Huawei UPS2000-G Solutions

Content

1 Challenges and Trends in UPS System

2 UPS2000-G Series Solutions

3 UPS2000-G Series Product Introduction

4 Successful Cases

2
Reliable UPS Against Poor Grid
Unavoidable grid problems Harsh environment condition

Blackout of Manhattan Blackout of USA and Canada Lightning Poor quality of grid

Poor grid Damage of electrical device Adverse environment condition A variety of loads

3
Efficient UPS for Energy Saving
High efficiency, low power consumption
It is estimated that the annual power consumption of the If the efficiency of UPS is improved from 90% to 92%,
data centers all over the world is up to 40,000,000,000 the power consumption decreasing for UPS itself is
kW·h. about 21.7% and cost saving for data center is about
0.5 billion kW·h, reducing about 20 million tons of
carbon emissions.

Energy consumption of typical data center Business grow with low OPEX

4
Content

1 Challenges and Trends in UPS System

2 UPS2000-G Series Solutions

3 UPS2000-G Series Product Introduction

4 Successful Cases

5
Huawei UPS Solutions
Modular UPS5000-E 25-800kVA & UPS5000-S 50-800kVA
UPS5000-E UPS5000-E UPS5000-E UPS5000-E UPS5000-E UPS5000-E
(25-125kVA) (50-200kVA) (50-300kVA) (50-500kVA) (50-600kVA) (50-800kVA)
50kVA power 50kVA power 50kVA power 50kVA power 50kVA power
25kVA power module 3U module 3U module 3U module 3U module 3U
module 2U UPS5000-S UPS5000-S UPS5000-S UPS5000-S UPS5000-S
(50-200kVA) (50-300kVA) (50-500kVA) (50-600kVA) (50-800kVA)

Tower UPS5000-A 30-800kVA

UPS5000-A UPS5000-A UPS5000-A UPS5000-A UPS5000-A UPS5000-A


(30/40kVA ) (60/80/120kVA) (200A/300kV ) (400/500kVA) (600kVA) 800kVA

R/T UPS2000-G 1-20kVA

UPS2000-G 1/3kVA UPS2000-G 6/10kVA UPS2000-G 15/20kVA

Tower UPS2000-A 1-10kVA

UPS2000-A 1kVA UPS2000-A 2kVA UPS2000-A 3kVA UPS2000-A 6/10kVA

6
UPS2000-G Core Value
• Widest input voltage range
• 5kA lightning design
Reliable • Powerful overload capability
• Alarms for key components

• Achieving the World‘s first batch of “ Energy Star ”certification


Efficient • High efficiency at low load rate

• Tower/rack convertible

• High expandability up to 4 units, easy to expand


Simple • Battery intelligent management, flexible configuration
• Integrated monitoring Platform for the whole network

7
Reliable Efficient Simple

High Adaptability to Extend 50% of Battery Life


Wide input voltage and frequency range

• Input voltage range: 80V to 280V


80V to 280V
• Input frequency range: 40 Hz to 70 Hz 40 Hz to 70 Hz
• Supports DG adaptability

Minimizes battery use to extend battery


lifespan.
Common Power Problems

80V AC input 280V AC input Spike wave input Serious distortion wave input

8
Reliable Efficient Simple

5 kA Lightning Protection Reducing 90% of Failure


Unrecoverable hardware damage to IT equipment caused by lightning

 More than 70% of lightning accidents involve


the power supply system.
 More than 90% of lightning accidents involve
computer network and communication
systems armed with UPS.

5 kA lightning protection design by simulating actual lightning

Lightning design  Huawei UPS can prevent 90% of failures


(Input common-mode)
caused by lightning by protecting equipment

Rocket- HUAWEI 6 kV/5 kA input ports.


triggered
lightening
Traditional 4 kV/2 kA or none

9
Reliable Efficient Simple

High Overload & Adaptability to Ensure Supply Quality


High Overload Capacity
 125% overload for 5 minutes
 150% overload for 1 minute
150%
Reduces transfer times to bypass Overload
mode, ensuring customer
equipment power supply quality.
Electrical load with constant changes

Various Loads

• Output power factor: 0.9


• Capacitive/inductive loads from Capacity/
Inductive Loads
lead 0.5 to lag 0.5
• High output load capacity ensuring
expansion demands in future
Load capacity

10
Reliable Efficient Simple

Failure Pre-Alarms against Potential System Risk


Dissipative components in UPS system

Fan failure Battery failure Capacitor failure

• Capacity decrease caused by electrolytes drying out will decrease the quality of
the power supply and increase the risk of power off.
Common failure
Reasons and • Fan will slow down due to dust and drying of lubrication; UPS temperature will
consequences
increase quickly until transfer to bypass mode. UPS life will be shortened and
power quality can not be ensured.
• Battery runtime will be reduced due to battery aging.

