Slab geometry
; Span of slab in x-direction; Span x = 7500 mm
; Span of slab in y-direction; Span y = 7500 mm
; Column dimension in x-direction; lx = 400 mm
; Column dimension in y-direction; ly = 400 mm
; External column dimension in x-direction; lx1 = 250 mm
; External column dimension in y-direction; ly1 = 250 mm
Edge dimension in x-direction; e x = lx1 / 2 = 125 mm
Edge dimension in y-direction; e y = ly1 / 2 = 125 mm
Effective span of internal bay in x direction; L x = Span x – lx = 7100 mm
Effective span of internal bay in y direction; L y = Span y – ly = 7100 mm
Effective span of end bay in x direction; L x1 = Span x – l x / 2 = 7300 mm
Effective span of end bay in y direction; L y1 = Span y – l y / 2 = 7300 mm
ex A B C
Span x Span x
ey l y1
1
lx1
lx lx
y
an
Sp
2 ly
y
an
Sp
3 ly
Slab details
; Depth of slab; h = 250 mm
; Characteristic strength of concrete; fcu = 35 N/mm 2
; Characteristic strength of reinforcement; fy = 500 N/mm 2
; Characteristic strength of shear reinforcement; fyv = 500 N/mm 2
; Material safety factor; m = 1.15
; Cover to bottom reinforcement; c = 20 mm
; Cover to top reinforcement; c’ = 20 mm
Loading details
; Characteristic dead load; G k = 5.000 kN/m 2
; Characteristic imposed load; Q k = 5.000 kN/m 2
; Dead load factor; G = 1.4
; Imposed load factor; Q = 1.6
Total ultimate load; N ult = (G k G ) + (Q k Q ) = 15.000 kN/m 2
; Moment redistribution ratio; b = 1.1
; Ratio of support moments to span moments; i = 1.0
Project Job no.
60 CURZON STREET, LONDON J125
BAZARAA ENGINEERING
69 Jala Taman Ibu Kota Calcs for Start page no./Revision
SAGGING MOMENTS
End bay A-B
Effective span; L = 7300 mm
Depth of reinforcement; d = 206 mm
Midspan moment; m = (N ult L 2 ) / (2 (1 + (1 + i)) 2 ) = 68.573 kNm/m
Support moment; m’ = i m = 68.573 kNm/m
Design reinforcement
Lever arm; K’ = 0.402 ( b – 0.4) – 0.18 ( b – 0.4) 2 = 0.193
K = m / (d 2 fcu ) = 0.046
Compression reinforcement is not required
z = min((0.5 + (0.25 – (K / 0.9))), 0.95) d = 194.8 mm
Area of reinforcement designed; A s_des = m / (z fy / m ) = 810 mm 2 /m
Minimum area of reinforcement required; A s_min = 0.0013 h = 325 mm 2 /m
Area of reinforcement required; A s_req = max(A s_des, A s_m in ) = 810 mm 2 /m
Provide 16 dia bars @ 150 centres
Area of reinforcement provided; A s_prov = D 2 / (4 s) = 1340 mm 2 /m
PASS - Span reinforcement is OK
Check deflection
Design service stress; fs = 2 fy A s_req / (3 A s_prov b ) = 183 N/mm 2
Modification factor; k 1 = min(0.55+(477N/mm 2 -fs )/(120(0.9N/mm 2 +(m/d 2 ))),2) = 1.524
Allowable span to depth ratio; 0.9 26 k 1 = 35.656
Actual span to depth ratio; L / d = 35.437
PASS - Span to depth ratio is OK
Internal bay B-C
Effective span; L = 7100 mm
Depth of reinforcement; d = 206 mm
Midspan moment; m = (N ult L 2 ) / (2 ((1 + i) + (1 + i))2 ) = 47.259 kNm/m
Support moment; m’ = i m = 47.259 kNm/m
Design reinforcement
Lever arm; K’ = 0.402 ( b – 0.4) – 0.18 ( b – 0.4) 2 = 0.193
K = m / (d 2 fcu ) = 0.032
Compression reinforcement is not required
z = min((0.5 + (0.25 – (K / 0.9))), 0.95) d = 195.7 mm
Area of reinforcement designed; A s_des = m / (z fy / m ) = 555 mm 2 /m
Minimum area of reinforcement required; A s_min = 0.0013 h = 325 mm 2 /m
Area of reinforcement required; A s_req = max(A s_des, A s_m in ) = 555 mm 2 /m
Provide 16 dia bars @ 300 centres
Area of reinforcement provided; A s_prov = D 2 / (4 s) = 670 mm 2 /m
PASS - Span reinforcement is OK
Check deflection
Design service stress; fs = 2 fy A s_req / (3 A s_prov b ) = 251 N/mm 2
Modification factor; k 1 = min(0.55+(477N/mm 2 -fs )/(120(0.9N/mm 2 +(m/d 2 ))),2) = 1.485
Project Job no.
