Slab geometry
; Span of slab in x-direction; Span x = 7500 mm
; Span of slab in y-direction; Span y = 7500 mm
; Column dimension in x-direction; lx = 400 mm
; Column dimension in y-direction; ly = 400 mm
; External column dimension in x-direction; lx1 = 250 mm
; External column dimension in y-direction; ly1 = 250 mm
Edge dimension in x-direction; e x = lx1 / 2 = 125 mm
Edge dimension in y-direction; e y = ly1 / 2 = 125 mm
Effective span of internal bay in x direction; L x = Span x – lx = 7100 mm
Effective span of internal bay in y direction; L y = Span y – ly = 7100 mm
Effective span of end bay in x direction; L x1 = Span x – l x / 2 = 7300 mm
Effective span of end bay in y direction; L y1 = Span y – l y / 2 = 7300 mm

ex A B C
Span x Span x
ey l y1
1
lx1
lx lx
y
an
Sp

2 ly
y
an
Sp

3 ly

Slab details
; Depth of slab; h = 250 mm
; Characteristic strength of concrete; fcu = 35 N/mm 2
; Characteristic strength of reinforcement; fy = 500 N/mm 2
; Characteristic strength of shear reinforcement; fyv = 500 N/mm 2
; Material safety factor; m = 1.15
; Cover to bottom reinforcement; c = 20 mm
; Cover to top reinforcement; c’ = 20 mm
Loading details
; Characteristic dead load; G k = 5.000 kN/m 2
; Characteristic imposed load; Q k = 5.000 kN/m 2
; Dead load factor; G = 1.4
; Imposed load factor; Q = 1.6
Total ultimate load; N ult = (G k   G ) + (Q k  Q ) = 15.000 kN/m 2
; Moment redistribution ratio;  b = 1.1
; Ratio of support moments to span moments; i = 1.0
Project Job no.
60 CURZON STREET, LONDON J125
BAZARAA ENGINEERING
69 Jala Taman Ibu Kota Calcs for Start page no./Revision

Zip Code 53100 ANTONIO TEXERIA 2


Kuala Lumpur, Malaysia Calcs by Calcs date Checked by Checked date Approved by Approved date
NAZAR 25/7/2019

DESIGN SLAB IN THE X-DIRECTION

SAGGING MOMENTS
End bay A-B
Effective span; L = 7300 mm
Depth of reinforcement; d = 206 mm
Midspan moment; m = (N ult  L 2 ) / (2  (1 + (1 + i)) 2 ) = 68.573 kNm/m
Support moment; m’ = i  m = 68.573 kNm/m

Design reinforcement
Lever arm; K’ = 0.402  ( b – 0.4) – 0.18  ( b – 0.4) 2 = 0.193
K = m / (d 2  fcu ) = 0.046
Compression reinforcement is not required
z = min((0.5 + (0.25 – (K / 0.9))), 0.95)  d = 194.8 mm
Area of reinforcement designed; A s_des = m / (z  fy / m ) = 810 mm 2 /m
Minimum area of reinforcement required; A s_min = 0.0013  h = 325 mm 2 /m
Area of reinforcement required; A s_req = max(A s_des, A s_m in ) = 810 mm 2 /m
Provide 16 dia bars @ 150 centres
Area of reinforcement provided; A s_prov =   D 2 / (4  s) = 1340 mm 2 /m
PASS - Span reinforcement is OK
Check deflection
Design service stress; fs = 2  fy  A s_req / (3  A s_prov   b ) = 183 N/mm 2
Modification factor; k 1 = min(0.55+(477N/mm 2 -fs )/(120(0.9N/mm 2 +(m/d 2 ))),2) = 1.524
Allowable span to depth ratio; 0.9  26  k 1 = 35.656
Actual span to depth ratio; L / d = 35.437
PASS - Span to depth ratio is OK
Internal bay B-C
Effective span; L = 7100 mm
Depth of reinforcement; d = 206 mm
Midspan moment; m = (N ult  L 2 ) / (2  ((1 + i) + (1 + i))2 ) = 47.259 kNm/m
Support moment; m’ = i  m = 47.259 kNm/m

Design reinforcement
Lever arm; K’ = 0.402  ( b – 0.4) – 0.18  ( b – 0.4) 2 = 0.193
K = m / (d 2  fcu ) = 0.032
Compression reinforcement is not required
z = min((0.5 + (0.25 – (K / 0.9))), 0.95)  d = 195.7 mm
Area of reinforcement designed; A s_des = m / (z  fy / m ) = 555 mm 2 /m
Minimum area of reinforcement required; A s_min = 0.0013  h = 325 mm 2 /m
Area of reinforcement required; A s_req = max(A s_des, A s_m in ) = 555 mm 2 /m
Provide 16 dia bars @ 300 centres
Area of reinforcement provided; A s_prov =   D 2 / (4  s) = 670 mm 2 /m
PASS - Span reinforcement is OK
Check deflection
Design service stress; fs = 2  fy  A s_req / (3  A s_prov   b ) = 251 N/mm 2
Modification factor; k 1 = min(0.55+(477N/mm 2 -fs )/(120(0.9N/mm 2 +(m/d 2 ))),2) = 1.485
Project Job no.
60 CURZON STREET, LONDON J125
BAZARAA ENGINEERING
69 Jala Taman Ibu Kota Calcs for Start page no./Revision

Zip Code 53100 ANTONIO TEXERIA 3


Kuala Lumpur, Malaysia Calcs by Calcs date Checked by Checked date Approved by Approved date
NAZAR 25/7/2019

Allowable span to depth ratio; 0.9  26  k 1 = 34.743


Actual span to depth ratio; L / d = 34.466
PASS - Span to depth ratio is OK

HOGGING MOMENTS – INTERNAL STRIP


Penultimate column B3
Consider the reinforcement concentrated in half width strip over the support
Depth of reinforcement; d’ = 206 mm
Support moment; m’ = 2  i  m = 137.147 kNm/m
Lever arm; K’ = 0.402  ( b – 0.4) – 0.18  ( b – 0.4) 2 = 0.193
K = m’ / (d’ 2  fcu ) = 0.092
Compression reinforcement is not required
z = min((0.5 + (0.25 – (K / 0.9))), 0.95)  d’ = 182.1 mm
Area of reinforcement required; A s_des = m’ / (z  f y /  m ) = 1732 mm 2 /m
Minimum area of reinforcement required; A s_min = 0.0013  h = 325 mm 2 /m
Area of reinforcement required; A s_req = max(A s_des, A s_m in ) = 1732 mm 2 /m
Provide 16 dia bars @ 100 centres
Area of reinforcement provided; A s_prov =   D 2 / (4  s) = 2011 mm 2 /m
PASS - Support reinforcement is OK
Internal column C3
Consider the reinforcement concentrated in half width strip over the support
Depth of reinforcement; d’ = 206 mm
Support moment; m’ = 2  i  m = 94.519 kNm/m
Lever arm; K’ = 0.402  ( b – 0.4) – 0.18  ( b – 0.4) 2 = 0.193
K = m’ / (d’ 2  fcu ) = 0.064
Compression reinforcement is not required
z = min((0.5 + (0.25 – (K / 0.9))), 0.95)  d’ = 190.2 mm
Area of reinforcement required; A s_des = m’ / (z  f y /  m ) = 1143 mm 2 /m
Minimum area of reinforcement required; A s_min = 0.0013  h = 325 mm 2 /m
Area of reinforcement required; A s_req = max(A s_des, A s_m in ) = 1143 mm 2 /m
Provide 16 dia bars @ 175 centres
Area of reinforcement provided; A s_prov =   D 2 / (4  s) = 1149 mm 2 /m
PASS - Support reinforcement is OK

