You are on page 1of 6

Kelompok 2

ERLANGGA SAPUTRA (1810313010)


IKHWAL IMAM REZALDY (1810313045)
RESTRINANDA SYIFAANI (1810313020)
ADAM ABDURRASYID B. (1810313050)
GADIS DWI NUR INDRIANI (1810313014)
RACHMAD HARYYADI (1810313016)
STEFANUS PARMADA (1810313058)
RIFKI PRIANDIKA (1810313022)
M. IQBAL RAMADHAN (1810313042)
SIDE VIEW

COFFERDAM

F. W. T
STEER. G. ROOM AUXILIARY ENGINE UPPER BALLAST TANK UPPER BALLAST TANK UPPER BALLAST TANK UPPER BALLAST TANK UPPER BALLAST TANK I

F.O.D.T 1
F.O.D.T 2
CHAIN
PUMP LOCKER
CONTROL

COFFERDAM
A. P. T ROOM
MUD BOX

CARGO HOLD V CARGO HOLD IV CARGO HOLD III CARGO HOLD II CARGO HOLD I F. P. T

LOWER BALLAST TANK LOWER BALLAST TANK LOWER BALLAST TANK LOWER BALLAST TANK LOWER BALLAST TANK

COFF
COFF

COFF
BASELINE L. O. T F. O. T SEWAGE AND DIRTY WATER TANK WATER BALLAST TANK IV WATER BALLAST TANK III WATER BALLAST TANK II WATER BALLAST TANK I BASELINE BASELINE BASELINE

frame spacing 600 mm


5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105

frame spacing 760 mm


110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190

frame spacing 600 mm


195 200

FRONT VIEW
POOP DECK BOAT DECK BRIDGE DECK NAVIGATION DECK COMPASS DECK FORECASTLE DECK
LIFE
BOAT
WUDHU
OF
FIC
E

MOSQUE
CLINIC
SECOND THIRD SECOND ELECTRICIAN
CREW DECK CREW DECK CREW DECK JURU MUDI ENGINEER ENGINEER OFFICER
I & II CAPTAIN
I & II III & IV V & VI II & III CHIEF ENGINEER

RADIO ROOM
PROVISION
STORAGE

DOWN DOWN DOWN ESEP


ENGINE CASHING ENGINE CASHING ENGINE CASHING
10 UP 15 20 25 30 UP UP ROOM
10 15 20 25 30 15 20 25 30 20 25 30 20 25 30 185 190 195
10 170 175 180 185 FP

DOWN
TOILET TOILET

MESS ROOM PANTRY CHART ROOM


MESS ROOM CREW ROOM CHIEF OFFICER RADIO OFFICER
LIBRARY
MOSQUE

OOM I & II
JURU MUDI BOATSWAIN DOKTER DR
R
GALLEY

I LIA
GALLEY

BIL
UP

OFFICE E
FIC
OF
LIFE
BOAT

MAIN DECK
UPPER BALLAST TANK V UPPER BALLAST TANK IV UPPER BALLAST TANK III UPPER BALLAST TANK II UPPER BALLAST TANK I
DRY
ROOM
TOILET TOILET

DRY
PROVISION
STORAGE CLEANER FIREMAN ENGINEMAN OIL MAN ROPE STORE
LAUNDRY

I & II I & II I & II I & II


COLD
PROVISION
STORAGE WO

COFFERDAM
RK
CHAIN SH
ENGINE OPEN LOCKER OP
DOWN
CL DOWN CL

RE
UP
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185
CHAIN 190 195 200
MESS ROOM

TO
LOCKER
GALLEY PANTRY

.S
N
CHIEF CHIEF

GE
PUMP MAN STEWARD STEWARDSTEWARD COOK
I & II II & III PAINT STORE

MOSQUE AST TANK I


WUDHU AREA
UPPER BALL
UPPER BALLAST TANK V UPPER BALLAST TANK IV UPPER BALLAST TANK III UPPER BALLAST TANK II

DOUBLE BOTTOM
V LOWER BALLAST TANK IV LOWER BALLAST TANK III LOWER BALLAST TANK I
T TANK
BALLAS LOW
LOWER ER B
FRESH WATER TANK FRESH WATER

ALL
AST
SEWAGE AND TAN
K
AFTER WATER BALLAST TANK IV WATER BALLAST TANK III WATER BALLAST TANK II WATE I FORE
DIRTY WATER RB ALLAS
PEAK F.O.T T
COFFERDAM

COFFERDAM

TANK PEAK TANK


COFFERDAM

COFFERDAM

COFFERDAM
L.O.T

TANK MAIN ENGINE TANK I CHAIN


LOCKER

CL CL
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185
CHAIN 190 195 200

AFTERAP 5 10 15 20 25 NK I
LOCKER

F.O.T SEWAGE AND ALLA ST TA FORE


PEAK
DIRTY WATER WATER BALLAST TANK IV WATER BALLAST TANK III WATER BALLAST TANK II WA TER B PEAK TANK
I
TANK ANK
TANK

TANK ST T
ALLA
LOWER BA ER B
LLAST TANK
V LOW
LOWER BALLAST TANK IV LOWER BALLAST TANK III LOWER BALLAST TANK II

SKALA : 1 : 100 DIGAMBAR : Kelompok 2


SATUAN : mm KELAS :A Teknik Perkapalan 2018
TANGGAL : 14-11-2019 DISETUJUI : Ir. Amir Marasabessy, MT.