60 CURZON STREET, LONDON J125
BAZARAA ENGINEERING
69 Jala Taman Ibu Kota Calcs for Start page no./Revision
SAGGING MOMENTS
End bay 1-2
Effective span; L = 7300 mm
Depth of reinforcement; d = 222 mm
Midspan moment; m = (N ult L 2 ) / (2 (1 + (1 + i)) 2 ) = 68.573 kNm/m
Support moment; m’ = i m = 68.573 kNm/m
Design reinforcement
Lever arm; K’ = 0.402 ( b – 0.4) – 0.18 ( b – 0.4) 2 = 0.193
K = m / (d 2 fcu ) = 0.040
Compression reinforcement is not required
z = min((0.5 + (0.25 – (K / 0.9))), 0.95) d = 210.9 mm
Area of reinforcement designed; A s_des = m / (z fy / m ) = 748 mm 2 /m
Minimum area of reinforcement required; A s_min = 0.0013 h = 325 mm 2 /m
Area of reinforcement required; A s_req = max(A s_des, A s_m in ) = 748 mm 2 /m
Provide 16 dia bars @ 200 centres
Area of reinforcement provided; A s_prov = D 2 / (4 s) = 1005 mm 2 /m
PASS - Span reinforcement is OK
Check deflection
Design service stress; fs = 2 fy A s_req / (3 A s_prov b ) = 225 N/mm 2
Modification factor; k 1 = min(0.55+(477N/mm 2 -fs )/(120(0.9N/mm 2 +(m/d 2 ))),2) = 1.465
Allowable span to depth ratio; 0.9 26 k 1 = 34.280
Actual span to depth ratio; L / d = 32.883
PASS - Span to depth ratio is OK
Internal bay 2-3
Effective span; L = 7100 mm
Depth of reinforcement; d = 222 mm
Midspan moment; m = (N ult L 2 ) / (2 ((1 + i) + (1 + i))2 ) = 47.259 kNm/m
Project Job no.