HOGGING MOMENTS – EXTERNAL STRIP


Penultimate column B1, B2
Consider one and a half bays of negative moment being resisted over the edge and penultimate column
W idth of span; B = 7500 mm
Edge distance; e = 125 mm
Depth of reinforcement; d’ = 206 mm
Support moment; m’ = m  i (e + B + B / 2) / ((0.5  B) + (0.2  B) + e) = 145.120 kNm/m
Lever arm; K’ = 0.402  ( b – 0.4) – 0.18  ( b – 0.4) 2 = 0.193
K = m’ / (d’ 2  fcu ) = 0.098
Compression reinforcement is not required
z = min((0.5 + (0.25 – (K / 0.9))), 0.95)  d’ = 180.5 mm
Area of reinforcement required; A s_des = m’ / (z  f y /  m ) = 1849 mm 2 /m
Project Job no.
60 CURZON STREET, LONDON J125
BAZARAA ENGINEERING
69 Jala Taman Ibu Kota Calcs for Start page no./Revision

Zip Code 53100 ANTONIO TEXERIA 4


Kuala Lumpur, Malaysia Calcs by Calcs date Checked by Checked date Approved by Approved date
NAZAR 25/7/2019

Minimum area of reinforcement required; A s_min = 0.0013  h = 325 mm 2 /m


Area of reinforcement required; A s_req = max(A s_des, A s_m in ) = 1849 mm 2 /m
Provide 16 dia bars @ 100 centres
Area of reinforcement provided; A s_prov =   D 2 / (4  s) = 2011 mm 2 /m
PASS - Support reinforcement is OK
Internal column C1, C2
Consider one and a half bays of negative moment being resisted over the edge and penultimate column
W idth of span; B = 7500 mm
Edge distance; e = 125 mm
Depth of reinforcement; d’ = 206 mm
Support moment; m’ = m  i (e + B + B / 2) / ((0.5  B) + (0.2  B) + e) = 100.014 kNm/m
Lever arm; K’ = 0.402  ( b – 0.4) – 0.18  ( b – 0.4) 2 = 0.193
K = m’ / (d’ 2  fcu ) = 0.067
Compression reinforcement is not required
z = min((0.5 + (0.25 – (K / 0.9))), 0.95)  d’ = 189.2 mm
Area of reinforcement required; A s_des = m’ / (z  f y /  m ) = 1216 mm 2 /m
Minimum area of reinforcement required; A s_min = 0.0013  h = 325 mm 2 /m
Area of reinforcement required; A s_req = max(A s_des, A s_m in ) = 1216 mm 2 /m
Provide 16 dia bars @ 150 centres
Area of reinforcement provided; A s_prov =   D 2 / (4  s) = 1340 mm 2 /m
PASS - Support reinforcement is OK
Corner column A1
Depth of reinforcement; d’ = 212 mm
Total load on column; S = ((Span x / 2) + e x)  ((Span y / 2) + e y)  N ult = 225 kN
Area of column head; A = l x  ly1 = 0.100 m 2
Support moment; m’ = S  (1 – (N ult  A / S)1/3 ) / 2 = 91.429 kNm/m
Lever arm; K’ = 0.402  ( b – 0.4) – 0.18  ( b – 0.4) 2 = 0.193
K = m’ / (d’ 2  fcu ) = 0.058
Compression reinforcement is not required
z = min((0.5 + (0.25 – (K / 0.9))), 0.95)  d’ = 197.3 mm
Area of reinforcement required; A s_des = m’ / (z  f y /  m ) = 1066 mm 2 /m
Minimum area of reinforcement required; A s_min = 0.0013  h = 325 mm 2 /m
Area of reinforcement required; A s_req = max(A s_des, A s_m in ) = 1066 mm 2 /m
Provide 12 dia bars @ 100 centres
Area of reinforcement provided; A s_prov =   D 2 / (4  s) = 1131 mm 2 /m
PASS - Support reinforcement is OK
Edge column A2, A3
Depth of reinforcement; d’ = 208 mm
Total load on column; S = Span x  (Span y / 2 + e y)  N ult = 436 kN
Area of column head; A = l x1  ly = 0.100 m 2
Support moment; m’ = S  (1 – (N ult  A / S)1/3 ) / 5.14 = 72.009 kNm/m
Lever arm; K’ = 0.402  ( b – 0.4) – 0.18  ( b – 0.4) 2 = 0.193
K = m’ / (d’ 2  fcu ) = 0.048
Compression reinforcement is not required
z = min((0.5 + (0.25 – (K / 0.9))), 0.95)  d’ = 196.4 mm
Project Job no.
60 CURZON STREET, LONDON J125
BAZARAA ENGINEERING
69 Jala Taman Ibu Kota Calcs for Start page no./Revision

Zip Code 53100 ANTONIO TEXERIA 5


Kuala Lumpur, Malaysia Calcs by Calcs date Checked by Checked date Approved by Approved date
NAZAR 25/7/2019

Area of reinforcement required; A s_des = m’ / (z  f y /  m ) = 843 mm 2 /m


Minimum area of reinforcement required; A s_min = 0.0013  h = 325 mm 2 /m
Area of reinforcement required; A s_req = max(A s_des, A s_m in ) = 843 mm 2 /m
Provide 12 dia bars @ 125 centres
Area of reinforcement provided; A s_prov =   D 2 / (4  s) = 905 mm 2 /m
PASS - Support reinforcement is OK
Betw een columns 1-2, 2-3
Around the perimeter between the column heads provide a minimum of 50% of the required end span bottom
reinforcement.
Area of reinforcement required; A s_req = A sx1 / 2 = 670 mm 2 /m
Provide 12 dia bars @ 150 centres - 'U' bars w ith 1600 mm long legs
Area of reinforcement provided; A s_prov =   D 2 / (4  s) = 754 mm 2 /m
PASS - Edge reinforcement is OK
Distribution reinforcement
Provide 12 dia bars @ 300 centres
Area of reinforcement provided; A s_prov =   D 2 / (4  s) = 377 mm 2 /m