11
Reliable Efficient Simple

Strictest Testing — Higher Than Industry Standard


-40°C to 70℃
Lightning test 1,000 hours at 40℃ Open field
HALT

5 kA Lightning High temperature test Temperature shock Global Certification Test Shenzhen open field
sampling test Center

Rocket-triggered Temperature, Humidity, Bias (THB) Long Life Test (LLT) Highly accelerated Hainan open field
lightening Temperature: 40℃ Temperature: 40℃ life test Airborne hygroscopic dust , salt
Humidity: 95% for 1,000h 6 months -60 ℃ to 110 ℃ spray environment
5 cycles

12
Reliable Efficient Simple

Airborne Hygroscopic Dust Test for Higher Reliability

Strengthen measures

High humidity
Enhance environmental
adaptability

Sulfide dust

Hainan open field

14 days

13
Reliable Efficient Simple

The Highest Efficiency Up to 95%


High efficiency , saving OPEX Energy star certification

efficiency 10kVA efficiency test curve

Load rate

Batch 1 Energy Star certification:


• System efficiency: 6kVA: 94%
First in the UPS field worldwide
10kVA: 94.5%
15kVA/20kVA: up to 95%
• High efficiency up to 98% in ECO mode

50% load rate of 10kW load,compared with other UPS,UPS2000-G save more than ¥ 4634/year

14
Reliable Efficient Simple

Various Installations for Multiple Scenarios


Rack or Tower Friendly Interactive Interface Multiple Formats

Single-phase three-wire Three-phase five-wire

• LCD rotating design, more convenient • LCD displays system status • 6 kVA supports 1ph input, 1ph output

for R/T conversion • Supports five languages: • 10 kVA supports 3ph input, 1ph output;

• High power density, 2U/3U high, 650 English, Chinese, French, 1ph input, 1ph output

mm depth Spanish, and Russian • 15 kVA/20 kVA supports 3ph input, 3ph

• Can be installed in 900 mm deep, 19- output; 3ph input, 1ph output; 1ph input,

inch rack 1ph output

15
Reliable Efficient Simple

Parallel System: Up to Four Units


Parallel system: Up to four units, easy to expand Hierarchical power distribution

Ring parallel line

• Auto-sensing parallel, easy to form N + X configuration Primary load Secondary load


• Parallel systems require only one communication card • The primary load is turned off when the system is
• The ring parallel line eliminates the failure of a single parallel
overloaded or in battery mode to extend quality of
cable the main load power supply.
• The 15/20 kVA parallel system shares batteries, reducing

customer battery costs

16
Reliable Efficient Simple

Intelligent Management to Extend Battery Life


Flexible Configuration and Maintenance Intelligent Charge and Discharge Senior Management

• 20 to 16 cells per string for 6K/10K; 32 to • Automatic equalized and float-charging • Automatic identification of electrical
40 cells per string for 15/20K. When conversion and temperature environment, enabling intelligent
removing damaged batteries, the compensation function prevent battery hibernation mode in a healthy grid.
remaining batteries will work normally. over- or under-charging to extend • Detects battery states in real time
battery life. and supports battery pre-alarm.
• Automatically adjusts discharge
termination voltage in accordance with
load condition and the discharge time.
Constant Battery
Battery voltage hibernation
voltage

× Temperature
compensation

Damaged battery due to thermal


Old batteries can be reused. Battery discharging curve runaway

17
Reliable Efficient Simple

Integrated Monitoring System


Easy to manage
•Displays real-time system running state.

•Power supply and battery testing systems can

be controlled.