60 CURZON STREET, LONDON J125
BAZARAA ENGINEERING
69 Jala Taman Ibu Kota Calcs for Start page no./Revision
Design reinforcement
Lever arm; K’ = 0.402 ( b – 0.4) – 0.18 ( b – 0.4) 2 = 0.193
K = m / (d 2 fcu ) = 0.027
Compression reinforcement is not required
z = min((0.5 + (0.25 – (K / 0.9))), 0.95) d = 210.9 mm
Area of reinforcement designed; A s_des = m / (z fy / m ) = 515 mm 2 /m
Minimum area of reinforcement required; A s_min = 0.0013 h = 325 mm 2 /m
Area of reinforcement required; A s_req = max(A s_des, A s_m in ) = 515 mm 2 /m
Provide 16 dia bars @ 300 centres
Area of reinforcement provided; A s_prov = D 2 / (4 s) = 670 mm 2 /m
PASS - Span reinforcement is OK
Check deflection
Design service stress; fs = 2 fy A s_req / (3 A s_prov b ) = 233 N/mm 2
Modification factor; k 1 = min(0.55+(477N/mm 2 -fs )/(120(0.9N/mm 2 +(m/d 2 ))),2) = 1.644
Allowable span to depth ratio; 0.9 26 k 1 = 38.462
Actual span to depth ratio; L / d = 31.982
PASS - Span to depth ratio is OK
PUNCHING SHEAR
Corner column A1
Design shear transferred to column; V t = ((0.45 Span x ) + e x ) ((0.45 Span y) + e y) N ult = 184 kN
Design effective shear transferred to column; V eff = 1.25 V t = 230 kN
Area of tension steel in x-direction; A sx_ten = A scorner = 1130 mm 2 /m
Area of tension steel in y-direction; A sy_ten = A scorner = 1130 mm 2 /m
Column perimeter; u c = lx1 + l y = 650 mm
Average effective depth of reinforcement; d = h – c’ - p = 214 mm
Maximum allowable shear stress; v max = min(0.8 (fcu ), 5) = 4.733 N/mm 2
Design shear stress at column perimeter; v 0 = V eff / (u c d) = 1.651 N/mm 2
PASS - Maximum concrete shear stress not exceeded at column perimeter
Shear reinforcement at a perimeter of 1.50d - (321 mm)
Length of shear perimeter; u = u c + (2 (k x k y) k d) = 1292 mm
Area of tension steel at shear perimeter; A s_ten = (k y (p x + (k x k d)) A sy_ten ) + (k x (p y + (k y k d)) A sx_ten )
A s_ten = 1460 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.668 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u d) = 0.831 N/mm 2
v c < v <= 1.6 v c
Shear reinforcement required at perimeter; A sv_req = (v - v c ) u d / (f yv / m ) = 103 mm 2
Shear reinforcement at a perimeter of 2.25d - (482 mm)
Length of shear perimeter; u = u c + (2 (k x k y) k d) = 1613 mm
Area of tension steel at shear perimeter; A s_ten = (k y (p x + (k x k d)) A sy_ten ) + (k x (p y + (k y k d)) A sx_ten )
A s_ten = 1823 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.668 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u d) = 0.665 N/mm 2
v < v c no shear reinforcement required
Penultimate edge column A2
Design shear transferred to column; V t = ((0.45 Span x ) + e x ) (1.05 Span y) N ult = 413 kN
Design effective shear transferred to column; V eff = 1.4 V t = 579 kN
Area of tension steel in x-direction; A sx_ten = A sx_edge = 904 mm 2 /m
Project Job no.
60 CURZON STREET, LONDON J125
BAZARAA ENGINEERING
69 Jala Taman Ibu Kota Calcs for Start page no./Revision
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.747 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u d) = 1.142 N/mm 2
v c < v <= 1.6 v c
Shear reinforcement required at perimeter; A sv_req = (v - v c ) u d / (f yv / m ) = 811 mm 2
Shear reinforcement at a perimeter of 2.25d - (482 mm)
Length of shear perimeter; u = u c + (2 (k x k y) k d) = 5452 mm
Area of tension steel at shear perimeter; A s_ten = (k y (p x + (k x k d)) A sy_ten ) + (k x (p y + (k y k d)) A sx_ten )
A s_ten = 8609 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.747 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u d) = 0.873 N/mm 2
v c < v <= 1.6 v c
Shear reinforcement required at perimeter; A sv_req = (v - v c ) u d / (f yv / m ) = 339 mm 2
Shear reinforcement at a perimeter of 3.00d - (642 mm)
Length of shear perimeter; u = u c + (2 (k x k y) k d) = 6736 mm
Area of tension steel at shear perimeter; A s_ten = (k y (p x + (k x k d)) A sy_ten ) + (k x (p y + (k y k d)) A sx_ten )
A s_ten = 10636 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.747 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u d) = 0.707 N/mm 2
v < v c no shear reinforcement required
Internal edge column C1