DESIGN SLAB IN THE Y-DIRECTION

SAGGING MOMENTS
End bay 1-2
Effective span; L = 7300 mm
Depth of reinforcement; d = 222 mm
Midspan moment; m = (N ult  L 2 ) / (2  (1 + (1 + i)) 2 ) = 68.573 kNm/m
Support moment; m’ = i  m = 68.573 kNm/m

Design reinforcement
Lever arm; K’ = 0.402  ( b – 0.4) – 0.18  ( b – 0.4) 2 = 0.193
K = m / (d 2  fcu ) = 0.040
Compression reinforcement is not required
z = min((0.5 + (0.25 – (K / 0.9))), 0.95)  d = 210.9 mm
Area of reinforcement designed; A s_des = m / (z  fy / m ) = 748 mm 2 /m
Minimum area of reinforcement required; A s_min = 0.0013  h = 325 mm 2 /m
Area of reinforcement required; A s_req = max(A s_des, A s_m in ) = 748 mm 2 /m
Provide 16 dia bars @ 200 centres
Area of reinforcement provided; A s_prov =   D 2 / (4  s) = 1005 mm 2 /m
PASS - Span reinforcement is OK
Check deflection
Design service stress; fs = 2  fy  A s_req / (3  A s_prov   b ) = 225 N/mm 2
Modification factor; k 1 = min(0.55+(477N/mm 2 -fs )/(120(0.9N/mm 2 +(m/d 2 ))),2) = 1.465
Allowable span to depth ratio; 0.9  26  k 1 = 34.280
Actual span to depth ratio; L / d = 32.883
PASS - Span to depth ratio is OK
Internal bay 2-3
Effective span; L = 7100 mm
Depth of reinforcement; d = 222 mm
Midspan moment; m = (N ult  L 2 ) / (2  ((1 + i) + (1 + i))2 ) = 47.259 kNm/m
Project Job no.
60 CURZON STREET, LONDON J125
BAZARAA ENGINEERING
69 Jala Taman Ibu Kota Calcs for Start page no./Revision

Zip Code 53100 ANTONIO TEXERIA 6


Kuala Lumpur, Malaysia Calcs by Calcs date Checked by Checked date Approved by Approved date
NAZAR 25/7/2019

Support moment; m’ = i  m = 47.259 kNm/m

Design reinforcement
Lever arm; K’ = 0.402  ( b – 0.4) – 0.18  ( b – 0.4) 2 = 0.193
K = m / (d 2  fcu ) = 0.027
Compression reinforcement is not required
z = min((0.5 + (0.25 – (K / 0.9))), 0.95)  d = 210.9 mm
Area of reinforcement designed; A s_des = m / (z  fy / m ) = 515 mm 2 /m
Minimum area of reinforcement required; A s_min = 0.0013  h = 325 mm 2 /m
Area of reinforcement required; A s_req = max(A s_des, A s_m in ) = 515 mm 2 /m
Provide 16 dia bars @ 300 centres
Area of reinforcement provided; A s_prov =   D 2 / (4  s) = 670 mm 2 /m
PASS - Span reinforcement is OK
Check deflection
Design service stress; fs = 2  fy  A s_req / (3  A s_prov   b ) = 233 N/mm 2
Modification factor; k 1 = min(0.55+(477N/mm 2 -fs )/(120(0.9N/mm 2 +(m/d 2 ))),2) = 1.644
Allowable span to depth ratio; 0.9  26  k 1 = 38.462
Actual span to depth ratio; L / d = 31.982
PASS - Span to depth ratio is OK

HOGGING MOMENTS – INTERNAL STRIP


Penultimate column C2
Consider the reinforcement concentrated in half width strip over the support
Depth of reinforcement; d’ = 222 mm
Support moment; m’ = 2  i  m = 137.147 kNm/m
Lever arm; K’ = 0.402  ( b – 0.4) – 0.18  ( b – 0.4) 2 = 0.193
K = m’ / (d’ 2  fcu ) = 0.080
Compression reinforcement is not required
z = min((0.5 + (0.25 – (K / 0.9))), 0.95)  d’ = 200.3 mm
Area of reinforcement required; A s_des = m’ / (z  f y /  m ) = 1575 mm 2 /m
Minimum area of reinforcement required; A s_min = 0.0013  h = 325 mm 2 /m
Area of reinforcement required; A s_req = max(A s_des, A s_m in ) = 1575 mm 2 /m
Provide 16 dia bars @ 125 centres
Area of reinforcement provided; A s_prov =   D 2 / (4  s) = 1608 mm 2 /m
PASS - Support reinforcement is OK
Internal column C3
Consider the reinforcement concentrated in half width strip over the support
Depth of reinforcement; d’ = 222 mm
Support moment; m’ = 2  i  m = 94.519 kNm/m
Lever arm; K’ = 0.402  ( b – 0.4) – 0.18  ( b – 0.4) 2 = 0.193
K = m’ / (d’ 2  fcu ) = 0.055
Compression reinforcement is not required
z = min((0.5 + (0.25 – (K / 0.9))), 0.95)  d’ = 207.5 mm
Area of reinforcement required; A s_des = m’ / (z  f y /  m ) = 1047 mm 2 /m
Minimum area of reinforcement required; A s_min = 0.0013  h = 325 mm 2 /m
Area of reinforcement required; A s_req = max(A s_des, A s_m in ) = 1047 mm 2 /m
Project Job no.
60 CURZON STREET, LONDON J125
BAZARAA ENGINEERING
69 Jala Taman Ibu Kota Calcs for Start page no./Revision

Zip Code 53100 ANTONIO TEXERIA 7


Kuala Lumpur, Malaysia Calcs by Calcs date Checked by Checked date Approved by Approved date
NAZAR 25/7/2019

Provide 16 dia bars @ 175 centres


Area of reinforcement provided; A s_prov =   D 2 / (4  s) = 1149 mm 2 /m
PASS - Support reinforcement is OK

