Begumpet AFS

JOB SAFETY ANALYSIS


PART-A : JSA No Date:
Unit: Area: Location:
Job Title:, construction of Pannel Room, Air compressor JSA done by: Name &
Sign.
Shed in AFS premises – Civil work, excavation & Hot civil Designation:
Work (Welding) 1. S S M RAJA
2. M Kameswara Rao
3. B Narsimhulu
Job to be Executed By :
Department Contractor
M/s. Sree Raam
Engg Dept., TAPSO
Nirmaan
JSA Reviewed By (HOD’s Name, Designation, Sign with date)
B Narsimhulu, Sr.APTM

Sl. Activities Hazards Recommended Actions /


No. Procedures & Control Measures

1. Drilling / Welding  Fire& Explosion  Ensure the all work under proper supervisions & all
workmen pre brief about job & hazards.
 Flash Back  Ensure that before start of work tank should be
electrically isolated.
 Eye injury (U.V.  Provide a fire blanket / fire screen & Trained Fire Watch
Rays) on site.
 Make sure fire extinguishers (BC type or Black CO 2), hose
 Electrical shock pipe & sand buckets are available on Site.
 Gas Monitor correctly sited.
 Fire Hazard  Ensure that welding work should be performed by
certified/qualified welders only.
 Ensure that welder is must in dry condition.
 Ensure that proper earthing should be provided to all
Elec. equipment & all cables through 30mA MCB`s,
ELCB`S.
 Electric connections should be taken by authorized
electrician only.
 Ensure that electrical should be in dry condition & use of
PPE`s like Electric shock proof gloves (IS 4770) & safety
shoes.
 Only cotton cloth will be allowed to the hot work.
 Ensure that rod holder, cables should be in good

Page 1 of 4
condition.
 Proper flame proof JBs for extension & connector for
joints with cable hoods should be use.
 If cables are crossing the road then ensure proper
protection.
 All workmen should be use proper PPE for welding like
asbestos jackets, leather Gloves, goggles/welding mask,
welding shield.
 Make sure spark containment is used such as separate
containers use for hot tabs end Pieces of welding rods.
 First Aid box should be maintained with proper
medicines.
 Do not cut near electrical fittings or lines.
 All instructions on Hot Work Permit must be followed.
 Ensure Work to be done under close supervision and
stand by electrician.
 Ensure sufficient illumination during night work.
2. Civil works and  Surface over  All excavation work should be planned and method of
Excavation burdens excavation and type of support should be decided
 Damage considering the following:
underground o The stability of the ground
utilities o The excavation will not affect adjoining buildings /
 Damage above pipelines & other restricted areas
ground utilities o Gas, water, electrical and other public utilities should
 Improper be shut-off or disconnected, if necessary.
access / egress o Presence of underground pipes, cable conductors, etc
 Traffic movement
near excavation  Sites of excavation should be thoroughly inspected :
 Exposure to o Daily prior to each shift and after
falling loads interruption in work of more than one day.
 Mobile o After an unexpected fall of ground.
equipment o After a heavy rain
 Hazardous  Excavated earth should not be placed within one meter
atmosphere of the edge of the treanch or depth of trench whichever
 Water is greater.
accumulation  Don’t allow vehicles to operate too close to excavated
 Adjacent area.
structures  No load, plant or equipment should be placed or moved
 Loose rock or soil near the edge of any excavation
 Fall inside  Adequately anchored stop blocks and barriers should be
excavation provided to prevent vehicles being driven into the
excavation.

Page 2 of 4
Begumpet AFS

JOB SAFETY ANALYSIS


PART-B : Compliance Audit by the Location In-Charge / DSO while the job is being executed :

S. Recommended actions / Observations Compliance Status Checked by


No. Procedures & Control Name of the Officer with Sign, Date
Measures & time
1

10

11

12

13

14

Page 3 of 4
15

Page 4 of 4