63 J63 N63 Q63 V63 W63 7
AA64 J64 N64 Q64 V64 W64 7
AA65 J65 N65 Q65 V65 W65 7
AA66 J66 N66 Q66 V66 W66 7
AA67 J67 N67 Q67 V67 W67 7
AA68 J68 N68 Q68 V68 W68 7
AA69 J69 N69 Q69 V69 W69 7
AA10 J10 N10 Q10 V10 W10 11
AA12 J12 N12 Q12 V12 W12 11
AA14 J14 N14 Q14 V14 W14 11
AA16 J16 N16 Q16 V16 W16 11
AA18 J18 N18 Q18 V18 W18 11
AA20 J20 N20 Q20 V20 W20 11
AA24 J24 N24 Q24 V24 W24 11
AA26 J26 N26 Q26 V26 W26 11
AA28 J28 N28 Q28 V28 W28 11
AA30 J30 N30 Q30 V30 W30 11
AA32 J32 N32 Q32 V32 W32 11
AA34 J34 N34 Q34 V34 W34 11
AA36 J36 N36 Q36 V36 W36 11
AA38 J38 N38 Q38 V38 W38 11
AA40 J40 N40 Q40 V40 W40 11
AA42 J42 N42 Q42 V42 W42 11
AA44 J44 N44 Q44 V44 W44 11
AA46 J46 N46 Q46 V46 W46 11
AA48 J48 N48 Q48 V48 W48 11
AA52 J52 N52 Q52 V52 W52 11
AA54 J54 N54 Q54 V54 W54 11
AA56 J56 N56 Q56 V56 W56 11
AA58 J58 N58 Q58 V58 W58 11
AA60 J60 N60 Q60 V60 W60 11
AA62 J62 N62 Q62 V62 W62 11
AA64 J64 N64 Q64 V64 W64 11
AA66 J66 N66 Q66 V66 W66 11
AA68 J68 N68 Q68 V68 W68 11
AA10 J10 N10 Q10 V10 W10 12
AA12 J12 N12 Q12 V12 W12 12
AA14 J14 N14 Q14 V14 W14 12
AA16 J16 N16 Q16 V16 W16 12
AA18 J18 N18 Q18 V18 W18 12
AA20 J20 N20 Q20 V20 W20 12
AA24 J24 N24 Q24 V24 W24 12
AA26 J26 N26 Q26 V26 W26 12
AA28 J28 N28 Q28 V28 W28 12
AA30 J30 N30 Q30 V30 W30 12
AA32 J32 N32 Q32 V32 W32 12
AA34 J34 N34 Q34 V34 W34 12
AA36 J36 N36 Q36 V36 W36 12
AA38 J38 N38 Q38 V38 W38 12
AA40 J40 N40 Q40 V40 W40 12
AA44 J44 N44 Q44 V44 W44 12
AA46 J46 N46 Q46 V46 W46 12
AA48 J48 N48 Q48 V48 W48 12
AA52 J52 N52 Q52 V52 W52 12
AA54 J54 N54 Q54 V54 W54 12
AA56 J56 N56 Q56 V56 W56 12
AA58 J58 N58 Q58 V58 W58 12
AA60 J60 N60 Q60 V60 W60 12
AA62 J62 N62 Q62 V62 W62 12
AA64 J64 N64 Q64 V64 W64 12
AA66 J66 N66 Q66 V66 W66 12
AA68 J68 N68 Q68 V68 W68 12
AA10 J10 N10 Q10 V10 W10 13
AA11 J11 N11 Q11 V11 W11 13
AA12 J12 N12 Q12 V12 W12 13
AA14 J14 N14 Q14 V14 W14 13
AA15 J15 N15 Q15 V15 W15 13
AA16 J16 N16 Q16 V16 W16 13
AA18 J18 N18 Q18 V18 W18 13
AA20 J20 N20 Q20 V20 W20 13
AA24 J24 N24 Q24 V24 W24 13
AA26 J26 N26 Q26 V26 W26 13
AA28 J28 N28 Q28 V28 W28 13
AA29 J29 N29 Q29 V29 W29 13
AA30 J30 N30 Q30 V30 W30 13
AA32 J32 N32 Q32 V32 W32 13
AA34 J34 N34 Q34 V34 W34 13
AA36 J36 N36 Q36 V36 W36 13
AA38 J38 N38 Q38 V38 W38 13
AA39 J39 N39 Q39 V39 W39 13
AA40 J40 N40 Q40 V40 W40 13
AA42 J42 N42 Q42 V42 W42 13
AA44 J44 N44 Q44 V44 W44 13
AA45 J45 N45 Q45 V45 W45 13
AA46 J46 N46 Q46 V46 W46 13
AA48 J48 N48 Q48 V48 W48 13
AA50 J50 N50 Q50 V50 W50 13
AA52 J52 N52 Q52 V52 W52 13
AA53 J53 N53 Q53 V53 W53 13
AA54 J54 N54 Q54 V54 W54 13
AA56 J56 N56 Q56 V56 W56 13
AA58 J58 N58 Q58 V58 W58 13
AA59 J59 N59 Q59 V59 W59 13
AA60 J60 N60 Q60 V60 W60 13
AA61 J61 N61 Q61 V61 W61 13
AA62 J62 N62 Q62 V62 W62 13
AA63 J63 N63 Q63 V63 W63 13
AA64 J64 N64 Q64 V64 W64 13
AA65 J65 N65 Q65 V65 W65 13
AA66 J66 N66 Q66 V66 W66 13
AA67 J67 N67 Q67 V67 W67 13
AA68 J68 N68 Q68 V68 W68 13
AA69 J69 N69 Q69 V69 W69 13
AA12 J12 N12 Q12 V12 W12 14
AA13 J13 N13 Q13 V13 W13 14
AA48 J48 N48 Q48 V48 W48 15
AA10 J10 N10 Q10 V10 W10 16
AA12 J12 N12 Q12 V12 W12 16
AA14 J14 N14 Q14 V14 W14 16
AA16 J16 N16 Q16 V16 W16 16
AA18 J18 N18 Q18 V18 W18 16
AA20 J20 N20 Q20 V20 W20 16
AA24 J24 N24 Q24 V24 W24 16
AA26 J26 N26 Q26 V26 W26 16
AA28 J28 N28 Q28 V28 W28 16
AA30 J30 N30 Q30 V30 W30 16
AA32 J32 N32 Q32 V32 W32 16
AA34 J34 N34 Q34 V34 W34 16
AA36 J36 N36 Q36 V36 W36 16
AA38 J38 N38 Q38 V38 W38 16
AA42 J42 N42 Q42 V42 W42 16
AA44 J44 N44 Q44 V44 W44 16
AA46 J46 N46 Q46 V46 W46 16
AA48 J48 N48 Q48 V48 W48 16
AA52 J52 N52 Q52 V52 W52 16
AA54 J54 N54 Q54 V54 W54 16
AA56 J56 N56 Q56 V56 W56 16
AA58 J58 N58 Q58 V58 W58 16
AA60 J60 N60 Q60 V60 W60 16
AA64 J64 N64 Q64 V64 W64 16
AA66 J66 N66 Q66 V66 W66 16
AA68 J68 N68 Q68 V68 W68 16
AA11 J11 N11 Q11 V11 W11 17
AA12 J12 N12 Q12 V12 W12 17
AA13 J13 N13 Q13 V13 W13 17
AA14 J14 N14 Q14 V14 W14 17
AA15 J15 N15 Q15 V15 W15 17
AA16 J16 N16 Q16 V16 W16 17
AA17 J17 N17 Q17 V17 W17 17
AA18 J18 N18 Q18 V18 W18 17
AA19 J19 N19 Q19 V19 W19 17
AA20 J20 N20 Q20 V20 W20 17
AA21 J21 N21 Q21 V21 W21 17
AA22 J22 N22 Q22 V22 W22 17
AA23 J23 N23 Q23 V23 W23 17
AA24 J24 N24 Q24 V24 W24 17
AA26 J26 N26 Q26 V26 W26 17
AA28 J28 N28 Q28 V28 W28 17
AA29 J29 N29 Q29 V29 W29 17
AA30 J30 N30 Q30 V30 W30 17
AA31 J31 N31 Q31 V31 W31 17
AA32 J32 N32 Q32 V32 W32 17
AA33 J33 N33 Q33 V33 W33 17
AA34 J34 N34 Q34 V34 W34 17
AA35 J35 N35 Q35 V35 W35 17
AA36 J36 N36 Q36 V36 W36 17
AA40 J40 N40 Q40 V40 W40 17
AA41 J41 N41 Q41 V41 W41 17
AA42 J42 N42 Q42 V42 W42 17
AA43 J43 N43 Q43 V43 W43 17
AA44 J44 N44 Q44 V44 W44 17
AA45 J45 N45 Q45 V45 W45 17
AA46 J46 N46 Q46 V46 W46 17
AA48 J48 N48 Q48 V48 W48 17
AA54 J54 N54 Q54 V54 W54 17
AA55 J55 N55 Q55 V55 W55 17
AA56 J56 N56 Q56 V56 W56 17
AA57 J57 N57 Q57 V57 W57 17
AA58 J58 N58 Q58 V58 W58 17
AA59 J59 N59 Q59 V59 W59 17
AA61 J61 N61 Q61 V61 W61 17
AA62 J62 N62 Q62 V62 W62 17
AA63 J63 N63 Q63 V63 W63 17
AA64 J64 N64 Q64 V64 W64 17
AA67 J67 N67 Q67 V67 W67 17
AA68 J68 N68 Q68 V68 W68 17
AA66 J66 N66 Q66 V66 W66 18
AA67 J67 N67 Q67 V67 W67 18
AA68 J68 N68 Q68 V68 W68 18
AA69 J69 N69 Q69 V69 W69 18
AA32 J32 N32 Q32 V32 W32 19
AA33 J33 N33 Q33 V33 W33 19
AA38 J38 N38 Q38 V38 W38 19
AA39 J39 N39 Q39 V39 W39 19
AA40 J40 N40 Q40 V40 W40 19
AA41 J41 N41 Q41 V41 W41 19
AA43 J43 N43 Q43 V43 W43 19
AA44 J44 N44 Q44 V44 W44 19
AA45 J45 N45 Q45 V45 W45 19
AA46 J46 N46 Q46 V46 W46 19
AA47 J47 N47 Q47 V47 W47 19
AA48 J48 N48 Q48 V48 W48 19
AA50 J50 N50 Q50 V50 W50 19
AA51 J51 N51 Q51 V51 W51 19
AA52 J52 N52 Q52 V52 W52 19
AA53 J53 N53 Q53 V53 W53 19
AA54 J54 N54 Q54 V54 W54 19
AA55 J55 N55 Q55 V55 W55 19
AA56 J56 N56 Q56 V56 W56 19
AA57 J57 N57 Q57 V57 W57 19
AA58 J58 N58 Q58 V58 W58 19
AA59 J59 N59 Q59 V59 W59 19
AA60 J60 N60 Q60 V60 W60 19
AA61 J61 N61 Q61 V61 W61 19
AA62 J62 N62 Q62 V62 W62 19
AA63 J63 N63 Q63 V63 W63 19
AA64 J64 N64 Q64 V64 W64 19
AA65 J65 N65 Q65 V65 W65 19
AA66 J66 N66 Q66 V66 W66 19
AA68 J68 N68 Q68 V68 W68 19
AA69 J69 N69 Q69 V69 W69 19
AA17 J17 N17 Q17 V17 W17 20
AA22 J22 N22 Q22 V22 W22 20
AA23 J23 N23 Q23 V23 W23 20
AA25 J25 N25 Q25 V25 W25 20
AA34 J34 N34 Q34 V34 W34 20
AA38 J38 N38 Q38 V38 W38 20
AA39 J39 N39 Q39 V39 W39 20
AA40 J40 N40 Q40 V40 W40 20
AA41 J41 N41 Q41 V41 W41 20
AA42 J42 N42 Q42 V42 W42 20
AA43 J43 N43 Q43 V43 W43 20
AA54 J54 N54 Q54 V54 W54 20
AA56 J56 N56 Q56 V56 W56 20
AA64 J64 N64 Q64 V64 W64 20
AA10 J10 N10 Q10 V10 W10 21
AA11 J11 N11 Q11 V11 W11 21
AA12 J12 N12 Q12 V12 W12 21
AA14 J14 N14 Q14 V14 W14 21
AA15 J15 N15 Q15 V15 W15 21
AA16 J16 N16 Q16 V16 W16 21
AA17 J17 N17 Q17 V17 W17 21
AA18 J18 N18 Q18 V18 W18 21
AA19 J19 N19 Q19 V19 W19 21
AA28 J28 N28 Q28 V28 W28 21
AA29 J29 N29 Q29 V29 W29 21
AA30 J30 N30 Q30 V30 W30 21
AA31 J31 N31 Q31 V31 W31 21
AA32 J32 N32 Q32 V32 W32 21
AA33 J33 N33 Q33 V33 W33 21
AA34 J34 N34 Q34 V34 W34 21
AA35 J35 N35 Q35 V35 W35 21
AA36 J36 N36 Q36 V36 W36 21
AA37 J37 N37 Q37 V37 W37 21
AA38 J38 N38 Q38 V38 W38 21
AA58 J58 N58 Q58 V58 W58 21
AA23 J23 N23 Q23 V23 W23 22
AA24 J24 N24 Q24 V24 W24 22
AA29 J29 N29 Q29 V29 W29 23
AA30 J30 N30 Q30 V30 W30 23
AA34 J34 N34 Q34 V34 W34 23
AA64 J64 N64 Q64 V64 W64 23
AA65 J65 N65 Q65 V65 W65 23
AA66 J66 N66 Q66 V66 W66 23
AA67 J67 N67 Q67 V67 W67 23
AA68 J68 N68 Q68 V68 W68 23
AA10 J10 N10 Q10 V10 W10 24
AA11 J11 N11 Q11 V11 W11 24
AA12 J12 N12 Q12 V12 W12 24
AA13 J13 N13 Q13 V13 W13 24
AA19 J19 N19 Q19 V19 W19 24
AA20 J20 N20 Q20 V20 W20 24
AA21 J21 N21 Q21 V21 W21 24
AA22 J22 N22 Q22 V22 W22 24
AA24 J24 N24 Q24 V24 W24 24
AA25 J25 N25 Q25 V25 W25 24
AA26 J26 N26 Q26 V26 W26 24
AA27 J27 N27 Q27 V27 W27 24
AA28 J28 N28 Q28 V28 W28 24
AA29 J29 N29 Q29 V29 W29 24
AA30 J30 N30 Q30 V30 W30 24
AA31 J31 N31 Q31 V31 W31 24
AA32 J32 N32 Q32 V32 W32 24
AA34 J34 N34 Q34 V34 W34 24
AA35 J35 N35 Q35 V35 W35 24
AA36 J36 N36 Q36 V36 W36 24
AA37 J37 N37 Q37 V37 W37 24
AA38 J38 N38 Q38 V38 W38 24
AA30 J30 N30 Q30 V30 W30 25
AA33 J33 N33 Q33 V33 W33 25
AA34 J34 N34 Q34 V34 W34 25
AA41 J41 N41 Q41 V41 W41 25
AA42 J42 N42 Q42 V42 W42 25
AA43 J43 N43 Q43 V43 W43 25
AA44 J44 N44 Q44 V44 W44 25
AA45 J45 N45 Q45 V45 W45 25
AA46 J46 N46 Q46 V46 W46 25
AA47 J47 N47 Q47 V47 W47 25
AA48 J48 N48 Q48 V48 W48 25
AA50 J50 N50 Q50 V50 W50 25
AA56 J56 N56 Q56 V56 W56 25
AA58 J58 N58 Q58 V58 W58 25
AA59 J59 N59 Q59 V59 W59 25
AA60 J60 N60 Q60 V60 W60 25
AA61 J61 N61 Q61 V61 W61 25
AA62 J62 N62 Q62 V62 W62 25
AA63 J63 N63 Q63 V63 W63 25
AA56 J56 N56 Q56 V56 W56 26
AA62 J62 N62 Q62 V62 W62 26
AA64 J64 N64 Q64 V64 W64 26
AA22 J22 N22 Q22 V22 W22 27
AA24 J24 N24 Q24 V24 W24 27
AA62 J62 N62 Q62 V62 W62 27
AA64 J64 N64 Q64 V64 W64 27
Date Shift Unit Equipment Type
30-Dec-99 Shift I TJP-D85ESS-802 Bulldozer D85ESS
30-Dec-99 Shift I TJP-D85ESS-802 Bulldozer D85ESS
30-Dec-99 Shift I TJP-D85ESS-802 Bulldozer D85ESS
30-Dec-99 Shift I TJP-D85ESS-802 Bulldozer D85ESS
30-Dec-99 Shift I TJP-D85ESS-802 Bulldozer D85ESS
30-Dec-99 Shift I TJP-D85ESS-802 Bulldozer D85ESS
30-Dec-99 Shift I TJP-D85ESS-802 Bulldozer D85ESS
30-Dec-99 Shift I TJP-D85ESS-802 Bulldozer D85ESS
30-Dec-99 Shift I TJP-D85ESS-802 Bulldozer D85ESS
30-Dec-99 Shift I TJP-D85ESS-802 Bulldozer D85ESS
30-Dec-99 Shift I TJP-D85ESS-802 Bulldozer D85ESS
30-Dec-99 Shift I TJP-D85ESS-802 Bulldozer D85ESS
30-Dec-99 Shift I TJP-D85ESS-802 Bulldozer D85ESS
30-Dec-99 Shift I TJP-D85ESS-802 Bulldozer D85ESS
30-Dec-99 Shift I TJP-D85ESS-802 Bulldozer D85ESS
30-Dec-99 Shift I TJP-D85ESS-802 Bulldozer D85ESS
30-Dec-99 Shift I TJP-D85ESS-802 Bulldozer D85ESS
30-Dec-99 Shift I TJP-D85ESS-802 Bulldozer D85ESS
30-Dec-99 Shift I TJP-D85ESS-802 Bulldozer D85ESS
30-Dec-99 Shift I TJP-D85ESS-802 Bulldozer D85ESS
30-Dec-99 Shift I TJP-D85ESS-802 Bulldozer D85ESS
30-Dec-99 Shift I TJP-D85ESS-802 Bulldozer D85ESS
30-Dec-99 Shift I TJP-D85ESS-802 Bulldozer D85ESS
30-Dec-99 Shift I TJP-D85ESS-802 Bulldozer D85ESS
30-Dec-99 Shift I TJP-D85ESS-802 Bulldozer D85ESS
30-Dec-99 Shift I TJP-D85ESS-802 Bulldozer D85ESS
30-Dec-99 Shift I TJP-D85ESS-802 Bulldozer D85ESS
30-Dec-99 Shift I TJP-D85ESS-802 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-807 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-807 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-807 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-807 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-807 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-807 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-807 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-807 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-807 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-807 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-807 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-807 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-807 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-807 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-807 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-807 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-807 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-807 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-807 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-807 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-807 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-807 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-807 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-807 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-807 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-807 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-807 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-831 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-831 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-831 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-831 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-831 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-831 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-831 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-831 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-831 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-831 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-831 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-831 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-831 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-831 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-831 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-831 Bulldozer D85ESS
30-Dec-99 Shift II TJP-D85ESS-831 Bulldozer D85ESS
30-Dec-99 Shift II TJP-EX200-816 Excavator 200
30-Dec-99 Shift II TJP-EX200-816 Excavator 200
30-Dec-99 Shift II TJP-EX200-816 Excavator 200
30-Dec-99 Shift II TJP-EX200-816 Excavator 200
30-Dec-99 Shift II TJP-EX200-816 Excavator 200
30-Dec-99 Shift II TJP-EX200-816 Excavator 200
30-Dec-99 Shift II TJP-EX200-816 Excavator 200
30-Dec-99 Shift II TJP-EX200-816 Excavator 200
30-Dec-99 Shift II TJP-EX200-816 Excavator 200
30-Dec-99 Shift II TJP-EX200-816 Excavator 200
30-Dec-99 Shift II TJP-EX200-816 Excavator 200
30-Dec-99 Shift II TJP-EX200-816 Excavator 200
30-Dec-99 Shift II TJP-EX200-816 Excavator 200
30-Dec-99 Shift II TJP-EX200-816 Excavator 200
30-Dec-99 Shift II TJP-EX200-816 Excavator 200
30-Dec-99 Shift II TJP-EX200-816 Excavator 200
30-Dec-99 Shift II TJP-EX200-816 Excavator 200
30-Dec-99 Shift II TJP-EX200-816 Excavator 200
30-Dec-99 Shift II TJP-EX200-816 Excavator 200
30-Dec-99 Shift II TJP-EX200-816 Excavator 200
30-Dec-99 Shift II TJP-EX200-816 Excavator 200
30-Dec-99 Shift II TJP-EX200-816 Excavator 200
30-Dec-99 Shift II TJP-EX200-816 Excavator 200
30-Dec-99 Shift II TJP-EX200-816 Excavator 200
30-Dec-99 Shift II TJP-EX200-816 Excavator 200
30-Dec-99 Shift II TJP-EX200-816 Excavator 200
30-Dec-99 Shift II TJP-EX200-819 Excavator 200
30-Dec-99 Shift II TJP-EX200-819 Excavator 200
30-Dec-99 Shift II TJP-EX200-819 Excavator 200
30-Dec-99 Shift II TJP-EX200-819 Excavator 200
30-Dec-99 Shift II TJP-EX200-819 Excavator 200
30-Dec-99 Shift II TJP-EX200-819 Excavator 200
30-Dec-99 Shift II TJP-EX200-819 Excavator 200
30-Dec-99 Shift II TJP-EX200-819 Excavator 200
30-Dec-99 Shift II TJP-EX200-819 Excavator 200
30-Dec-99 Shift II TJP-EX200-819 Excavator 200
30-Dec-99 Shift II TJP-EX200-819 Excavator 200
30-Dec-99 Shift II TJP-EX200-819 Excavator 200
30-Dec-99 Shift II TJP-EX200-819 Excavator 200
30-Dec-99 Shift II TJP-EX200-819 Excavator 200
30-Dec-99 Shift II TJP-EX200-819 Excavator 200
30-Dec-99 Shift II TJP-EX200-819 Excavator 200
30-Dec-99 Shift II TJP-EX200-819 Excavator 200
30-Dec-99 Shift II TJP-EX200-819 Excavator 200
30-Dec-99 Shift II TJP-EX200-819 Excavator 200
30-Dec-99 Shift II TJP-EX200-819 Excavator 200
30-Dec-99 Shift II TJP-EX200-819 Excavator 200
30-Dec-99 Shift II TJP-EX200-819 Excavator 200
30-Dec-99 Shift II TJP-EX200-819 Excavator 200
30-Dec-99 Shift II TJP-EX200-819 Excavator 200
30-Dec-99 Shift II TJP-EX200-819 Excavator 200
30-Dec-99 Shift II TJP-EX200-819 Excavator 200
30-Dec-99 Shift II TJP-EX200-819 Excavator 200
30-Dec-99 Shift II TJP-EX200-819 Excavator 200
30-Dec-99 Shift II TJP-EX200-825 Excavator 200
30-Dec-99 Shift II TJP-EX200-825 Excavator 200
30-Dec-99 Shift II TJP-EX200-825 Excavator 200
30-Dec-99 Shift II TJP-EX200-825 Excavator 200
30-Dec-99 Shift II TJP-EX200-825 Excavator 200
30-Dec-99 Shift II TJP-EX200-825 Excavator 200
30-Dec-99 Shift II TJP-EX200-825 Excavator 200
30-Dec-99 Shift II TJP-EX200-825 Excavator 200
30-Dec-99 Shift II TJP-EX200-825 Excavator 200
30-Dec-99 Shift II TJP-EX200-825 Excavator 200
30-Dec-99 Shift II TJP-EX200-825 Excavator 200
30-Dec-99 Shift II TJP-EX200-825 Excavator 200
30-Dec-99 Shift II TJP-EX200-825 Excavator 200
30-Dec-99 Shift II TJP-EX200-825 Excavator 200
30-Dec-99 Shift II TJP-EX200-825 Excavator 200
30-Dec-99 Shift II TJP-EX200-825 Excavator 200
30-Dec-99 Shift II TJP-EX200-825 Excavator 200
30-Dec-99 Shift II TJP-EX200-825 Excavator 200
30-Dec-99 Shift II TJP-EX200-825 Excavator 200
30-Dec-99 Shift II TJP-EX200-825 Excavator 200
30-Dec-99 Shift II TJP-EX200-825 Excavator 200
30-Dec-99 Shift II TJP-EX200-825 Excavator 200
30-Dec-99 Shift II TJP-EX200-825 Excavator 200
30-Dec-99 Shift II TJP-EX200-825 Excavator 200
30-Dec-99 Shift II TJP-EX200-825 Excavator 200
30-Dec-99 Shift II TJP-EX200-825 Excavator 200
30-Dec-99 Shift II TJP-EX200-825 Excavator 200
30-Dec-99 Shift II TJP-EX200-825 Excavator 200
30-Dec-99 Shift II TJP-EX200-825 Excavator 200
30-Dec-99 Shift II TJP-EX200-825 Excavator 200
30-Dec-99 Shift II TJP-EX200-825 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-EX200-826 Excavator 200
30-Dec-99 Shift II TJP-MG535-872 Grader
30-Dec-99 Shift II TJP-MG535-872 Grader
30-Dec-99 Shift II TJP-MG535-872 Grader
30-Dec-99 Shift II TJP-MG535-872 Grader
30-Dec-99 Shift II TJP-MG535-872 Grader
30-Dec-99 Shift II TJP-MG535-872 Grader
30-Dec-99 Shift II TJP-MG535-872 Grader
30-Dec-99 Shift II TJP-MG535-872 Grader
30-Dec-99 Shift II TJP-MG535-872 Grader
30-Dec-99 Shift II TJP-MG535-872 Grader
30-Dec-99 Shift II TJP-MG535-872 Grader
30-Dec-99 Shift II TJP-MG535-872 Grader
30-Dec-99 Shift II TJP-MG535-872 Grader
30-Dec-99 Shift II TJP-MG535-872 Grader
30-Dec-99 Shift II TJP-MG535-872 Grader
30-Dec-99 Shift II TJP-MG535-872 Grader
30-Dec-99 Shift II TJP-MG535-872 Grader
30-Dec-99 Shift II TJP-MG535-872 Grader
30-Dec-99 Shift II TJP-MG535-872 Grader
30-Dec-99 Shift II TJP-MG535-872 Grader
30-Dec-99 Shift II TJP-MG535-872 Grader
30-Dec-99 Shift II TJP-MG535-872 Grader
30-Dec-99 Shift II TJP-MG535-872 Grader
30-Dec-99 Shift II TJP-MG535-872 Grader
30-Dec-99 Shift II TJP-MG535-872 Grader
30-Dec-99 Shift II TJP-MG535-872 Grader
30-Dec-99 Shift II TJP-MG535-872 Grader
30-Dec-99 Shift II TJP-MG535-872 Grader
30-Dec-99 Shift II TJP-CP525-875 Compact
30-Dec-99 Shift II TJP-CP525-875 Compact
30-Dec-99 Shift II TJP-CP525-875 Compact
30-Dec-99 Shift II TJP-CP525-875 Compact
30-Dec-99 Shift II TJP-CP525-875 Compact
30-Dec-99 Shift II TJP-CP525-875 Compact
30-Dec-99 Shift II TJP-CP525-875 Compact
30-Dec-99 Shift II TJP-CP525-875 Compact
30-Dec-99 Shift II TJP-CP525-875 Compact
30-Dec-99 Shift II TJP-CP525-875 Compact
30-Dec-99 Shift II TJP-CP525-875 Compact
30-Dec-99 Shift II TJP-CP525-875 Compact
30-Dec-99 Shift II TJP-CP525-875 Compact
30-Dec-99 Shift II TJP-CP525-875 Compact
30-Dec-99 Shift II TJP-CP525-875 Compact
30-Dec-99 Shift II TJP-CP525-875 Compact
30-Dec-99 Shift II TJP-CP525-875 Compact
30-Dec-99 Shift II TJP-CP525-875 Compact
30-Dec-99 Shift II TJP-CP525-875 Compact
30-Dec-99 Shift II TJP-CP525-875 Compact
30-Dec-99 Shift II TJP-CP525-875 Compact
30-Dec-99 Shift II TJP-CP525-875 Compact
30-Dec-99 Shift II TJP-CP525-875 Compact
30-Dec-99 Shift II TJP-CP525-875 Compact
30-Dec-99 Shift II TJP-CP525-875 Compact
30-Dec-99 Shift II TJP-CP525-875 Compact
30-Dec-99 Shift II TJP-CP525-875 Compact
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-WT-874 Water Truck
30-Dec-99 Shift II TJP-DT30T-974 DT30 Ton
30-Dec-99 Shift II TJP-DT30T-974 DT30 Ton
30-Dec-99 Shift II TJP-DT30T-932 DT30 Ton
30-Dec-99 Shift II TJP-EX200-818 Excavator 200
30-Dec-99 Shift II TJP-EX200-818 Excavator 200
30-Dec-99 Shift II TJP-EX200-818 Excavator 200
30-Dec-99 Shift II TJP-EX200-818 Excavator 200
30-Dec-99 Shift II TJP-EX200-818 Excavator 200
30-Dec-99 Shift II TJP-EX200-818 Excavator 200
30-Dec-99 Shift II TJP-EX200-818 Excavator 200
30-Dec-99 Shift II TJP-EX200-818 Excavator 200
30-Dec-99 Shift II TJP-EX200-818 Excavator 200
30-Dec-99 Shift II TJP-EX200-818 Excavator 200
30-Dec-99 Shift II TJP-EX200-818 Excavator 200
30-Dec-99 Shift II TJP-EX200-818 Excavator 200
30-Dec-99 Shift II TJP-EX200-818 Excavator 200
30-Dec-99 Shift II TJP-EX200-818 Excavator 200
30-Dec-99 Shift II TJP-EX200-818 Excavator 200
30-Dec-99 Shift II TJP-EX200-818 Excavator 200
30-Dec-99 Shift II TJP-EX200-818 Excavator 200
30-Dec-99 Shift II TJP-EX200-818 Excavator 200
30-Dec-99 Shift II TJP-EX200-818 Excavator 200
30-Dec-99 Shift II TJP-EX200-818 Excavator 200
30-Dec-99 Shift II TJP-EX200-818 Excavator 200
30-Dec-99 Shift II TJP-EX200-818 Excavator 200
30-Dec-99 Shift II TJP-EX200-818 Excavator 200
30-Dec-99 Shift II TJP-EX200-818 Excavator 200
30-Dec-99 Shift II TJP-EX200-818 Excavator 200
30-Dec-99 Shift II TJP-EX200-818 Excavator 200
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-821 Excavator 300
30-Dec-99 Shift II TJP-EX300-817 Excavator 300
30-Dec-99 Shift II TJP-EX300-817 Excavator 300
30-Dec-99 Shift II TJP-EX300-817 Excavator 300
30-Dec-99 Shift II TJP-EX300-817 Excavator 300
30-Dec-99 Shift II TJP-EX400-810 Excavator 400
30-Dec-99 Shift II TJP-EX400-810 Excavator 400
30-Dec-99 Shift II TJP-EX400-810 Excavator 400
30-Dec-99 Shift II TJP-EX400-810 Excavator 400
30-Dec-99 Shift II TJP-EX400-810 Excavator 400
30-Dec-99 Shift II TJP-EX400-810 Excavator 400
30-Dec-99 Shift II TJP-EX400-810 Excavator 400
30-Dec-99 Shift II TJP-EX400-810 Excavator 400
30-Dec-99 Shift II TJP-EX400-810 Excavator 400
30-Dec-99 Shift II TJP-EX400-810 Excavator 400
30-Dec-99 Shift II TJP-EX400-810 Excavator 400
30-Dec-99 Shift II TJP-EX400-810 Excavator 400
30-Dec-99 Shift II TJP-EX400-810 Excavator 400
30-Dec-99 Shift II TJP-EX400-810 Excavator 400
30-Dec-99 Shift II TJP-EX400-810 Excavator 400
30-Dec-99 Shift II TJP-EX400-810 Excavator 400
30-Dec-99 Shift II TJP-EX400-810 Excavator 400
30-Dec-99 Shift II TJP-EX400-810 Excavator 400
30-Dec-99 Shift II TJP-EX400-810 Excavator 400
30-Dec-99 Shift II TJP-EX400-810 Excavator 400
30-Dec-99 Shift II TJP-EX400-810 Excavator 400
30-Dec-99 Shift II TJP-EX400-810 Excavator 400
30-Dec-99 Shift II TJP-EX400-810 Excavator 400
30-Dec-99 Shift II TJP-EX400-810 Excavator 400
30-Dec-99 Shift II TJP-EX400-810 Excavator 400
30-Dec-99 Shift II TJP-EX400-810 Excavator 400
30-Dec-99 Shift II TJP-EX400-810 Excavator 400
30-Dec-99 Shift II TJP-EX400-810 Excavator 400
30-Dec-99 Shift II TJP-EX400-810 Excavator 400
30-Dec-99 Shift II TJP-EX400-810 Excavator 400
30-Dec-99 Shift II TJP-EX400-810 Excavator 400
30-Dec-99 Shift II TJP-EX400-811 Excavator 400
30-Dec-99 Shift II TJP-EX400-811 Excavator 400
30-Dec-99 Shift II TJP-EX400-811 Excavator 400
30-Dec-99 Shift II TJP-EX400-811 Excavator 400
30-Dec-99 Shift II TJP-EX400-811 Excavator 400
30-Dec-99 Shift II TJP-EX400-811 Excavator 400
30-Dec-99 Shift II TJP-EX400-811 Excavator 400
30-Dec-99 Shift II TJP-EX400-811 Excavator 400
30-Dec-99 Shift II TJP-EX400-811 Excavator 400
30-Dec-99 Shift II TJP-EX400-811 Excavator 400
30-Dec-99 Shift II TJP-EX400-811 Excavator 400
30-Dec-99 Shift II TJP-EX400-811 Excavator 400
30-Dec-99 Shift II TJP-EX400-811 Excavator 400
30-Dec-99 Shift II TJP-EX400-811 Excavator 400
30-Dec-99 Shift II TJP-EX400-815 Excavator 400
30-Dec-99 Shift II TJP-EX400-815 Excavator 400
30-Dec-99 Shift II TJP-EX400-815 Excavator 400
30-Dec-99 Shift II TJP-EX400-815 Excavator 400
30-Dec-99 Shift II TJP-EX400-815 Excavator 400
30-Dec-99 Shift II TJP-EX400-815 Excavator 400
30-Dec-99 Shift II TJP-EX400-815 Excavator 400
30-Dec-99 Shift II TJP-EX400-815 Excavator 400
30-Dec-99 Shift II TJP-EX400-815 Excavator 400
30-Dec-99 Shift II TJP-EX400-815 Excavator 400
30-Dec-99 Shift II TJP-EX400-815 Excavator 400
30-Dec-99 Shift II TJP-EX400-815 Excavator 400
30-Dec-99 Shift II TJP-EX400-815 Excavator 400
30-Dec-99 Shift II TJP-EX400-815 Excavator 400
30-Dec-99 Shift II TJP-EX400-815 Excavator 400
30-Dec-99 Shift II TJP-EX400-815 Excavator 400
30-Dec-99 Shift II TJP-EX400-815 Excavator 400
30-Dec-99 Shift II TJP-EX400-815 Excavator 400
30-Dec-99 Shift II TJP-EX400-815 Excavator 400
30-Dec-99 Shift II TJP-EX400-815 Excavator 400
30-Dec-99 Shift II TJP-EX400-815 Excavator 400
30-Dec-99 Shift II TJP-EX470-851 Excavator 400
30-Dec-99 Shift II TJP-EX470-851 Excavator 400
30-Dec-99 Shift II TJP-EX470-853 Excavator 400
30-Dec-99 Shift II TJP-EX470-853 Excavator 400
30-Dec-99 Shift II TJP-EX470-853 Excavator 400
30-Dec-99 Shift II TJP-EX470-853 Excavator 400
30-Dec-99 Shift II TJP-EX470-853 Excavator 400
30-Dec-99 Shift II TJP-EX470-853 Excavator 400
30-Dec-99 Shift II TJP-EX470-853 Excavator 400
30-Dec-99 Shift II TJP-EX470-853 Excavator 400
30-Dec-99 Shift II TJP-EX470-854 Excavator 400
30-Dec-99 Shift II TJP-EX470-854 Excavator 400
30-Dec-99 Shift II TJP-EX470-854 Excavator 400
30-Dec-99 Shift II TJP-EX470-854 Excavator 400
30-Dec-99 Shift II TJP-EX470-854 Excavator 400
30-Dec-99 Shift II TJP-EX470-854 Excavator 400
30-Dec-99 Shift II TJP-EX470-854 Excavator 400
30-Dec-99 Shift II TJP-EX470-854 Excavator 400
30-Dec-99 Shift II TJP-EX470-854 Excavator 400
30-Dec-99 Shift II TJP-EX470-854 Excavator 400
30-Dec-99 Shift II TJP-EX470-854 Excavator 400
30-Dec-99 Shift II TJP-EX470-854 Excavator 400
30-Dec-99 Shift II TJP-EX470-854 Excavator 400
30-Dec-99 Shift II TJP-EX470-854 Excavator 400
30-Dec-99 Shift II TJP-EX470-854 Excavator 400
30-Dec-99 Shift II TJP-EX470-854 Excavator 400
30-Dec-99 Shift II TJP-EX470-854 Excavator 400
30-Dec-99 Shift II TJP-EX470-854 Excavator 400
30-Dec-99 Shift II TJP-EX470-854 Excavator 400
30-Dec-99 Shift II TJP-EX470-854 Excavator 400
30-Dec-99 Shift II TJP-EX470-854 Excavator 400
30-Dec-99 Shift II TJP-EX470-854 Excavator 400
30-Dec-99 Shift II TJP-EX470-855 Excavator 400
30-Dec-99 Shift II TJP-EX470-855 Excavator 400
30-Dec-99 Shift II TJP-EX470-855 Excavator 400
30-Dec-99 Shift II TJP-EX470-855 Excavator 400
30-Dec-99 Shift II TJP-EX470-855 Excavator 400
30-Dec-99 Shift II TJP-EX470-855 Excavator 400
30-Dec-99 Shift II TJP-EX470-855 Excavator 400
30-Dec-99 Shift II TJP-EX470-855 Excavator 400
30-Dec-99 Shift II TJP-EX470-855 Excavator 400
30-Dec-99 Shift II TJP-EX470-855 Excavator 400
30-Dec-99 Shift II TJP-EX470-855 Excavator 400
30-Dec-99 Shift II TJP-EX470-855 Excavator 400
30-Dec-99 Shift II TJP-EX470-855 Excavator 400
30-Dec-99 Shift II TJP-EX470-855 Excavator 400
30-Dec-99 Shift II TJP-EX470-855 Excavator 400
30-Dec-99 Shift II TJP-EX470-855 Excavator 400
30-Dec-99 Shift II TJP-EX470-855 Excavator 400
30-Dec-99 Shift II TJP-EX470-855 Excavator 400
30-Dec-99 Shift II TJP-EX470-855 Excavator 400
30-Dec-99 Shift II TJP-EX349-856 Excavator 400
30-Dec-99 Shift II TJP-EX349-856 Excavator 400
30-Dec-99 Shift II TJP-EX349-856 Excavator 400
30-Dec-99 Shift II TJP-EX349-858 Excavator 400
30-Dec-99 Shift II TJP-EX349-858 Excavator 400
30-Dec-99 Shift II TJP-EX349-858 Excavator 400
30-Dec-99 Shift II TJP-EX349-858 Excavator 400
Total HM No Operator Maintenance Time SCOPE JOB REMARK
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
-0.3 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
-0.5 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
-0.5 0 0 Reslope 0
0 0 0 Reslope 0
-0.3 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
-1.5 0 4.3 Reslope 0
-0.3 0 0 Reslope 0
0 0 0 Reslope 0
-0.5 0 0 Swampy forest 0
-2 0 0 Swampy forest 0
0 0 0 Swampy forest 0
0 0 0 Swampy forest 0
0 0 0 Swampy forest 0
0 0 0 Swampy forest 0
0 0 0 Swampy forest 0
0 0 0 Swampy forest 0
0 0 0 Swampy forest 0
0 0 0 Swampy forest 0
0 0 0 Swampy forest 0
0 0 0 Swampy forest 0
0 0 0 Swampy forest 0
-0.1 0 0 Reslope 0
-0.1 0 0 Reslope 0
-0.2 0 0 Reslope 0
0 0 0 Reslope 0
-0.2 0 0 Reslope 0
-0.3 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
-5.5 0 0 Reslope 0
0 0 0 Reslope 0
-0.2 0 0 Reslope 0
-0.3 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
0 0 0 Reslope 0
-0.3 0 0 Reslope 0
-0.1 0 0 Reslope 0
0 0 0 Reslope 0
-0.9 0 0 Reslope 0
-0.2 0 0 Reslope 0
0 0 0 Top Soil 0
-0.2 0 0 Top Soil 0
-0.2 0 0 Top Soil 0
0 0 0 Top Soil 0
0 0 9.1 Top Soil 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 catchment area 0
0 0 0 catchment area 0
0 0 0 catchment area 0
0 0 0 catchment area 0
0 0 0 catchment area 0
0 0 0 catchment area 0
0 0 0 catchment area 0
0 0 0 catchment area 0
0 0 0 catchment area 0
0 0 0 catchment area 0
0 0 0 catchment area 0
0 0 0 catchment area 0
0 0 0 catchment area 0
0 0 0 catchment area 0
0 0 5.9 catchment area 0
0 0 5 catchment area 0
0 0 0 catchment area 0
0 0 0 catchment area 0
0 0 0 catchment area 0
0 0 0 catchment area 0
0 0 0 catchment area 0
0 0 0 catchment area 0
0 0 0 catchment area 0
0 0 0 catchment area 0
0 0 0 catchment area 0
0 0 0 catchment area 0
0 0 0 catchment area 0
0 0 0 catchment area 0
0 0 0 catchment area 0
0 0 0 catchment area 0
0 0 0 catchment area 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Cut Channel 0
-0.1 0 0 Cut Channel 0
0 0 0 Cut Channel 0
0 0 0 Swampy forest 0
0 0 0 Swampy forest 0
0 0 0 Loading Port 0
0 0 0 Loading Port 0
-0.1 0 0 Loading Port 0
0 0 0 Loading Port 0
0 0 0 Loading Port 0
0 0 0 Loading Port 0
0 0 0 Loading Port 0
0 0 0 Coal Processing 0
0 0 0 Coal Processing 0
-0.1 0 0 Coal Processing 0
0 0 0 Coal Processing 0
-0.1 0 0 Coal Processing 0
0 0 0 Coal Processing 0
0 0 0 Coal Processing 0
0 0 0 Coal Processing 0
-0.1 0 0 Coal Processing 0
0 0 0 Coal Processing 0
-0.1 0 0 Coal Processing 0
0 0 0 Coal Processing 0
0 0 0 Coal Processing 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance ComDev
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 3.2 Road Maintenance 0
0 0 8 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
11 0 0 Road Maintenance 0
2.2 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
25.1 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
11 0 0 Road Maintenance 0
49.4 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
11 0 0 Road Maintenance 0
38.1 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
11 0 0 Road Maintenance 0
23.2 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
11 0 0 Road Maintenance 0
25.6 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
10 0 0 Road Maintenance 0
22 0 0 Road Maintenance 0
6 0 0 Road Maintenance 0
2.2 0 0 Road Maintenance 0
11 0 0 Road Maintenance 0
2.6 0 0 Road Maintenance 0
11 0 0 Road Maintenance 0
3.1 0 0 Road Maintenance 0
10.6 0 0 Road Maintenance 0
2.1 0 0 Road Maintenance 0
11 0 0 Road Maintenance 0
1.4 0 0 Road Maintenance 0
4.05 0 0 Sand Removal 0
0.65 0 0 Sand Removal 0
2.7 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 7 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 7.4 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 4.4 Road Maintenance 0
0 0 6 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 6.3 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Road Maintenance 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
-1 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
-2 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Sand Removal 0
0 0 0 Loading Port 0
0 0 0 Loading Port 0
0 0 0 Loading Port 0
0 0 0 Loading Port 0
0 0 0 Loading Port 0
0 0 0 Loading Port 0
1 0 0 Coal Loading 0
6.36 0 0 Coal Loading 0
2.08 0 0 Coal Loading 0
7.43 0 0 Coal Loading 0
8.44 0 0 Coal Loading 0
0.71 0 0 Coal Loading 0
8.6 0 0 Coal Loading 0
9.7 0 0 Coal Loading 0
10.1 0 0 Coal Loading 0
1.3 0 0 Coal Loading 0
6.7 0 0 Coal Loading 0
8.5 0 0 Coal Loading 0
10 0 0 Coal Loading 0
9.76 0 0 Coal Loading 0
8.33 0 0 Coal Loading 0
3.6 0 0 Coal Loading 0
9.4 0 0 Coal Loading 0
11.01 0 0 Coal Loading 0
11 0 0 Coal Loading 0
11 0 0 Coal Loading 0
11 0 0 Coal Loading 0
11 0 0 Coal Loading 0
8.57 0 0 Coal Loading 0
11.03 0 0 Coal Loading 0
11 0 0 Coal Loading 0
8.81 0 0 Coal Loading 0
10.99 0 0 Coal Loading 0
8.94 0 0 Coal Loading 0
10.96 0 0 Coal Loading 0
10.35 0 0 Coal Loading 0
11.05 0 0 Coal Loading 0
7.72 0 0 Coal Loading 0
9.06 0 0 Coal Loading 0
1.7 0 0 Coal Loading 0
8.27 0 0 Coal Loading 0
3.82 0 0 Coal Loading 0
2.76 0 0 Coal Loading 0
0.89 0 0 Coal Loading 0
2.8 0 0 Coal Loading 0
2.9 0 0 Coal Loading 0
4.4 0 0 Coal Loading 0
4.7 0 0 Coal Loading 0
4.42 0 0 Coal Loading 0
4.75 0 0 Coal Loading 0
4.7 0 0 Coal Loading 0
2.3 0 0 Coal Loading 0
2.6 0 0 Coal Loading 0
0.36 0 0 Coal Loading 0
0.1 0 0 Coal Loading 0
6.65 0 0 Coal Loading 0
7.5 0 0 Coal Loading 0
0.52 0 0 Coal Loading 0
8.97 0 0 Coal Loading 0
7 0 0 Coal Loading 0
4.6 0 0 Coal Loading 0
6.1 0 0 Coal Loading 0
10 0 0 Coal Loading 0
0.56 0 0 Coal Loading 0
5.9 0 0 Coal Loading 0
0.8 0 0 Coal Loading 0
5.9 0 0 Coal Loading 0
6.2 0 0 Coal Loading 0
4.4 0 0 Coal Loading 0
7.1 0 0 Coal Loading 0
5.9 0 0 Coal Loading 0
7.2 0 0 Coal Loading 0
6.9 0 0 Coal Loading 0
7.3 0 0 Coal Loading 0
1.2 0 0 Coal Loading 0
0.1 0 0 Coal Loading 0
2.86 0 0 Coal Loading 0
1.15 0 0 Coal Loading 0
8.21 0 0 Coal Loading 0
1.6 0 0 Coal Loading 0
1.5 0 0 Water Management 0
3.3 0 0 Coal Loading 0
5.79 0 0 Coal Loading 0
9.13 0 0 Coal Loading 0
9.17 0 0 Coal Loading 0
8.86 0 0 Coal Loading 0
10.97 0 0 Coal Loading 0
9.87 0 0 Coal Loading 0
11 0 0 Coal Loading 0
7.33 0 0 Coal Loading 0
5.8 0 0 Coal Loading 0
10.18 0 0 Coal Loading 0
8.58 0 0 Coal Loading 0
7.31 0 0 Coal Loading 0
11 0 0 Coal Loading 0
3.7 0 0 Coal Loading 0
11 0 0 Coal Loading 0
6.77 0 0 Coal Loading 0
11 0 0 Coal Loading 0
2.32 0 0 Coal Loading 0
9.5 0 0 Coal Loading 0
9.71 0 0 Coal Loading 0
1.16 0 0 Coal Loading 0
8.1 0 0 Coal Loading 0
9.4 0 0 Coal Loading 0
11 0 0 Coal Loading 0
8.71 0 0 Coal Loading 0
3.69 0 0 Coal Loading 0
0.33 0 0 Coal Loading 0
6.3 0 0 Coal Loading 0
0.67 0 0 Coal Loading 0
8.8 0 0 Coal Loading 0
10.9 0 0 Coal Loading 0
7.78 0 0 Coal Loading 0
3.21 0 0 Coal Loading 0
5.3 0 0 Coal Loading 0
7.8 0 0 Coal Loading 0
11 0 0 Coal Loading 0
2.3 0 0 Coal Loading 0
2.3 0 0 Coal Loading 0
4.04 0 0 Coal Loading 0
1.5 0 0 Coal Loading 0
4.3 0 0 Coal Loading 0
7.05 0 0 Coal Loading 0
8.12 0 0 Coal Loading 0
6.5 0 0 Coal Loading 0
5.2 0 0 Coal Loading 0
0.89 0 0 Coal Loading 0
0.1 0 0 Coal Loading 0
0.71 0 0 Coal Loading 0
1.16 0 0 Coal Loading 0
1 0 0 Coal Loading 0
0.4 0 0 Coal Loading 0
2.24 0 0 Coal Loading 0
PT. JORONG
MO
RENTAL