Design shear transferred to column; V t = Span x ((0.45 Span y) + e y) N ult = 394 kN
Design effective shear transferred to column; V eff = 1.4 V t = 551 kN
Area of tension steel in x-direction; A sx_ten = A sxe = 1340 mm 2 /m
Area of tension steel in y-direction; A sy_ten = A sy_edge = 904 mm 2 /m
Column perimeter; u c = lx + (2 ly1) = 900 mm
(Library item: Flat slab shear map C1) Average effective depth of reinforcement; d = h – c’ - p = 214 mm
Maximum allowable shear stress; v max = min(0.8 (fcu ), 5) = 4.733 N/mm 2
Design shear stress at column perimeter; v 0 = V eff / (u c d) = 2.862 N/mm 2
PASS - Maximum concrete shear stress not exceeded at column perimeter
Shear reinforcement at a perimeter of 1.50d - (321 mm)
Length of shear perimeter; u = u c + (2 (k x k y) k d) = 2184 mm
Area of tension steel at shear perimeter; A s_ten = (k y (p x + (k x k d)) A sy_ten ) + (k x (p y + (k y k d)) A sx_ten )
A s_ten = 2472 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.669 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u d) = 1.179 N/mm 2
1.6 v c < v <= 2 v c
Shear reinforcement required at perimeter; A sv_req = 5 ((0.7 v) - v c ) u d / (f yv / m ) = 844 mm 2
Shear reinforcement at a perimeter of 2.25d - (482 mm)
Length of shear perimeter; u = u c + (2 (k x k y) k d) = 2826 mm
Area of tension steel at shear perimeter; A s_ten = (k y (p x + (k x k d)) A sy_ten ) + (k x (p y + (k y k d)) A sx_ten )
A s_ten = 3193 mm 2
Project Job no.
60 CURZON STREET, LONDON J125
BAZARAA ENGINEERING
69 Jala Taman Ibu Kota Calcs for Start page no./Revision
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.668 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u d) = 0.912 N/mm 2
v c < v <= 1.6 v c
Shear reinforcement required at perimeter; A sv_req = (v - v c ) u d / (f yv / m ) = 339 mm 2
Shear reinforcement at a perimeter of 3.00d - (642 mm)
Length of shear perimeter; u = u c + (2 (k x k y) k d) = 3468 mm
Area of tension steel at shear perimeter; A s_ten = (k y (p x + (k x k d)) A sy_ten ) + (k x (p y + (k y k d)) A sx_ten )
A s_ten = 3913 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.668 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u d) = 0.743 N/mm 2
v c < v <= 1.6 v c
Shear reinforcement required at perimeter; A sv_req = (v - v c ) u d / (f yv / m ) = 128 mm 2
Shear reinforcement at a perimeter of 3.75d - (803 mm)
Length of shear perimeter; u = u c + (2 (k x k y) k d) = 4110 mm
Area of tension steel at shear perimeter; A s_ten = (k y (p x + (k x k d)) A sy_ten ) + (k x (p y + (k y k d)) A sx_ten )
A s_ten = 4633 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.668 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u d) = 0.627 N/mm 2
v < v c no shear reinforcement required
Internal central column C2
Design shear transferred to column; V t = Span x (1.05 Span y) N ult = 886 kN
Design effective shear transferred to column; V eff = 1.15 V t = 1019 kN
Area of tension steel in x-direction; A sx_ten = A sxe = 1340 mm 2 /m
Area of tension steel in y-direction; A sy_ten = A sy1i = 1608 mm 2 /m
Column perimeter; u c = 2 (lx + ly) = 1600 mm
Average effective depth of reinforcement; d = h – c’ - p = 214 mm
Maximum allowable shear stress; v max = min(0.8 (fcu ), 5) = 4.733 N/mm 2
Design shear stress at column perimeter; v 0 = V eff / (u c d) = 2.976 N/mm 2
PASS - Maximum concrete shear stress not exceeded at column perimeter
Shear reinforcement at a perimeter of 1.50d - (321 mm)
Length of shear perimeter; u = u c + (2 (k x k y) k d) = 4168 mm
Area of tension steel at shear perimeter; A s_ten = (k y (p x + (k x k d)) A sy_ten ) + (k x (p y + (k y k d)) A sx_ten )
A s_ten = 6144 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.730 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u d) = 1.142 N/mm 2
v c < v <= 1.6 v c
Shear reinforcement required at perimeter; A sv_req = (v - v c ) u d / (f yv / m ) = 846 mm 2
Shear reinforcement at a perimeter of 2.25d - (482 mm)
Length of shear perimeter; u = u c + (2 (k x k y) k d) = 5452 mm
Area of tension steel at shear perimeter; A s_ten = (k y (p x + (k x k d)) A sy_ten ) + (k x (p y + (k y k d)) A sx_ten )
A s_ten = 8036 mm 2
Project Job no.
