METHOD STATEMENT FOR UPS AND BATTERIES OMO6-MAV-E_WIC-TYP-XX-MDS-0032_Rev-0 of new 66/11 KV Secondary Substation (88-3) and Existing SS-1 at Bangalore International Airport, Bangalore. 6.0 7.0 8.0 9.0 10.0 INSPECTION AND TESTING sale eps) tiran oe INSTALLATION OF UPS AND BATTERIES CONTENTS SCOPE Wher REFERENCE DRAWING NUMBER MATERIALS APPLICABLE LOCATIONS RESPONSIBILITIES METHOD STATEMENT INSTALLATION LIST OF EQUIPMENT | Ountt PPoerrnes ot Cantret Aone zee e tte; ebm ° beet Bis ASG p31 METHOD STATEMENT FOR UPS AND BATTERIES mavin COOMO6-MAV-E_MC-TYP-XX-MDS-0032_Rev-0 4 Project: Design and Coneiruction of new 66/11 KV Secondary Substation | (SS-3) and Existing SS-1 at Bangalore International Airport, Bangalore, 1.0 SCOPE 11 This method statement details the method of Installation of UPS and Batteries —t- 2.0 _ REFERENCE} 6tky AES Sebytahm (oe 3) 20 Aout hes ‘COOMO6-MAV-E_EL-TYP-XX-DWG-3016, (COOM06-MAV-E_SD-TYP-XX-DWG-3001. eeu fe hea Sncee 3.0 MATERIAL kt pels i. embod J wpod —-34__‘Mateialused forthe systems as pr MIR approved by IAL, yi pork eck Pf MIR No: 4.0 APPLICABLE LOCATIONS: 41 66/11 KV New $5-3 Substatior 5.0 RESPONSIBILITY: 5.1 Engineer in charge and site engineer electrical ya Sh alln eds! 6.0 METHOD: | 6.1 STORAGE 6.4.4 Material shall be stored ina dry pace at all the time. tN 6.1.2 The materials shall be stacked itemized for easy identification 6.1.3. Allitem received are petted prior to storage as per attached goods receipt inspection checklist. 6.14 All components / materials received at site shall be inspected and ensured against approved material submittal, / 6.15 Any discrepancies, damages etc, shall be notified immediately for further action/ 6.1.6 Static UPS panels shall be carefully unloaded from the vehicle using Fork lift nd ‘moved to suitable place for storage, as per manufacturer recommendation, 6.1.7 _ Static UPS panels shall be stored in a covered place separately as per manufacturer recommended ambient condition. 6.1.8 Factory packing of a UPS system shall only be removed at the installation spot to avoid damages. / 6.1.9 Static UPS system shall be covered properly to prevent dust and contamination, | mavin COOMO6-MAV-E_WIC-TYP-XX-MDS-0032_Rev-0 METHOD STATEMENT FOR UPS AND BATTERIES Design and Construction of new 66/17 kV Secondary Substation (SS-3) and Existing SS-1 at Bangalore International Airport, Bangalore. Ceti — cm fanart aren OS BR bot od. 621 622 6.23 624 6.25 6.2.6 62.7 6.28 6.2.9 6.2.10 6.2.11 6.2.12 63.1 632 6.33 Shift the static UPS system Panels from stores to the Installation spot using fork lift. |“ For floor mounted panels, the exact location of the panel and fixing holes to be marked on the concrete plinth provided by others for the installation. Remove the packing and ensure that the panel is free from transportation damages | | For wall mounted UPS panels, the exact location of the panel and fixing holes to be | marked based on approved shop drawings keeping panel in place and willbe fixed in | cmermednanegee ‘ Provide fixing arrangement in an approved manner in e marked nag {install the panel on the plinth, Mauna ore 4 Aes eB aes apy owt Donte Gland the cables trover ebro con the glancing pate i the panel and terminate Properly, (~~ Tighten all the connections as required. ‘Access around the panel to be peters tad Igture maintenance 2s per ADC regulations.— 24 incoming and Outgoing cables shall be marked / identified as per approved shop drawings. All components of the UPS panel such as MCB, Relays, Fuses, Meters, Contactors, Terminals, etc. shall be verified against the approved panel Internal drawings for correct rating and size. a“ After installation UPS panel shall be properly cleaned and protected to prevent dust and contamination. d Gree Sruvey Jot nee ome ‘The Batteries will be stored in racks, and the connectors shall be Installed tes and positive and negative terminals shall be connected to the UPS DC input: The Batteries coll shall be cleaned and fire suppression grease applied to terminals and covered - ‘The batteries shall be charged by 3 PH input through UPS and then the Cell voltage and Speci gravity of Acid shal be checked, aft ek eth Ef behomn *hathnns~ sels SEL lg Bags Lo e-n She, pe Diba itn METHOD STATEMENT FOR UPS AND BATTERIES mavin COOMO6-MAV-E_MC-TYP-XX-MDS-0032 Rev-0 _| Project: Design and Construction of new 68/11 kV Secondary Substation (SS-3) and Existing SS-1 at Bangalore international Airport, {| Bangalore. 