Professional Documents
Culture Documents
Subject: Rescheduled Meeting Note for review Meeting on Chambal Date: 11/16/19 05:34 PM
Expressway Project in Madhya Pradesh on 18.11.19 at 1.00 PM at
From: SANKET BHONDVE <ps-morth@gov.in>
R.No. 44, Parliament House, New Delhi
To: kotharin@nic.in, SECRETARY MORT&H <secy-road@nic.in>,
"I. K. Pandey" <indresh.pandey@nic.in>,
Malay Shrivastava <pspwd@mp.gov.in>,
mdmprdc <mdmprdc@mp.nic.in>, opshri1966@gmail.com,
sushilkumarmishra@nhai.org, robhopal@nhai.org,
mord kb <mord.kb@gmail.com>, minoffice@nic.in,
minister rd <minister.rd@gov.in>,
Narendra Singh Tomar <ns.tomar@sansad.nic.in>,
rathore kuldeep <rathore.kuldeep@nic.in>,
kuldeep delhi <kuldeep.delhi@gmail.com>,
ro bpl-morth <ro.bpl-morth@gov.in>,
romorthbhopal@gmail.com,
Ashutosh Mishra <building-mprdc@mp.gov.in>,
pwdbhop pwdbhop <pwdbhop@mp.nic.in>,
mdmprdc <mdmprdc@nic.in>, cs <cs@mp.nic.in>
Cc: narenarun@gmail.com, ps morth <ps.morth@gmail.com>,
ps morth <ps.morth@gmail.com>,
Vaibhav dange <Vaibhav.dange@gmail.com>,
jcjoshi41@gmail.com, kumardelhi2010@gmail.com,
deepakpathak du <deepakpathak.du@gmail.com>,
sndp300@gmail.com, dpksain38 <dpksain38@gmail.com>,
kabirji78@gmail.com
Most Immediate
Rescheduled Meeting Notice
Office Of Hon’ble Minister Of Road Transport & Highways and Micro, Small & Medium Enterprises (MSME),
Hon'ble Minister will be taking a review Meeting on Chambal Expressway project in the state of Madhya Pradesh, on
18th November, 2019 (Monday) at 1.00 PM at his Parliament Chamber (R.No. 44, Parliament House, New Delhi).
Kindly make it convenient to attend the meeting along with officials concerned and relevant details.
Sh. Malay Shrivastava, Prl. Secretary, PWD, Govt. of Madhya Pradesh, Bhopal,
Copy to:
https://mail.gov.in/iwc_static/layout/shell.html?lang=en&3.0.1.2.0_15121607 19-11-2019
Page 2 of 2
Sh. Sudhi Ranjan Mohanty, Chief Secretary, Madhya Pradesh, with a request to attend the meeting.
https://mail.gov.in/iwc_static/layout/shell.html?lang=en&3.0.1.2.0_15121607 19-11-2019
No. CE-RO BPLI 10030 I 01 I 2017 -18
GOVERNAAENT OF INDIA
I'AINISTRY OF ROAD TMNSPORT & HIGHWAYS
(Zone -4- Section)
Transport Bhawan, 1, Partiament Street, New Dethi-110001
Subject: Sanction of 15 nos. of works under Central Road Fund (CRF) for the State of
Madhya Pradesh- reg.
Sir,
2. You may accord technica[ and financial sanction to the individuat projects within a
period of four months from the.date of administration approval of the
works faiiing whiclr the
works wi[[ be deemed to have been deteted from the programme. ln any case, th-e period
of
comptetion of project should not exceed 24 months inctuding the period ror ienaeiing. any
excess cost beyond 10% will have to be arranged by Govt. of Madhya pradesh from
their own
resources. No revised estimate witt be considered in this scheme. Audit shatt
admit
expenditure on the basis of technicatty approved and financiatty sanctioned estimaie by
the
Competent State/ UT authority.
5. The State Government witt be required to furnish work wise utitization certificate as
per Ministry circular No. RW/NH-11011/2/2000-p&M (pt) dated 08.08.2007 (Notification
No.
GsR 475-E Dated 10.07.2007) atong with quarterty progress report. Further instattment
of
funds witI be reteased to the extent of expenditure incuired as per utitization certificate
by
30th Aprit each year.
6. The State Government shoutd furnish comptetion certificate duty vetted by Audit after
comptetion of works as stipulated in the sanction in para 5 above.
7. it
white according technical and financial sanction, may be ensured that the
contingencies, works charged estabtishment and quatity controt cha;ges are as per Ministry,s
guidetines.
8. The work have been assigned job number, which may be quoted in att future
correspondence.
9. lt may be noted that the approval is subject to the condition that Government of
Madhya Prdesh shatl furnish atl the retevant detai[s of the roads considered
u, p"i cRiRrt",
viz. index map showing the area.and the proposat, scope/specification of the wortrin
urier,
estimated cost of the project based on the actual requirement and proposed
siartingr
completion dated etc. and upgradation of category of roads as per cRF r,lt"Jpl-
up the work.
tolahng
10. The expenditure is debitabte under Major Head- 3601 (ptan) Grants-in-Aid
to state
Government; 02 Grants for state ptan schemes
lsuu-tta.,o,. Head); 02.ios-Grants from centrat
Road Fund (Major Head); o1 Grants for state ioad; oi.oo.:s- -apitat
6.rants for creation or
assets corresponding the Demand no. gl of the Ministry of Road
rransport una iigh*uy, fo,"
the Financiat Year 2018-19.
1
,1
. The sanction is subject to,obtaining the necessary approval, if needed for carrying out
the work from other Department tike Raitways, Forest etc. '
Enc[: As above.
,,*.fr!*ln^,,
rnternar Distribution: under secretary t" tn" c#lJlllE##iiai.
l. The DG(RD)&SS, MoRT&H, New Dethi.
' Annexure to sanction letter no. CE-RO-B,PLl1UU3tJtU1l'tUtU-19 dated t}Jt'1u19
q
road
Total 259.10 1135.46