HOGGING MOMENTS – EXTERNAL STRIP


Penultimate column A2, B2
Consider one and a half bays of negative moment being resisted over the edge and penultimate column
W idth of span; B = 7500 mm
Edge distance; e = 125 mm
Depth of reinforcement; d’ = 222 mm
Support moment; m’ = m  i (e + B + B / 2) / ((0.5  B) + (0.2  B) + e) = 145.120 kNm/m
Lever arm; K’ = 0.402  ( b – 0.4) – 0.18  ( b – 0.4) 2 = 0.193
K = m’ / (d’ 2  fcu ) = 0.084
Compression reinforcement is not required
z = min((0.5 + (0.25 – (K / 0.9))), 0.95)  d’ = 198.8 mm
Area of reinforcement required; A s_des = m’ / (z  f y /  m ) = 1679 mm 2 /m
Minimum area of reinforcement required; A s_min = 0.0013  h = 325 mm 2 /m
Area of reinforcement required; A s_req = max(A s_des, A s_m in ) = 1679 mm 2 /m
Provide 16 dia bars @ 100 centres
Area of reinforcement provided; A s_prov =   D 2 / (4  s) = 2011 mm 2 /m
PASS - Support reinforcement is OK
Internal column A3, B3
Consider one and a half bays of negative moment being resisted over the edge and penultimate column
W idth of span; B = 7500 mm
Edge distance; e = 125 mm
Depth of reinforcement; d’ = 222 mm
Support moment; m’ = m  i (e + B + B / 2) / ((0.5  B) + (0.2  B) + e) = 100.014 kNm/m
Lever arm; K’ = 0.402  ( b – 0.4) – 0.18  ( b – 0.4) 2 = 0.193
K = m’ / (d’ 2  fcu ) = 0.058
Compression reinforcement is not required
z = min((0.5 + (0.25 – (K / 0.9))), 0.95)  d’ = 206.6 mm
Area of reinforcement required; A s_des = m’ / (z  f y /  m ) = 1113 mm 2 /m
Minimum area of reinforcement required; A s_min = 0.0013  h = 325 mm 2 /m
Area of reinforcement required; A s_req = max(A s_des, A s_m in ) = 1113 mm 2 /m
Provide 16 dia bars @ 175 centres
Area of reinforcement provided; A s_prov =   D 2 / (4  s) = 1149 mm 2 /m
PASS - Support reinforcement is OK
Edge column B1, C1
Depth of reinforcement; d’ = 224 mm
Total load on column; S = (Span x / 2 + e x )  Span y  N ult = 436 kN
Area of column head; A = l y1  lx = 0.100 m 2
Support moment; m’ = S  (1 – (N ult  A / S)1/3 ) / 5.14 = 72.009 kNm/m
Lever arm; K’ = 0.402  ( b – 0.4) – 0.18  ( b – 0.4) 2 = 0.193
K = m’ / (d’ 2  fcu ) = 0.041
Compression reinforcement is not required
z = min((0.5 + (0.25 – (K / 0.9))), 0.95)  d’ = 212.8 mm
Project Job no.
60 CURZON STREET, LONDON J125
BAZARAA ENGINEERING
69 Jala Taman Ibu Kota Calcs for Start page no./Revision

Zip Code 53100 ANTONIO TEXERIA 8


Kuala Lumpur, Malaysia Calcs by Calcs date Checked by Checked date Approved by Approved date
NAZAR 25/7/2019

Area of reinforcement required; A s_des = m’ / (z  f y /  m ) = 778 mm 2 /m


Minimum area of reinforcement required; A s_min = 0.0013  h = 325 mm 2 /m
Area of reinforcement required; A s_req = max(A s_des, A s_m in ) = 778 mm 2 /m
Provide 12 dia bars @ 125 centres
Area of reinforcement provided; A s_prov =   D 2 / (4  s) = 905 mm 2 /m
PASS - Support reinforcement is OK
Betw een columns A-B, B-C
Around the perimeter between the column heads provide a minimum of 50% of the required end span bottom
reinforcement.
Area of reinforcement required; A s_req = A sy1 / 2 = 503 mm 2 /m
Provide 12 dia bars @ 225 centres - 'U' bars w ith 1600 mm long legs
Area of reinforcement provided; A s_prov =   D 2 / (4  s) = 503 mm 2 /m
PASS - Edge reinforcement is OK

PUNCHING SHEAR
Corner column A1
Design shear transferred to column; V t = ((0.45  Span x ) + e x )  ((0.45  Span y) + e y)  N ult = 184 kN
Design effective shear transferred to column; V eff = 1.25  V t = 230 kN
Area of tension steel in x-direction; A sx_ten = A scorner = 1130 mm 2 /m
Area of tension steel in y-direction; A sy_ten = A scorner = 1130 mm 2 /m
Column perimeter; u c = lx1 + l y = 650 mm
Average effective depth of reinforcement; d = h – c’ - p = 214 mm
Maximum allowable shear stress; v max = min(0.8  (fcu ), 5) = 4.733 N/mm 2
Design shear stress at column perimeter; v 0 = V eff / (u c  d) = 1.651 N/mm 2
PASS - Maximum concrete shear stress not exceeded at column perimeter
Shear reinforcement at a perimeter of 1.50d - (321 mm)
Length of shear perimeter; u = u c + (2  (k x  k y)  k  d) = 1292 mm
Area of tension steel at shear perimeter; A s_ten = (k y  (p x + (k x  k  d))  A sy_ten ) + (k x  (p y + (k y  k  d))  A sx_ten )
A s_ten = 1460 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.668 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u  d) = 0.831 N/mm 2
v c < v <= 1.6  v c
Shear reinforcement required at perimeter; A sv_req = (v - v c )  u  d / (f yv / m ) = 103 mm 2
Shear reinforcement at a perimeter of 2.25d - (482 mm)
Length of shear perimeter; u = u c + (2  (k x  k y)  k  d) = 1613 mm
Area of tension steel at shear perimeter; A s_ten = (k y  (p x + (k x  k  d))  A sy_ten ) + (k x  (p y + (k y  k  d))  A sx_ten )
A s_ten = 1823 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.668 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u  d) = 0.665 N/mm 2
v < v c no shear reinforcement required
Penultimate edge column A2
Design shear transferred to column; V t = ((0.45  Span x ) + e x )  (1.05  Span y)  N ult = 413 kN
Design effective shear transferred to column; V eff = 1.4  V t = 579 kN
Area of tension steel in x-direction; A sx_ten = A sx_edge = 904 mm 2 /m
Project Job no.
60 CURZON STREET, LONDON J125
BAZARAA ENGINEERING
69 Jala Taman Ibu Kota Calcs for Start page no./Revision

Zip Code 53100 ANTONIO TEXERIA 9


Kuala Lumpur, Malaysia Calcs by Calcs date Checked by Checked date Approved by Approved date
NAZAR 25/7/2019