7.0 List of Equipment. Lopes Sec Satomi a ae 75 Drilling machine“, 76 Fire Extinguisher ~ 7.7 Proper safety to Labours. 78 Crimping tool 79 wend 8.0 Safety — pea ily 8.1 All safety precaution procedures shall be followed as per BIAL Safety Requirements and Standards. Work shall carried out as per approved Safety procedures and risk assessment~ 9.0 TESTING AND COMMISSIONING. ‘A. INSULATION RESISTANCE TEST The insulation resistance shall be measured by applying 500-volt megger with all fuses in places, circuit breaker and all switches closed. The insulation resistance in mega-chms of an installation, measured shall not be less than SO mega-ohms divided by the number of points on the circuit. The insulation resistance shall be measured between EARTH TO PHASE c EARTHTO NEUTRAL PHASE TO NEURAL PHASE TO PHASE B. COMPLETION CERTIFICATES All the above tests shall be carried out in presence of Employer and the results shall be recorded In prescribed forms. Any default during the testing shall be immediately rectified and that section of the installation shall be re tested, C. The load balancing shail be done for the Distribution Boards. ie" fb ae or AGG on Coterfes se flart 16, Safle ont Gavirasoe U Shalt, “f a 4 ( 2 a amie PS AND BATTERIES COOM06-MAV-E_NMC-TYP-XX-MDS-0032_Rev-0 Project: Design and Construction of new G6/17 kV: Bangalore, yndary Substation (SS-3) and Existing SS-1 at Bangalore International Airport, MY AND LV PANELS Do INSPECTION AND-TEST PLAN” f Ler 4 Verification Sign-off A. Srl pyr S.No ies /1 Activities / Items to Inspected Engineer ac Check the UPS system panels and associated material installed ‘| have approved submittals, ‘a >, _ | Check the rating and capacity of UPS panels as per approved submittals. Z 3. | Check adequate supports are provided as required. v Check all meters, circuit breakers, indication lamp, handles are correct and undamaged Y Ensure adequate clearance available around UPS panels as required and as per drawings and regulations for service and maintenance All cables and wires including grounding are terminated and identified and Check the tightness of all termination nuts and bolt Al cables and wires inelucing grounding are ferminated and identified. Check the adjustment range of output float and equalize voltages. Note: that the adjustment of float and equalize should be independent of each other. High and low output voltages alarm/shutdown, ground monitoring/ground detector and all other protective alarms/shutdowns c 10. ‘Check output voltage ripple content (battery disconnected), check regulation at 0%, 50% & 100% of full load. 11, Measure AC input and DC output Voltages and currents & calculate efficiency at 50% and 100% of rated output current. 2, Ensure UPS panels interiors are cleaned and free from dust. 2 Check the locking arrangement of handles and alignment of panel doors and Check the panel doors are earthed properly. Eewtnere fessity or a oh Ose algae boop | Lag st ioc Caen ‘METHOD STATEMENT FOR | UPS AND BATTERIES mavin COOMO6-MAV-E_MC-TYP-XX-MDS-0032_Rev-0 wie. Project: Design and Construction of new 66/11 kV Secondary Substation (SS-3) and Existing SS-1 at Bangalore International Airport, Bangalore : 14 Final inspection after completing the installation as per manufacturer's instruction and approved drawings. Comments/ Remarks, if any : rate hae RoR Pp a fe ae fra wanen \ S ‘Contractor Representative Client Representative Signature Name Date fem monn ca ra ene Installation of UPS and Batteries we _| wee" = — a oe as i bm, | el La — = ree, auf —s 7 — ee ermne =o = SSSR me | een maa =

You might also like