WORKING HOUR
HOURS TOTAL METER
TOTAL
DATE WORKING HM
START STOP HOURS START STOP

Shift I 0.00 7318.7 7318.7 0.0


#VALUE! 0.00
Shift II 0.00 7318.7 7318.7 0.0
Shift I 0.00 7318.7 7318.7 0.0
#VALUE! 0.00
Shift II 0.00 7318.7 7318.7 0.0
Shift I 0.00 7318.7 7318.7 0.0
#VALUE! 0.00
Shift II 0.00 7318.7 7318.7 0.0
Shift I 0.00 7318.7 7318.7 -0.3
#VALUE! 0.00
Shift II 0.00 7318.7 7318.7 0.0
Shift I 0.00 7318.7 7318.7 0.0
#VALUE! 0.00
Shift II 0.00 7318.7 7318.7 0.0
Shift I 0.00 7318.7 7318.7 0.0
#VALUE! 0.00
Shift II 0.00 7318.7 7318.7 0.0
Shift I 0.00 7318.7 7318.7 0.0
#VALUE! 0.00
Shift II 0.00 7318.7 7318.7 0.0
Shift I 0.00 7318.7 7318.7 0.0
#VALUE! 0.00
Shift II 0.00 7318.7 7318.7 0.0
Shift I 0.00 7318.7 7318.7 0.0
#VALUE! 0.00
Shift II 0.00 7318.7 7318.7 0.0
Shift I 0.00 7318.7 7318.7 0.0
#VALUE! 0.00
Shift II 0.00 7318.7 7318.7 0.0
Shift I 0.00 7318.7 7318.7 0.0
#VALUE! 0.00
#VALUE! 0.00
Shift II 0.00 7318.7 7318.7 0.0
Shift I 0.00 7318.7 7318.7 -0.5
#VALUE! 0.00
Shift II 0.00 7318.7 7318.7 0.0
Shift I 0.00 7318.7 7318.7 0.0
#VALUE! 0.00
Shift II 0.00 7318.7 7318.7 0.0
Shift I 0.00 7318.7 7318.7 0.0
#VALUE! 0.00
Shift II 0.00 7318.7 7318.7 0.0
Shift I 0.00 7318.7 7318.7 -0.5
#VALUE! 0.00
Shift II 0.00 7318.7 7318.7 0.0
Shift I 0.00 7318.7 7318.7 0.0
#VALUE! 0.00
Shift II 0.00 7318.7 7318.7 0.0
Shift I 0.00 7318.7 7318.7 0.0
#VALUE! 0.00
Shift II 0.00 7318.7 7318.7 0.0
Shift I 0.00 7318.7 7318.7 -0.3
#VALUE! 0.00
Shift II 0.00 7318.7 7318.7 0.0
Shift I 0.00 7318.7 7318.7 0.0
#VALUE! 0.00
Shift II 0.00 7318.7 7318.7 0.0
Shift I 0.00 7318.7 7318.7 0.0
#VALUE! 0.00
Shift II 0.00 7318.7 7318.7 0.0
Shift I 0.00 7318.7 7318.7 0.0
#VALUE! 0.00
Shift II 0.00 7318.7 7318.7 0.0
Shift I 0.00 7318.7 7318.7 0.0
#VALUE! 0.00
Shift II 0.00 7318.7 7318.7 0.0
Shift I 0.00 7318.7 7318.7 0.0
#VALUE! 0.00
Shift II 0.00 7318.7 7318.7 0.0
Shift I 0.00 7318.7 7318.7 0.0
#VALUE! 0.00
Shift II 0.00 7318.7 7318.7 0.0
Shift I 0.00 7318.7 7318.7 0.0
#VALUE! 0.00
Shift II 0.00 7318.7 7318.7 0.0
Shift I 0.00 7318.7 7318.7 0.0
#VALUE! 0.00
Shift II 0.00 7318.7 7318.7 0.0
Shift I 0.00 7318.7 7318.7 0.0
#VALUE! 0.00
Shift II 0.00 7318.7 7318.7 0.0
Shift I 0.00 7318.7 7318.7 0.0
#VALUE! 0.00
Shift II 0.00 7318.7 7318.7 0.0
Shift I 7318.7 7318.7 0.0
#VALUE!
Shift II 7318.7 7318.7 0.0
Shift I 7318.7 7318.7 0.0
#VALUE!
Shift II 7318.7 7318.7 0.0
Total 0.00 -1.60

