TATA PROJECTS LIMITED ‘TRANSMISSION & DISTRIBUTION Ref: MS/TPLIDDU-007 Date: 24.09 2016 Revision 000) METHOD STATEMENT FOR SHUTDOWN ACTIVITY Document No Shut Down / All Areas / 07 Name of the Job Site = DDUGJY P-11B SL. List of Control Measures ‘Action by Existing Control Measures 77 [Sie engineers shall mate te Pre task plan (PTR) bolo one day for] Sito Erginacr the joo fo be executes ire of eoraluelon manager shal approve the PTP bel ‘executing the 28 & inform fo EHS In-charge (ni ine man (Chart) shal remove the juniper Wolate The ne, o raw sf rained electrician sill be deployed fr puting the dlscharge rod | and making the working zane free rem eny hazards wil ke assigned for LG jo, After isolation ney wil put 3 green flag and red fag co ddematk the sale work zone and unsafe working area respecively, “Tefro aking up Tne work, Supervgor ius Bethe shutdown workto | Ste E the concerned arcup und aang, " Before staring the job LC Token shall be gan foal workrion name by the supervisor Site Enginaer 3 ern orcoaraion wt Sic } Glerance on fe ona utes eb 2 Sle enpie/spetvsr sal tere Iie llr Tiwaker | Sle Enger {use are kept n open conden and eaution boards are henges Sie engince/superiser sould ensure ] Linen ine au arangoments foe the feeder, any such arrangements | ‘ate there C ust be taken accordingly cf tested by a1 electronic mul tester (Procedure demonstrated al i ‘ils eannedting discharge rod earth, decharge the Ine by charge rod and keep it on the neti completion of ob opdluelor near to the werking area, Ted on bath sides of rgerod tains cath "| Provide earth discharge od at all nearing and outgoing lina of ha | Site Engineer Site Engineer iy Sod be informed to al he line workers before thal person should be Kept at GOS locaton er pad lock — fe Engineer ‘arrangement fo be made onthe GOS location to avod any tid party ‘operation, a a 7 | Une Clearance for eter ine also must have oblained snco te Sie Engineer eee ie ee cr a, = at 76 | Aiter competion of the jb, work supervisor wil ensure hat fhe work | Sie Enginaer competed and the mor & materials ae removed, ‘7 | Remove the earth dscharge red from the canductor then remove the | Site Engineer arth comeetions. [ie © conearned sie engineerlauperiser should return UC ans’ Site Engineer i | Tewone em ta ln. 30 | tor se supervise by name. aH [Sis Engaer FB | Sulavie PE Seay meine wi ia ‘Bie Eieer | shoo. Relecive jae, Sectreal aes rbber hand lve et sl be a Sie Eni =| ‘onneing the dca 0d. Fa” ops sakous by ao Engneoruuponiaeron dalybascs | Slb Er 25 Fist Hid boxand veined rst Ader shal be ovaabe at ste Bie Engine 25 | No wars shoud be carted outator darkness 27 | Stich sapordeion sallbe ensured Aevitional Control Measures idual Risk ! Impact (f ary) ® Oa tincharge Safety Officer ReM foe

You might also like