Area of tension steel in y-direction; A sy_ten = A sy1e = 2010 mm 2 /m


Column perimeter; u c = (2  lx1 )+ l y = 900 mm
Average effective depth of reinforcement; d = h – c’ - p = 214 mm
Maximum allowable shear stress; v max = min(0.8  (fcu ), 5) = 4.733 N/mm 2
Design shear stress at column perimeter; v 0 = V eff / (u c  d) = 3.005 N/mm 2
PASS - Maximum concrete shear stress not exceeded at column perimeter
Shear reinforcement at a perimeter of 1.50d - (321 mm)
Length of shear perimeter; u = u c + (2  (k x  k y)  k  d) = 2184 mm
Area of tension steel at shear perimeter; A s_ten = (k y  (p x + (k x  k  d))  A sy_ten ) + (k x  (p y + (k y  k  d))  A sx_ten )
A s_ten = 3237 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.731 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u  d) = 1.238 N/mm 2
1.6  v c < v <= 2  v c
Shear reinforcement required at perimeter; A sv_req = 5  ((0.7  v) - v c )  u  d / (f yv /  m ) = 728 mm 2
Shear reinforcement at a perimeter of 2.25d - (482 mm)
Length of shear perimeter; u = u c + (2  (k x  k y)  k  d) = 2826 mm
Area of tension steel at shear perimeter; A s_ten = (k y  (p x + (k x  k  d))  A sy_ten ) + (k x  (p y + (k y  k  d))  A sx_ten )
A s_ten = 4173 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.730 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u  d) = 0.957 N/mm 2
v c < v <= 1.6  v c
Shear reinforcement required at perimeter; A sv_req = (v - v c )  u  d / (f yv / m ) = 315 mm 2
Shear reinforcement at a perimeter of 3.00d - (642 mm)
Length of shear perimeter; u = u c + (2  (k x  k y)  k  d) = 3468 mm
Area of tension steel at shear perimeter; A s_ten = (k y  (p x + (k x  k  d))  A sy_ten ) + (k x  (p y + (k y  k  d))  A sx_ten )
A s_ten = 5108 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.730 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u  d) = 0.780 N/mm 2
v c < v <= 1.6  v c
Shear reinforcement required at perimeter; A sv_req = (v - v c )  u  d / (f yv / m ) = 85 mm 2
Shear reinforcement at a perimeter of 3.75d - (803 mm)
Length of shear perimeter; u = u c + (2  (k x  k y)  k  d) = 4110 mm
Area of tension steel at shear perimeter; A s_ten = (k y  (p x + (k x  k  d))  A sy_ten ) + (k x  (p y + (k y  k  d))  A sx_ten )
A s_ten = 6044 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.729 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u  d) = 0.658 N/mm 2
v < v c no shear reinforcement required
Internal edge column A3
Design shear transferred to column; V t = ((0.45  Span x ) + e x )  Span y  N ult = 394 kN
Design effective shear transferred to column; V eff = 1.4  V t = 551 kN
Area of tension steel in x-direction; A sx_ten = A sx_edge = 904 mm 2 /m
Area of tension steel in y-direction; A sy_ten = A sye = 1148 mm 2 /m
Project Job no.
60 CURZON STREET, LONDON J125
BAZARAA ENGINEERING
69 Jala Taman Ibu Kota Calcs for Start page no./Revision

Zip Code 53100 ANTONIO TEXERIA 10


Kuala Lumpur, Malaysia Calcs by Calcs date Checked by Checked date Approved by Approved date
NAZAR 25/7/2019

Column perimeter; u c = (2  lx1 )+ l y = 900 mm


Average effective depth of reinforcement; d = h – c’ - p = 214 mm
Maximum allowable shear stress; v max = min(0.8  (fcu ), 5) = 4.733 N/mm 2
Design shear stress at column perimeter; v 0 = V eff / (u c  d) = 2.862 N/mm 2
PASS - Maximum concrete shear stress not exceeded at column perimeter
Shear reinforcement at a perimeter of 1.50d - (321 mm)
Length of shear perimeter; u = u c + (2  (k x  k y)  k  d) = 2184 mm
Area of tension steel at shear perimeter; A s_ten = (k y  (p x + (k x  k  d))  A sy_ten ) + (k x  (p y + (k y  k  d))  A sx_ten )
A s_ten = 2253 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.648 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u  d) = 1.179 N/mm 2
1.6  v c < v <= 2  v c
Shear reinforcement required at perimeter; A sv_req = 5  ((0.7  v) - v c )  u  d / (f yv /  m ) = 954 mm 2
Shear reinforcement at a perimeter of 2.25d - (482 mm)
Length of shear perimeter; u = u c + (2  (k x  k y)  k  d) = 2826 mm
Area of tension steel at shear perimeter; A s_ten = (k y  (p x + (k x  k  d))  A sy_ten ) + (k x  (p y + (k y  k  d))  A sx_ten )
A s_ten = 2912 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.648 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u  d) = 0.912 N/mm 2
v c < v <= 1.6  v c
Shear reinforcement required at perimeter; A sv_req = (v - v c )  u  d / (f yv / m ) = 367 mm 2
Shear reinforcement at a perimeter of 3.00d - (642 mm)
Length of shear perimeter; u = u c + (2  (k x  k y)  k  d) = 3468 mm
Area of tension steel at shear perimeter; A s_ten = (k y  (p x + (k x  k  d))  A sy_ten ) + (k x  (p y + (k y  k  d))  A sx_ten )
A s_ten = 3570 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.648 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u  d) = 0.743 N/mm 2
v c < v <= 1.6  v c
Shear reinforcement required at perimeter; A sv_req = (v - v c )  u  d / (f yv / m ) = 162 mm 2
Shear reinforcement at a perimeter of 3.75d - (803 mm)
Length of shear perimeter; u = u c + (2  (k x  k y)  k  d) = 4110 mm
Area of tension steel at shear perimeter; A s_ten = (k y  (p x + (k x  k  d))  A sy_ten ) + (k x  (p y + (k y  k  d))  A sx_ten )
A s_ten = 4229 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.648 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u  d) = 0.627 N/mm 2
v < v c no shear reinforcement required
Penultimate edge column B1
Design shear transferred to column; V t = (1.05  Span x)  ((0.45  Span y) + e y)  N ult = 413 kN
Design effective shear transferred to column; V eff = 1.4  V t = 579 kN
Area of tension steel in x-direction; A sx_ten = A sx1e = 2010 mm 2 /m
Area of tension steel in y-direction; A sy_ten = A sy_edge = 904 mm 2 /m
Project Job no.
60 CURZON STREET, LONDON J125
BAZARAA ENGINEERING
69 Jala Taman Ibu Kota Calcs for Start page no./Revision

Zip Code 53100 ANTONIO TEXERIA 11


Kuala Lumpur, Malaysia Calcs by Calcs date Checked by Checked date Approved by Approved date
NAZAR 25/7/2019

