This study was prepared with the financial assistance of the
Special Programs Branch of the Institutional Cooperation and
Development Services Division of the Canadian International
Development Agency.
Foreword 1
References 44
‘a
II
o r e w o r d
F I
p 1. PROBLEMS ASSOCIATED WITH SITES AND SERVICES AND
FORMAL HOUSING
Ths report forms the thra setteme”s. Ratner t cons’sts partcipaton n settlement design BACKGROUND intemediate level of ‘serviced cities of India (Bhatt, 1986) and
‘oiume of the cartnung senes of an expenment in whch the cy demonstrating an
sites.” to an upper level of “core several other studies of
of pubicatons “How the Other fndngs cf the eerier stuces exoenmentally effective model One popular approach to the housing” complete with utilities completed projects, have
Half Builds” based o the ong were apped n a search for new for an optimal coliaboraton o provision of low-cost housing for and access to community-based identified the following problems
term researcr undertaken by design rr hods for the formal and spontaneous agents the urban poor is the so-called services (Mayo and Gross, that are inherent in this design
McGill Unive s y s M um Cost prod i ser responsive e housing process “sites and services” strategy. 1987). Depending upon the approach:
Housng Gro..j T fr, ho c oor Th This has been advocated by capacity of the beneficiary to pay
oiume ertt Spac v an
. us r c red arourd his work has been carr ed a t several international aid for the housing, the authority can 1) The bias of economics in
ir estigaton of the a t e t at h pothetc p oa h we have under the auspices of the agencies such as the World choose the level of servicing. planning typically discounts the
take place n p bI spaces a d t Se f.’Selection M n iiu Cost Hous ng Graduate Bank and the United Nations and This flexibility permits the formal social aspects of design. 2)
ad acentto a d arourd dwel irgs Process. h asdeveooed Program of fr e McGill School of adopted by many housing sector to target its projects Projects lack quality and variety
n unpla ned settle nants aid ough e g buld Architecture, It forms one part of authorities in developing towards very low income groups of open spaces 3) During
ow such spac s ar a ranged to Ia o excr c undertak r the project ‘Human Settlements countries during the last decade
accommodate tb se activ ties by a g oup a gr duate students Tra n rg, India.” which s project planning incorrent
and a halt In a typical sites and ASSOCIATED PROBLEMS assumptions are made
Volume two ir te se as Plots in tn’ r Cost Housing supoo led by the Special services project the serviced
examned how and why plots in Prograr T e new approach rogram Branch of the concerning family income and
land is provided by the housing Sites and services make housing plot sizes, 4) Projects lack
unplannea settlements acquire smuiates the settiement process Institutional Cooperation and authority while the actual house available to the urban poor at a variety of plot sizes. 5) Projects
certan pnyscai cnaractenstics which. might take place in an Development Services Division building is left to the home relatively low cost. However, do not provide multi-family plots.
A quantitatve approach was unplanned settlement. Where. of the Canadian internationaI owner. This change of role. from there are several problems that 6) They follow a blind plot
taken to these questons using however, sufticent control to Development Agency, the Vastu being a provider of housing to are associated with this design allocation process. 7) Project
certan statistical techniques ntegrate proper services in a Shlpa Foundation and McGiI that of a facilitator that makes approach. A survey of key sites planning and implementation
ernp’oyed ri the social scences cost effechve manner, s University. We would Like to infrastructure and other related and service.s projects in major takes a very long time.
mantaned by the formal sector thank Dr. Donald Chan for his facilities available to users,
The study reported n the The stud’
1 ponzs out nherent neip in generating the random represents a significant
present volume departs shghtiy lmltationc of conventonai desgn famiy profiles for the sirnuIaton. departure from the traditional
from the previou t v It is not methodc ccd in planning sites and my friend and colleague attitude of housing agencies.
directly conce vi t cx nding and r nd other low cost P off Witold Rybczynsk for his - -
our understa g of the ho g jc t It contributes uggetions at differert stages of The success of the sites and
underlying o r. r un ar ed h ag rrr f user ie project
1) Poor consideration of cultural and social factors 2) Poor quality and variety of open spaces:
The design of sites and services come srelter (Bertaud 1986. ‘I ios W ous chemes the successful it is essential that they
projects is primarily based on Bertaud and Wright. 1981: pub oper paces lack diversity are conceived along witI- the
economic factors and cultural Housing and Urban Development and icr ess The quality of housing and other surrounding
and social factors are rarely Coporaton of India. 1982i. spaces crovoed s such that they amenities.
taken nto consderatfon. As a These models can be run on a often eman empty and unused
result. The current planning hand-heid calculator or a micro this s a waste of a vaiuaole
methods emphasize economc computer. The ntention beh:nd resource On the other hand.
efficiency n site layout by these models s to alert planners . studies of n’ormai settlements in,
optimising varabies such as plot to the economic advantages of India have snown that the public
rato5 and road wdths but have ratonalized layouts. But often open spaces n these settlements
E—-r-:--—.
been ess successful n they are used as an excuse for w’hle ‘pcaily small n scale -
responding to the cuitura and unirr aginative planning and a are rich and diverse n spatial
social factors (Rybczynski et al.. means to achieve higher qualite lively. fuil of activtes.
.
‘983. For example. na study densities and cheaper ways of and wel ntegrateo with the
of a sites and servces proJect in subdividing land The result is a housng Rybczynsk et ci..