Approved By, Checked By,

Catur Cahyadi Yamani


Mine Operation Head Revegetation Section Chief
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019

Schedule Time 334.00 Required MA % (MIN)


Maintenance Actual 0.00 Actual MA%
No Operator 0.00 Penalty due to Low MA% (Hours)
Working Hour -1.60 Penalty due to No Operator (Hours)
T. JORONG BARUTAMA GRESTON
MONTHLY REPORT
RENTAL HEAVY EQUIPMENT
LOSS TIME
IDLE Delay
TOTAL
HM No Mtc.
Schedule Not No Time
Required Operator Rainfall Others Travel

2.0 0.0 10.0 0.0


0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.3 0.0
-0.3
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.5 0.0
-0.5
2.0 0.0 10.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.5 0.0
-0.5
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.3 0.0
-0.3
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
-1.60 410.00 0.00 0.00 0.00 335.60 0.00 0.00

Jorong, January 22, 2020


Checked By, Approved

Supianoor Hiras P Tind


Chief Mine Operation Support PJO. PT.T
019 Date: xxxxx/xxxxx/2019 Date: xxxxx/xxx

80%
100%
ours) No Penalty
(Hours) No Penalty
Owner #VALUE!
Unit #VALUE!
Period #VALUE!

Delay
LOSS Location SCOPE JOB Remaks
HM
Others

Reslope

Reslope

Reslope

0.3 Reslope

Reslope

Reslope

Reslope

Reslope

Reslope

Reslope

Reslope
0.5 Reslope

Reslope

Reslope

0.5 Reslope

Reslope

0.3 Reslope

Reslope

Reslope

Reslope

Reslope

Reslope

Reslope
Reslope

Reslope

Reslope

Reslope

Reslope

0.00 1.60

Approved By, Prepared By,

Hiras P Tindaon ____________________


PJO. PT.TJP Data Center PT. TJP
e: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
PT. JORONG
MO
RENTAL

WORKING HOUR
HOURS TOTAL METER
TOTAL
DATE WORKING HM
START STOP HOURS START STOP

Shift I 0.00 1039.4 1039.4 0.0


#VALUE! 0.00
Shift II 0.00 1039.4 1039.4 0.0
Shift I 0.00 1039.4 1039.4 0.0
#VALUE! 0.00
Shift II 0.00 1039.4 1039.4 0.0
Shift I 0.00 1039.4 1039.4 0.0
#VALUE! 0.00
Shift II 0.00 1039.4 1039.4 0.0
Shift I 0.00 1039.4 1039.4 0.0
#VALUE! 0.00
Shift II 0.00 1039.4 1039.4 0.0
Shift I 0.00 1039.4 1039.4 0.0
#VALUE! 0.00
Shift II 0.00 1039.4 1039.4 0.0
Shift I 0.00 1039.4 1039.4 0.0
#VALUE! 0.00
Shift II 0.00 1039.4 1039.4 0.0
Shift I 0.00 1039.4 1039.4 0.0
#VALUE! 0.00
Shift II 0.00 1039.4 1039.4 0.0
Shift I 0.00 1039.4 1039.4 0.0
#VALUE! 0.00
Shift II 0.00 1039.4 1039.4 0.0
Shift I 0.00 1039.4 1039.4 0.0
#VALUE! 0.00
Shift II 0.00 1039.4 1039.4 0.0
Shift I 0.00 1039.4 1039.4 0.0
#VALUE! 0.00
Shift II 0.00 1039.4 1039.4 0.0
Shift I 0.00 1039.4 1039.4 0.0
#VALUE! 0.00
#VALUE! 0.00
Shift II 0.00 1039.4 1039.4 0.0
Shift I 0.00 1039.4 1039.4 0.0
#VALUE! 0.00
Shift II 0.00 1039.4 1039.4 0.0
Shift I 0.00 1039.4 1039.4 0.0
#VALUE! 0.00
Shift II 0.00 1039.4 1039.4 0.0
Shift I 0.00 1039.4 1039.4 0.0
#VALUE! 0.00
Shift II 0.00 1039.4 1039.4 0.0
Shift I 0.00 1039.4 1039.4 0.0
#VALUE! 0.00
Shift II 0.00 1039.4 1039.4 0.0
Shift I 0.00 1039.4 1039.4 0.0
#VALUE! 0.00
Shift II 0.00 1039.4 1039.4 0.0
Shift I 0.00 1039.4 1039.4 0.0
#VALUE! 0.00
Shift II 0.00 1039.4 1039.4 0.0
Shift I 0.00 1039.4 1039.4 0.0
#VALUE! 0.00
Shift II 0.00 1039.4 1039.4 0.0
Shift I 0.00 1039.4 1039.4 0.0
#VALUE! 0.00
Shift II 0.00 1039.4 1039.4 0.0
Shift I 0.00 1039.4 1039.4 0.0
#VALUE! 0.00
Shift II 0.00 1039.4 1039.4 0.0
Shift I 0.00 1039.4 1039.4 0.0
#VALUE! 0.00
Shift II 0.00 1039.4 1039.4 0.0
Shift I 0.00 1039.4 1039.4 0.0
#VALUE! 0.00
Shift II 0.00 1039.4 1039.4 0.0
Shift I 0.00 1039.4 1039.4 0.0
#VALUE! 0.00
Shift II 0.00 1039.4 1039.4 0.0
Shift I 0.00 1039.4 1039.4 0.0
#VALUE! 0.00
Shift II 0.00 1039.4 1039.4 0.0
Shift I 0.00 1039.4 1039.4 0.0
#VALUE! 0.00
Shift II 0.00 1039.4 1039.4 0.0
Shift I 0.00 1039.4 1039.4 0.0
#VALUE! 0.00
Shift II 0.00 1039.4 1039.4 0.0
Shift I 0.00 1039.4 1039.4 0.0
#VALUE! 0.00
Shift II 0.00 1039.4 1039.4 0.0
Shift I 0.00 1039.4 1039.4 0.0
#VALUE! 0.00
Shift II 0.00 1039.4 1039.4 0.0
Shift I 1039.4 1039.4 0.0
#VALUE!
Shift II 1039.4 1039.4 0.0
Shift I 1039.4 1039.4 0.0
#VALUE!
Shift II 1039.4 1039.4 0.0
Total 0.00 0.00

Approved By, Checked By,

Catur Cahyadi Yamani


Mine Operation Head Revegetation Section Chief
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019

Schedule Time 324.00 Required MA % (MIN)


Maintenance Actual 0.00 Actual MA%
No Operator 0.00 Penalty due to Low MA% (Hours)
Working Hour 0.00 Penalty due to No Operator (Hours)
T. JORONG BARUTAMA GRESTON
MONTHLY REPORT
RENTAL HEAVY EQUIPMENT
LOSS TIME
IDLE Delay
TOTAL
HM No Mtc.
Schedule Not No Time
Required Operator Rainfall Others Travel

2.0 0.0 10.0 0.0


0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
0.00 420.00 0.00 0.00 0.00 324.00 0.00 0.00

Jorong, January 22, 2020


Checked By, Approved

Supianoor Hiras P Tind


Chief Mine Operation Support PJO. PT.T
019 Date: xxxxx/xxxxx/2019 Date: xxxxx/xxx

80%
100%
ours) No Penalty
(Hours) No Penalty
Owner #VALUE!
Unit #VALUE!
Period #VALUE!

Delay
LOSS Location SCOPE JOB Remaks
HM
Others

Reslope

Reslope

Reslope

Reslope

Reslope

Reslope

Reslope

Reslope

Reslope

Reslope

Reslope
Reslope

Reslope

Reslope

Reslope

Reslope

Reslope

Reslope

Reslope

Reslope

Reslope

Reslope
Reslope

Reslope

Reslope

Reslope

Reslope

0.00 0.00

Approved By, Prepared By,

Hiras P Tindaon ____________________


PJO. PT.TJP Data Center PT. TJP
e: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
PT. JORONG
MO
RENTAL

WORKING HOUR
HOURS TOTAL METER
TOTAL
DATE WORKING HM
START STOP HOURS START STOP

Shift I 0.00 2260.0 2260.0 0.0


#VALUE! 0.00
Shift II 0.00 2260.0 2260.0 0.0
Shift I 0.00 2260.0 2260.0 0.0
#VALUE! 0.00
Shift II 0.00 2260.0 2260.0 0.0
Shift I 0.00 2260.0 2260.0 0.0
#VALUE! 0.00
Shift II 0.00 2260.0 2260.0 0.0
Shift I 0.00 2260.0 2260.0 0.0
#VALUE! 0.00
Shift II 0.00 2260.0 2260.0 0.0
Shift I 0.00 2260.0 2260.0 0.0
#VALUE! 0.00
Shift II 0.00 2260.0 2260.0 0.0
Shift I 0.00 2260.0 2260.0 -1.5
#VALUE! 0.00
Shift II 0.00 2260.0 2260.0 0.0
Shift I 0.00 2260.0 2260.0 -0.3
#VALUE! 0.00
Shift II 0.00 2260.0 2260.0 0.0
Shift I 0.00 2260.0 2260.0 0.0
#VALUE! 0.00
Shift II 0.00 2260.0 2260.0 0.0
Shift I 0.00 2260.0 2260.0 0.0
#VALUE! 0.00
Shift II 0.00 2260.0 2260.0 0.0
Shift I 0.00 2260.0 2260.0 0.0
#VALUE! 0.00
Shift II 0.00 2260.0 2260.0 0.0
Shift I 0.00 2260.0 2260.0 -0.5
#VALUE! 0.00
#VALUE! 0.00
Shift II 0.00 2260.0 2260.0 0.0
Shift I 0.00 2260.0 2260.0 0.0
#VALUE! 0.00
Shift II 0.00 2260.0 2260.0 0.0
Shift I 0.00 2260.0 2260.0 0.0
#VALUE! 0.00
Shift II 0.00 2260.0 2260.0 0.0
Shift I 0.00 2260.0 2260.0 0.0
#VALUE! 0.00
Shift II 0.00 2260.0 2260.0 0.0
Shift I 0.00 2260.0 2260.0 0.0
#VALUE! 0.00
Shift II 0.00 2260.0 2260.0 0.0
Shift I 0.00 2260.0 2260.0 0.0
#VALUE! 0.00
Shift II 0.00 2260.0 2260.0 0.0
Shift I 0.00 2260.0 2260.0 0.0
#VALUE! 0.00
Shift II 0.00 2260.0 2260.0 0.0
Shift I 0.00 2260.0 2260.0 -2.0
#VALUE! 0.00
Shift II 0.00 2260.0 2260.0 0.0
Shift I 0.00 2260.0 2260.0 0.0
#VALUE! 0.00
Shift II 0.00 2260.0 2260.0 0.0
Shift I 0.00 2260.0 2260.0 0.0
#VALUE! 0.00
Shift II 0.00 2260.0 2260.0 0.0
Shift I 0.00 2260.0 2260.0 0.0
#VALUE! 0.00
Shift II 0.00 2260.0 2260.0 0.0
Shift I 0.00 2260.0 2260.0 0.0
#VALUE! 0.00
Shift II 0.00 2260.0 2260.0 0.0
Shift I 0.00 2260.0 2260.0 0.0
#VALUE! 0.00
Shift II 0.00 2260.0 2260.0 0.0
Shift I 0.00 2260.0 2260.0 0.0
#VALUE! 0.00
Shift II 0.00 2260.0 2260.0 0.0
Shift I 0.00 2260.0 2260.0 0.0
#VALUE! 0.00
Shift II 0.00 2260.0 2260.0 0.0
Shift I 0.00 2260.0 2260.0 0.0
#VALUE! 0.00
Shift II 0.00 2260.0 2260.0 0.0
Shift I 0.00 2260.0 2260.0 0.0
#VALUE! 0.00
Shift II 0.00 2260.0 2260.0 0.0
Shift I 0.00 2260.0 2260.0 0.0
#VALUE! 0.00
Shift II 0.00 2260.0 2260.0 0.0
Shift I 2260.0 2260.0 0.0
#VALUE!
Shift II 2260.0 2260.0 0.0
Shift I 2260.0 2260.0 0.0
#VALUE!
Shift II 2260.0 2260.0 0.0
Total 0.00 -4.30

Approved By, Checked By,

Catur Cahyadi Yamani


Mine Operation Head Revegetation Section Chief
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019

Schedule Time 324.00 Required MA % (MIN)


Maintenance Actual 4.30 Actual MA%
No Operator 0.00 Penalty due to Low MA% (Hours)
Working Hour -4.30 Penalty due to No Operator (Hours)
T. JORONG BARUTAMA GRESTON
MONTHLY REPORT
RENTAL HEAVY EQUIPMENT
LOSS TIME
IDLE Delay
TOTAL
HM No Mtc.
Schedule Not No Time
Required Operator Rainfall Others Travel

2.0 0.0 10.0 0.0


0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 7.2 4.3
-1.5
12.0 0.0 0.0 0.0
2.0 0.0 10.3 0.0
-0.3
12.0 0.0 0.0
2.0 10.0 0.0
0.0
12.0 0.0 0.0
2.0 10.0 0.0
0.0
12.0 0.0 0.0
2.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.5 0.0
-0.5
-0.5
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 12.0 0.0
-2.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
-4.30 420.00 0.00 0.00 0.00 324.00 4.30 0.00

Jorong, January 22, 2020


Checked By, Approved

Supianoor Hiras P Tind


Chief Mine Operation Support PJO. PT.T
019 Date: xxxxx/xxxxx/2019 Date: xxxxx/xxx

80%
99%
ours) No Penalty
(Hours) No Penalty
Owner #VALUE!
Unit #VALUE!
Period #VALUE!

Delay
LOSS Location SCOPE JOB Remaks
HM
Others

Reslope

1.5 Reslope

0.3 Reslope

Reslope

0.5 Swampy forest


2.0 Swampy forest

Swampy forest

Swampy forest

Swampy forest

Swampy forest

Swampy forest

Swampy forest

Swampy forest
Swampy forest

Swampy forest

Swampy forest

Swampy forest

0.00 4.30

Approved By, Prepared By,

Hiras P Tindaon ____________________


PJO. PT.TJP Data Center PT. TJP
e: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
PT. JORON
MO
RENTA

WORKING HOUR
HOURS TOTAL METER
TOTAL
DATE WORKING HM
START STOP HOURS START STOP

Shift I 0.00 13388.3 13388.3 0.0


#VALUE! 0.00
Shift II 0.00 13388.3 13388.3 0.0
Shift I 0.00 13388.3 13388.3 -0.1
#VALUE! 0.00
Shift II 0.00 13388.3 13388.3 0.0
Shift I 0.00 13388.3 13388.3 -0.1
#VALUE! 0.00
Shift II 0.00 13388.3 13388.3 0.0
Shift I 0.00 13388.3 13388.3 -0.2
#VALUE! 0.00
Shift II 0.00 13388.3 13388.3 0.0
Shift I 0.00 13388.3 13388.3 0.0
#VALUE! 0.00
Shift II 0.00 13388.3 13388.3 0.0
Shift I 0.00 13388.3 13388.3 -0.2
#VALUE! 0.00
Shift II 0.00 13388.3 13388.3 0.0
Shift I 0.00 13388.3 13388.3 0.0
#VALUE! 0.00
Shift II 0.00 13388.3 13388.3 0.0
Shift I 0.00 13388.3 13388.3 -0.3
#VALUE! 0.00
Shift II 0.00 13388.3 13388.3 0.0
Shift I 0.00 13388.3 13388.3 0.0
#VALUE! 0.00
Shift II 0.00 13388.3 13388.3 0.0
Shift I 0.00 13388.3 13388.3 0.0
#VALUE! 0.00
Shift II 0.00 13388.3 13388.3 0.0
Shift I 0.00 13388.3 13388.3 0.0
#VALUE! 0.00
#VALUE! 0.00
Shift II 0.00 13388.3 13388.3 0.0
Shift I 0.00 13388.3 13388.3 0.0
#VALUE! 0.00
Shift II 0.00 13388.3 13388.3 0.0
Shift I 0.00 13388.3 13388.3 -5.5
#VALUE! 0.00
Shift II 0.00 13388.3 13388.3 0.0
Shift I 0.00 13388.3 13388.3 0.0
#VALUE! 0.00
Shift II 0.00 13388.3 13388.3 0.0
Shift I 0.00 13388.3 13388.3 -0.2
#VALUE! 0.00
Shift II 0.00 13388.3 13388.3 0.0
Shift I 0.00 13388.3 13388.3 -0.3
#VALUE! 0.00
Shift II 0.00 13388.3 13388.3 0.0
Shift I 0.00 13388.3 13388.3 0.0
#VALUE! 0.00
Shift II 0.00 13388.3 13388.3 0.0
Shift I 0.00 13388.3 13388.3 0.0
#VALUE! 0.00
Shift II 0.00 13388.3 13388.3 0.0
Shift I 0.00 13388.3 13388.3 0.0
#VALUE! 0.00
Shift II 0.00 13388.3 13388.3 0.0
Shift I 0.00 13388.3 13388.3 -0.3
#VALUE! 0.00
Shift II 0.00 13388.3 13388.3 0.0
Shift I 0.00 13388.3 13388.3 -0.1
#VALUE! 0.00
Shift II 0.00 13388.3 13388.3 0.0
Shift I 0.00 13388.3 13388.3 0.0
#VALUE! 0.00
Shift II 0.00 13388.3 13388.3 0.0
Shift I 0.00 13388.3 13388.3 -0.9
#VALUE! 0.00
Shift II 0.00 13388.3 13388.3 0.0
Shift I 0.00 13388.3 13388.3 -0.2
#VALUE! 0.00
Shift II 0.00 13388.3 13388.3 0.0
Shift I 0.00 13388.3 13388.3 0.0
#VALUE! 0.00
Shift II 0.00 13388.3 13388.3 0.0
Shift I 0.00 13388.3 13388.3 -0.2
#VALUE! 0.00
Shift II 0.00 13388.3 13388.3 0.0
Shift I 0.00 13388.3 13388.3 -0.2
#VALUE! 0.00
Shift II 0.00 13388.3 13388.3 0.0
Shift I 0.00 13388.3 13388.3 0.0
#VALUE! 0.00
Shift II 0.00 13388.3 13388.3 0.0
Shift I 13388.3 13388.3 0.0
#VALUE!
Shift II 13388.3 13388.3 0.0
Shift I 13388.3 13388.3 0.0
#VALUE!
Shift II 13388.3 13388.3 0.0
Total 0.00 -8.80

Approved By, Checked By,

Catur Cahyadi Yamani


Mine Operation Head Revegetation Section Chief
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019

Schedule Time 324.00 Required MA % (MIN)


Maintenance Actual 9.10 Actual MA%
No Operator 0.00 Penalty due to Low MA% (Hours)
Working Hour -8.80 Penalty due to No Operator (Hours)
T. JORONG BARUTAMA GRESTON
MONTHLY REPORT
RENTAL HEAVY EQUIPMENT
LOSS TIME
IDLE Delay
TOTAL
HM No Mtc.
Schedule Not No Time
Required Operator Rainfall Others Travel

2.0 0.0 10.0 0.0


0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.1 0.0
-0.1
12.0 0.0 0.0 0.0
2.0 0.0 10.1 0.0
-0.1
12.0 0.0 0.0 0.0
2.0 0.0 10.2 0.0
-0.2
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.2 0.0
-0.2
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.3 0.0
-0.3
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 15.5 0.0
-5.5
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.2 0.0
-0.2
12.0 0.0 0.0 0.0
2.0 0.0 10.3 0.0
-0.3
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.3 0.0
-0.3
12.0 0.0 0.0 0.0
2.0 0.0 10.1 0.0
-0.1
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.9 0.0
-0.9
12.0 0.0 0.0 0.0
2.0 0.0 10.2 0.0
-0.2
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.2 0.0
-0.2
12.0 0.0 0.0 0.0
2.0 0.0 10.2 0.0
-0.2
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 0.9 9.1
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
-8.80 420.00 0.00 0.00 0.00 323.70 9.10 0.00

Jorong, January 22, 2020


Checked By, Approved

Supianoor Hiras P Tind


Chief Mine Operation Support PJO. PT.T
019 Date: xxxxx/xxxxx/2019 Date: xxxxx/xxx

80%
97%
No Penalty
ours) No Penalty
Owner #VALUE!
Unit #VALUE!
Period #VALUE!

