Murs
Murs
COLUMN
BAG KG. 40 87.21 4.845 9.69
MIXTURE CLASS : A
TOTAL VLOUME : 9.69
FOOTING
WT PER BAG 40 78.975 4.3875 8.775
MIXTURE CLASS : A
TOTAL VLOUME : 8.775
STIFFENER COLUMN
WT PER BAG 40 2.916 0.162 0.324
MIXTURE CLASS : A
TOTAL VLOUME : 0.324
TOTAL
CEMENT: 588.681 SAY 589 BAGS
SAND: 32.7045 SAY 33 CU. M.
GRAVEL: 65.409 SAY 66 CU. M.
MASONRY WORKS
CONCRETE HOLLOW BLOCKS
main
Total no. CHB per layer 138.6125 Total no. of layers: 48.8
Perimeter 55.445 Total Layer 24.4 Total no. of CHB: 4298
Height 4.88 total no. of CHB 3383
cr
Total no. CHB per layer 37.5
15
Perimeter Total Layer 24.4
Height 4.88 total no. of CHB 915
PLASTERING
Total Volume5.500346 (perimeter x height x 2faces x t)
wt. per bag 40 cement 66.00415 say 67 bags
mixture class B sand 5.500346 say 6 cu. m.
STEEL WORKS
CHB REINFORCEMENT
AREA OF WALL 12 VERTICAL REINFORCEMENT 19.2
SPACING (cm) 80 HORIZONTAL REINFORCEMENT 25.8
LAYER 3 TOTAL 45
BAR DIAMETER (mm) 10 NO. OF BARS NEEDED 7.5
BAR LENGTH (m) 6 SAY 8 - 10 mm dia. Bars
TIE WIRES
WALL AREA 12
VERT. S 80
HOR. LAY. 3
KG./ SQ. M. 30
OREDER (kg) 0.288 #16 - G.I. WIRE
FOOTING REINFORCEMENT
LENGTH OF BARS 1
BAR DIAMETER (mm) 12 TOTAL NUMBER OF FOOTINGS 360
BAR LENGTH (m) 6 TOTAL LENGTH OF CUT BARS 432
MINIMUM HOOK (mm) 108 NO. OF BARS NEEDED 72 PIECES
NET LENGTH 1.2
COLUMN REINFORCEMENT
BAR DIAMETER (mm) 20 NO. OF COLUMN 1
BAR LENGTH (m) 5 NO. OF BARS IN 1 COLUMN 10
BEND @ BASE OF FOOTING 0.2 ORDER 10
LENGTH FROM FOOTING TO GF 1.2
HEIGHT FROM GL TO BEAM 3.5
d OF BEAM 0.5
t OF SLAB 0.15
DOWEL(m) 0.4
TOTAL LENGTH(M) 5.95
COMP. L < BAR L CHANGE BAR L
LATERAL TIES
COLUMN DIM.(mm X mm) 500 X 400
BAR DIAMETER (mm) 10
320
SPACING mm: 480
400
2 3
2
40 60 80
0.047 0.032 0.024
MIXTURE PROPORT CEMENT BAGS SAND CU. GRAVEL CHB REINF. VERT
CLASS ION 40 KG 50 KG M. CU. M. SPACING PER BLOCKPER SQ. M
AA 12 9.5 0.5 1 40 0.235 2.93
A 9 7 0.5 1 60 0.171 2.13
B 7.5 6 0.5 1 80 0.128 1.6
C 6 5 0.5 1
40 BAR DIA. 5 6
50 8 1.98 2.37
10 3.08 3.7
quantity of cement and sand for mortar and plaster 12 4.44 5.33
Mix. Class proportion 40 50 sand cu. M. 13 5.21 6.25
A 1:2 18 14.5 1 16 7.9 9.47
B 1:3 12 9.5 1 20 12.33 14.8
C 1:4 9 7 1 25 19.27 23.12
D 1:5 7.5 6 1 28 24.17 29
30 27.75 33.29
32 31.57 37.88
36 39.96 47.95
vert hor layer 25 30 40
40 2 0.054 0.065 0.086 40
40 3 0.039 0.047 0.063 2
40 4 0.024 0.029 0.039
60 2 0.036 0.044 0.057
60 3 0.026 0.032 0.042
60 4 0.02 0.024 0.032
80 2 0.027 0.033 0.044
80 3 0.02 0.024 0.032
80 4 0.015 0.018 0.024
HOR
LAYER PER BLOCKPER SQ. M
2 0.264 3.3
3 0.172 2.15
4 0.138 1.72