Remote online upgrade

•Monitoring unit supports remote online

upgrade.
•Supports RS485, SNMP, USB, and dry
NetEco 1000U
contact.
interface
Single UPS monitoring (USB) Multiple UPS network management system SMS alarm Terminal remote management
Real-time monitoring
Output report
Pre-failure

Asset management

18
Content

1 Challenges and Trends in UPS System

2 UPS2000-G Series Solutions

3 UPS2000-G Series Product Introduction

4 Successful Cases

19
UPS2000-G Family Overview SNMP card

Battery temperature sensor


Description Remarks
Modbus card
1kVA long backup time model
3kVA long backup time model
6kVA Standard/long backup time model
UPS
10kVA Standard/long backup time model
Transformer
UPS
15kVA long backup time model
Dry contact card
20kVA long backup time model
Battery pack 240V ,7/9Ah; 36V,7Ah; 96V,7Ah
Battery box 40Ah/65Ah,36V;40Ah,96V

Power 3/1 PDU Only for 6kVA to 20kVA UPS


distribution 3/3 PDU Only for 6kVA to 20kVA UPS
6kVA transformer 2:1:1 (Only for 6kVA to 20kVA UPS) GSM Modem
Battery pack
10kVA transformer 2:1:1 (Only for 6kVA to 20kVA UPS)

SNMP card SNMP/Web monitoring management Power Distribution Unit


(PDU)
Modbus card RS485 networking
Optional Temperature
accessories Dry contact card Input and output signal and humidity
Battery temperature sensor
Battery temperature monitoring
sensor
Temperature and Environment temperature and humidity
humidity sensor monitoring

20
Page20
UPS Port Introduction (1K to 3K)
GB Long Run Model IEC Long Run Model

1KVA

3 10A output 10A input Battery Terminals 4 C13 output C14 input Battery Terminals

2KVA

4 10A output 10A input Battery Terminals 6 C13 output C14 input Battery Terminals

3KVA

OT Terminals 4 10A output 16A input Battery Terminals C19 Terminals 6 C13 output C20 input Battery Terminals

Standard Model: No external battery interface

21
UPS Port Introduction (6K to 20K)

Battery ports: PP45 Input circuit


Emergency Power Off Temperature sensor
breaker
port : (40~80℃)

AC input ports AC output Maintenance


ports bypass port • Optional card slot
(MBS) • SNMP card
Parallel ports • Modbus card
• Dry contact card

Controller Area Network


(CAN) communications
10K Model Example

22
Flexible Installation: Tower/Rack

Open the panel Rotate LOGO

Rotate control panel


Support bases Adjustable guide rails
(Tower-installation ) ( Rack-installation) Tower installation
• The support bases are
delivered with the UPS. • The installation brackets are
delivered with the UPS.
•The support base length is
adjustable, you can add •The guide rails are optional
components to increase the accessories
length.

23
Mupltiple Formats: 1/1,3/1,3/3
• Formats transformation is realized by short-circuit busbars.
• Output format can be set on the LCD display.

3/3 3/3
Two mains input Two mains input

3/3 3/3
One mains input One mains input

3/1 3/1
Two mains input Two mains input

3/1 3/1 3/1


One mains input One mains input One mains input

1/1 1/1 1/1 1/1


One mains input One mains input One mains input One mains input

6K model 10K model 15K model 20K model

24
Battery Installation Type

6K/10K model :Battery ports: PP45 for

Battery pack 15K/20K model : Battery ports: OT

Battery Battery
pack rack

Short backup time mode Long backup time mode


(Battery pack ) (Battery rack )

IMPORTANT: 15K/20K requires cable distribution box in battery pack mode !!

25
Flexible Monitoring-USB/SNMP/Modbus/Dry Contact
Single monitoring : USB + NetEco 1000U Network monitoring : RS485 (Modbus)

Modbus protocol
YDN-23 protocol
UPS and PC are connected by USB line in single UPS system

Modbus networking mode


Network monitoring : Network monitoring :
SNMP+ Ethernet Dry contact +User interface Single UPS
networking

Parallel networking

Only one
communication
Standard cable card

Parallel system networking

26
Optional Accessories: Battery Pack and Box (1K to 3K)
Type Model Capacity Brand UPS
ESS-36V9Ah*2-BPVBB 36V/9Ah YUSA 1K
Battery
ESS-72V9Ah*2-BPVBB 72V/9Ah YUSA 2K
pack
ESS-96V9Ah*1-BPVBB 96V/9Ah YUSA 3K
ESS-36V40Ah*1-BBNBB 36V/40Ah Shoto/B.B. 1K
Battery
ESS-36V65Ah*1-BBNBB 36V/65Ah Shoto/B.B. 1K
box
ESS-96V40Ah*1-BBNBB 96V/40Ah Shoto/B.B. 3K