Delay
LOSS Location SCOPE JOB Remaks
HM
Others

0.1 Reslope

0.1 Reslope

0.2 Reslope

Reslope

0.2 Reslope

0.3 Reslope

Reslope

Reslope

Reslope
5.5 Reslope

Reslope

0.2 Reslope

0.3 Reslope

Reslope

Reslope

Reslope

0.3 Reslope

0.1 Reslope

Reslope

0.9 Reslope

0.2 Reslope

Top Soil
0.2 Top Soil

0.2 Top Soil

Top Soil

Top Soil

0.00 8.80

Approved By, Prepared By,

Hiras P Tindaon ____________________


PJO. PT.TJP Data Center PT. TJP
e: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
PT. JORON
MO
RENTA

WORKING HOUR
HOURS TOTAL METER
TOTAL
DATE WORKING HM
START STOP HOURS START STOP

Shift I 0.00 20039.0 20039.0 0.0


#VALUE! 0.00
Shift II 0.00 20039.0 20039.0 0.0
Shift I 0.00 20039.0 20039.0 0.0
#VALUE! 0.00
Shift II 0.00 20039.0 20039.0 0.0
Shift I 0.00 20039.0 20039.0 0.0
#VALUE! 0.00
Shift II 0.00 20039.0 20039.0 0.0
Shift I 0.00 20039.0 20039.0 0.0
#VALUE! 0.00
Shift II 0.00 20039.0 20039.0 0.0
Shift I 0.00 20039.0 20039.0 0.0
#VALUE! 0.00
Shift II 0.00 20039.0 20039.0 0.0
Shift I 0.00 20039.0 20039.0 0.0
#VALUE! 0.00
Shift II 0.00 20039.0 20039.0 0.0
Shift I 0.00 20039.0 20039.0 0.0
#VALUE! 0.00
Shift II 0.00 20039.0 20039.0 0.0
Shift I 0.00 20039.0 20039.0 0.0
#VALUE! 0.00
Shift II 0.00 20039.0 20039.0 0.0
Shift I 0.00 20039.0 20039.0 0.0
#VALUE! 0.00
Shift II 0.00 20039.0 20039.0 0.0
Shift I 0.00 20039.0 20039.0 0.0
#VALUE! 0.00
Shift II 0.00 20039.0 20039.0 0.0
Shift I 0.00 20039.0 20039.0 0.0
#VALUE! 0.00
#VALUE! 0.00
Shift II 0.00 20039.0 20039.0 0.0
Shift I 0.00 20039.0 20039.0 0.0
#VALUE! 0.00
Shift II 0.00 20039.0 20039.0 0.0
Shift I 0.00 20039.0 20039.0 0.0
#VALUE! 0.00
Shift II 0.00 20039.0 20039.0 0.0
Shift I 0.00 20039.0 20039.0 0.0
#VALUE! 0.00
Shift II 0.00 20039.0 20039.0 0.0
Shift I 0.00 20039.0 20039.0 0.0
#VALUE! 0.00
Shift II 0.00 20039.0 20039.0 0.0
Shift I 0.00 20039.0 20039.0 0.0
#VALUE! 0.00
Shift II 0.00 20039.0 20039.0 0.0
Shift I 0.00 20039.0 20039.0 0.0
#VALUE! 0.00
Shift II 0.00 20039.0 20039.0 0.0
Shift I 0.00 20039.0 20039.0 0.0
#VALUE! 0.00
Shift II 0.00 20039.0 20039.0 0.0
Shift I 0.00 20039.0 20039.0 0.0
#VALUE! 0.00
Shift II 0.00 20039.0 20039.0 0.0
Shift I 0.00 20039.0 20039.0 0.0
#VALUE! 0.00
Shift II 0.00 20039.0 20039.0 0.0
Shift I 0.00 20039.0 20039.0 0.0
#VALUE! 0.00
Shift II 0.00 20039.0 20039.0 0.0
Shift I 0.00 20039.0 20039.0 0.0
#VALUE! 0.00
Shift II 0.00 20039.0 20039.0 0.0
Shift I 0.00 20039.0 20039.0 0.0
#VALUE! 0.00
Shift II 0.00 20039.0 20039.0 0.0
Shift I 0.00 20039.0 20039.0 0.0
#VALUE! 0.00
Shift II 0.00 20039.0 20039.0 0.0
Shift I 0.00 20039.0 20039.0 0.0
#VALUE! 0.00
Shift II 0.00 20039.0 20039.0 0.0
Shift I 0.00 20039.0 20039.0 0.0
#VALUE! 0.00
Shift II 0.00 20039.0 20039.0 0.0
Shift I 0.00 20039.0 20039.0 0.0
#VALUE! 0.00
Shift II 0.00 20039.0 20039.0 0.0
Shift I 0.00 20039.0 20039.0 0.0
#VALUE! 0.00
Shift II 0.00 20039.0 20039.0 0.0
Shift I 20039.0 20039.0 0.0
#VALUE!
Shift II 20039.0 20039.0 0.0
Shift I 20039.0 20039.0 0.0
#VALUE!
Shift II 20039.0 20039.0 0.0
Total 0.00 0.00

Approved By, Checked By,

Catur Cahyadi Yamani


Mine Operation Head Revegetation Section Chief
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019

Schedule Time 324.00 Required MA % (MIN)


Maintenance Actual 0.00 Actual MA%
No Operator 0.00 Penalty due to Low MA% (Hours)
Working Hour 0.00 Penalty due to No Operator (Hours)
T. JORONG BARUTAMA GRESTON
MONTHLY REPORT
RENTAL HEAVY EQUIPMENT
LOSS TIME
IDLE Delay
TOTAL
HM No Mtc.
Schedule Not No Time
Required Operator Rainfall Others Travel

2.0 0.0 10.0 0.0


0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
0.00 420.00 0.00 0.00 0.00 324.00 0.00 0.00

Jorong, January 22, 2020


Checked By, Approved

Supianoor Hiras P Tind


Chief Mine Operation Support PJO. PT.T
019 Date: xxxxx/xxxxx/2019 Date: xxxxx/xxx

80%
100%
No Penalty
ours) No Penalty
Owner #VALUE!
Unit #VALUE!
Period #VALUE!

Delay
LOSS Location SCOPE JOB Remaks
HM
Others

Cut Channel

Cut Channel

Cut Channel

Cut Channel

Cut Channel

Cut Channel

Cut Channel

Cut Channel

Cut Channel

Cut Channel
Cut Channel

Cut Channel

Cut Channel

Cut Channel

Cut Channel

Cut Channel

Cut Channel

Cut Channel

Cut Channel

Cut Channel

Cut Channel

Cut Channel

Cut Channel

Cut Channel
Cut Channel

Cut Channel

Cut Channel

Cut Channel

0.00 0.00

Approved By, Prepared By,

Hiras P Tindaon ____________________


PJO. PT.TJP Data Center PT. TJP
e: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
PT. JORON
MO
RENTAL

WORKING HOUR
HOURS TOTAL METER
TOTAL
DATE WORKING HM
START STOP HOURS START STOP

Shift I 0.00 10270.0 10270.0 0.0


#VALUE! 0.00
Shift II 0.00 10270.0 10270.0 0.0
Shift I 0.00 10270.0 10270.0 0.0
#VALUE! 0.00
Shift II 0.00 10270.0 10270.0 0.0
Shift I 0.00 10270.0 10270.0 0.0
#VALUE! 0.00
Shift II 0.00 10270.0 10270.0 0.0
Shift I 0.00 10270.0 10270.0 0.0
#VALUE! 0.00
Shift II 0.00 10270.0 10270.0 0.0
Shift I 0.00 10270.0 10270.0 0.0
#VALUE! 0.00
Shift II 0.00 10270.0 10270.0 0.0
Shift I 0.00 10270.0 10270.0 0.0
#VALUE! 0.00
Shift II 0.00 10270.0 10270.0 0.0
Shift I 0.00 10270.0 10270.0 0.0
#VALUE! 0.00
Shift II 0.00 10270.0 10270.0 0.0
Shift I 0.00 10270.0 10270.0 0.0
#VALUE! 0.00
Shift II 0.00 10270.0 10270.0 0.0
Shift I 0.00 10270.0 10270.0 0.0
#VALUE! 0.00
Shift II 0.00 10270.0 10270.0 0.0
Shift I 0.00 10270.0 10270.0 0.0
#VALUE! 0.00
Shift II 0.00 10270.0 10270.0 0.0
Shift I 0.00 10270.0 10270.0 0.0
#VALUE! 0.00
#VALUE! 0.00
Shift II 0.00 10270.0 10270.0 0.0
Shift I 0.00 10270.0 10270.0 0.0
#VALUE! 0.00
Shift II 0.00 10270.0 10270.0 0.0
Shift I 0.00 10270.0 10270.0 0.0
#VALUE! 0.00
Shift II 0.00 10270.0 10270.0 0.0
Shift I 0.00 10270.0 10270.0 0.0
#VALUE! 0.00
Shift II 0.00 10270.0 10270.0 0.0
Shift I 0.00 10270.0 10270.0 0.0
#VALUE! 0.00
Shift II 0.00 10270.0 10270.0 0.0
Shift I 0.00 10270.0 10270.0 0.0
#VALUE! 0.00
Shift II 0.00 10270.0 10270.0 0.0
Shift I 0.00 10270.0 10270.0 0.0
#VALUE! 0.00
Shift II 0.00 10270.0 10270.0 0.0
Shift I 0.00 10270.0 10270.0 0.0
#VALUE! 0.00
Shift II 0.00 10270.0 10270.0 0.0
Shift I 0.00 10270.0 10270.0 0.0
#VALUE! 0.00
Shift II 0.00 10270.0 10270.0 0.0
Shift I 0.00 10270.0 10270.0 0.0
#VALUE! 0.00
Shift II 0.00 10270.0 10270.0 0.0
Shift I 0.00 10270.0 10270.0 0.0
#VALUE! 0.00
Shift II 0.00 10270.0 10270.0 0.0
Shift I 0.00 10270.0 10270.0 0.0
#VALUE! 0.00
Shift II 0.00 10270.0 10270.0 0.0
Shift I 0.00 10270.0 10270.0 0.0
#VALUE! 0.00
Shift II 0.00 10270.0 10270.0 0.0
Shift I 0.00 10270.0 10270.0 0.0
#VALUE! 0.00
Shift II 0.00 10270.0 10270.0 0.0
Shift I 0.00 10270.0 10270.0 0.0
#VALUE! 0.00
Shift II 0.00 10270.0 10270.0 0.0
Shift I 0.00 10270.0 10270.0 0.0
#VALUE! 0.00
Shift II 0.00 10270.0 10270.0 0.0
Shift I 0.00 10270.0 10270.0 0.0
#VALUE! 0.00
Shift II 0.00 10270.0 10270.0 0.0
Shift I 0.00 10270.0 10270.0 0.0
#VALUE! 0.00
Shift II 0.00 10270.0 10270.0 0.0
Shift I 10270.0 10270.0 0.0
#VALUE!
Shift II 10270.0 10270.0 0.0
Shift I 10270.0 10270.0 0.0
#VALUE!
Shift II 10270.0 10270.0 0.0
Total 0.00 0.00

Approved By, Checked By,

Catur Cahyadi Yamani


Mine Operation Head Revegetation Section Chief
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019

Schedule Time 334.00 Required MA % (MIN)


Maintenance Actual 10.90 Actual MA%
No Operator 0.00 Penalty due to Low MA% (Hours)
Working Hour 0.00 Penalty due to No Operator (Hours)
T. JORONG BARUTAMA GRESTON
MONTHLY REPORT
RENTAL HEAVY EQUIPMENT
LOSS TIME
IDLE Delay
TOTAL
HM No Mtc.
Schedule Not No Time
Required Operator Rainfall Others Travel

2.0 0.0 10.0 0.0


0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
2.0 0.0 10.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 4.1 5.9
0.0
12.0 0.0 0.0 0.0
2.0 0.0 5.0 5.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
0.00 410.00 0.00 0.00 0.00 323.10 10.90 0.00

Jorong, January 22, 2020


Checked By, Approved

Supianoor Hiras P Tind


Chief Mine Operation Support PJO. PT.T
019 Date: xxxxx/xxxxx/2019 Date: xxxxx/xxx

80%
97%
urs) No Penalty
Hours) No Penalty
Owner #VALUE!
Unit #VALUE!
Period #VALUE!

Delay
LOSS Location SCOPE JOB Remaks
HM
Others

catchment area

catchment area

catchment area

catchment area

catchment area

catchment area

catchment area

catchment area

catchment area

catchment area

catchment area

catchment area
catchment area

catchment area

catchment area

catchment area

catchment area

catchment area

catchment area

catchment area

catchment area

catchment area

catchment area

catchment area

catchment area

catchment area
catchment area

catchment area

catchment area

catchment area

catchment area

0.00 0.00

Approved By, Prepared By,

Hiras P Tindaon ____________________


PJO. PT.TJP Data Center PT. TJP
e: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
PT. JORONG
MO
RENTAL

WORKING HOUR
HOURS TOTAL METER
TOTAL
DATE WORKING HM
START STOP HOURS START STOP

Shift I 0.00 5878.9 5878.9 0.0


#VALUE! 0.00
Shift II 0.00 5878.9 5878.9 0.0
Shift I 0.00 5878.9 5878.9 0.0
#VALUE! 0.00
Shift II 0.00 5878.9 5878.9 0.0
Shift I 0.00 5878.9 5878.9 0.0
#VALUE! 0.00
Shift II 0.00 5878.9 5878.9 0.0
Shift I 0.00 5878.9 5878.9 0.0
#VALUE! 0.00
Shift II 0.00 5878.9 5878.9 0.0
Shift I 0.00 5878.9 5878.9 0.0
#VALUE! 0.00
Shift II 0.00 5878.9 5878.9 0.0
Shift I 0.00 5878.9 5878.9 0.0
#VALUE! 0.00
Shift II 0.00 5878.9 5878.9 0.0
Shift I 0.00 5878.9 5878.9 0.0
#VALUE! 0.00
Shift II 0.00 5878.9 5878.9 0.0
Shift I 0.00 5878.9 5878.9 0.0
#VALUE! 0.00
Shift II 0.00 5878.9 5878.9 0.0
Shift I 0.00 5878.9 5878.9 0.0
#VALUE! 0.00
Shift II 0.00 5878.9 5878.9 0.0
Shift I 0.00 5878.9 5878.9 0.0
#VALUE! 0.00
Shift II 0.00 5878.9 5878.9 0.0
Shift I 0.00 5878.9 5878.9 0.0
#VALUE! 0.00
#VALUE! 0.00
Shift II 0.00 5878.9 5878.9 0.0
Shift I 0.00 5878.9 5878.9 0.0
#VALUE! 0.00
Shift II 0.00 5878.9 5878.9 0.0
Shift I 0.00 5878.9 5878.9 0.0
#VALUE! 0.00
Shift II 0.00 5878.9 5878.9 0.0
Shift I 0.00 5878.9 5878.9 0.0
#VALUE! 0.00
Shift II 0.00 5878.9 5878.9 0.0
Shift I 0.00 5878.9 5878.9 0.0
#VALUE! 0.00
Shift II 0.00 5878.9 5878.9 0.0
Shift I 0.00 5878.9 5878.9 0.0
#VALUE! 0.00
Shift II 0.00 5878.9 5878.9 0.0
Shift I 0.00 5878.9 5878.9 -0.1
#VALUE! 0.00
Shift II 0.00 5878.9 5878.9 0.0
Shift I 0.00 5878.9 5878.9 0.0
#VALUE! 0.00
Shift II 0.00 5878.9 5878.9 0.0
Shift I 0.00 5878.9 5878.9 0.0
#VALUE! 0.00
Shift II 0.00 5878.9 5878.9 0.0
Shift I 0.00 5878.9 5878.9 0.0
#VALUE! 0.00
Shift II 0.00 5878.9 5878.9 0.0
Shift I 0.00 5878.9 5878.9 0.0
#VALUE! 0.00
Shift II 0.00 5878.9 5878.9 0.0
Shift I 0.00 5878.9 5878.9 -0.1
#VALUE! 0.00
Shift II 0.00 5878.9 5878.9 0.0
Shift I 0.00 5878.9 5878.9 0.0
#VALUE! 0.00
Shift II 0.00 5878.9 5878.9 0.0
Shift I 0.00 5878.9 5878.9 0.0
#VALUE! 0.00
Shift II 0.00 5878.9 5878.9 0.0
Shift I 0.00 5878.9 5878.9 0.0
#VALUE! 0.00
Shift II 0.00 5878.9 5878.9 -0.1
Shift I 0.00 5878.9 5878.9 0.0
#VALUE! 0.00
Shift II 0.00 5878.9 5878.9 -0.1
Shift I 0.00 5878.9 5878.9 0.0
#VALUE! 0.00
Shift II 0.00 5878.9 5878.9 0.0
Shift I 0.00 5878.9 5878.9 0.0
#VALUE! 0.00
Shift II 0.00 5878.9 5878.9 -0.1
Shift I 5878.9 5878.9 0.0
#VALUE!
Shift II 5878.9 5878.9 -0.1
Shift I 5878.9 5878.9 0.0
#VALUE!
Shift II 5878.9 5878.9 0.0
Total 0.00 -0.60

Approved By, Checked By,

Catur Cahyadi Yamani


Mine Operation Head Revegetation Section Chief
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019

Schedule Time 464.00 Required MA % (MIN)


Maintenance Actual 0.00 Actual MA%
No Operator 0.00 Penalty due to Low MA% (Hours)
Working Hour -0.60 Penalty due to No Operator (Hours)
T. JORONG BARUTAMA GRESTON
MONTHLY REPORT
RENTAL HEAVY EQUIPMENT
LOSS TIME
IDLE Delay
TOTAL
HM No Mtc.
Schedule Not No Time
Required Operator Rainfall Others Travel

2.0 0.0 10.0 0.0


0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.1 0.0
-0.1
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
0.0 12.1 0.0
-0.1
0.0 12.0 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
0.0 12.0 0.0
-0.1
0.0 12.1 0.0
0.0 12.0 0.0
-0.1
0.0 12.1 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
0.0 12.0 0.0
-0.1
0.0 12.1 0.0
0.0 12.0 0.0
-0.1
0.0 12.1 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
-0.60 280.00 0.00 0.00 0.00 464.60 0.00 0.00

Jorong, January 22, 2020


Checked By, Approved

Supianoor Hiras P Tind


Chief Mine Operation Support PJO. PT.T
019 Date: xxxxx/xxxxx/2019 Date: xxxxx/xxx

80%
100%
ours) No Penalty
(Hours) No Penalty
Owner #VALUE!
Unit #VALUE!
Period #VALUE!

Delay
LOSS HM Location SCOPE JOB Remaks
Others

Cut Channel

Cut Channel

Cut Channel

Cut Channel

Cut Channel

Cut Channel

Cut Channel

Cut Channel

Cut Channel

Cut Channel

Cut Channel
Cut Channel

Cut Channel

Cut Channel

Cut Channel

Cut Channel

0.1 Cut Channel

Cut Channel

Swampy forest

Swampy forest

Loading Port
Loading Port
0.1 Loading Port
Loading Port
Loading Port
Loading Port
Loading Port
Coal Processing
Coal Processing
0.1 Coal Processing
Coal Processing
0.1 Coal Processing
Coal Processing
Coal Processing
Coal Processing
0.1 Coal Processing
Coal Processing
0.1 Coal Processing
Coal Processing
Coal Processing
0.00 0.60

Approved By, Prepared By,

Hiras P Tindaon ____________________


PJO. PT.TJP Data Center PT. TJP
e: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
PT. JORON
MO
RENTA

WORKING HOUR
HOURS TOTAL METER
TOTAL
DATE WORKING HM
START STOP HOURS START STOP

Shift I 0.00 0.0 0.0 0.0


#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.0 0.0 0.0
#VALUE!
Shift II 0.0 0.0 0.0
Shift I 0.0 0.0 0.0
#VALUE!
Shift II 0.0 0.0 0.0
Shift I 0.0 0.0 0.0
#VALUE!
Shift II 0.0 0.0
Total 0.00 0.00

Approved By, Checked By,

Catur Cahyadi Yamani


Mine Operation Head Revegetation Section Chief
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019

Schedule Time 310.00 Required MA % (MIN)


Maintenance Actual 0.00 Actual MA%
No Operator 310.00 Penalty due to Low MA% (Hours)
Working Hour 0.00 Penalty due to No Operator (Hours)
T. JORONG BARUTAMA GRESTON
MONTHLY REPORT
RENTAL HEAVY EQUIPMENT
LOSS TIME
IDLE Delay
TOTAL
HM No Mtc.
Schedule Not No Time
Required Operator Rainfall Others Travel

2.0 10.0 0.0 0.0


0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0
12.0 0.0 0.0
0.00 434.00 0.00 310.00 0.00 0.00 0.00 0.00

Jorong, January 22, 2020


Checked By, Approved

Supianoor Hiras P Tind


Chief Mine Operation Support PJO. PT.T
019 Date: xxxxx/xxxxx/2019 Date: xxxxx/xxx

80%
100%
No Penalty
ours) 31.00
Owner #VALUE!
Unit #VALUE!
Period #VALUE!

Delay
LOSS Location SCOPE JOB Remaks
HM
Others
0.00 0.00

Approved By, Prepared By,

Hiras P Tindaon ____________________


PJO. PT.TJP Data Center PT. TJP
e: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
PT. JORON
MO
RENTA

WORKING HOUR
HOURS TOTAL METER
TOTAL
DATE WORKING HM
START STOP HOURS START STOP

Shift I 0.00 0.0 0.0 0.0


#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.0 0.0 0.0
#VALUE!
Shift II 0.0 0.0 0.0
Shift I 0.0 0.0 0.0
#VALUE!
Shift II 0.0 0.0 0.0
Shift I 0.0 0.0 0.0
#VALUE!
Shift II 0.0 0.0
Total 0.00 0.00

Approved By, Checked By,

Catur Cahyadi Yamani


Mine Operation Head Revegetation Section Chief
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019

Schedule Time 310.00 Required MA % (MIN)


Maintenance Actual 0.00 Actual MA%
No Operator 310.00 Penalty due to Low MA% (Hours)
Working Hour 0.00 Penalty due to No Operator (Hours)
T. JORONG BARUTAMA GRESTON
MONTHLY REPORT
RENTAL HEAVY EQUIPMENT
LOSS TIME
IDLE Delay
TOTAL
HM No Mtc.
Schedule Not No Time
Required Operator Rainfall Others Travel

2.0 10.0 0.0 0.0


0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0
12.0 0.0 0.0
0.00 434.00 0.00 310.00 0.00 0.00 0.00 0.00

Jorong, January 22, 2020


Checked By, Approved

Supianoor Hiras P Tind


Chief Mine Operation Support PJO. PT.T
019 Date: xxxxx/xxxxx/2019 Date: xxxxx/xxx

80%
100%
No Penalty
ours) 31.00
Owner #VALUE!
Unit #VALUE!
Period #VALUE!

Delay
LOSS Location SCOPE JOB Remaks
HM
Others
0.00 0.00

Approved By, Prepared By,

Hiras P Tindaon ____________________


PJO. PT.TJP Data Center PT. TJP
e: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
PT. JORON
MO
RENTA

WORKING HOUR
HOURS TOTAL METER
TOTAL
DATE WORKING HM
START STOP HOURS START STOP

Shift I 0.00 0.0 0.0 0.0


#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.00 0.0 0.0 0.0
#VALUE! 0.00
Shift II 0.00 0.0 0.0 0.0
Shift I 0.0 0.0 0.0
#VALUE!
Shift II 0.0 0.0 0.0
Shift I 0.0 0.0 0.0
#VALUE!
Shift II 0.0 0.0 0.0
Shift I 0.0 0.0 0.0
#VALUE!
Shift II 0.0 0.0
Total 0.00 0.00

Approved By, Checked By,

Catur Cahyadi Yamani


Mine Operation Head Revegetation Section Chief
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019

Schedule Time 310.00 Required MA % (MIN)


Maintenance Actual 0.00 Actual MA%
No Operator 310.00 Penalty due to Low MA% (Hours)
Working Hour 0.00 Penalty due to No Operator (Hours)
T. JORONG BARUTAMA GRESTON
MONTHLY REPORT
RENTAL HEAVY EQUIPMENT
LOSS TIME
IDLE Delay
TOTAL
HM No Mtc.
Schedule Not No Time
Required Operator Rainfall Others Travel

2.0 10.0 0.0 0.0


0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 10.0 0.0
12.0 0.0 0.0
0.00 434.00 0.00 310.00 0.00 0.00 0.00 0.00

Jorong, January 22, 2020


Checked By, Approved

Supianoor Hiras P Tind


Chief Mine Operation Support PJO. PT.T
019 Date: xxxxx/xxxxx/2019 Date: xxxxx/xxx

80%
100%
No Penalty
ours) 31.00
Owner #VALUE!
Unit #VALUE!
Period #VALUE!

Delay
LOSS Location SCOPE JOB Remaks
HM
Others
0.00 0.00

Approved By, Prepared By,

Hiras P Tindaon ____________________


PJO. PT.TJP Data Center PT. TJP
e: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
PT. JORON
M
RENTA

WORKING HOUR
HOURS TOTAL METER
TOTAL
DATE WORKING HM
START STOP HOURS START STOP

Shift I 0.00 18344.0 18344.0 0.0


#VALUE! 0.00
Shift II 0.00 18344.0 18344.0 0.0
Shift I 0.00 18344.0 18344.0 0.0
#VALUE! 0.00
Shift II 0.00 18344.0 18344.0 0.0
Shift I 0.00 18344.0 18344.0 0.0
#VALUE! 0.00
Shift II 0.00 18344.0 18344.0 0.0
Shift I 0.00 18344.0 18344.0 0.0
#VALUE! 0.00
Shift II 0.00 18344.0 18344.0 0.0
Shift I 0.00 18344.0 18344.0 0.0
#VALUE! 0.00
Shift II 0.00 18344.0 18344.0 0.0
Shift I 0.00 18344.0 18344.0 0.0
#VALUE! 0.00
Shift II 0.00 18344.0 18344.0 0.0
Shift I 0.00 18344.0 18344.0 0.0
#VALUE! 0.00
Shift II 0.00 18344.0 18344.0 0.0
Shift I 0.00 18344.0 18344.0 0.0
#VALUE! 0.00
Shift II 0.00 18344.0 18344.0 0.0
Shift I 0.00 18344.0 18344.0 0.0
#VALUE! 0.00
Shift II 0.00 18344.0 18344.0 0.0
Shift I 0.00 18344.0 18344.0 -1.0
#VALUE! 0.00
Shift II 0.00 18344.0 18344.0 0.0
Shift I 0.00 18344.0 18344.0 0.0
#VALUE! 0.00
#VALUE! 0.00
Shift II 0.00 18344.0 18344.0 0.0
Shift I 0.00 18344.0 18344.0 0.0
#VALUE! 0.00
Shift II 0.00 18344.0 18344.0 0.0
Shift I 0.00 18344.0 18344.0 0.0
#VALUE! 0.00
Shift II 0.00 18344.0 18344.0 0.0
Shift I 0.00 18344.0 18344.0 0.0
#VALUE! 0.00
Shift II 0.00 18344.0 18344.0 0.0
Shift I 0.00 18344.0 18344.0 0.0
#VALUE! 0.00
Shift II 0.00 18344.0 18344.0 0.0
Shift I 0.00 18344.0 18344.0 0.0
#VALUE! 0.00
Shift II 0.00 18344.0 18344.0 0.0
Shift I 0.00 18344.0 18344.0 0.0
#VALUE! 0.00
Shift II 0.00 18344.0 18344.0 0.0
Shift I 0.00 18344.0 18344.0 0.0
#VALUE! 0.00
Shift II 0.00 18344.0 18344.0 0.0
Shift I 0.00 18344.0 18344.0 0.0
#VALUE! 0.00
Shift II 0.00 18344.0 18344.0 0.0
Shift I 0.00 18344.0 18344.0 0.0
#VALUE! 0.00
Shift II 0.00 18344.0 18344.0 0.0
Shift I 0.00 18344.0 18344.0 0.0
#VALUE! 0.00
Shift II 0.00 18344.0 18344.0 0.0
Shift I 0.00 18344.0 18344.0 0.0
#VALUE! 0.00
Shift II 0.00 18344.0 18344.0 0.0
Shift I 0.00 18344.0 18344.0 -2.0
#VALUE! 0.00
Shift II 0.00 18344.0 18344.0 0.0
Shift I 0.00 18344.0 18344.0 0.0
#VALUE! 0.00
Shift II 0.00 18344.0 18344.0 0.0
Shift I 0.00 18344.0 18344.0 0.0
#VALUE! 0.00
Shift II 0.00 18344.0 18344.0 0.0
Shift I 0.00 18344.0 18344.0 0.0
#VALUE! 0.00
Shift II 0.00 18344.0 18344.0 0.0
Shift I 0.00 18344.0 18344.0 0.0
#VALUE! 0.00
Shift II 0.00 18344.0 18344.0 0.0
Shift I 0.00 18344.0 18344.0 0.0
#VALUE! 0.00
Shift II 0.00 18344.0 18344.0 0.0
Shift I 18344.0 18344.0 0.0
#VALUE!
Shift II 18344.0 18344.0 0.0
Shift I 18344.0 18344.0 0.0
#VALUE!
Shift II 18344.0 18344.0 0.0
Total 0.00 -3.00

Approved By, Checked By,

Catur Cahyadi Henry I Senduk


Mine Operation Head Pit Operation Superintendent
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019

Schedule Time 744.00 Required MA % (MIN)


Maintenance Actual 0.00 Actual MA%
No Operator 0.00 Penalty due to Low MA% (Hours)
Working Hour -3.00 Penalty due to No Operator (Hours)
JORONG BARUTAMA GRESTON
MONTHLY REPORT
RENTAL HEAVY EQUIPMENT
LOSS TIME
IDLE Delay
TOTAL
HM No Mtc.
Schedule Not No Time
Required Operator Rainfall Others Travel

0.0 12.0 0.0


0.0
0.0 12.0 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
0.0 13.0 0.0
-1.0
0.0 12.0 0.0
0.0 12.0 0.0
0.0
0.0
0.0 12.0 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
0.0 14.0 0.0
-2.0
0.0 12.0 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
-3.00 0.00 0.00 0.00 0.00 747.00 0.00 0.00

Jorong, January 22, 2020


Checked By, Approved

Supianoor Hiras P Tind


ndent Mine Operation Support PJO. PT.T
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxx

80%
100%
No Penalty
urs) No Penalty
Owner #VALUE!
Unit #VALUE!
Period #VALUE!