UPN "VETERAN" JAKARTA Rencana Umum Kapal Kargo TUGAS A3


Gading 27 Gading 25

1.7719

1.1000

SKALA : 1 : 100 DIGAMBAR : Kelompok 2


SATUAN : mm KELAS :A Teknik Perkapalan 2018
TANGGAL : 14-11-2019 DIPERIKSA : Ir. Amir Marasabessy, MT.

UPN "VETERAN" JAKARTA Gading Besar dan Kecil pada Kamar Mesin (gading 27 dan 25) TUGAS A3
Gading 101 Gading 100
1.0000

1.1000

SKALA : 1 :100 DIGAMBAR : Kelompok 2


SATUAN : mm KELAS :A Teknik Perkapalan 2018
TANGGAL : 14-11-2019 DISETUJUI : Ir. Amir Marasabessy, MT.

Gading Besar dan Kecil pada Ruang Muat (gading 101 dan 100)
UPN "VETERAN" JAKARTA TUGAS A3
Keterangan
1 Center girder 26 Deck girder
2 Side girder 27 Hatch coaming
3 Bottom longitudinal 28 Strong beam
4 Top longitudinal 29 Web frame
5 Solid floor 30 Hold pillar
6 Keel 31 Tween deck pillar
7 Astrake 32 Bulwark plate
33
8 Bottom platig 33 Hand rail
35
34 9 Bilge strake 34 Bulwark stay
25 24 21 10 Side plating 35 Horizontal stiffener
32 43
26 11 Top side strake 36 Bilge keel
27 12 Sheer strake 37 Docking bracket
13 Inner bottom plating 38 Bracket to margin plate
22
12 14 Tank side bracket 39 Half depth girder
31
15 Gusset plate 40 Boat deck
20 16 Hold frame 41 Vertical stiffener
11 42 Strut
17 Tween deck frame
17 18 Second deck beam 43 Scallop
23
19 Beam bracket 44 Lightening hole
28 19 20 Tween deck 45 Margin plate
21 Upper deck 46 Manhole
30 18 47 Doubling
22 Stringer plate
10 23 Tripping bracket
16
29 24 Deck transverse beam
13
25 Deck longitudinal
47 23

14
14
36

45 5
9 38 1 8 15
37 6 4 3 2
46 7
44 42

SKALA : 1:5 DIGAMBAR : Kelompok 2


SATUAN : mm KELAS :A Teknik Perkapalan 2018
TANGGAL : 14-11-2019 DISETUJUI : Ir. Amir Marasabessy, MT.

UPN "VETERAN" JAKARTA Konstruksi Kapal Bagian Ruang Muat A3


TUGAS
Keterangan
1 Center girder 21 Engine room pilar
2 Side girder 22 Engine casing
3 Solid floor 23 Engine room recess
4 Bottom longitudinal 24 Engine opening
24 5 Tank top plating 25 Saloon deck
6 Tank top bracket 26 Curtain plate
7 Horizontal margin plate 27 Bulwark plate
8 Frame 28 Sheer strake
32 9 Web frame 29 Side plating
10 Auxiliary engine bed 30 Bilge strake
40 25 11 Main engine bed 31 Bottom plating
12 Engine bed bracket 32 Keel
13 Beam bracket 33 Engine girder
14 Engine room bracket 34 Docking bracket
27 18 15 Deck beam 35 Bilge keel
22 16 Tween deck frame 36 Vertical stiffener
17
17 Upper deck 37 Strut
19
18 Cabin wall 38 Bracket to margin plate
23 19 Wall side stiffener 39 Half depth girder
14 16 20 Horizontal stiffener 40 Boat deck

28
20 13
15
11 9
21
8
29

10
38

37 12 3 7 6
35 36 39 33 5
30 34 1 2 4
32 32

SKALA : 1:5 DIGAMBAR : Kelompok 2


SATUAN : mm KELAS :A Teknik Perkapalan 2018
TANGGAL : 14-11-2019 DISETUJUI : Ir. Amir Marasabessy, MT.

Konstruksi Kapal Bagian Kamar Mesin


UPN "VETERAN" JAKARTA TUGAS A3

You might also like