1K: Backup time schedule of battery pack 2K: Backup time schedule of battery pack 3K: Backup time schedule of battery pack
No. Load Backup time No. Load Backup time No. Load Backup time
100% 15.0min 100% 6.5min 100% 7min
1 1
75% 21.0min 75% 10.0min 75% 11min
1 100% 17.0min 100% 16min
50% 39.0min 2 2
25% 77.0min 75% 25.0min 75% 25min
100% 36.0min 100% 39min 100% 31min
3 3
75% 47.0min 75% 55min 75% 45min
2 100% 63min 100% 39min
50% 83.0min 4 4
25% 159.0min 75% 87min 75% 55min

27
Optional Accessories: Battery Pack (6K to 20K)
Model Capacity Brand
ESS-240V12-7AhBPVBA01 7Ah B.B.
ESS-240V12-7AhBPVBA02 7Ah Panasonic
ESS-240V12-9AhBPVBA01 9Ah B.B.
ESS-240V12-9AhBPVBA02 9Ah Panasonic
Part backup time schedule :
B.B. 7Ah B.B. 9Ah B.B. 9Ah
Backup Backup Backup
Battery Battery Battery
UPS UPS model
number number number
time time time
6K 6K 4 19min
15K long
Standard 1 6min Standard 1 4min
backup time 6 32min
model model model 8 48min
6K long 2 19min 2 12min
10K long 4 12min
backup time 3 29min 20Klong
backup time 3 23min 6 23min
model 4 46min backup time
model model
4 32min 8 32min

28
Optional Accessories –Battery Rack and Switch Box

Model Specifications UPS


More connection type of battery racks
PDC-63DC-440V 440VDC 63A 3K/6K/10K
PDC-63DC-660V 630VDC 63A 15K/20K

UPS
Battery switch box
+ -

Battery rack

•Type of battery rack depends on


battery number and capacity.
+Rack 1- + Rack -2 + Rack-3 +Rack 4-
•2V and 12V series battery rack
more battery racks connections

29
Optional Accessories -PDU
PDU model UPS model
PDC-0038V4ACIOA 15K/20K ( 3/3 )

PDC-0091V2ACIOA 6K/10K/15K/20K (3/1 , 1/1)

Functions :
• Input and output power distribution of
parallel system.
1. Maintenance 2. DIP switch 3. Voltage monitoring ports 4. Output ports
( 6K/10K 1+1,2+0 & 15K/20K 1+1 ) bypass ports (MBS)
•Provide maintenance bypass in UPS single or 5. Bypass input ports 6. Mains input ports 7. Output socket group 1 8. Output socket
(250 V AC, 15 A) group 1 fuses
parallel system.
9. Output socket 10. Output socket 11. UPS 1 mains input port 12. UPS 2 mains
• Provide output sockets: OT ;4*C13;2*C19. group 2 fuses group 2 (250 V AC, 10 (under the cover) input port (under the
A) cover)
• Report voltage signals of PDU to UPS. 13. UPS 1 bypass 14. UPS 2 bypass 15. UPS 1 output port 16. UPS 2 output
input port (under the input port (under the (under the cover) port (under the
cover) cover) cover)

30
Maintenance bypass
Optional Accessories -PDU opening will trigger the
maintenance bypass
switch(MBS ) signal
PDU front panel
( Logo panel removed )

Input and output


circuit breakers

端口连接

PDU rear panel


(Cover plate removed)

31
Optional Accessories - Transformer
Functions Configuration
• Realize electric isolation 15K 3/3 : 3 x 6kVA transformers
• Transformer ratio 2:1:1 20K 3/3 : 3 x 10kVA transformers
• Output dual 110V or another 220V 15/20K 3/1,1/1 : 2pcs 10kVA transformers

Types
• 6kVA transformers for 6K&15K UPS
•10kVA transformers for 10K&20K UPS

32
Optional Accessories –Monitoring Card
Monitoring
card slot
SNMP card
•Monitors, via NMS, NetEco, and the Web, the UPS.
operating status based on the computer network type.
• Environment temperature and humidity sensor can be
inserted in SNMP to monitor surrounding information.

Modbus card
• RS485 networking.
• Monitoring via the NetEco 1000U.
Monitoring • Only one card required in parallel system.
card slot
Dry contact card
Card slot can hold three types • 6 alarm outputs :( Normal mode , battery mode ,

of monitoring cards. bypass mode , Low battery voltage, Bypass


backfeed , UPS faults )
• 2 control inputs : Shutdown , reserved.