Delay
LOSS Location SCOPE JOB Remaks
HM
Others

Sand Removal
Sand Removal
Sand Removal
Sand Removal
Sand Removal
Sand Removal
Sand Removal
Sand Removal
Sand Removal
Sand Removal
Sand Removal
Sand Removal
Sand Removal
Sand Removal

Sand Removal

1.0 Sand Removal


Sand Removal
Sand Removal
Sand Removal
Sand Removal
Sand Removal
Sand Removal
Sand Removal
Sand Removal

Sand Removal
Sand Removal
Sand Removal
Sand Removal
Sand Removal
Sand Removal
Sand Removal

Sand Removal

2.0 Sand Removal


Sand Removal
Sand Removal
Sand Removal
Sand Removal
Sand Removal
Loading Port
Loading Port
Loading Port
Loading Port

Loading Port
Loading Port

0.00 3.00

Approved By, Prepared By,

Hiras P Tindaon ____________________


PJO. PT.TJP Data Center PT. TJP
e: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
PT. JORON
MO
RENTA

WORKING HOUR
HOURS TOTAL METER
TOTAL
DATE WORKING HM
START STOP HOURS START STOP

Shift I 0.00 3928.7 3928.7 0.0


#VALUE! 0.00
Shift II 0.00 3928.7 3928.7 0.0
Shift I 0.00 3928.7 3932.7 4.0
#VALUE! 0.00
Shift II 0.00 3932.7 3933.6 0.7
Shift I 0.00 3933.6 3933.6 0.0
#VALUE! 0.00
Shift II 0.00 3933.6 3933.6 0.0
Shift I 0.00 3933.6 3933.6 0.0
#VALUE! 0.00
Shift II 0.00 3933.6 3933.6 0.0
Shift I 0.00 3933.6 3933.6 0.0
#VALUE! 0.00
Shift II 0.00 3933.6 3933.6 0.0
Shift I 0.00 3933.6 3933.6 0.0
#VALUE! 0.00
Shift II 0.00 3933.6 3933.6 0.0
Shift I 0.00 3933.6 3933.6 0.0
#VALUE! 0.00
Shift II 0.00 3933.6 3933.6 0.0
Shift I 0.00 3933.6 3933.6 0.0
#VALUE! 0.00
Shift II 0.00 3933.6 3933.6 0.0
Shift I 0.00 3933.6 3933.6 0.0
#VALUE! 0.00
Shift II 0.00 3933.6 3933.6 0.0
Shift I 0.00 3933.6 3933.6 0.0
#VALUE! 0.00
Shift II 0.00 3933.6 3933.6 0.0
Shift I 0.00 3933.6 3933.6 0.0
#VALUE! 0.00
#VALUE! 0.00
Shift II 0.00 3933.6 3933.6 0.0
Shift I 0.00 3933.6 3933.6 0.0
#VALUE! 0.00
Shift II 0.00 3933.6 3933.6 0.0
Shift I 0.00 3933.6 3933.6 0.0
#VALUE! 0.00
Shift II 0.00 3933.6 3933.6 0.0
Shift I 0.00 3933.6 3933.6 0.0
#VALUE! 0.00
Shift II 0.00 3933.6 3933.6 0.0
Shift I 0.00 3933.6 3933.6 0.0
#VALUE! 0.00
Shift II 0.00 3933.6 3933.6 0.0
Shift I 0.00 3933.6 3933.6 0.0
#VALUE! 0.00
Shift II 0.00 3933.6 3933.6 0.0
Shift I 0.00 3933.6 3933.6 0.0
#VALUE! 0.00
Shift II 0.00 3933.6 3933.6 0.0
Shift I 0.00 3933.6 3933.6 0.0
#VALUE! 0.00
Shift II 0.00 3933.6 3933.6 0.0
Shift I 0.00 3933.6 3933.6 0.0
#VALUE! 0.00
Shift II 0.00 3933.6 3933.6 0.0
Shift I 0.00 3933.6 3933.6 0.0
#VALUE! 0.00
Shift II 0.00 3933.6 3933.6 0.0
Shift I 0.00 3933.6 3933.6 0.0
#VALUE! 0.00
Shift II 0.00 3933.6 3933.6 0.0
Shift I 0.00 3933.6 3933.6 0.0
#VALUE! 0.00
Shift II 0.00 3933.6 3933.6 0.0
Shift I 0.00 3933.6 3933.6 0.0
#VALUE! 0.00
Shift II 0.00 3933.6 3933.6 0.0
Shift I 0.00 3933.6 3933.6 0.0
#VALUE! 0.00
Shift II 0.00 3933.6 3933.6 0.0
Shift I 0.00 3933.6 3933.6 0.0
#VALUE! 0.00
Shift II 0.00 3933.6 3933.6 0.0
Shift I 0.00 3933.6 3933.6 0.0
#VALUE! 0.00
Shift II 0.00 3933.6 3933.6 0.0
Shift I 0.00 3933.6 3933.6 0.0
#VALUE! 0.00
Shift II 0.00 3933.6 3933.6 0.0
Shift I 0.00 3933.6 3933.6 0.0
#VALUE! 0.00
Shift II 0.00 3933.6 3933.6 0.0
Shift I 3933.6 3933.6 0.0
#VALUE!
Shift II 3933.6 3933.6 0.0
Shift I 3933.6 3933.6 0.0
#VALUE!
Shift II 3933.6 3933.6 0.0
Shift I 3933.6 3933.6 0.0
#VALUE!
Shift II 3933.6 3933.6
Total 0.00 4.70

Approved By, Checked By,

Catur Cahyadi Ronaldo Sianturi


Mine Operation Head Pit Service Superintendent
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019

Schedule Time 48.00 Required MA % (MIN)


Maintenance Actual 0.00 Actual MA%
No Operator 0.00 Penalty due to Low MA% (Hours)
Working Hour 4.70 Penalty due to No Operator (Hours)
T. JORONG BARUTAMA GRESTON
MONTHLY REPORT
RENTAL HEAVY EQUIPMENT
LOSS TIME
IDLE Delay
TOTAL
HM No Mtc.
Schedule Not No Time
Required Operator Rainfall Others Travel

12.0 0.0 0.0 0.0


0.0
12.0 0.0 0.0 0.0
0.0 8.0 0.0
4.7
0.0 11.3 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0
12.0 0.0
4.70 696.00 0.00 0.00 0.00 43.30 0.00 0.00

Jorong, January 22, 2020


Checked By, Approved

Supianoor Hiras P Tind


ndent Mine Operation Support PJO. PT.T
019 Date: xxxxx/xxxxx/2019 Date: xxxxx/xxx

80%
100%
No Penalty
ours) No Penalty
Owner #VALUE!
Unit #VALUE!
Period #VALUE!

Delay
LOSS Location SCOPE JOB Remaks
HM
Others

Sand Removal
0.2 Sand Removal
0.00 0.20

Approved By, Prepared By,

Hiras P Tindaon ____________________


PJO. PT.TJP Data Center PT. TJP
e: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
PT. JORON
MO
RENTA

WORKING HOUR
HOURS TOTAL METER
TOTAL
DATE WORKING HM
START STOP HOURS START STOP

Shift I 0.00 8724.6 8724.6 0.0


#VALUE! 0.00
Shift II 0.00 8724.6 8724.6 0.0
Shift I 0.00 8724.6 8724.6 0.0
#VALUE! 0.00
Shift II 0.00 8724.6 8724.6 0.0
Shift I 0.00 8724.6 8724.6 0.0
#VALUE! 0.00
Shift II 0.00 8724.6 8724.6 0.0
Shift I 0.00 8724.6 8724.6 0.0
#VALUE! 0.00
Shift II 0.00 8724.6 8724.6 0.0
Shift I 0.00 8724.6 8724.6 0.0
#VALUE! 0.00
Shift II 0.00 8724.6 8724.6 0.0
Shift I 0.00 8724.6 8724.6 0.0
#VALUE! 0.00
Shift II 0.00 8724.6 8724.6 0.0
Shift I 0.00 8724.6 8724.6 0.0
#VALUE! 0.00
Shift II 0.00 8724.6 8724.6 0.0
Shift I 0.00 8724.6 8724.6 0.0
#VALUE! 0.00
Shift II 0.00 8724.6 8724.6 0.0
Shift I 0.00 8724.6 8724.6 0.0
#VALUE! 0.00
Shift II 0.00 8724.6 8724.6 0.0
Shift I 0.00 8724.6 8724.6 0.0
#VALUE! 0.00
Shift II 0.00 8724.6 8724.6 0.0
Shift I 0.00 8724.6 8724.6 0.0
#VALUE! 0.00
#VALUE! 0.00
Shift II 0.00 8724.6 8724.6 0.0
Shift I 0.00 8724.6 8724.6 0.0
#VALUE! 0.00
Shift II 0.00 8724.6 8724.6 0.0
Shift I 0.00 8724.6 8724.6 0.0
#VALUE! 0.00
Shift II 0.00 8724.6 8724.6 0.0
Shift I 0.00 8724.6 8724.6 0.0
#VALUE! 0.00
Shift II 0.00 8724.6 8724.6 0.0
Shift I 0.00 8724.6 8724.6 0.0
#VALUE! 0.00
Shift II 0.00 8724.6 8724.6 0.0
Shift I 0.00 8724.6 8724.6 0.0
#VALUE! 0.00
Shift II 0.00 8724.6 8724.6 0.0
Shift I 0.00 8724.6 8724.6 0.0
#VALUE! 0.00
Shift II 0.00 8724.6 8724.6 0.0
Shift I 0.00 8724.6 8724.6 0.0
#VALUE! 0.00
Shift II 0.00 8724.6 8724.6 0.0
Shift I 0.00 8724.6 8724.6 0.0
#VALUE! 0.00
Shift II 0.00 8724.6 8724.6 0.0
Shift I 0.00 8724.6 8727.3 2.7
#VALUE! 0.00
Shift II 0.00 8727.3 8727.3 0.0
Shift I 0.00 8727.3 8727.3 0.0
#VALUE! 0.00
Shift II 0.00 8727.3 8727.3 0.0
Shift I 0.00 8727.3 8727.3 0.0
#VALUE! 0.00
Shift II 0.00 8727.3 8727.3 0.0
Shift I 0.00 8727.3 8727.3 0.0
#VALUE! 0.00
Shift II 0.00 8727.3 8727.3 0.0
Shift I 0.00 8727.3 8727.3 0.0
#VALUE! 0.00
Shift II 0.00 8727.3 8727.3 0.0
Shift I 0.00 8727.3 8727.3 0.0
#VALUE! 0.00
Shift II 0.00 8727.3 8727.3 0.0
Shift I 0.00 8727.3 8727.3 0.0
#VALUE! 0.00
Shift II 0.00 8727.3 8727.3 0.0
Shift I 0.00 8727.3 8727.3 0.0
#VALUE! 0.00
Shift II 0.00 8727.3 8727.3 0.0
Shift I 0.00 8727.3 8727.3 0.0
#VALUE! 0.00
Shift II 0.00 8727.3 8727.3 0.0
Shift I 8727.3 8727.3 0.0
#VALUE!
Shift II 8727.3 8727.3 0.0
Shift I 8727.3 8727.3 0.0
#VALUE!
Shift II 8727.3 8727.3 0.0
Shift I 8727.3 8727.3 0.0
#VALUE!
Shift II 8727.3 8727.3 0.0
Total 0.00 2.70

Approved By, Checked By,

Catur Cahyadi _______________________


Mine Operation Head
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019

Schedule Time 36.00 Required MA % (MIN)


Maintenance Actual 0.00 Actual MA%
No Operator 0.00 Penalty due to Low MA% (Hours)
Working Hour 2.70 Penalty due to No Operator (Hours)
T. JORONG BARUTAMA GRESTON
MONTHLY REPORT
RENTAL HEAVY EQUIPMENT
LOSS TIME
IDLE Delay
TOTAL
HM No Mtc.
Schedule Not No Time
Required Operator Rainfall Others Travel

12.0 0.0 0.0 0.0


0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
0.0 9.3 0.0
2.7
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0
0.0
12.0 0.0
2.70 708.00 0.00 0.00 0.00 33.30 0.00 0.00

Jorong, January 22, 2020


Checked By, Approved

_____ Supianoor Hiras P Tind


Mine Operation Support PJO. PT.T
019 Date: xxxxx/xxxxx/2019 Date: xxxxx/xxx

80%
100%
No Penalty
ours) No Penalty
Owner #VALUE!
Unit #VALUE!
Period #VALUE!

Delay
LOSS Location SCOPE JOB Remaks
HM
Others
Road Maintenance
0.00 0.00

Approved By, Prepared By,

Hiras P Tindaon ____________________


PJO. PT.TJP Data Center PT. TJP
e: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
PT. JORON
M
RENTA

WORKING HOUR
HOURS TOTAL METER
TOTAL
DATE WORKING HM
START STOP HOURS START STOP

Shift I 0.00 8900.0 8900.0 0.0


#VALUE! 0.00
Shift II 0.00 8900.0 8900.0 0.0
Shift I 0.00 8900.0 8900.0 0.0
#VALUE! 0.00
Shift II 0.00 8900.0 8900.0 0.0
Shift I 0.00 8900.0 8900.0 0.0
#VALUE! 0.00
Shift II 0.00 8900.0 8900.0 0.0
Shift I 0.00 8900.0 8900.0 0.0
#VALUE! 0.00
Shift II 0.00 8900.0 8900.0 0.0
Shift I 0.00 8900.0 8900.0 0.0
#VALUE! 0.00
Shift II 0.00 8900.0 8900.0 0.0
Shift I 0.00 8900.0 8900.0 0.0
#VALUE! 0.00
Shift II 0.00 8900.0 8900.0 0.0
Shift I 0.00 8900.0 8900.0 0.0
#VALUE! 0.00
Shift II 0.00 8900.0 8900.0 0.0
Shift I 0.00 8900.0 8900.0 0.0
#VALUE! 0.00
Shift II 0.00 8900.0 8900.0 0.0
Shift I 0.00 8900.0 8900.0 0.0
#VALUE! 0.00
Shift II 0.00 8900.0 8900.0 0.0
Shift I 0.00 8900.0 8900.0 0.0
#VALUE! 0.00
Shift II 0.00 8900.0 8900.0 0.0
Shift I 0.00 8900.0 8900.0 0.0
#VALUE! 0.00
#VALUE! 0.00
Shift II 0.00 8900.0 8900.0 0.0
Shift I 0.00 8900.0 8908.4 8.4
#VALUE! 0.00
Shift II 0.00 8908.4 8909.2 0.7
Shift I 0.00 8909.2 8909.2 0.0
#VALUE! 0.00
Shift II 0.00 8909.2 8909.2 0.0
Shift I 0.00 8909.2 8909.2 0.0
#VALUE! 0.00
Shift II 0.00 8909.2 8909.2 0.0
Shift I 0.00 8909.2 8969.6 8.6
#VALUE! 0.00
Shift II 0.00 8969.6 8980.7 9.7
Shift I 0.00 8980.7 8991.1 10.1
#VALUE! 0.00
Shift II 0.00 8991.1 8992.4 1.3
Shift I 0.00 8992.4 8992.4 0.0
#VALUE! 0.00
Shift II 0.00 8992.4 9000.7 6.7
Shift I 0.00 9000.7 9011.5 8.5
#VALUE! 0.00
Shift II 0.00 9011.5 9023.0 10.0
Shift I 0.00 9023.0 9032.7 9.8
#VALUE! 0.00
Shift II 0.00 9032.7 9041.1 8.3
Shift I 0.00 9041.1 9044.7 3.6
#VALUE! 0.00
Shift II 0.00 9044.7 9044.7 0.0
Shift I 0.00 9044.7 9055.4 9.4
#VALUE! 0.00
Shift II 0.00 9055.4 9066.4 11.0
Shift I 0.00 9066.4 9077.4 11.0
#VALUE! 0.00
Shift II 0.00 9077.4 9088.4 11.0
Shift I 0.00 9088.4 9099.4 11.0
#VALUE! 0.00
Shift II 0.00 9099.4 9110.4 11.0
Shift I 0.00 9110.4 9119.0 8.6
#VALUE! 0.00
Shift II 0.00 9119.0 9130.0 11.0
Shift I 0.00 9130.0 9141.0 11.0
#VALUE! 0.00
Shift II 0.00 9141.0 9149.8 8.8
Shift I 0.00 9149.8 9160.8 11.0
#VALUE! 0.00
Shift II 0.00 9160.8 9169.7 8.9
Shift I 0.00 9169.7 9180.7 11.0
#VALUE! 0.00
Shift II 0.00 9180.7 9191.1 10.4
Shift I 0.00 9191.1 9202.1 11.0
#VALUE! 0.00
Shift II 0.00 9202.1 9209.8 7.7
Shift I 9209.8 9218.9 9.1
#VALUE!
Shift II 9218.9 9218.9 0.0
Shift I 9218.9 9231.7 1.7
#VALUE!
Shift II 9231.7 9240.0 8.3
Shift I 9240.0 9240.0 0.0
#VALUE!
Shift II 9240.0 9240.0
Total 0.00 268.60

Approved By, Checked By,

Catur Cahyadi Henry I Senduk


Mine Operation Head Pit Operation Superintendent
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
. JORONG BARUTAMA GRESTON
MONTHLY REPORT
RENTAL HEAVY EQUIPMENT
LOSS TIME
IDLE Delay
TOTAL
HM No Mtc.
Schedule Not No Time
Required Operator Rainfall Others Travel

12.0 0.0 0.0 0.0


0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
0.0
12.0 0.0 0.0 0.0
0.0 3.6 0.0
9.1
0.0 11.3 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
0.0 12.0 0.0
0.0
0.0 12.0 0.0
0.0 3.4 0.0
18.3
0.0 2.3 0.0
0.0 1.9 0.0
11.4
0.0 10.7 0.0
0.0 12.0 0.0
6.7
0.0 5.3 0.0
0.0 3.5 0.0
18.5
0.0 2.0 0.0
0.0 2.2 0.0
18.1
0.0 3.7 0.0
0.0 8.4 0.0
3.6
0.0 12.0 0.0
0.0 2.6 0.0
20.4
0.0 1.0 0.0
0.0 1.0 0.0
22.0
0.0 1.0 0.0
0.0 1.0 0.0
22.0
0.0 1.0 0.0
0.0 3.4 0.0
19.6
0.0 1.0 0.0
0.0 1.0 0.0
19.8
0.0 3.2 0.0
0.0 1.0 0.0
19.9
0.0 3.1 0.0
0.0 1.0 0.0
21.3
0.0 1.6 0.0
0.0 1.0 0.0
18.8
0.0 4.3 0.0
0.0 2.9 0.0
9.1
0.0 12.0 0.0
0.0 10.3 0.0
10.0
0.0 3.7 0.0
12.0 0.0
12.0 0.0
268.60 264.00 0.00 0.00 0.00 211.40 0.00 0.00

Jorong, January 22, 2020


Checked By, Approved

Supianoor Hiras P Tind


ndent Mine Operation Support PJO. PT.T
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxx
Owner #VALUE!
Unit #VALUE!
Period #VALUE!

Delay
LOSS Location SCOPE JOB Remaks
HM
Others
Coal Loading
Coal Loading

51.8 Coal Loading


1.4 Coal Loading
0.3 Coal Loading
0.1 Coal Loading
0.0
1.6 Coal Loading
2.3 Coal Loading
1.5 Coal Loading
Coal Loading
Coal Loading
Coal Loading

1.3 Coal Loading


Coal Loading
Coal Loading
Coal Loading
Coal Loading
Coal Loading
Coal Loading
Coal Loading
Coal Loading
Coal Loading
Coal Loading
Coal Loading
Coal Loading
Coal Loading
Coal Loading
Coal Loading
Coal Loading

11.1 Coal Loading


Coal Loading

0.00 71.38

Approved By, Prepared By,

Hiras P Tindaon ____________________


PJO. PT.TJP Data Center PT. TJP
e: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
PT. JORON
M
RENTA

WORKING HOUR
HOURS TOTAL METER
TOTAL
DATE WORKING HM
START STOP HOURS START STOP

Shift I 0.00 11300.0 11300.0 0.0


#VALUE! 0.00
Shift II 0.00 11300.0 11300.0 0.0
Shift I 0.00 11300.0 11300.0 0.0
#VALUE! 0.00
Shift II 0.00 11300.0 11300.0 0.0
Shift I 0.00 11300.0 11300.0 0.0
#VALUE! 0.00
Shift II 0.00 11300.0 11300.0 0.0
Shift I 0.00 11300.0 11300.0 0.0
#VALUE! 0.00
Shift II 0.00 11300.0 11303.8 3.8
Shift I 0.00 11303.8 11303.8 0.0
#VALUE! 0.00
Shift II 0.00 11303.8 11303.8 0.0
Shift I 0.00 11303.8 11303.8 0.0
#VALUE! 0.00
Shift II 0.00 11303.8 11303.8 0.0
Shift I 0.00 11303.8 11347.6 2.8
#VALUE! 0.00
Shift II 0.00 11347.6 11348.5 0.9
Shift I 0.00 11348.5 11348.5 0.0
#VALUE! 0.00
Shift II 0.00 11348.5 11359.8 2.8
Shift I 0.00 11359.8 11359.8 0.0
#VALUE! 0.00
Shift II 0.00 11359.8 11359.8 0.0
Shift I 0.00 11359.8 11359.8 0.0
#VALUE! 0.00
Shift II 0.00 11359.8 11359.8 0.0
Shift I 0.00 11359.8 11359.8 0.0
#VALUE! 0.00
#VALUE! 0.00
Shift II 0.00 11359.8 11359.8 0.0
Shift I 0.00 11359.8 11359.8 0.0
#VALUE! 0.00
Shift II 0.00 11359.8 11359.8 0.0
Shift I 0.00 11359.8 11425.9 2.9
#VALUE! 0.00
Shift II 0.00 11425.9 11425.9 0.0
Shift I 0.00 11425.9 11425.9 0.0
#VALUE! 0.00
Shift II 0.00 11425.9 11425.9 0.0
Shift I 0.00 11425.9 11462.4 4.4
#VALUE! 0.00
Shift II 0.00 11462.4 11471.7 4.7
Shift I 0.00 11471.7 11476.1 4.4
#VALUE! 0.00
Shift II 0.00 11476.1 11480.9 4.8
Shift I 0.00 11480.9 11499.7 4.7
#VALUE! 0.00
Shift II 0.00 11499.7 11503.3 2.3
Shift I 0.00 11503.3 11503.3 0.0
#VALUE! 0.00
Shift II 0.00 11503.3 11503.3 0.0
Shift I 0.00 11503.3 11503.3 0.0
#VALUE! 0.00
Shift II 0.00 11503.3 11503.3 0.0
Shift I 0.00 11503.3 11503.3 0.0
#VALUE! 0.00
Shift II 0.00 11503.3 11503.3 0.0
Shift I 0.00 11503.3 11503.3 0.0
#VALUE! 0.00
Shift II 0.00 11503.3 11503.3 0.0
Shift I 0.00 11503.3 11503.3 0.0
#VALUE! 0.00
Shift II 0.00 11503.3 11503.3 0.0
Shift I 0.00 11503.3 11507.6 2.6
#VALUE! 0.00
Shift II 0.00 11507.6 11507.6 0.0
Shift I 0.00 11507.6 11523.6 0.4
#VALUE! 0.00
Shift II 0.00 11523.6 11523.6 0.0
Shift I 0.00 11523.6 11523.6 0.0
#VALUE! 0.00
Shift II 0.00 11523.6 11523.6 0.0
Shift I 0.00 11523.6 11523.6 0.0
#VALUE! 0.00
Shift II 0.00 11523.6 11523.6 0.0
Shift I 0.00 11523.6 11523.6 0.0
#VALUE! 0.00
Shift II 0.00 11523.6 11523.6 0.0
Shift I 0.00 11523.6 11598.1 0.1
#VALUE! 0.00
Shift II 0.00 11598.1 11598.1 0.0
Shift I 11598.1 11598.1 0.0
#VALUE!
Shift II 11598.1 11598.1 0.0
Shift I 11598.1 11598.1 0.0
#VALUE!
Shift II 11598.1 11598.1 0.0
Shift I 11598.1 11598.1 0.0
#VALUE!
Shift II 11598.1 11598.1
Total 0.00 41.50

Approved By, Checked By,

Catur Cahyadi Henry I Senduk


Mine Operation Head Pit Operation Superintendent
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
. JORONG BARUTAMA GRESTON
MONTHLY REPORT
RENTAL HEAVY EQUIPMENT
LOSS TIME
IDLE Delay
TOTAL
HM No Mtc.
Schedule Not No Time
Required Operator Rainfall Others Travel

12.0 0.0 0.0 0.0


0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
3.8
0.0 8.2 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
0.0 9.2 0.0
3.6
0.0 11.1 0.0
12.0 0.0 0.0 0.0
2.8
0.0 9.2 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
0.0 9.1 0.0
2.9
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
0.0 7.6 0.0
9.1
0.0 7.3 0.0
0.0 7.6 0.0
9.2
0.0 7.3 0.0
0.0 7.3 0.0
7.0
0.0 9.7 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
0.0 12.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
0.0 9.4 0.0
2.6
12.0 0.0 0.0 0.0
0.0 11.6 0.0
0.4
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
0.0 11.9 0.0
0.1
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0
12.0 0.0
41.50 540.00 0.00 0.00 0.00 162.50 0.00 0.00

Jorong, January 22, 2020


Checked By, Approved

Supianoor Hiras P Tind


ndent Mine Operation Support PJO. PT.T
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxx
Owner #VALUE!
Unit #VALUE!
Period #VALUE!