Column perimeter; u c = lx + (2  ly1) = 900 mm


Average effective depth of reinforcement; d = h – c’ - p = 214 mm
Maximum allowable shear stress; v max = min(0.8  (fcu ), 5) = 4.733 N/mm 2
Design shear stress at column perimeter; v 0 = V eff / (u c  d) = 3.005 N/mm 2
PASS - Maximum concrete shear stress not exceeded at column perimeter
Shear reinforcement at a perimeter of 1.50d - (321 mm)
Length of shear perimeter; u = u c + (2  (k x  k y)  k  d) = 2184 mm
Area of tension steel at shear perimeter; A s_ten = (k y  (p x + (k x  k  d))  A sy_ten ) + (k x  (p y + (k y  k  d))  A sx_ten )
A s_ten = 3237 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.731 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u  d) = 1.238 N/mm 2
1.6  v c < v <= 2  v c
Shear reinforcement required at perimeter; A sv_req = 5  ((0.7  v) - v c )  u  d / (f yv /  m ) = 728 mm 2
Shear reinforcement at a perimeter of 2.25d - (482 mm)
Length of shear perimeter; u = u c + (2  (k x  k y)  k  d) = 2826 mm
Area of tension steel at shear perimeter; A s_ten = (k y  (p x + (k x  k  d))  A sy_ten ) + (k x  (p y + (k y  k  d))  A sx_ten )
A s_ten = 4173 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.730 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u  d) = 0.957 N/mm 2
v c < v <= 1.6  v c
Shear reinforcement required at perimeter; A sv_req = (v - v c )  u  d / (f yv / m ) = 315 mm 2
Shear reinforcement at a perimeter of 3.00d - (642 mm)
Length of shear perimeter; u = u c + (2  (k x  k y)  k  d) = 3468 mm
Area of tension steel at shear perimeter; A s_ten = (k y  (p x + (k x  k  d))  A sy_ten ) + (k x  (p y + (k y  k  d))  A sx_ten )
A s_ten = 5108 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.730 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u  d) = 0.780 N/mm 2
v c < v <= 1.6  v c
Shear reinforcement required at perimeter; A sv_req = (v - v c )  u  d / (f yv / m ) = 85 mm 2
Shear reinforcement at a perimeter of 3.75d - (803 mm)
Length of shear perimeter; u = u c + (2  (k x  k y)  k  d) = 4110 mm
Area of tension steel at shear perimeter; A s_ten = (k y  (p x + (k x  k  d))  A sy_ten ) + (k x  (p y + (k y  k  d))  A sx_ten )
A s_ten = 6044 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.729 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u  d) = 0.658 N/mm 2
v < v c no shear reinforcement required
Penultimate central column B2
Design shear transferred to column; V t = (1.05  Span x)  (1.05  Span y)  N ult = 930 kN
Design effective shear transferred to column; V eff = 1.15  V t = 1070 kN
Area of tension steel in x-direction; A sx_ten = A sx1e = 2010 mm 2 /m
Area of tension steel in y-direction; A sy_ten = A sy1e = 2010 mm 2 /m
Project Job no.
60 CURZON STREET, LONDON J125
BAZARAA ENGINEERING
69 Jala Taman Ibu Kota Calcs for Start page no./Revision

Zip Code 53100 ANTONIO TEXERIA 12


Kuala Lumpur, Malaysia Calcs by Calcs date Checked by Checked date Approved by Approved date
NAZAR 25/7/2019

Column perimeter; u c = 2  (lx + ly) = 1600 mm


Average effective depth of reinforcement; d = h – c’ - p = 214 mm
Maximum allowable shear stress; v max = min(0.8  (fcu ), 5) = 4.733 N/mm 2
Design shear stress at column perimeter; v 0 = V eff / (u c  d) = 3.124 N/mm 2
PASS - Maximum concrete shear stress not exceeded at column perimeter
Shear reinforcement at a perimeter of 1.50d - (321 mm)
Length of shear perimeter; u = u c + (2  (k x  k y)  k  d) = 4168 mm
Area of tension steel at shear perimeter; A s_ten = (k y  (p x + (k x  k  d))  A sy_ten ) + (k x  (p y + (k y  k  d))  A sx_ten )
A s_ten = 8378 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.810 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u  d) = 1.199 N/mm 2
v c < v <= 1.6  v c
Shear reinforcement required at perimeter; A sv_req = (v - v c )  u  d / (f yv / m ) = 800 mm 2
Shear reinforcement at a perimeter of 2.25d - (482 mm)
Length of shear perimeter; u = u c + (2  (k x  k y)  k  d) = 5452 mm
Area of tension steel at shear perimeter; A s_ten = (k y  (p x + (k x  k  d))  A sy_ten ) + (k x  (p y + (k y  k  d))  A sx_ten )
A s_ten = 10959 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.810 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u  d) = 0.917 N/mm 2
v c < v <= 1.6  v c
Shear reinforcement required at perimeter; A sv_req = (v - v c )  u  d / (f yv / m ) = 288 mm 2
Shear reinforcement at a perimeter of 3.00d - (642 mm)
Length of shear perimeter; u = u c + (2  (k x  k y)  k  d) = 6736 mm
Area of tension steel at shear perimeter; A s_ten = (k y  (p x + (k x  k  d))  A sy_ten ) + (k x  (p y + (k y  k  d))  A sx_ten )
A s_ten = 13539 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.810 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u  d) = 0.742 N/mm 2
v < v c no shear reinforcement required
Internal central column B3
Design shear transferred to column; V t = (1.05  Span x)  Span y  N ult = 886 kN
Design effective shear transferred to column; V eff = 1.15  V t = 1019 kN
Area of tension steel in x-direction; A sx_ten = A sx1i = 2010 mm 2 /m
Area of tension steel in y-direction; A sy_ten = A sye = 1148 mm 2 /m
Column perimeter; u c = 2  (lx + ly) = 1600 mm
Average effective depth of reinforcement; d = h – c’ - p = 214 mm
Maximum allowable shear stress; v max = min(0.8  (fcu ), 5) = 4.733 N/mm 2
Design shear stress at column perimeter; v 0 = V eff / (u c  d) = 2.976 N/mm 2
PASS - Maximum concrete shear stress not exceeded at column perimeter
Shear reinforcement at a perimeter of 1.50d - (321 mm)
Length of shear perimeter; u = u c + (2  (k x  k y)  k  d) = 4168 mm
Area of tension steel at shear perimeter; A s_ten = (k y  (p x + (k x  k  d))  A sy_ten ) + (k x  (p y + (k y  k  d))  A sx_ten )
A s_ten = 6581 mm 2
Project Job no.
60 CURZON STREET, LONDON J125
BAZARAA ENGINEERING
69 Jala Taman Ibu Kota Calcs for Start page no./Revision

Zip Code 53100 ANTONIO TEXERIA 13


Kuala Lumpur, Malaysia Calcs by Calcs date Checked by Checked date Approved by Approved date
NAZAR 25/7/2019

Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.747 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u  d) = 1.142 N/mm 2
v c < v <= 1.6  v c
Shear reinforcement required at perimeter; A sv_req = (v - v c )  u  d / (f yv / m ) = 811 mm 2
Shear reinforcement at a perimeter of 2.25d - (482 mm)
Length of shear perimeter; u = u c + (2  (k x  k y)  k  d) = 5452 mm
Area of tension steel at shear perimeter; A s_ten = (k y  (p x + (k x  k  d))  A sy_ten ) + (k x  (p y + (k y  k  d))  A sx_ten )
A s_ten = 8609 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.747 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u  d) = 0.873 N/mm 2
v c < v <= 1.6  v c
Shear reinforcement required at perimeter; A sv_req = (v - v c )  u  d / (f yv / m ) = 339 mm 2
Shear reinforcement at a perimeter of 3.00d - (642 mm)
Length of shear perimeter; u = u c + (2  (k x  k y)  k  d) = 6736 mm
Area of tension steel at shear perimeter; A s_ten = (k y  (p x + (k x  k  d))  A sy_ten ) + (k x  (p y + (k y  k  d))  A sx_ten )
A s_ten = 10636 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.747 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u  d) = 0.707 N/mm 2
v < v c no shear reinforcement required
Internal edge column C1
Design shear transferred to column; V t = Span x  ((0.45  Span y) + e y)  N ult = 394 kN
Design effective shear transferred to column; V eff = 1.4  V t = 551 kN
Area of tension steel in x-direction; A sx_ten = A sxe = 1340 mm 2 /m
Area of tension steel in y-direction; A sy_ten = A sy_edge = 904 mm 2 /m
Column perimeter; u c = lx + (2  ly1) = 900 mm
(Library item: Flat slab shear map C1) Average effective depth of reinforcement; d = h – c’ - p = 214 mm
Maximum allowable shear stress; v max = min(0.8  (fcu ), 5) = 4.733 N/mm 2
Design shear stress at column perimeter; v 0 = V eff / (u c  d) = 2.862 N/mm 2
PASS - Maximum concrete shear stress not exceeded at column perimeter
Shear reinforcement at a perimeter of 1.50d - (321 mm)
Length of shear perimeter; u = u c + (2  (k x  k y)  k  d) = 2184 mm
Area of tension steel at shear perimeter; A s_ten = (k y  (p x + (k x  k  d))  A sy_ten ) + (k x  (p y + (k y  k  d))  A sx_ten )
A s_ten = 2472 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.669 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u  d) = 1.179 N/mm 2
1.6  v c < v <= 2  v c
Shear reinforcement required at perimeter; A sv_req = 5  ((0.7  v) - v c )  u  d / (f yv /  m ) = 844 mm 2
Shear reinforcement at a perimeter of 2.25d - (482 mm)
Length of shear perimeter; u = u c + (2  (k x  k y)  k  d) = 2826 mm
Area of tension steel at shear perimeter; A s_ten = (k y  (p x + (k x  k  d))  A sy_ten ) + (k x  (p y + (k y  k  d))  A sx_ten )
A s_ten = 3193 mm 2
Project Job no.
60 CURZON STREET, LONDON J125
BAZARAA ENGINEERING
69 Jala Taman Ibu Kota Calcs for Start page no./Revision

Zip Code 53100 ANTONIO TEXERIA 14


Kuala Lumpur, Malaysia Calcs by Calcs date Checked by Checked date Approved by Approved date
NAZAR 25/7/2019

Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.668 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u  d) = 0.912 N/mm 2
v c < v <= 1.6  v c
Shear reinforcement required at perimeter; A sv_req = (v - v c )  u  d / (f yv / m ) = 339 mm 2
Shear reinforcement at a perimeter of 3.00d - (642 mm)
Length of shear perimeter; u = u c + (2  (k x  k y)  k  d) = 3468 mm
Area of tension steel at shear perimeter; A s_ten = (k y  (p x + (k x  k  d))  A sy_ten ) + (k x  (p y + (k y  k  d))  A sx_ten )
A s_ten = 3913 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.668 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u  d) = 0.743 N/mm 2
v c < v <= 1.6  v c
Shear reinforcement required at perimeter; A sv_req = (v - v c )  u  d / (f yv / m ) = 128 mm 2
Shear reinforcement at a perimeter of 3.75d - (803 mm)
Length of shear perimeter; u = u c + (2  (k x  k y)  k  d) = 4110 mm
Area of tension steel at shear perimeter; A s_ten = (k y  (p x + (k x  k  d))  A sy_ten ) + (k x  (p y + (k y  k  d))  A sx_ten )
A s_ten = 4633 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.668 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u  d) = 0.627 N/mm 2
v < v c no shear reinforcement required
Internal central column C2
Design shear transferred to column; V t = Span x  (1.05  Span y)  N ult = 886 kN
Design effective shear transferred to column; V eff = 1.15  V t = 1019 kN
Area of tension steel in x-direction; A sx_ten = A sxe = 1340 mm 2 /m
Area of tension steel in y-direction; A sy_ten = A sy1i = 1608 mm 2 /m
Column perimeter; u c = 2  (lx + ly) = 1600 mm
Average effective depth of reinforcement; d = h – c’ - p = 214 mm
Maximum allowable shear stress; v max = min(0.8  (fcu ), 5) = 4.733 N/mm 2
Design shear stress at column perimeter; v 0 = V eff / (u c  d) = 2.976 N/mm 2
PASS - Maximum concrete shear stress not exceeded at column perimeter
Shear reinforcement at a perimeter of 1.50d - (321 mm)
Length of shear perimeter; u = u c + (2  (k x  k y)  k  d) = 4168 mm
Area of tension steel at shear perimeter; A s_ten = (k y  (p x + (k x  k  d))  A sy_ten ) + (k x  (p y + (k y  k  d))  A sx_ten )
A s_ten = 6144 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.730 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u  d) = 1.142 N/mm 2
v c < v <= 1.6  v c
Shear reinforcement required at perimeter; A sv_req = (v - v c )  u  d / (f yv / m ) = 846 mm 2
Shear reinforcement at a perimeter of 2.25d - (482 mm)
Length of shear perimeter; u = u c + (2  (k x  k y)  k  d) = 5452 mm
Area of tension steel at shear perimeter; A s_ten = (k y  (p x + (k x  k  d))  A sy_ten ) + (k x  (p y + (k y  k  d))  A sx_ten )
A s_ten = 8036 mm 2
Project Job no.
60 CURZON STREET, LONDON J125
BAZARAA ENGINEERING
69 Jala Taman Ibu Kota Calcs for Start page no./Revision

Zip Code 53100 ANTONIO TEXERIA 15


Kuala Lumpur, Malaysia Calcs by Calcs date Checked by Checked date Approved by Approved date
NAZAR 25/7/2019

Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.730 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u  d) = 0.873 N/mm 2
v c < v <= 1.6  v c
Shear reinforcement required at perimeter; A sv_req = (v - v c )  u  d / (f yv / m ) = 384 mm 2
Shear reinforcement at a perimeter of 3.00d - (642 mm)
Length of shear perimeter; u = u c + (2  (k x  k y)  k  d) = 6736 mm
Area of tension steel at shear perimeter; A s_ten = (k y  (p x + (k x  k  d))  A sy_ten ) + (k x  (p y + (k y  k  d))  A sx_ten )
A s_ten = 9929 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.730 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u  d) = 0.707 N/mm 2
v < v c no shear reinforcement required
Internal column C3
Design shear transferred to column; V t = Span x  Span y  N ult = 844 kN
Design effective shear transferred to column; V eff = 1.15  V t = 970 kN
Area of tension steel in x-direction; A sx_ten = A sxi = 1148 mm 2/m
Area of tension steel in y-direction; A sy_ten = A syi = 1148 mm 2/m
Column perimeter; u c = 2  (lx + ly) = 1600 mm
Average effective depth of reinforcement; d = h – c’ - p = 214 mm
Maximum allowable shear stress; v max = min(0.8  (fcu ), 5) = 4.733 N/mm 2
Design shear stress at column perimeter; v 0 = V eff / (u c  d) = 2.834 N/mm 2
PASS - Maximum concrete shear stress not exceeded at column perimeter
Shear reinforcement at a perimeter of 1.50d - (321 mm)
Length of shear perimeter; u = u c + (2  (k x  k y)  k  d) = 4168 mm
Area of tension steel at shear perimeter; A s_ten = (k y  (p x + (k x  k  d))  A sy_ten ) + (k x  (p y + (k y  k  d))  A sx_ten )
A s_ten = 4785 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.672 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u  d) = 1.088 N/mm 2
1.6  v c < v <= 2  v c
Shear reinforcement required at perimeter; A sv_req = 5  ((0.7  v) - v c )  u  d / (f yv /  m ) = 921 mm 2
Shear reinforcement at a perimeter of 2.25d - (482 mm)
Length of shear perimeter; u = u c + (2  (k x  k y)  k  d) = 5452 mm
Area of tension steel at shear perimeter; A s_ten = (k y  (p x + (k x  k  d))  A sy_ten ) + (k x  (p y + (k y  k  d))  A sx_ten )
A s_ten = 6259 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.672 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u  d) = 0.832 N/mm 2
v c < v <= 1.6  v c
Shear reinforcement required at perimeter; A sv_req = (v - v c )  u  d / (f yv / m ) = 429 mm 2
Shear reinforcement at a perimeter of 3.00d - (642 mm)
Length of shear perimeter; u = u c + (2  (k x  k y)  k  d) = 6736 mm
Area of tension steel at shear perimeter; A s_ten = (k y  (p x + (k x  k  d))  A sy_ten ) + (k x  (p y + (k y  k  d))  A sx_ten )
A s_ten = 7733 mm 2
Project Job no.
60 CURZON STREET, LONDON J125
BAZARAA ENGINEERING
69 Jala Taman Ibu Kota Calcs for Start page no./Revision

Zip Code 53100 ANTONIO TEXERIA 16


Kuala Lumpur, Malaysia Calcs by Calcs date Checked by Checked date Approved by Approved date
NAZAR 25/7/2019

Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.672 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u  d) = 0.673 N/mm 2
v c < v <= 1.6  v c
Shear reinforcement required at perimeter; A sv_req = (v - v c )  u  d / (f yv / m ) = 5 mm 2
Shear reinforcement at a perimeter of 3.75d - (803 mm)
Length of shear perimeter; u = u c + (2  (k x  k y)  k  d) = 8020 mm
Area of tension steel at shear perimeter; A s_ten = (k y  (p x + (k x  k  d))  A sy_ten ) + (k x  (p y + (k y  k  d))  A sx_ten )
A s_ten = 9207 mm 2
Design concrete shear stress; v c=(min(f cu ,40)/25) 1/30.79min(100A s_ten/(ud),3)1/3 max(400/d,1) 1/4 /1.25
v c = 0.672 N/mm 2
Nominal design shear stress at perimeter; v = V eff / (u  d) = 0.565 N/mm 2
v < v c no shear reinforcement required

CURTAILMENT OF REINFORCEMENT
Internal column
Radius of circular yield line; r = (l x  ly / ) 1/2  (1.05 Span x  1.05  Span y / (l x  ly))1/3 = 1645 mm
Minimum curtailment length in x-direction; lint_x = Max(r + 12  D, 0.25  Span x) = 1875 mm
Minimum curtailment length in y-direction; lint_y = Max(r + 12  D, 0.25  Span y) = 1875 mm

Corner column
Radius of yield line; r = (l x1  ly / )1/2  ((0.45 Span x + e x )  (0.45  Span y + e y)/ (lx1  ly))1/3
r = 886 mm
Minimum curtailment length in x-direction; lcorner_x = Max(r + 12  D, 0.2  Span x ) = 1500 mm
Minimum curtailment length in y-direction; lcorner_y = Max(r + 12  D, 0.2  Span y) = 1500 mm

Edge columns
Radius of yield line in x-direction; r = (l x1  ly / )1/2  ((0.45 Span x + e x )  (1.05  Span y) / (l x1  l y)) 1/3
r = 1161 mm
Minimum curtailment length in x-direction; ledge_x = Max(r + 12  D, 0.2  Span x ) = 1500 mm
Radius of yield line in y-direction; r = (l x  ly1 / )1/2  ((0.45 Span y + e y)  (1.05  Span x ) / (lx  l y1)) 1/3
r = 1161 mm
Minimum curtailment length in y-direction; ledge_y = Max(r + 12  D, 0.2  Span y) = 1500 mm
Project Job no.
60 CURZON STREET, LONDON J125
BAZARAA ENGINEERING
69 Jala Taman Ibu Kota Calcs for Start page no./Revision

Zip Code 53100 ANTONIO TEXERIA 17


Kuala Lumpur, Malaysia Calcs by Calcs date Checked by Checked date Approved by Approved date
NAZAR 25/7/2019

A B C
ex
Span x Span x
l x1
ey
1 n e f
l y1 s 0.2 x Spany
n r s r s

Spany
a b
q

p e f

0.5 x Spany
x x
2

ly
j j l
Spany

p g h

3
k k m

lx
0.5 x Spanx
0.2 x Spanx

W hen the effective span in the x direction, L x , is greater than the effective span in the y direction, L y, the reinforcement in
the outer layer is assumed to be that in the x direction otherwise it is assumed to be that in the y direction.

REINFORCEMENT KEY
a = 16 dia bars @ 150 centres - (1340 mm 2 /m); b = 16 dia bars @ 300 centres - (670 mm 2 /m)
c = 16 dia bars @ 200 centres - (1005 mm 2 /m); d = 16 dia bars @ 300 centres - (670 mm 2 /m)
e = 16 dia bars @ 100 centres - (2010 mm 2 /m); f = 16 dia bars @ 150 centres - (1340 mm 2/m)
g = 16 dia bars @ 100 centres - (2010 mm 2 /m); h = 16 dia bars @ 175 centres - (1148 mm 2 /m)
j = 16 dia bars @ 100 centres - (2010 mm 2/m); k = 16 dia bars @ 175 centres - (1148 mm 2/m)
l = 16 dia bars @ 125 centres - (1608 mm 2/m); m = 16 dia bars @ 175 centres - (1148 mm 2 /m)
n = 12 dia bars @ 100 centres - (1130 mm 2 /m)
p = 12 dia bars @ 125 centres - (904 mm 2 /m); q = 12 dia bars @ 150 centres - (753 mm 2/m)
r = 12 dia bars @ 125 centres - (904 mm 2/m); s = 12 dia bars @ 225 centres - (502 mm 2 /m) 

Distribution bars = 12 dia bars @ 300 centres - (377 mm 2/m)

Shear reinforcement is required - Refer to output above for details;

 WARNING - reinforcement is inadequate