60 CURZON STREET, LONDON J125
BAZARAA ENGINEERING
69 Jala Taman Ibu Kota Calcs for Start page no./Revision
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.730 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u d) = 0.873 N/mm 2
v c < v <= 1.6 v c
Shear reinforcement required at perimeter; A sv_req = (v - v c ) u d / (f yv / m ) = 384 mm 2
Shear reinforcement at a perimeter of 3.00d - (642 mm)
Length of shear perimeter; u = u c + (2 (k x k y) k d) = 6736 mm
Area of tension steel at shear perimeter; A s_ten = (k y (p x + (k x k d)) A sy_ten ) + (k x (p y + (k y k d)) A sx_ten )
A s_ten = 9929 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.730 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u d) = 0.707 N/mm 2
v < v c no shear reinforcement required
Internal column C3
Design shear transferred to column; V t = Span x Span y N ult = 844 kN
Design effective shear transferred to column; V eff = 1.15 V t = 970 kN
Area of tension steel in x-direction; A sx_ten = A sxi = 1148 mm 2/m
Area of tension steel in y-direction; A sy_ten = A syi = 1148 mm 2/m
Column perimeter; u c = 2 (lx + ly) = 1600 mm
Average effective depth of reinforcement; d = h – c’ - p = 214 mm
Maximum allowable shear stress; v max = min(0.8 (fcu ), 5) = 4.733 N/mm 2
Design shear stress at column perimeter; v 0 = V eff / (u c d) = 2.834 N/mm 2
PASS - Maximum concrete shear stress not exceeded at column perimeter
Shear reinforcement at a perimeter of 1.50d - (321 mm)
Length of shear perimeter; u = u c + (2 (k x k y) k d) = 4168 mm
Area of tension steel at shear perimeter; A s_ten = (k y (p x + (k x k d)) A sy_ten ) + (k x (p y + (k y k d)) A sx_ten )
A s_ten = 4785 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.672 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u d) = 1.088 N/mm 2
1.6 v c < v <= 2 v c
Shear reinforcement required at perimeter; A sv_req = 5 ((0.7 v) - v c ) u d / (f yv / m ) = 921 mm 2
Shear reinforcement at a perimeter of 2.25d - (482 mm)
Length of shear perimeter; u = u c + (2 (k x k y) k d) = 5452 mm
Area of tension steel at shear perimeter; A s_ten = (k y (p x + (k x k d)) A sy_ten ) + (k x (p y + (k y k d)) A sx_ten )
A s_ten = 6259 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.672 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u d) = 0.832 N/mm 2
v c < v <= 1.6 v c
Shear reinforcement required at perimeter; A sv_req = (v - v c ) u d / (f yv / m ) = 429 mm 2
Shear reinforcement at a perimeter of 3.00d - (642 mm)
Length of shear perimeter; u = u c + (2 (k x k y) k d) = 6736 mm
Area of tension steel at shear perimeter; A s_ten = (k y (p x + (k x k d)) A sy_ten ) + (k x (p y + (k y k d)) A sx_ten )
A s_ten = 7733 mm 2
Project Job no.