Delay
LOSS Location SCOPE JOB Remaks
HM
Others

Coal Loading

41.0 Coal Loading


Coal Loading

8.5 Coal Loading


63.3 Coal Loading

32.1 Coal Loading


4.6 Coal Loading
Coal Loading
Coal Loading
14.2 Coal Loading
1.3 Coal Loading

1.7 Coal Loading


0.0
15.6 Coal Loading
74.5 Coal Loading

0.00 256.62

Approved By, Prepared By,

Hiras P Tindaon ____________________


PJO. PT.TJP Data Center PT. TJP
e: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
PT. JORON
M
RENTA

WORKING HOUR
HOURS TOTAL METER
TOTAL
DATE WORKING HM
START STOP HOURS START STOP

Shift I 0.00 9163.0 9163.0 0.0


#VALUE! 0.00
Shift II 0.00 9163.0 9163.0 0.0
Shift I 0.00 9163.0 9163.0 0.0
#VALUE! 0.00
Shift II 0.00 9163.0 9163.0 0.0
Shift I 0.00 9163.0 9163.0 0.0
#VALUE! 0.00
Shift II 0.00 9163.0 9163.0 0.0
Shift I 0.00 9163.0 9163.0 0.0
#VALUE! 0.00
Shift II 0.00 9163.0 9163.0 0.0
Shift I 0.00 9163.0 9163.0 0.0
#VALUE! 0.00
Shift II 0.00 9163.0 9163.0 0.0
Shift I 0.00 9163.0 9163.0 0.0
#VALUE! 0.00
Shift II 0.00 9163.0 9163.0 0.0
Shift I 0.00 9163.0 9163.0 0.0
#VALUE! 0.00
Shift II 0.00 9163.0 9163.0 0.0
Shift I 0.00 9163.0 9163.0 0.0
#VALUE! 0.00
Shift II 0.00 9163.0 9163.0 0.0
Shift I 0.00 9163.0 9163.0 0.0
#VALUE! 0.00
Shift II 0.00 9163.0 9163.0 0.0
Shift I 0.00 9163.0 9163.0 0.0
#VALUE! 0.00
Shift II 0.00 9163.0 9163.0 0.0
Shift I 0.00 9163.0 9163.0 0.0
#VALUE! 0.00
#VALUE! 0.00
Shift II 0.00 9163.0 9163.0 0.0
Shift I 0.00 9163.0 9163.0 0.0
#VALUE! 0.00
Shift II 0.00 9163.0 9163.0 0.0
Shift I 0.00 9163.0 9163.0 0.0
#VALUE! 0.00
Shift II 0.00 9163.0 9163.0 0.0
Shift I 0.00 9163.0 9163.0 0.0
#VALUE! 0.00
Shift II 0.00 9163.0 9163.0 0.0
Shift I 0.00 9163.0 9163.0 0.0
#VALUE! 0.00
Shift II 0.00 9163.0 9163.0 0.0
Shift I 0.00 9163.0 9163.0 0.0
#VALUE! 0.00
Shift II 0.00 9163.0 9163.0 0.0
Shift I 0.00 9163.0 9163.0 0.0
#VALUE! 0.00
Shift II 0.00 9163.0 9163.0 0.0
Shift I 0.00 9163.0 9163.0 0.0
#VALUE! 0.00
Shift II 0.00 9163.0 9163.0 0.0
Shift I 0.00 9163.0 9163.0 0.0
#VALUE! 0.00
Shift II 0.00 9163.0 9163.0 0.0
Shift I 0.00 9163.0 9163.0 0.0
#VALUE! 0.00
Shift II 0.00 9163.0 9163.0 0.0
Shift I 0.00 9163.0 9163.0 0.0
#VALUE! 0.00
Shift II 0.00 9163.0 9163.0 0.0
Shift I 0.00 9163.0 9163.0 0.0
#VALUE! 0.00
Shift II 0.00 9163.0 9163.0 0.0
Shift I 0.00 9163.0 9163.0 0.0
#VALUE! 0.00
Shift II 0.00 9163.0 9163.0 0.0
Shift I 0.00 9163.0 9163.0 0.0
#VALUE! 0.00
Shift II 0.00 9163.0 9163.0 0.0
Shift I 0.00 9163.0 9163.0 0.0
#VALUE! 0.00
Shift II 0.00 9163.0 9163.0 0.0
Shift I 0.00 9163.0 9163.0 0.0
#VALUE! 0.00
Shift II 0.00 9163.0 9163.0 0.0
Shift I 0.00 9163.0 9163.0 0.0
#VALUE! 0.00
Shift II 0.00 9163.0 9163.0 0.0
Shift I 0.00 9163.0 9163.0 0.0
#VALUE! 0.00
Shift II 0.00 9163.0 9163.0 0.0
Shift I 9163.0 9164.0 1.0
#VALUE!
Shift II 9164.0 9170.4 6.4
Shift I 9170.4 9172.4 2.1
#VALUE!
Shift II 9172.4 9179.9 7.4
Shift I 9179.9 9179.9 0.0
#VALUE!
Shift II 9179.9 9179.9
Total 0.00 16.87

Approved By, Checked By,

Catur Cahyadi Henry I Senduk


Mine Operation Head Pit Operation Superintendent
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
. JORONG BARUTAMA GRESTON
MONTHLY REPORT
RENTAL HEAVY EQUIPMENT
LOSS TIME
IDLE Delay
TOTAL
HM No Mtc.
Schedule Not No Time
Required Operator Rainfall Others Travel

12.0 0.0 0.0 0.0


0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
0.0 11.0 0.0
7.4
0.0 5.6 0.0
0.0 9.9 0.0
9.5
0.0 4.6 0.0
12.0 0.0
12.0 0.0
16.87 672.00 0.00 0.00 0.00 55.13 0.00 0.00

Jorong, January 22, 2020


Checked By, Approved

Supianoor Hiras P Tind


ndent Mine Operation Support PJO. PT.T
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxx
Owner #VALUE!
Unit #VALUE!
Period #VALUE!

Delay
LOSS Location SCOPE JOB Remaks
HM
Others
Coal Loading
Coal Loading
Coal Loading
Coal Loading

0.00 0.00

Approved By, Prepared By,

Hiras P Tindaon ____________________


PJO. PT.TJP Data Center PT. TJP
e: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
PT. JORON
M
RENTA

WORKING HOUR
HOURS TOTAL METER
TOTAL
DATE WORKING HM
START STOP HOURS START STOP

Shift I 0.00 11503.0 11509.7 6.6


#VALUE! 0.00
Shift II 0.00 11509.7 11520.5 7.5
Shift I 0.00 11520.5 11521.0 0.5
#VALUE! 0.00
Shift II 0.00 11521.0 11527.0 0.0
Shift I 0.00 11527.0 11540.0 9.0
#VALUE! 0.00
Shift II 0.00 11540.0 11548.0 7.0
Shift I 0.00 11548.0 11556.6 4.6
#VALUE! 0.00
Shift II 0.00 11556.6 11568.1 6.1
Shift I 0.00 11568.1 11579.0 10.0
#VALUE! 0.00
Shift II 0.00 11579.0 11579.6 0.6
Shift I 0.00 11579.6 11579.6 0.0
#VALUE! 0.00
Shift II 0.00 11579.6 11579.6 0.0
Shift I 0.00 11579.6 11579.6 0.0
#VALUE! 0.00
Shift II 0.00 11579.6 11579.6 0.0
Shift I 0.00 11579.6 11579.6 0.0
#VALUE! 0.00
Shift II 0.00 11579.6 11579.6 0.0
Shift I 0.00 11579.6 11579.6 0.0
#VALUE! 0.00
Shift II 0.00 11579.6 11579.6 0.0
Shift I 0.00 11579.6 11675.9 5.9
#VALUE! 0.00
Shift II 0.00 11675.9 11676.7 0.8
Shift I 0.00 11676.7 11688.4 5.9
#VALUE! 0.00
#VALUE! 0.00
Shift II 0.00 11688.4 11694.6 6.2
Shift I 0.00 11694.6 11708.4 4.4
#VALUE! 0.00
Shift II 0.00 11708.4 11721.1 7.1
Shift I 0.00 11721.1 11728.9 5.9
#VALUE! 0.00
Shift II 0.00 11728.9 11736.1 7.2
Shift I 0.00 11736.1 11748.9 6.9
#VALUE! 0.00
Shift II 0.00 11748.9 11759.3 7.3
Shift I 0.00 11759.3 11762.2 1.2
#VALUE! 0.00
Shift II 0.00 11762.2 11762.2 0.0
Shift I 0.00 11762.2 11762.2 0.0
#VALUE! 0.00
Shift II 0.00 11762.2 11762.2 0.0
Shift I 0.00 11762.2 11762.2 0.0
#VALUE! 0.00
Shift II 0.00 11762.2 11762.2 0.0
Shift I 0.00 11762.2 11762.2 0.0
#VALUE! 0.00
Shift II 0.00 11762.2 11762.2 0.0
Shift I 0.00 11762.2 11762.2 0.0
#VALUE! 0.00
Shift II 0.00 11762.2 11762.2 0.0
Shift I 0.00 11762.2 11762.2 0.0
#VALUE! 0.00
Shift II 0.00 11762.2 11762.2 0.0
Shift I 0.00 11762.2 11762.2 0.0
#VALUE! 0.00
Shift II 0.00 11762.2 11762.2 0.0
Shift I 0.00 11762.2 11762.2 0.0
#VALUE! 0.00
Shift II 0.00 11762.2 11762.2 0.0
Shift I 0.00 11762.2 11762.2 0.0
#VALUE! 0.00
Shift II 0.00 11762.2 11762.2 0.0
Shift I 0.00 11762.2 11762.2 0.0
#VALUE! 0.00
Shift II 0.00 11762.2 11762.2 0.0
Shift I 0.00 11762.2 11940.1 0.1
#VALUE! 0.00
Shift II 0.00 11940.1 11940.1 0.0
Shift I 0.00 11940.1 11940.1 0.0
#VALUE! 0.00
Shift II 0.00 11940.1 11940.1 0.0
Shift I 0.00 11940.1 11940.1 0.0
#VALUE! 0.00
Shift II 0.00 11940.1 11940.1 0.0
Shift I 0.00 11940.1 11940.1 0.0
#VALUE! 0.00
Shift II 0.00 11940.1 11940.1 0.0
Shift I 11940.1 11940.1 0.0
#VALUE!
Shift II 11940.1 11940.1 0.0
Shift I 11940.1 11940.1 0.0
#VALUE!
Shift II 11940.1 11940.1 0.0
Shift I 11940.1 11940.1 0.0
#VALUE!
Shift II 11940.1 11940.1 0.0
Total 0.00 110.80

Approved By, Checked By,

Catur Cahyadi Henry I Senduk


Mine Operation Head Pit Operation Superintendent
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
. JORONG BARUTAMA GRESTON
MONTHLY REPORT
RENTAL HEAVY EQUIPMENT
LOSS TIME
IDLE Delay
TOTAL
HM No Mtc.
Schedule Not No Time
Required Operator Rainfall Others Travel

0.0 5.4 0.0


14.1
0.0 4.5 0.0
0.0 11.5 0.0
0.5
0.0 12.0 0.0
0.0 3.0 0.0
16.0
0.0 5.0 0.0
0.0 7.4 0.0
10.7
0.0 5.9 0.0
0.0 2.0 0.0
10.6
0.0 11.4 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
0.0 6.1 0.0
6.7
0.0 11.2 0.0
0.0 6.1 0.0
12.1
12.1
0.0 5.8 0.0
0.0 7.6 0.0
11.5
0.0 4.9 0.0
0.0 6.1 0.0
13.1
0.0 4.8 0.0
0.0 5.1 0.0
14.2
0.0 4.7 0.0
0.0 10.8 0.0
1.2
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
0.0 11.9 0.0
0.1
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0
0.0
12.0 0.0
110.80 456.00 0.00 0.00 0.00 177.20 0.00 0.00

Jorong, January 22, 2020


Checked By, Approved

Supianoor Hiras P Tind


ndent Mine Operation Support PJO. PT.T
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxx
Owner #VALUE!
Unit #VALUE!
Period #VALUE!

Delay
LOSS Location SCOPE JOB Remaks
HM
Others

Coal Loading
3.3 Coal Loading
Coal Loading
6.0
4.1 Coal Loading
1.0 Coal Loading
4.0 Coal Loading
5.3 Coal Loading
0.9 Coal Loading
Coal Loading

90.4 Coal Loading


0.1 Coal Loading
5.8 Coal Loading
0.0 Coal Loading
9.4 Coal Loading
5.7 Coal Loading
1.9 Coal Loading
0.0 Coal Loading
5.8 Coal Loading
3.1 Coal Loading
1.7 Coal Loading

177.8 Coal Loading


0.00 326.34

Approved By, Prepared By,

Hiras P Tindaon ____________________


PJO. PT.TJP Data Center PT. TJP
e: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
PT. JORON
MO
RENTAL

WORKING HOUR
HOURS TOTAL METER
TOTAL
DATE WORKING HM
START STOP HOURS START STOP

Shift I 0.00 4984.0 4984.0 0.0


#VALUE! 0.00
Shift II 0.00 4984.0 4984.0 0.0
Shift I 0.00 4984.0 4984.0 0.0
#VALUE! 0.00
Shift II 0.00 4984.0 4984.0 0.0
Shift I 0.00 4984.0 4984.0 0.0
#VALUE! 0.00
Shift II 0.00 4984.0 4984.0 0.0
Shift I 0.00 4984.0 4984.0 0.0
#VALUE! 0.00
Shift II 0.00 4984.0 4984.0 0.0
Shift I 0.00 4984.0 4984.0 0.0
#VALUE! 0.00
Shift II 0.00 4984.0 4984.0 0.0
Shift I 0.00 4984.0 4984.0 0.0
#VALUE! 0.00
Shift II 0.00 4984.0 4984.0 0.0
Shift I 0.00 4984.0 4984.0 0.0
#VALUE! 0.00
Shift II 0.00 4984.0 4986.9 2.9
Shift I 0.00 4986.9 4988.0 1.1
#VALUE! 0.00
Shift II 0.00 4988.0 4988.0 0.0
Shift I 0.00 4988.0 4988.0 0.0
#VALUE! 0.00
Shift II 0.00 4988.0 4988.0 0.0
Shift I 0.00 4988.0 4988.0 0.0
#VALUE! 0.00
Shift II 0.00 4988.0 4988.0 0.0
Shift I 0.00 4988.0 4988.0 0.0
#VALUE! 0.00
#VALUE! 0.00
Shift II 0.00 4988.0 4988.0 0.0
Shift I 0.00 4988.0 4988.0 0.0
#VALUE! 0.00
Shift II 0.00 4988.0 4988.0 0.0
Shift I 0.00 4988.0 4988.0 0.0
#VALUE! 0.00
Shift II 0.00 4988.0 4988.0 0.0
Shift I 0.00 4988.0 4988.0 0.0
#VALUE! 0.00
Shift II 0.00 4988.0 4988.0 0.0
Shift I 0.00 4988.0 4988.0 0.0
#VALUE! 0.00
Shift II 0.00 4988.0 4988.0 0.0
Shift I 0.00 4988.0 4988.0 0.0
#VALUE! 0.00
Shift II 0.00 4988.0 4988.0 0.0
Shift I 0.00 4988.0 4988.0 0.0
#VALUE! 0.00
Shift II 0.00 4988.0 4988.0 0.0
Shift I 0.00 4988.0 4988.0 0.0
#VALUE! 0.00
Shift II 0.00 4988.0 4988.0 0.0
Shift I 0.00 4988.0 4988.0 0.0
#VALUE! 0.00
Shift II 0.00 4988.0 4988.0 0.0
Shift I 0.00 4988.0 4988.0 0.0
#VALUE! 0.00
Shift II 0.00 4988.0 4988.0 0.0
Shift I 0.00 4988.0 4988.0 0.0
#VALUE! 0.00
Shift II 0.00 4988.0 4988.0 0.0
Shift I 0.00 4988.0 4988.0 0.0
#VALUE! 0.00
Shift II 0.00 4988.0 4988.0 0.0
Shift I 0.00 4988.0 4988.0 0.0
#VALUE! 0.00
Shift II 0.00 4988.0 4988.0 0.0
Shift I 0.00 4988.0 4988.0 0.0
#VALUE! 0.00
Shift II 0.00 4988.0 4988.0 0.0
Shift I 0.00 4988.0 4988.0 0.0
#VALUE! 0.00
Shift II 0.00 4988.0 4988.0 0.0
Shift I 0.00 4988.0 4988.0 0.0
#VALUE! 0.00
Shift II 0.00 4988.0 4988.0 0.0
Shift I 0.00 4988.0 4988.0 0.0
#VALUE! 0.00
Shift II 0.00 4988.0 4988.0 0.0
Shift I 0.00 4988.0 4988.0 0.0
#VALUE! 0.00
Shift II 0.00 4988.0 4988.0 0.0
Shift I 4988.0 4988.0 0.0
#VALUE!
Shift II 4988.0 4988.0 0.0
Shift I 4988.0 4988.0 0.0
#VALUE!
Shift II 4988.0 4988.0 0.0
Shift I 0.0
#VALUE!
Shift II 0.0
Total 0.00 4.01

Approved By, Checked By,

Catur Cahyadi Henry I Senduk


Mine Operation Head Pit Operation Superintendent
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
T. JORONG BARUTAMA GRESTON
MONTHLY REPORT
RENTAL HEAVY EQUIPMENT
LOSS TIME
IDLE Delay
TOTAL
HM No Mtc.
Schedule Not No Time
Required Operator Rainfall Others Travel

12.0 0.0 0.0 0.0


0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
2.9
0.0 9.1 0.0
0.0 10.9 0.0
1.1
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0
0.0
12.0 0.0
4.01 696.00 0.00 0.00 0.00 43.99 0.00 0.00

Jorong, January 22, 2020


Checked By, Approved

Supianoor Hiras P Tind


ndent Mine Operation Support PJO. PT.T
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxx
Owner #VALUE!
Unit #VALUE!
Period #VALUE!

Delay
LOSS Location SCOPE JOB Remaks
HM
Others

Coal Loading
Coal Loading
0.00 0.00

Approved By, Prepared By,

Hiras P Tindaon ____________________


PJO. PT.TJP Data Center PT. TJP
e: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
PT. JORON
M
RENTA

WORKING HOUR
HOURS TOTAL METER
TOTAL
DATE WORKING HM
START STOP HOURS START STOP

Shift I 0.00 5083.5 5083.5 0.0


#VALUE! 0.00
Shift II 0.00 5083.5 5083.5 0.0
Shift I 0.00 5083.5 5083.5 0.0
#VALUE! 0.00
Shift II 0.00 5083.5 5083.5 0.0
Shift I 0.00 5083.5 5083.5 0.0
#VALUE! 0.00
Shift II 0.00 5083.5 5083.5 0.0
Shift I 0.00 5083.5 5083.5 0.0
#VALUE! 0.00
Shift II 0.00 5083.5 5083.5 0.0
Shift I 0.00 5083.5 5083.5 0.0
#VALUE! 0.00
Shift II 0.00 5083.5 5083.5 0.0
Shift I 0.00 5083.5 5083.5 0.0
#VALUE! 0.00
Shift II 0.00 5083.5 5083.5 0.0
Shift I 0.00 5083.5 5083.5 0.0
#VALUE! 0.00
Shift II 0.00 5083.5 5083.5 0.0
Shift I 0.00 5083.5 5083.5 0.0
#VALUE! 0.00
Shift II 0.00 5083.5 5083.5 0.0
Shift I 0.00 5083.5 5083.5 0.0
#VALUE! 0.00
Shift II 0.00 5083.5 5083.5 0.0
Shift I 0.00 5083.5 5083.5 0.0
#VALUE! 0.00
Shift II 0.00 5083.5 5091.7 8.2
Shift I 0.00 5091.7 5094.7 1.6
#VALUE! 0.00
#VALUE! 0.00
Shift II 0.00 5094.7 5094.7 0.0
Shift I 0.00 5094.7 5094.7 0.0
#VALUE! 0.00
Shift II 0.00 5094.7 5094.7 0.0
Shift I 0.00 5094.7 5096.2 1.5
#VALUE! 0.00
Shift II 0.00 5096.2 5096.2 0.0
Shift I 0.00 5096.2 5096.2 0.0
#VALUE! 0.00
Shift II 0.00 5096.2 5096.2 0.0
Shift I 0.00 5096.2 5096.2 0.0
#VALUE! 0.00
Shift II 0.00 5096.2 5096.2 0.0
Shift I 0.00 5096.2 5096.2 0.0
#VALUE! 0.00
Shift II 0.00 5096.2 5096.2 0.0
Shift I 0.00 5096.2 5096.2 0.0
#VALUE! 0.00
Shift II 0.00 5096.2 5096.2 0.0
Shift I 0.00 5096.2 5096.2 0.0
#VALUE! 0.00
Shift II 0.00 5096.2 5096.2 0.0
Shift I 0.00 5096.2 5096.2 0.0
#VALUE! 0.00
Shift II 0.00 5096.2 5096.2 0.0
Shift I 0.00 5096.2 5096.2 0.0
#VALUE! 0.00
Shift II 0.00 5096.2 5096.2 0.0
Shift I 0.00 5096.2 5096.2 0.0
#VALUE! 0.00
Shift II 0.00 5096.2 5096.2 0.0
Shift I 0.00 5096.2 5096.2 0.0
#VALUE! 0.00
Shift II 0.00 5096.2 5096.2 0.0
Shift I 0.00 5096.2 5096.2 0.0
#VALUE! 0.00
Shift II 0.00 5096.2 5096.2 0.0
Shift I 0.00 5096.2 5096.2 0.0
#VALUE! 0.00
Shift II 0.00 5096.2 5096.2 0.0
Shift I 0.00 5096.2 5096.2 0.0
#VALUE! 0.00
Shift II 0.00 5096.2 5096.2 0.0
Shift I 0.00 5096.2 5096.2 0.0
#VALUE! 0.00
Shift II 0.00 5096.2 5096.2 0.0
Shift I 0.00 5096.2 5096.2 0.0
#VALUE! 0.00
Shift II 0.00 5096.2 5096.2 0.0
Shift I 0.00 5096.2 5407.5 3.3
#VALUE! 0.00
Shift II 0.00 5407.5 5413.2 5.8
Shift I 5413.2 5422.4 9.1
#VALUE!
Shift II 5422.4 5431.5 9.2
Shift I 5431.5 5440.4 8.9
#VALUE!
Shift II 5440.4 5440.4 0.0
Shift I 5440.4 5440.4 0.0
#VALUE!
Shift II 5440.4 5440.4 0.0
Total 0.00 47.56

Approved By, Checked By,

Catur Cahyadi Henry I Senduk


Mine Operation Head Pit Operation Superintendent
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
. JORONG BARUTAMA GRESTON
MONTHLY REPORT
RENTAL HEAVY EQUIPMENT
LOSS TIME
IDLE Delay
TOTAL
HM No Mtc.
Schedule Not No Time
Required Operator Rainfall Others Travel

12.0 0.0 0.0 0.0


0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
8.2
0.0 3.8 0.0
0.0 10.4 0.0
1.6
1.6
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
0.0 10.5 0.0
1.5
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
0.0 8.7 0.0
9.1
0.0 6.2 0.0
0.0 2.9 0.0
18.3
0.0 2.8 0.0
0.0 3.1 0.0
8.9
0.0 12.0 0.0
12.0 0.0
12.0 0.0
47.56 612.00 0.00 0.00 0.00 84.44 0.00 0.00

Jorong, January 22, 2020


Checked By, Approved

Supianoor Hiras P Tind


ndent Mine Operation Support PJO. PT.T
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxx
Owner #VALUE!
Unit #VALUE!
Period #VALUE!

