CALCULATING OEE WORKSHEET

Overall Equipment Effectiveness


Line / Cell :
Process : OEE
Machine :
Date :
90.8%
OEE DATA
Shift Length (Minutes) : 480
Number of Shift(s) : 2
Short Breaks per Shift (Minutes) : Each (Minutes) : 30 Nb : Total : 0
Meal Break per Shift (Minutes) : Each (Minutes) : 20 Nb : Total : 0
Down Time (Minutes) : 30
Ideal Rate : (Pieces/Hour) : 3000 (Pieces/Minute) : 50
Total Pieces Produced per Shift : 22000
Rejected Pieces per Shift : 200

OEE VARIABLES CALCULATION


Planned Production Time (Minutes) : 960
Operating Time (Minutes) : 900
Good Pieces per Shift : 21800

OEE FACTORS CALCULATION


Availability 93.8% 90.0%
Performance 97.8% 95.0%
Quality 99.1% 99.9%
Overall OEE 90.8% 85.4%

120.0%
Calculated Factor World Class
100.0%

80.0%

60.0%

40.0%

20.0%

0.0%
Availability Performance Quality Overall OEE
Rate

File : 456659385.xls
Form Release : 1.10 US
Copyright © 2004-2008 - Philippe Magnier
0.0%
Availability Performance Quality Overall OEE
Rate

File : 456659385.xls
Form Release : 1.10 US
Copyright © 2004-2008 - Philippe Magnier