60 CURZON STREET, LONDON J125
BAZARAA ENGINEERING
69 Jala Taman Ibu Kota Calcs for Start page no./Revision
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.672 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u d) = 0.673 N/mm 2
v c < v <= 1.6 v c
Shear reinforcement required at perimeter; A sv_req = (v - v c ) u d / (f yv / m ) = 5 mm 2
Shear reinforcement at a perimeter of 3.75d - (803 mm)
Length of shear perimeter; u = u c + (2 (k x k y) k d) = 8020 mm
Area of tension steel at shear perimeter; A s_ten = (k y (p x + (k x k d)) A sy_ten ) + (k x (p y + (k y k d)) A sx_ten )
A s_ten = 9207 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.672 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u d) = 0.565 N/mm 2
v < v c no shear reinforcement required
CURTAILMENT OF REINFORCEMENT
Internal column
Radius of circular yield line; r = (l x ly / ) 1/2 (1.05 Span x 1.05 Span y / (l x ly))1/3 = 1645 mm
Minimum curtailment length in x-direction; lint_x = Max(r + 12 D, 0.25 Span x) = 1875 mm
Minimum curtailment length in y-direction; lint_y = Max(r + 12 D, 0.25 Span y) = 1875 mm
Corner column
Radius of yield line; r = (l x1 ly / )1/2 ((0.45 Span x + e x ) (0.45 Span y + e y)/ (lx1 ly))1/3
r = 886 mm
Minimum curtailment length in x-direction; lcorner_x = Max(r + 12 D, 0.2 Span x ) = 1500 mm
Minimum curtailment length in y-direction; lcorner_y = Max(r + 12 D, 0.2 Span y) = 1500 mm
Edge columns
Radius of yield line in x-direction; r = (l x1 ly / )1/2 ((0.45 Span x + e x ) (1.05 Span y) / (l x1 l y)) 1/3
r = 1161 mm
Minimum curtailment length in x-direction; ledge_x = Max(r + 12 D, 0.2 Span x ) = 1500 mm
Radius of yield line in y-direction; r = (l x ly1 / )1/2 ((0.45 Span y + e y) (1.05 Span x ) / (lx l y1)) 1/3
r = 1161 mm
Minimum curtailment length in y-direction; ledge_y = Max(r + 12 D, 0.2 Span y) = 1500 mm
Project Job no.
60 CURZON STREET, LONDON J125
BAZARAA ENGINEERING
69 Jala Taman Ibu Kota Calcs for Start page no./Revision
A B C
ex
Span x Span x
l x1
ey
1 n e f
l y1 s 0.2 x Spany
n r s r s
Spany
a b
q
p e f
0.5 x Spany
x x
2
ly
j j l
Spany
p g h
3
k k m
lx
0.5 x Spanx
0.2 x Spanx
W hen the effective span in the x direction, L x , is greater than the effective span in the y direction, L y, the reinforcement in
the outer layer is assumed to be that in the x direction otherwise it is assumed to be that in the y direction.
REINFORCEMENT KEY
a = 16 dia bars @ 150 centres - (1340 mm 2 /m); b = 16 dia bars @ 300 centres - (670 mm 2 /m)
c = 16 dia bars @ 200 centres - (1005 mm 2 /m); d = 16 dia bars @ 300 centres - (670 mm 2 /m)
e = 16 dia bars @ 100 centres - (2010 mm 2 /m); f = 16 dia bars @ 150 centres - (1340 mm 2/m)
g = 16 dia bars @ 100 centres - (2010 mm 2 /m); h = 16 dia bars @ 175 centres - (1148 mm 2 /m)
j = 16 dia bars @ 100 centres - (2010 mm 2/m); k = 16 dia bars @ 175 centres - (1148 mm 2/m)
l = 16 dia bars @ 125 centres - (1608 mm 2/m); m = 16 dia bars @ 175 centres - (1148 mm 2 /m)
n = 12 dia bars @ 100 centres - (1130 mm 2 /m)
p = 12 dia bars @ 125 centres - (904 mm 2 /m); q = 12 dia bars @ 150 centres - (753 mm 2/m)
r = 12 dia bars @ 125 centres - (904 mm 2/m); s = 12 dia bars @ 225 centres - (502 mm 2 /m)