Delay
LOSS Location SCOPE JOB Remaks
HM
Others

Coal Loading
1.3 Coal Loading
Water Management
308.0 Coal Loading
Coal Loading
Coal Loading
Coal Loading
Coal Loading

0.00 309.34

Approved By, Prepared By,

Hiras P Tindaon ____________________


PJO. PT.TJP Data Center PT. TJP
e: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
PT. JORON
M
RENTA

WORKING HOUR
HOURS TOTAL METER
TOTAL
DATE WORKING HM
START STOP HOURS START STOP

Shift I 0.00 4903.7 4914.7 11.0


#VALUE! 0.00
Shift II 0.00 4914.7 4924.5 9.9
Shift I 0.00 4924.5 4935.5 11.0
#VALUE! 0.00
Shift II 0.00 4935.5 4942.9 7.3
Shift I 0.00 4942.9 4942.9 0.0
#VALUE! 0.00
Shift II 0.00 4942.9 4942.9 0.0
Shift I 0.00 4942.9 4942.9 0.0
#VALUE! 0.00
Shift II 0.00 4942.9 4942.9 0.0
Shift I 0.00 4942.9 4942.9 0.0
#VALUE! 0.00
Shift II 0.00 4942.9 4998.7 5.8
Shift I 0.00 4998.7 5008.9 10.2
#VALUE! 0.00
Shift II 0.00 5008.9 5017.5 8.6
Shift I 0.00 5017.5 5024.8 7.3
#VALUE! 0.00
Shift II 0.00 5024.8 5024.8 0.0
Shift I 0.00 5024.8 5046.3 11.0
#VALUE! 0.00
Shift II 0.00 5046.3 5052.3 3.7
Shift I 0.00 5052.3 5064.9 11.0
#VALUE! 0.00
Shift II 0.00 5064.9 5071.7 6.8
Shift I 0.00 5071.7 5083.6 11.0
#VALUE! 0.00
Shift II 0.00 5083.6 5085.9 2.3
Shift I 0.00 5085.9 5100.9 9.5
#VALUE! 0.00
#VALUE! 0.00
Shift II 0.00 5100.9 5110.6 9.7
Shift I 0.00 5110.6 5111.8 1.2
#VALUE! 0.00
Shift II 0.00 5111.8 5111.8 0.0
Shift I 0.00 5111.8 5122.1 8.1
#VALUE! 0.00
Shift II 0.00 5122.1 5131.5 9.4
Shift I 0.00 5131.5 5145.2 11.0
#VALUE! 0.00
Shift II 0.00 5145.2 5153.9 8.7
Shift I 0.00 5153.9 5157.6 3.7
#VALUE! 0.00
Shift II 0.00 5157.6 5157.6 0.0
Shift I 0.00 5157.6 5157.6 0.0
#VALUE! 0.00
Shift II 0.00 5157.6 5157.6 0.0
Shift I 0.00 5157.6 5157.6 0.0
#VALUE! 0.00
Shift II 0.00 5157.6 5157.6 0.0
Shift I 0.00 5157.6 5157.6 0.0
#VALUE! 0.00
Shift II 0.00 5157.6 5157.6 0.0
Shift I 0.00 5157.6 5157.6 0.0
#VALUE! 0.00
Shift II 0.00 5157.6 5157.6 0.0
Shift I 0.00 5157.6 5157.6 0.0
#VALUE! 0.00
Shift II 0.00 5157.6 5157.6 0.0
Shift I 0.00 5157.6 5157.6 0.0
#VALUE! 0.00
Shift II 0.00 5157.6 5157.6 0.0
Shift I 0.00 5157.6 5157.6 0.0
#VALUE! 0.00
Shift II 0.00 5157.6 5157.6 0.0
Shift I 0.00 5157.6 5157.6 0.0
#VALUE! 0.00
Shift II 0.00 5157.6 5157.6 0.0
Shift I 0.00 5157.6 5157.6 0.0
#VALUE! 0.00
Shift II 0.00 5157.6 5157.6 0.0
Shift I 0.00 5157.6 5157.6 0.0
#VALUE! 0.00
Shift II 0.00 5157.6 5157.6 0.0
Shift I 0.00 5157.6 5157.6 0.0
#VALUE! 0.00
Shift II 0.00 5157.6 5157.6 0.0
Shift I 0.00 5157.6 5157.6 0.0
#VALUE! 0.00
Shift II 0.00 5157.6 5157.6 0.0
Shift I 0.00 5157.6 5157.6 0.0
#VALUE! 0.00
Shift II 0.00 5157.6 5157.6 0.0
Shift I 5157.6 5157.6 0.0
#VALUE!
Shift II 5157.6 5157.6 0.0
Shift I 5157.6 5157.6 0.0
#VALUE!
Shift II 5157.6 5157.6 0.0
Shift I 5157.6 5157.6 0.0
#VALUE!
Shift II 5157.6 5157.6 0.0
Total 0.00 178.10

Approved By, Checked By,

Catur Cahyadi Henry I Senduk


Mine Operation Head Pit Operation Superintendent
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
. JORONG BARUTAMA GRESTON
MONTHLY REPORT
RENTAL HEAVY EQUIPMENT
LOSS TIME
IDLE Delay
TOTAL
HM No Mtc.
Schedule Not No Time
Required Operator Rainfall Others Travel

0.0 1.0 0.0


20.8
0.0 2.1 0.0
0.0 1.0 0.0
18.3
0.0 4.7 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
5.8
0.0 6.2 0.0
0.0 1.8 0.0
18.8
0.0 3.4 0.0
0.0 4.7 0.0
7.3
12.0 0.0 0.0 0.0
0.0 1.0 0.0
14.7
0.0 8.3 0.0
0.0 1.0 0.0
17.8
0.0 5.2 0.0
0.0 1.0 0.0
13.3
0.0 9.7 0.0
0.0 2.5 0.0
19.2
19.2
0.0 2.3 0.0
0.0 10.8 0.0
1.2
12.0 0.0 0.0 0.0
0.0 3.9 0.0
17.5
0.0 2.6 0.0
0.0 1.0 0.0
19.7
0.0 3.3 0.0
0.0 8.3 0.0
3.7
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0
12.0 0.0
178.10 456.00 0.00 0.00 0.00 109.90 0.00 0.00

Jorong, January 22, 2020


Checked By, Approved

Supianoor Hiras P Tind


ndent Mine Operation Support PJO. PT.T
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxx
Owner #VALUE!
Unit #VALUE!
Period #VALUE!

Delay
LOSS Location SCOPE JOB Remaks
HM
Others

Coal Loading
Coal Loading
Coal Loading
Coal Loading

50.1 Coal Loading


Coal Loading
Coal Loading
Coal Loading

10.5 Coal Loading


2.3 Coal Loading
1.6 Coal Loading

Coal Loading
0.9 Coal Loading
Coal Loading
5.5 Coal Loading
Coal Loading
Coal Loading

2.3 Coal Loading


Coal Loading
2.7 Coal Loading
Coal Loading
Coal Loading
0.00 75.80

Approved By, Prepared By,

Hiras P Tindaon ____________________


PJO. PT.TJP Data Center PT. TJP
e: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
PT. JORON
M
RENTA

WORKING HOUR
HOURS TOTAL METER
TOTAL
DATE WORKING HM
START STOP HOURS START STOP

Shift I 0.00 4546.0 4546.0 0.0


#VALUE! 0.00
Shift II 0.00 4546.0 4546.0 0.0
Shift I 0.00 4546.0 4546.0 0.0
#VALUE! 0.00
Shift II 0.00 4546.0 4546.0 0.0
Shift I 0.00 4546.0 4546.0 0.0
#VALUE! 0.00
Shift II 0.00 4546.0 4546.0 0.0
Shift I 0.00 4546.0 4546.0 0.0
#VALUE! 0.00
Shift II 0.00 4546.0 4546.0 0.0
Shift I 0.00 4546.0 4546.0 0.0
#VALUE! 0.00
Shift II 0.00 4546.0 4546.0 0.0
Shift I 0.00 4546.0 4546.0 0.0
#VALUE! 0.00
Shift II 0.00 4546.0 4546.0 0.0
Shift I 0.00 4546.0 4546.0 0.0
#VALUE! 0.00
Shift II 0.00 4546.0 4546.0 0.0
Shift I 0.00 4546.0 4546.0 0.0
#VALUE! 0.00
Shift II 0.00 4546.0 4546.0 0.0
Shift I 0.00 4546.0 4546.0 0.0
#VALUE! 0.00
Shift II 0.00 4546.0 4546.0 0.0
Shift I 0.00 4546.0 4546.0 0.0
#VALUE! 0.00
Shift II 0.00 4546.0 4546.0 0.0
Shift I 0.00 4546.0 4546.3 0.3
#VALUE! 0.00
#VALUE! 0.00
Shift II 0.00 4546.3 4546.3 0.0
Shift I 0.00 4546.3 4546.3 0.0
#VALUE! 0.00
Shift II 0.00 4546.3 4562.3 6.3
Shift I 0.00 4562.3 4563.0 0.7
#VALUE! 0.00
Shift II 0.00 4563.0 4563.0 0.0
Shift I 0.00 4563.0 4563.0 0.0
#VALUE! 0.00
Shift II 0.00 4563.0 4563.0 0.0
Shift I 0.00 4563.0 4563.0 0.0
#VALUE! 0.00
Shift II 0.00 4563.0 4563.0 0.0
Shift I 0.00 4563.0 4563.0 0.0
#VALUE! 0.00
Shift II 0.00 4563.0 4638.8 8.8
Shift I 0.00 4638.8 4653.2 10.9
#VALUE! 0.00
Shift II 0.00 4653.2 4661.0 7.8
Shift I 0.00 4661.0 4664.2 3.2
#VALUE! 0.00
Shift II 0.00 4664.2 4669.5 5.3
Shift I 0.00 4669.5 4688.0 7.8
#VALUE! 0.00
Shift II 0.00 4688.0 4701.7 11.0
Shift I 0.00 4701.7 4704.0 2.3
#VALUE! 0.00
Shift II 0.00 4704.0 4704.0 0.0
Shift I 0.00 4704.0 4714.3 2.3
#VALUE! 0.00
Shift II 0.00 4714.3 4714.3 0.0
Shift I 0.00 4714.3 4714.3 0.0
#VALUE! 0.00
Shift II 0.00 4714.3 4714.3 0.0
Shift I 0.00 4714.3 4714.3 0.0
#VALUE! 0.00
Shift II 0.00 4714.3 4714.3 0.0
Shift I 0.00 4714.3 4723.8 4.0
#VALUE! 0.00
Shift II 0.00 4723.8 4723.8 0.0
Shift I 0.00 4723.8 4732.5 1.5
#VALUE! 0.00
Shift II 0.00 4732.5 4736.8 4.3
Shift I 0.00 4736.8 4743.8 7.1
#VALUE! 0.00
Shift II 0.00 4743.8 4752.0 8.1
Shift I 0.00 4752.0 4758.5 6.5
#VALUE! 0.00
Shift II 0.00 4758.5 4763.7 5.2
Shift I 0.00 4763.7 4763.7 0.0
#VALUE! 0.00
Shift II 0.00 4763.7 4763.7 0.0
Shift I 4763.7 4763.7 0.0
#VALUE!
Shift II 4763.7 4763.7 0.0
Shift I 4763.7 4763.7 0.0
#VALUE!
Shift II 4763.7 4763.7 0.0
Shift I 4763.7 4763.7 0.0
#VALUE!
Shift II 4763.7 4763.7 0.0
Total 0.00 103.40

Approved By, Checked By,

Catur Cahyadi Henry I Senduk


Mine Operation Head Pit Operation Superintendent
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
. JORONG BARUTAMA GRESTON
MONTHLY REPORT
RENTAL HEAVY EQUIPMENT
LOSS TIME
IDLE Delay
TOTAL
HM No Mtc.
Schedule Not No Time
Required Operator Rainfall Others Travel

12.0 0.0 0.0 0.0


0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
0.0 11.7 0.0
0.3
0.3
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
6.3
0.0 5.7 0.0
0.0 11.3 0.0
0.7
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
8.8
0.0 3.2 0.0
0.0 1.1 0.0
18.7
0.0 4.2 0.0
0.0 8.8 0.0
8.5
0.0 6.7 0.0
0.0 4.2 0.0
18.8
0.0 1.0 0.0
0.0 9.7 0.0
2.3
12.0 0.0 0.0 0.0
0.0 9.7 0.0
2.3
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
0.0 8.0 0.0
4.0
12.0 0.0 0.0 0.0
0.0 10.5 0.0
5.8
0.0 7.7 0.0
0.0 4.9 0.0
15.2
0.0 3.9 0.0
0.0 5.5 0.0
11.7
0.0 6.8 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0
12.0 0.0
103.40 492.00 0.00 0.00 0.00 148.60 0.00 0.00

Jorong, January 22, 2020


Checked By, Approved

Supianoor Hiras P Tind


ndent Mine Operation Support PJO. PT.T
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxx
Owner #VALUE!
Unit #VALUE!
Period #VALUE!

Delay
LOSS Location SCOPE JOB Remaks
HM
Others

Coal Loading
9.7 Coal Loading
Coal Loading

67.0 Coal Loading


3.5 Coal Loading
Coal Loading
Coal Loading
Coal Loading
10.7 Coal Loading
2.7 Coal Loading
Coal Loading

8.0 Coal Loading

5.5 Coal Loading


0.0
7.2 Coal Loading
Coal Loading
Coal Loading
Coal Loading
Coal Loading
Coal Loading

0.00 114.25

Approved By, Prepared By,

Hiras P Tindaon ____________________


PJO. PT.TJP Data Center PT. TJP
e: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
PT. JORON
M
RENTA

WORKING HOUR
HOURS TOTAL METER
TOTAL
DATE WORKING HM
START STOP HOURS START STOP

Shift I 0.00 3708.0 3708.0 0.0


#VALUE! 0.00
Shift II 0.00 3708.0 3708.0 0.0
Shift I 0.00 3708.0 3708.0 0.0
#VALUE! 0.00
Shift II 0.00 3708.0 3708.0 0.0
Shift I 0.00 3708.0 3708.0 0.0
#VALUE! 0.00
Shift II 0.00 3708.0 3708.0 0.0
Shift I 0.00 3708.0 3708.0 0.0
#VALUE! 0.00
Shift II 0.00 3708.0 3708.0 0.0
Shift I 0.00 3708.0 3708.0 0.0
#VALUE! 0.00
Shift II 0.00 3708.0 3708.0 0.0
Shift I 0.00 3708.0 3708.0 0.0
#VALUE! 0.00
Shift II 0.00 3708.0 3708.0 0.0
Shift I 0.00 3708.0 3708.0 0.0
#VALUE! 0.00
Shift II 0.00 3708.0 3708.0 0.0
Shift I 0.00 3708.0 3708.0 0.0
#VALUE! 0.00
Shift II 0.00 3708.0 3708.0 0.0
Shift I 0.00 3708.0 3708.0 0.0
#VALUE! 0.00
Shift II 0.00 3708.0 3708.0 0.0
Shift I 0.00 3708.0 3708.0 0.0
#VALUE! 0.00
Shift II 0.00 3708.0 3708.0 0.0
Shift I 0.00 3708.0 3708.0 0.0
#VALUE! 0.00
#VALUE! 0.00
Shift II 0.00 3708.0 3708.0 0.0
Shift I 0.00 3708.0 3708.0 0.0
#VALUE! 0.00
Shift II 0.00 3708.0 3708.0 0.0
Shift I 0.00 3708.0 3708.0 0.0
#VALUE! 0.00
Shift II 0.00 3708.0 3708.0 0.0
Shift I 0.00 3708.0 3708.0 0.0
#VALUE! 0.00
Shift II 0.00 3708.0 3708.0 0.0
Shift I 0.00 3708.0 3708.0 0.0
#VALUE! 0.00
Shift II 0.00 3708.0 3708.0 0.0
Shift I 0.00 3708.0 3708.0 0.0
#VALUE! 0.00
Shift II 0.00 3708.0 3708.0 0.0
Shift I 0.00 3708.0 3708.0 0.0
#VALUE! 0.00
Shift II 0.00 3708.0 3708.0 0.0
Shift I 0.00 3708.0 3708.0 0.0
#VALUE! 0.00
Shift II 0.00 3708.0 3708.0 0.0
Shift I 0.00 3708.0 3708.0 0.0
#VALUE! 0.00
Shift II 0.00 3708.0 3708.0 0.0
Shift I 0.00 3708.0 3708.0 0.0
#VALUE! 0.00
Shift II 0.00 3708.0 3708.0 0.0
Shift I 0.00 3708.0 3708.0 0.0
#VALUE! 0.00
Shift II 0.00 3708.0 3708.0 0.0
Shift I 0.00 3708.0 3708.0 0.0
#VALUE! 0.00
Shift II 0.00 3708.0 3708.0 0.0
Shift I 0.00 3708.0 3708.0 0.0
#VALUE! 0.00
Shift II 0.00 3708.0 3708.0 0.0
Shift I 0.00 3708.0 3708.9 0.9
#VALUE! 0.00
Shift II 0.00 3708.9 3708.9 0.0
Shift I 0.00 3708.9 3708.9 0.0
#VALUE! 0.00
Shift II 0.00 3708.9 3708.9 0.0
Shift I 0.00 3708.9 3708.9 0.0
#VALUE! 0.00
Shift II 0.00 3708.9 3708.9 0.0
Shift I 0.00 3708.9 3755.1 0.1
#VALUE! 0.00
Shift II 0.00 3755.1 3755.1 0.0
Shift I 0.00 3755.1 3777.4 0.7
#VALUE! 0.00
Shift II 0.00 3777.4 3777.4 0.0
Shift I 3777.4 3777.4 0.0
#VALUE!
Shift II 3777.4 3777.4 0.0
Shift I 3777.4 3777.4 0.0
#VALUE!
Shift II 3777.4 3777.4 0.0
Shift I 3777.4 3777.4 0.0
#VALUE!
Shift II 3777.4 3777.4
Total 0.00 1.70

Approved By, Checked By,

Catur Cahyadi Henry I Senduk


Mine Operation Head Pit Operation Superintendent
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
. JORONG BARUTAMA GRESTON
MONTHLY REPORT
RENTAL HEAVY EQUIPMENT
LOSS TIME
IDLE Delay
TOTAL
HM No Mtc.
Schedule Not No Time
Required Operator Rainfall Others Travel

12.0 0.0 0.0 0.0


0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
0.0 11.1 0.0
0.9
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
0.0 11.9 0.0
0.1
12.0 0.0 0.0 0.0
0.0 11.3 0.0
0.7
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0
12.0 0.0
1.70 684.00 0.00 0.00 0.00 58.30 0.00 0.00

Jorong, January 22, 2020


Checked By, Approved

Supianoor Hiras P Tind


ndent Mine Operation Support PJO. PT.T
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxx
Owner #VALUE!
Unit #VALUE!
Period #VALUE!

Delay
LOSS Location SCOPE JOB Remaks
HM
Others
Coal Loading
46.2 Coal Loading

21.5 Coal Loading

0.00 67.67

Approved By, Prepared By,

Hiras P Tindaon ____________________


PJO. PT.TJP Data Center PT. TJP
e: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
PT. JORON
M
RENTA

WORKING HOUR
HOURS TOTAL METER
TOTAL
DATE WORKING HM
START STOP HOURS START STOP

Shift I 0.00 2350.0 2350.0 0.0


#VALUE! 0.00
Shift II 0.00 2350.0 2350.0 0.0
Shift I 0.00 2350.0 2350.0 0.0
#VALUE! 0.00
Shift II 0.00 2350.0 2350.0 0.0
Shift I 0.00 2350.0 2350.0 0.0
#VALUE! 0.00
Shift II 0.00 2350.0 2350.0 0.0
Shift I 0.00 2350.0 2350.0 0.0
#VALUE! 0.00
Shift II 0.00 2350.0 2350.0 0.0
Shift I 0.00 2350.0 2350.0 0.0
#VALUE! 0.00
Shift II 0.00 2350.0 2350.0 0.0
Shift I 0.00 2350.0 2350.0 0.0
#VALUE! 0.00
Shift II 0.00 2350.0 2350.0 0.0
Shift I 0.00 2350.0 2351.2 1.2
#VALUE! 0.00
Shift II 0.00 2351.2 2351.2 0.0
Shift I 0.00 2351.2 2369.5 1.0
#VALUE! 0.00
Shift II 0.00 2369.5 2369.5 0.0
Shift I 0.00 2369.5 2369.5 0.0
#VALUE! 0.00
Shift II 0.00 2369.5 2369.5 0.0
Shift I 0.00 2369.5 2369.5 0.0
#VALUE! 0.00
Shift II 0.00 2369.5 2369.5 0.0
Shift I 0.00 2369.5 2369.5 0.0
#VALUE! 0.00
#VALUE! 0.00
Shift II 0.00 2369.5 2369.5 0.0
Shift I 0.00 2369.5 2369.5 0.0
#VALUE! 0.00
Shift II 0.00 2369.5 2369.5 0.0
Shift I 0.00 2369.5 2369.5 0.0
#VALUE! 0.00
Shift II 0.00 2369.5 2369.5 0.0
Shift I 0.00 2369.5 2369.5 0.0
#VALUE! 0.00
Shift II 0.00 2369.5 2369.5 0.0
Shift I 0.00 2369.5 2369.5 0.0
#VALUE! 0.00
Shift II 0.00 2369.5 2369.5 0.0
Shift I 0.00 2369.5 2369.5 0.0
#VALUE! 0.00
Shift II 0.00 2369.5 2369.5 0.0
Shift I 0.00 2369.5 2369.5 0.0
#VALUE! 0.00
Shift II 0.00 2369.5 2369.5 0.0
Shift I 0.00 2369.5 2369.5 0.0
#VALUE! 0.00
Shift II 0.00 2369.5 2369.5 0.0
Shift I 0.00 2369.5 2369.5 0.0
#VALUE! 0.00
Shift II 0.00 2369.5 2369.5 0.0
Shift I 0.00 2369.5 2369.5 0.0
#VALUE! 0.00
Shift II 0.00 2369.5 2369.5 0.0
Shift I 0.00 2369.5 2369.5 0.0
#VALUE! 0.00
Shift II 0.00 2369.5 2369.5 0.0
Shift I 0.00 2369.5 2369.5 0.0
#VALUE! 0.00
Shift II 0.00 2369.5 2369.5 0.0
Shift I 0.00 2369.5 2369.5 0.0
#VALUE! 0.00
Shift II 0.00 2369.5 2369.5 0.0
Shift I 0.00 2369.5 2369.5 0.0
#VALUE! 0.00
Shift II 0.00 2369.5 2369.5 0.0
Shift I 0.00 2369.5 2369.5 0.0
#VALUE! 0.00
Shift II 0.00 2369.5 2369.5 0.0
Shift I 0.00 2369.5 2369.5 0.0
#VALUE! 0.00
Shift II 0.00 2369.5 2369.5 0.0
Shift I 0.00 2369.5 2701.9 0.4
#VALUE! 0.00
Shift II 0.00 2701.9 2701.9 0.0
Shift I 0.00 2701.9 2720.5 2.2
#VALUE! 0.00
Shift II 0.00 2720.5 2720.5 0.0
Shift I 2720.5 2720.5 0.0
#VALUE!
Shift II 2720.5 2720.5 0.0
Shift I 2720.5 2720.5 0.0
#VALUE!
Shift II 2720.5 2720.5 0.0
Shift I 2720.5 2720.5 0.0
#VALUE!
Shift II 2720.5 2720.5
Total 0.00 4.80

Approved By, Checked By,

Catur Cahyadi Henry I Senduk


Mine Operation Head Pit Operation Superintendent
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
. JORONG BARUTAMA GRESTON
MONTHLY REPORT
RENTAL HEAVY EQUIPMENT
LOSS TIME
IDLE Delay
TOTAL
HM No Mtc.
Schedule Not No Time
Required Operator Rainfall Others Travel

12.0 0.0 0.0 0.0


0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
0.0 10.8 0.0
1.2
12.0 0.0 0.0 0.0
0.0 11.0 0.0
1.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
0.0 11.6 0.0
0.4
12.0 0.0 0.0 0.0
0.0 9.8 0.0
2.2
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0
12.0 0.0
4.80 672.00 0.00 0.00 0.00 67.20 0.00 0.00

Jorong, January 22, 2020


Checked By, Approved

Supianoor Hiras P Tind


ndent Mine Operation Support PJO. PT.T
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxx
Owner #VALUE!
Unit #VALUE!
Period #VALUE!