33
Optional Accessories -NetEco 1000U

• Real-time monitoring. NetEco 1000U monitors UPSs in real


time and allows users to configure and control UPSs
• Delay shutdown, shut down the computer application system
and operating system
• USB, SNMP, Modbus networking communication
• Historical data query. Query historical data and UPS alarm logs
through the NetEco 1000U.
• Remote alarm notification. NetEco 1000U notifies users via by
emails or SMS short messages immediately after a UPS
reports an alarm
Notes: The SMS alarm requires GSM MODEM :

The free NetEco 1000U can only support monitoring within ten UPSs.
An installation CD of NetEco 1000U is delivered with the UPS.

34
Content

1 Challenges and Trends in UPS System

2 UPS2000-G Series Solutions

3 UPS2000-G Series Product Introduction

4 Successful Cases

35
Huawei Provides Smart Solutions to Saudi Aramaco
Project Background
 Saudi Aramaco is the largest oil production company, whose
business is worldwide. The company is providing continuous power
to management sites.

Customer Requirements and Challenges


 Various sites with different scenarios need UPS to adapt
different installation requirements.
 Some of the sites use dual-live power supply system.
 All the UPSs should be monitored by customer’s network Saudi Aramaco
manage system.

Huawei Solution and Customer Values


 3kVA-10kVA UPS system with battery pack or battery rack.
 Customers can select rack/tower installation according to
requirement.
 UPS2000-G supports dual-live-input after customization.
 UPS2000-G supports SNMP, RS484, etc.
Huawei UPS

HUAWEI TECHNOLOGIES CO., 36


LTD. Page 36
HUAWEI Wins the Bid of London Underground
Background
 The London Underground is a public metro system serving a large part of Greater
London and parts of the counties of Buckinghamshire, Hertfordshire and Essex. The
system serves 270 stations and has 402 kilometers (250 mi) of track, 55% of which is
above ground.

Challenge And Requirements


 The original power supply system of London Underground is of various kinds of UPS
from different brands and different capacity. The UPSs have been used for over 10
years. All the UPS and batteries need to be replaced.
 UPS for London Underground would support the public alarming system, CCTV, IT
system and emergency system, etc.

HUAWEI UPS Solution and Customer Value


 HUAWEI provides 1136 sets of UPS
 All-in-one UPS solution: high power density, easy maintenance, flexible expansion,
front and rear access
 Highly reliable UPS with wide input voltage, ensure the system stable operating.
 Key Components have failure warning to avoid Potential System Risk

HUAWEI TECHNOLOGIES CO., 37


LTD. Page 37
Turkey Halkbank
Project Background
 Halkbank is one of the largest state-owned banks in Turkey, this project is a large
procurement of UPS, covering all the units in the nationwide, requirements for high
reliability and environment applicability is much stricter.

Customer Requirements and Challenges


 Requires high reliability, low THDI
 UPS should be available for Ethernet network connection, as well as remote
monitoring of UPS conditions

HUAWEI Solution and Customer Value


 HUAWEI provides 300 sets of UPS 2000-G-10kVA, with standard SNMP card
 UPS 2000-G has super-wide input voltage and frequency range, suitable for harsh
power environment and is adopted in various units
 The number of batteries in UPS 2000-G is between 16 and 20, and the batteries can
be recycled

38
Munich institute realizing the goal of energy saving
Munich institute, one of the
Challenges of Munich institute most important institute of
Huawei, with an area of
 Requirement of high reliability, MTBF>300,000 hours and MTTR<1 hour. about 3000m2, and 370
 Requirement of high efficiency and 50% reduction in carbon emission employee, among which 80%
is local employees in
compared with 2006.
German
 Requirement of standard certification(EU CE).
Huawei solution & Customer Benefits
UPS1
Servers  UPS2000-G 20kVA UPS 1+1 redundant system, 1

Input RAID hour backup time.

Firewall  Compared with traditional UPS, Huawei UPS2000-G

Minicomputer support a high efficiency of up to 95%, that can reduce


carbon emissions by 50% and provide a MTBF≥ 350
UPS2
Officials of German government and thousand hours.
Chinese consul-general visit Huawei UPS2000-G redundant system  UPS2000-G has achieved EU, CE, ROSH certification
Munich institute
and the global first batch of UPSs achieving Energy
Star certification.
39
THANK YOU

Copyright©2016 Huawei Technologies Co., Ltd. All Rights Reserved.


The information in this document may contain predictive statements including, without limitation, statements regarding the future financial and operating results, future product portfolio, new
technology, etc. There are a number of factors that could cause actual results and developments to differ materially from those expressed or implied in the predictive statements. Therefore, such
information is provided for reference purpose only and constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.

You might also like