MPRDC Schedules to Concession Agreement

Kilometer Chainage (RHS) Proposed Works to be executed on RHS (Thickness in mm) Remark TCS as per
Length over lay Sub- Earth Schedule
From To From To BC DBM WMM GSB DLC PQC
DBM grade work D
As per
88.000 88.050 0.050 40 80 250 200 500 TCS-1
88+000 89+000 P&P
88.050 89.000 0.950 50 40 - - - - - - - TCS-1
As per
89.000 89.200 0.200 40 80 250 200 500 TCS-1
P&P
89+000 90+000 89.200 89.700 0.500 40 80 250 - - - - - TCS-1
As per
89.700 90.000 0.300 40 80 250 200 500 TCS-1
P&P
As per
90.000 90.040 0.040 40 80 250 200 500 TCS-1
P&P
90.040 90.280 0.240 50 40 - - - - - - - - TCS-1
90.280 90.295 0.015 40 - - - - - - - MNB Structure
90+000 91+000
90.295 90.490 0.195 50 40 - - - - - - - - TCS-1
90.490 90.800 0.310 40 80 250 200 - - - - TCS-1
90.800 91.000 0.200 40 80 250 - - - - - TCS-1
91.000 91.200 0.200 40 80 250 - - - - - TCS-1
As per
91.200 91.356 0.156 40 80 250 200 500 TCS-1
91+000 92+000 P&P
91.356 91.386 0.030 40 - - - - - - - MNB Structure
91.386 92.000 0.614 50 40 - - - - - - - TCS-1
92.000 92.200 0.200 50 40 - - - - - - - TCS-1
As per
92+000 93+000 92.200 92.610 0.410 40 80 250 200 500 TCS-1
P&P
92.610 93.000 0.390 50 40 - - - - - - - TCS-1
93.000 93.640 0.640 50 40 - - - - - - - TCS-1
93.640 93.827 0.187 40 80 250 - - - - - TCS-1
93+000 94+000
93.827 93.857 0.030 40 - - - - - - - MNB Structure
93.857 94.000 0.143 40 80 250 - - - - - TCS-1
94.000 94.570 0.570 40 80 250 - - - - - TCS-1
94+000 95+000
94.570 95.000 0.430 40 80 - - - - - - TCS-1
95+000 96+000 95.000 95.940 0.940 40 80 - - - - TCS-1

4 –Laning of Sidhi – Singrauli Section from Km 83/4 to Km188/6 of NH-75E in the State of Madhya Pradesh on BOT.
B-25