Delay
LOSS Location SCOPE JOB Remaks
HM
Others

Coal Loading

17.3 Coal Loading


332.0 Coal Loading

16.3 Coal Loading

0.00 365.68

Approved By, Prepared By,

Hiras P Tindaon ____________________


PJO. PT.TJP Data Center PT. TJP
e: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
PT. JORON
MO
RENTA

WORKING HOUR
HOURS TOTAL METER
TOTAL
DATE WORKING HM
START STOP HOURS START STOP

Shift I 0.00 20939.6 20939.6 0.0


#VALUE! 0.00
Shift II 0.00 20939.6 20939.6 0.0
Shift I 0.00 20939.6 20939.6 0.0
#VALUE! 0.00
Shift II 0.00 20939.6 20939.6 0.0
Shift I 0.00 20939.6 20939.6 0.0
#VALUE! 0.00
Shift II 0.00 20939.6 20939.6 0.0
Shift I 0.00 20939.6 20939.6 0.0
#VALUE! 0.00
Shift II 0.00 20939.6 20939.6 0.0
Shift I 0.00 20939.6 20939.6 0.0
#VALUE! 0.00
Shift II 0.00 20939.6 20939.6 0.0
Shift I 0.00 20939.6 20939.6 0.0
#VALUE! 0.00
Shift II 0.00 20939.6 20939.6 0.0
Shift I 0.00 20939.6 20939.6 0.0
#VALUE! 0.00
Shift II 0.00 20939.6 20939.6 0.0
Shift I 0.00 20939.6 20939.6 0.0
#VALUE! 0.00
Shift II 0.00 20939.6 20939.6 0.0
Shift I 0.00 20939.6 20939.6 0.0
#VALUE! 0.00
Shift II 0.00 20939.6 20939.6 0.0
Shift I 0.00 20939.6 20939.6 0.0
#VALUE! 0.00
Shift II 0.00 20939.6 20939.6 0.0
Shift I 0.00 20939.6 20939.6 0.0
#VALUE! 0.00
#VALUE! 0.00
Shift II 0.00 20939.6 20939.6 0.0
Shift I 0.00 20939.6 20939.6 0.0
#VALUE! 0.00
Shift II 0.00 20939.6 20939.6 0.0
Shift I 0.00 20939.6 20939.6 0.0
#VALUE! 0.00
Shift II 0.00 20939.6 20939.6 0.0
Shift I 0.00 20939.6 20939.6 0.0
#VALUE! 0.00
Shift II 0.00 20939.6 20939.6 0.0
Shift I 0.00 20939.6 20939.6 0.0
#VALUE! 0.00
Shift II 0.00 20939.6 20939.6 0.0
Shift I 0.00 20939.6 20939.6 0.0
#VALUE! 0.00
Shift II 0.00 20939.6 20939.6 0.0
Shift I 0.00 20939.6 20939.6 0.0
#VALUE! 0.00
Shift II 0.00 20939.6 20939.6 0.0
Shift I 0.00 20939.6 20939.6 0.0
#VALUE! 0.00
Shift II 0.00 20939.6 20939.6 0.0
Shift I 0.00 20939.6 20939.6 0.0
#VALUE! 0.00
Shift II 0.00 20939.6 20939.6 0.0
Shift I 0.00 20939.6 20939.6 0.0
#VALUE! 0.00
Shift II 0.00 20939.6 20939.6 0.0
Shift I 0.00 20939.6 20939.6 0.0
#VALUE! 0.00
Shift II 0.00 20939.6 20939.6 0.0
Shift I 0.00 20939.6 20939.6 0.0
#VALUE! 0.00
Shift II 0.00 20939.6 20939.6 0.0
Shift I 0.00 20939.6 20939.6 0.0
#VALUE! 0.00
Shift II 0.00 20939.6 20939.6 0.0
Shift I 0.00 20939.6 20939.6 0.0
#VALUE! 0.00
Shift II 0.00 20939.6 20939.6 0.0
Shift I 0.00 20939.6 20939.6 0.0
#VALUE! 0.00
Shift II 0.00 20939.6 20939.6 0.0
Shift I 0.00 20939.6 20939.6 0.0
#VALUE! 0.00
Shift II 0.00 20939.6 20939.6 0.0
Shift I 0.00 20939.6 20939.6 0.0
#VALUE! 0.00
Shift II 0.00 20939.6 20939.6 0.0
Shift I 0.00 20939.6 20939.6 0.0
#VALUE! 0.00
Shift II 0.00 20939.6 20939.6 0.0
Shift I 20939.6 20939.6 0.0
#VALUE!
Shift II 20939.6 20939.6 0.0
Shift I 20939.6 20939.6 0.0
#VALUE!
Shift II 20939.6 20939.6 0.0
Total 0.00 0.00

Approved By, Checked By,

Catur Cahyadi Yamani


Mine Operation Head Revegetation Section Chief
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019

Schedule Time 304.00 Required MA % (MIN)


Maintenance Actual 31.10 Actual MA%
No Operator 0.00 Penalty due to Low MA% (Hours)
Working Hour 0.00 Penalty due to No Operator (Hours)
T. JORONG BARUTAMA GRESTON
MONTHLY REPORT
RENTAL HEAVY EQUIPMENT
LOSS TIME
IDLE Delay
TOTAL
HM No Mtc.
Schedule Not No Time
Required Operator Rainfall Others Travel

2.0 0.0 10.0 0.0


0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 3.0 7.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 2.6 7.4
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 5.6 4.4
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 4.0 6.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 3.7 6.3
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
12.0 0.0 0.0 0.0
0.00 440.00 0.00 0.00 0.00 272.90 31.10 0.00

Jorong, January 22, 2020


Checked By, Approved

Supianoor Hiras P Tind


Chief Mine Operation Support PJO. PT.T
019 Date: xxxxx/xxxxx/2019 Date: xxxxx/xxx

80%
90%
No Penalty
ours) No Penalty
Owner #VALUE!
Unit #VALUE!
Period #VALUE!

Delay
LOSS Location SCOPE JOB Remaks
HM
Others

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance
Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance
Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

0.00 0.00

Approved By, Prepared By,

Hiras P Tindaon ____________________


PJO. PT.TJP Data Center PT. TJP
e: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019
PT. JORON
MO
RENTA

WORKING HOUR
HOURS TOTAL METER
TOTAL
DATE WORKING HM
START STOP HOURS START STOP

Shift I 0.00 1937.0 1937.0 0.0


#VALUE! 0.00
Shift II 0.00 1937.0 1937.0 0.0
Shift I 0.00 1937.0 1937.0 0.0
#VALUE! 0.00
Shift II 0.00 1937.0 1937.0 0.0
Shift I 0.00 1937.0 1937.0 0.0
#VALUE! 0.00
Shift II 0.00 1937.0 1937.0 0.0
Shift I 0.00 1937.0 1937.0 0.0
#VALUE! 0.00
Shift II 0.00 1937.0 1937.0 0.0
Shift I 0.00 1937.0 1937.0 0.0
#VALUE! 0.00
Shift II 0.00 1937.0 1937.0 0.0
Shift I 0.00 1937.0 1937.0 0.0
#VALUE! 0.00
Shift II 0.00 1937.0 1937.0 0.0
Shift I 0.00 1937.0 1937.0 0.0
#VALUE! 0.00
Shift II 0.00 1937.0 1937.0 0.0
Shift I 0.00 1937.0 1937.0 0.0
#VALUE! 0.00
Shift II 0.00 1937.0 1937.0 0.0
Shift I 0.00 1937.0 1937.0 0.0
#VALUE! 0.00
Shift II 0.00 1937.0 1937.0 0.0
Shift I 0.00 1937.0 1937.0 0.0
#VALUE! 0.00
Shift II 0.00 1937.0 1937.0 0.0
Shift I 0.00 1937.0 1937.0 0.0
#VALUE! 0.00
#VALUE! 0.00
Shift II 0.00 1937.0 1937.0 0.0
Shift I 0.00 1937.0 1937.0 0.0
#VALUE! 0.00
Shift II 0.00 1937.0 1937.0 0.0
Shift I 0.00 1937.0 1937.0 0.0
#VALUE! 0.00
Shift II 0.00 1937.0 1937.0 0.0
Shift I 0.00 1937.0 1937.0 0.0
#VALUE! 0.00
Shift II 0.00 1937.0 1937.0 0.0
Shift I 0.00 1937.0 1937.0 0.0
#VALUE! 0.00
Shift II 0.00 1937.0 1937.0 0.0
Shift I 0.00 1937.0 1937.0 0.0
#VALUE! 0.00
Shift II 0.00 1937.0 1937.0 0.0
Shift I 0.00 1937.0 1937.0 0.0
#VALUE! 0.00
Shift II 0.00 1937.0 1937.0 0.0
Shift I 0.00 1937.0 1937.0 0.0
#VALUE! 0.00
Shift II 0.00 1937.0 1937.0 0.0
Shift I 0.00 1937.0 1937.0 0.0
#VALUE! 0.00
Shift II 0.00 1937.0 1937.0 0.0
Shift I 0.00 1937.0 1937.0 0.0
#VALUE! 0.00
Shift II 0.00 1937.0 1937.0 0.0
Shift I 0.00 1937.0 1937.0 0.0
#VALUE! 0.00
Shift II 0.00 1937.0 1937.0 0.0
Shift I 0.00 1937.0 1937.0 0.0
#VALUE! 0.00
Shift II 0.00 1937.0 1937.0 0.0
Shift I 0.00 1937.0 1937.0 0.0
#VALUE! 0.00
Shift II 0.00 1937.0 1937.0 0.0
Shift I 0.00 1937.0 1937.0 0.0
#VALUE! 0.00
Shift II 0.00 1937.0 1937.0 0.0
Shift I 0.00 1937.0 1937.0 0.0
#VALUE! 0.00
Shift II 0.00 1937.0 1937.0 0.0
Shift I 0.00 1937.0 1937.0 0.0
#VALUE! 0.00
Shift II 0.00 1937.0 1937.0 0.0
Shift I 0.00 1937.0 1937.0 0.0
#VALUE! 0.00
Shift II 0.00 1937.0 1937.0 0.0
Shift I 0.00 1937.0 1937.0 0.0
#VALUE! 0.00
Shift II 0.00 1937.0 1937.0 0.0
Shift I 1937.0 1937.0 0.0
#VALUE!
Shift II 1937.0 1937.0 0.0
Shift I 1937.0 1937.0 0.0
#VALUE!
Shift II 1937.0 1937.0 0.0
Total 0.00 0.00

Approved By, Checked By,

Catur Cahyadi Ronaldo Sianturi


Mine Operation Head Pit Service Superintendent
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019

Schedule Time 331.00 Required MA % (MIN)


Maintenance Actual 0.00 Actual MA%
No Operator 0.00 Penalty due to Low MA% (Hours)
Working Hour 0.00 Penalty due to No Operator (Hours)
T. JORONG BARUTAMA GRESTON
MONTHLY REPORT
RENTAL HEAVY EQUIPMENT
LOSS TIME
IDLE Delay
TOTAL
HM No Mtc.
Schedule Not No Time
Required Operator Rainfall Others Travel

1.0 0.0 11.0 0.0


0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
2.0 0.0 10.0 0.0
0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
0.00 413.00 0.00 0.00 0.00 331.00 0.00 0.00

Jorong, January 22, 2020


Checked By, Approved

Supianoor Hiras P Tind


ndent Mine Operation Support PJO. PT.T
019 Date: xxxxx/xxxxx/2019 Date: xxxxx/xxx

80% Required MA % (MAX)


100% Reward due to Higher MA% (Hours)
No Penalty
ours) No Penalty
Owner #VALUE!
Unit #VALUE!
Period #VALUE!

Delay
LOSS Location SCOPE JOB Remaks
HM
Others

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance
Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance
Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

0.00 0.00

Approved By, Prepared By,

Hiras P Tindaon ____________________


PJO. PT.TJP Data Center PT. TJP
e: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019

90%
A% (Hours) 0.99
PT. JORON
MO
RENTA

WORKING HOUR
HOURS TOTAL METER
TOTAL
DATE WORKING HM
START STOP HOURS START STOP

Shift I 0.00 1282.8 1293.8 11.0


#VALUE! 0.00
Shift II 0.00 1293.8 1296.0 2.2
Shift I 0.00 1296.0 1296.0 0.0
#VALUE! 0.00
Shift II 0.00 1296.0 1296.0 0.0
Shift I 0.00 1296.0 1296.0 0.0
#VALUE! 0.00
Shift II 0.00 1296.0 1321.1 25.1
Shift I 0.00 1321.1 1321.1 0.0
#VALUE! 0.00
Shift II 0.00 1321.1 1321.1 0.0
Shift I 0.00 1321.1 1321.1 0.0
#VALUE! 0.00
Shift II 0.00 1321.1 1321.1 0.0
Shift I 0.00 1321.1 1321.1 0.0
#VALUE! 0.00
Shift II 0.00 1321.1 1321.1 0.0
Shift I 0.00 1321.1 1321.1 0.0
#VALUE! 0.00
Shift II 0.00 1321.1 1321.1 0.0
Shift I 0.00 1321.1 1321.1 0.0
#VALUE! 0.00
Shift II 0.00 1321.1 1321.1 0.0
Shift I 0.00 1321.1 1321.1 0.0
#VALUE! 0.00
Shift II 0.00 1321.1 1321.1 0.0
Shift I 0.00 1321.1 1332.1 11.0
#VALUE! 0.00
Shift II 0.00 1332.1 1381.5 49.4
Shift I 0.00 1381.5 1381.5 0.0
#VALUE! 0.00
#VALUE! 0.00
Shift II 0.00 1381.5 1381.5 0.0
Shift I 0.00 1381.5 1381.5 0.0
#VALUE! 0.00
Shift II 0.00 1381.5 1381.5 0.0
Shift I 0.00 1381.5 1381.5 0.0
#VALUE! 0.00
Shift II 0.00 1381.5 1381.5 0.0
Shift I 0.00 1381.5 1381.5 0.0
#VALUE! 0.00
Shift II 0.00 1381.5 1381.5 0.0
Shift I 0.00 1381.5 1392.5 11.0
#VALUE! 0.00
Shift II 0.00 1392.5 1430.6 38.1
Shift I 0.00 1430.6 1430.6 0.0
#VALUE! 0.00
Shift II 0.00 1430.6 1430.6 0.0
Shift I 0.00 1430.6 1430.6 0.0
#VALUE! 0.00
Shift II 0.00 1430.6 1430.6 0.0
Shift I 0.00 1430.6 1441.6 11.0
#VALUE! 0.00
Shift II 0.00 1441.6 1464.8 23.2
Shift I 0.00 1464.8 1464.8 0.0
#VALUE! 0.00
Shift II 0.00 1464.8 1464.8 0.0
Shift I 0.00 1464.8 1464.8 0.0
#VALUE! 0.00
Shift II 0.00 1464.8 1464.8 0.0
Shift I 0.00 1464.8 1464.8 0.0
#VALUE! 0.00
Shift II 0.00 1464.8 1464.8 0.0
Shift I 0.00 1464.8 1475.8 11.0
#VALUE! 0.00
Shift II 0.00 1475.8 1501.4 25.6
Shift I 0.00 1501.4 1501.4 0.0
#VALUE! 0.00
Shift II 0.00 1501.4 1501.4 0.0
Shift I 0.00 1501.4 1501.4 0.0
#VALUE! 0.00
Shift II 0.00 1501.4 1501.4 0.0
Shift I 0.00 1501.4 1511.4 10.0
#VALUE! 0.00
Shift II 0.00 1511.4 1533.4 22.0
Shift I 0.00 1533.4 1539.4 6.0
#VALUE! 0.00
Shift II 0.00 1539.4 1541.6 2.2
Shift I 0.00 1541.6 1552.6 11.0
#VALUE! 0.00
Shift II 0.00 1552.6 1555.2 2.6
Shift I 0.00 1555.2 1566.2 11.0
#VALUE! 0.00
Shift II 0.00 1566.2 1569.3 3.1
Shift I 1569.3 1580.3 10.6
#VALUE!
Shift II 1580.3 1582.4 2.1
Shift I 1582.4 1593.4 11.0
#VALUE!
Shift II 1593.4 1594.8 1.4
Total 0.00 311.60

Approved By, Checked By,

Catur Cahyadi Ronaldo Sianturi


Mine Operation Head Pit Service Superintendent
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019

Schedule Time 506.00 Required MA % (MIN)


Maintenance Actual 0.00 Actual MA%
No Operator 0.00 Penalty due to Low MA% (Hours)
Working Hour 311.60 Penalty due to No Operator (Hours)
T. JORONG BARUTAMA GRESTON
MONTHLY REPORT
RENTAL HEAVY EQUIPMENT
LOSS TIME
IDLE Delay
TOTAL
HM No Mtc.
Schedule Not No Time
Required Operator Rainfall Others Travel

0.0 1.0 0.0


13.2
8.0 0.0 1.8 0.0
0.0 12.0 0.0
0.0
8.0 0.0 4.0 0.0
0.0 12.0 0.0
25.1
6.0 0.0 -19.1 0.0
0.0 12.0 0.0
0.0
8.0 0.0 4.0 0.0
0.0 12.0 0.0
0.0
8.0 0.0 4.0 0.0
0.0 12.0 0.0
0.0
8.0 0.0 4.0 0.0
0.0 12.0 0.0
0.0
8.0 0.0 4.0 0.0
0.0 12.0 0.0
0.0
8.0 0.0 4.0 0.0
0.0 12.0 0.0
0.0
8.0 0.0 4.0 0.0
0.0 1.0 0.0
60.4
8.0 0.0 -45.4 0.0
0.0 12.0 0.0
0.0
0.0
8.0 0.0 4.0 0.0
0.0 12.0 0.0
0.0
8.0 0.0 4.0 0.0
0.0 12.0 0.0
0.0
8.0 0.0 4.0 0.0
0.0 12.0 0.0
0.0
8.0 0.0 4.0 0.0
0.0 1.0 0.0
49.1
8.0 0.0 -34.1 0.0
0.0 12.0 0.0
0.0
8.0 0.0 4.0 0.0
0.0 12.0 0.0
0.0
8.0 0.0 4.0 0.0
0.0 1.0 0.0
34.2
8.0 0.0 -19.2 0.0
0.0 12.0 0.0
0.0
8.0 0.0 4.0 0.0
0.0 12.0 0.0
0.0
8.0 0.0 4.0 0.0
0.0 12.0 0.0
0.0
8.0 0.0 4.0 0.0
0.0 1.0 0.0
36.6
8.0 0.0 -21.6 0.0
0.0 12.0 0.0
0.0
8.0 0.0 4.0 0.0
0.0 12.0 0.0
0.0
8.0 0.0 4.0 0.0
0.0 2.0 0.0
32.0
8.0 0.0 -18.0 0.0
0.0 6.0 0.0
8.2
8.0 0.0 1.8 0.0
0.0 1.0 0.0
13.6
8.0 0.0 1.4 0.0
0.0 1.0 0.0
14.1
8.0 0.0 0.9 0.0
0.0 1.4 0.0
12.7
8.0 0.0 1.9 0.0
0.0 1.0 0.0
12.4
8.0 0.0 2.6 0.0
311.60 238.00 0.00 0.00 0.00 194.40 0.00 0.00

Jorong, January 22, 2020


Checked By, Approved

Supianoor Hiras P Tind


ndent Mine Operation Support PJO. PT.T
019 Date: xxxxx/xxxxx/2019 Date: xxxxx/xxx

80% Required MA % (MAX)


100% Reward due to Higher MA% (Hours)
No Penalty
ours) No Penalty
Owner #VALUE!
Unit #VALUE!
Period #VALUE!

Delay
LOSS Location SCOPE JOB Remaks
HM
Others

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance
Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance
Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

0.4 Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

0.00 0.40

Approved By, Prepared By,

Hiras P Tindaon ____________________


PJO. PT.TJP Data Center PT. TJP
e: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019

90%
A% (Hours) 1.52
PT. JORON
MO
RENTA

WORKING HOUR
HOURS TOTAL METER
TOTAL
DATE WORKING HM
START STOP HOURS START STOP

Shift I 0.00 1491.5 1491.5 0.0


#VALUE! 0.00
Shift II 0.00 1491.5 1491.5 0.0
Shift I 0.00 1491.5 1491.5 0.0
#VALUE! 0.00
Shift II 0.00 1491.5 1491.5 0.0
Shift I 0.00 1491.5 1491.5 0.0
#VALUE! 0.00
Shift II 0.00 1491.5 1491.5 0.0
Shift I 0.00 1491.5 1491.5 0.0
#VALUE! 0.00
Shift II 0.00 1491.5 1491.5 0.0
Shift I 0.00 1491.5 1491.5 0.0
#VALUE! 0.00
Shift II 0.00 1491.5 1491.5 0.0
Shift I 0.00 1491.5 1491.5 0.0
#VALUE! 0.00
Shift II 0.00 1491.5 1491.5 0.0
Shift I 0.00 1491.5 1491.5 0.0
#VALUE! 0.00
Shift II 0.00 1491.5 1491.5 0.0
Shift I 0.00 1491.5 1491.5 0.0
#VALUE! 0.00
Shift II 0.00 1491.5 1491.5 0.0
Shift I 0.00 1491.5 1491.5 0.0
#VALUE! 0.00
Shift II 0.00 1491.5 1491.5 0.0
Shift I 0.00 1491.5 1491.5 0.0
#VALUE! 0.00
Shift II 0.00 1491.5 1491.5 0.0
Shift I 0.00 1491.5 1491.5 0.0
#VALUE! 0.00
#VALUE! 0.00
Shift II 0.00 1491.5 1491.5 0.0
Shift I 0.00 1491.5 1491.5 0.0
#VALUE! 0.00
Shift II 0.00 1491.5 1491.5 0.0
Shift I 0.00 1491.5 1491.5 0.0
#VALUE! 0.00
Shift II 0.00 1491.5 1491.5 0.0
Shift I 0.00 1491.5 1491.5 0.0
#VALUE! 0.00
Shift II 0.00 1491.5 1491.5 0.0
Shift I 0.00 1491.5 1491.5 0.0
#VALUE! 0.00
Shift II 0.00 1491.5 1491.5 0.0
Shift I 0.00 1491.5 1491.5 0.0
#VALUE! 0.00
Shift II 0.00 1491.5 1491.5 0.0
Shift I 0.00 1491.5 1491.5 0.0
#VALUE! 0.00
Shift II 0.00 1491.5 1491.5 0.0
Shift I 0.00 1491.5 1491.5 0.0
#VALUE! 0.00
Shift II 0.00 1491.5 1491.5 0.0
Shift I 0.00 1491.5 1491.5 0.0
#VALUE! 0.00
Shift II 0.00 1491.5 1491.5 0.0
Shift I 0.00 1491.5 1491.5 0.0
#VALUE! 0.00
Shift II 0.00 1491.5 1491.5 0.0
Shift I 0.00 1491.5 1491.5 0.0
#VALUE! 0.00
Shift II 0.00 1491.5 1491.5 0.0
Shift I 0.00 1491.5 1491.5 0.0
#VALUE! 0.00
Shift II 0.00 1491.5 1491.5 0.0
Shift I 0.00 1491.5 1491.5 0.0
#VALUE! 0.00
Shift II 0.00 1491.5 1491.5 0.0
Shift I 0.00 1491.5 1491.5 0.0
#VALUE! 0.00
Shift II 0.00 1491.5 1491.5 0.0
Shift I 0.00 1491.5 1491.5 0.0
#VALUE! 0.00
Shift II 0.00 1491.5 1491.5 0.0
Shift I 0.00 1491.5 1491.5 0.0
#VALUE! 0.00
Shift II 0.00 1491.5 1491.5 0.0
Shift I 0.00 1491.5 1491.5 0.0
#VALUE! 0.00
Shift II 0.00 1491.5 1491.5 0.0
Shift I 0.00 1491.5 1491.5 0.0
#VALUE! 0.00
Shift II 0.00 1491.5 1491.5 0.0
Shift I 1491.5 1491.5 0.0
#VALUE!
Shift II 1491.5 1491.5 0.0
Shift I 1491.5 1491.5 0.0
#VALUE!
Shift II 1491.5 1491.5 0.0
Total 0.00 0.00

Approved By, Checked By,

Catur Cahyadi Ronaldo Sianturi


Mine Operation Head Pit Service Superintendent
Date: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019

Schedule Time 332.00 Required MA % (MIN)


Maintenance Actual 11.20 Actual MA%
No Operator 0.00 Penalty due to Low MA% (Hours)
Working Hour 0.00 Penalty due to No Operator (Hours)
T. JORONG BARUTAMA GRESTON
MONTHLY REPORT
RENTAL HEAVY EQUIPMENT
LOSS TIME
IDLE Delay
TOTAL
HM No Mtc.
Schedule Not No Time
Required Operator Rainfall Others Travel

1.0 0.0 11.0 0.0


0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
12.0 0.0 0.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 7.8 3.2
0.0
12.0 0.0 0.0 0.0
1.0 0.0 3.0 8.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
1.0 0.0 11.0 0.0
0.0
12.0 0.0 0.0 0.0
0.00 412.00 0.00 0.00 0.00 320.80 11.20 0.00

Jorong, January 22, 2020


Checked By, Approved

Supianoor Hiras P Tind


ndent Mine Operation Support PJO. PT.T
019 Date: xxxxx/xxxxx/2019 Date: xxxxx/xxx

80% Required MA % (MAX)


97% Reward due to Higher MA% (Hours)
No Penalty
ours) No Penalty
Owner #VALUE!
Unit #VALUE!
Period #VALUE!

Delay
LOSS Location SCOPE JOB Remaks
HM
Others

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance ComDev

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance
Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance
Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

Road Maintenance

0.00 0.00

Approved By, Prepared By,

Hiras P Tindaon ____________________


PJO. PT.TJP Data Center PT. TJP
e: xxxxx/xxxxx/2019 Date: xxxxx/xxxxx/2019

90%
A% (Hours) 0.66

You might also like