Ahmedabad. lnda. t was found monotonous. mind-numbing grid 1984i.
that the typical pre designed and blocks of housing that are
seruce core. bult for each plot ruboer-stamped, over and over Wrier designing a formai sites
was alteren by more than 90% of agan. wThout any socal or and services housing proect th.e
the occupants fMeiln 19831. cultural considerations. For any decgner does not know who wili
housing design approach to be be living wnere and what their
Various aid agencies such as the successful it Is essential that it common spatial needs will be.
World Bank and India’s Housing goes beyond mere economic TI-c e o e a close relationship
and Urban Development factor considers social and betwe d v du homes and
Corporation have developed uitura a pects and responds to ub I po’sible to
mathematical models for the the I festyle o the people who will ac eve o per aces to be
nalysis of alternatives fo low ye 1
N
N
N i__k
4’ i .‘
I
L : r
iii : 1. .L.: .
1
4.j r ( t
—‘..-L.
U
ASSOCIATED PROBLEMS
3 Incor cot assuripti re concerning family i ome and plot s’zes 4) Lack of variety of plot sizes’
F-orthesak if ott ercyara ir oi’o ar 0 ed larger p When planning sites and standard (30 to 35 M2) for the
planning ease in ste a d whe as o rcome families services projects it is assumed EWS category. But on a closer
services projects the target smallcr pots However, studies that if two families earn the same look it was also found that no
population 5 dded nto several of infoma settlements have amount of money their spatial one size of plot predominated:
ncome catagones. For example. shown :itde correlaton between requirements should be the plots less than 20 M2 accounted
the Government of india uses famiy ncome and physcal piot same. thus plot sizes within each for 25% of the total, plots 20-30
four ncome categories’ characteristics Rybczynsi’ et al income category in typical sites M2 and 30-40 M2 for 22% each.
Economically Weaker Sector 1986 and services projects are kept and plots over 40 M2 for 31%
‘EWS). Low Income Group (LIG. uniform. However this iRybczynski et al. 1986). These
Middle Income Group fMlG and In desgn’g actuai housing supposition is wrong The spatial figures are not absolute, but
Hgh Income urcup .HG. projects hch Is necessary
- needs of low ncome population show that there exists a very
to accommodate several ncome are not uniform, but vary large variety of plot sizes in
EWS below Rs 700 month groups “ segregahon of considerably from one family to nformai settlements. To make
plots e 035M2 dffemr ‘ne groups ‘s ‘ccen another These variations sites and services projects more
a rte r c fferent income depend on several factors such “uccessful it is important to
LIG R 7 rorfr g’ou a 1 o mixed. Th as’ the size and structure of the noorporate a wide variety of plot
pose SM epa n rg,base family’ their occupation if the sizes w thin each income
orro s o the family engages in ‘orre category
MIG 150 0.) ot’ at n bse coo ‘iomic activity (wo k at 1 o e
o 0 40M adi a o Schoer or not whether they rrairtain
6.) In inforrr animals at home or lot and so
HIG ov R 2’0 orth set LiT 1 egardless of thei on (Pandya. 1988> n a survey
plot s o 325 475 M2 incor e riilies from the of informal settlemonts in Indore
same c e igmus group live the average size of plots was
Based on trese atoroabUry next to a a another Brook found to be 32 M2 which is very
critena. it is assumed that nigher 1988: Pybczynsk et al 1986 close to the official government
I $1
‘—‘-t r-’-t
/;.
Z
AssociATED PROBLEMS
N
- -,
U
ASsOO)ATEDRoBLMS
I
7) Extended p’anning and be made to develop new housing schemes as presently
pI 2. SELF-SELECTION DESIGN PROCESS: A NEW DESIGN METHOD
Implementahon time approaches that can says t me at irrpiemented does rot take into
every stage of the housng account the actual user.
Large urban development delivery system from plannng Conventionally-planned projects
projects take a long time to and design to production and are developed in a few definite
coil p ate According to the U S delivery of houses After a I the stages by a planner or an
Agency for International t me saved can always be used architect. and the involvement of THE IDEA Autonomous growth: The idea mechanical character. The
Developments Office of Housing to produce more housing the project participants in the
behind autonomous growth organic nature of the urban
and Urban Programs. which has decson-makng process is kept The framework of ideas behind suggests that the user should be fabric, representative of the
been instrumental in helping to a m nimum In a typical sites the typical low cost housing involved in the housing process traditional cities and unplanned
many developing countries TOWARDS A NEW APPROACH ar d serv ces project, the level of scheme does not take into at every level of design. For a settlements, can be attributed to
formulate ther national housing user participation is greater but account the user. On the other built environment to be socio such an autonomous and piece
programs. large area The problems assocated with limited to the construction of hand. the characteristics inherent cultu rally appropriate it should meal growth process.
development’ projects usually sites and services range from the ndividual houses. The project in the development process in have as a primary element the
equire three to four years to lack of culturally appropriate parti ipants are still excluded ir formal settlements permit the contributior of its future The attempt at integrating
complete (PADCO. 1984) The housing to the creation of from th crucial planning and user to be involved in the design residents. To achieve this, user autonomous growth and
Aranya project in lndore. impersonal urban envr’onments, aesign stages of the proJect. and process at various levels in participation in the decision- continuous development
designed by the Vastu-Shilpa to wrong assumptions about the thus. from the actual process of creating their environment. It is making process should be processes in low-cost housing
Foundat’on, took five years to clients needs, and so on The development no wonder that informal ircreased from the ‘micro level” schemes is not new. The two
complete Th s s a long time ame problems are ommon ii settlements (i a slums) have of individual homes to the ‘macro key components of the sites and
span. Gonsidenng the scale and most public hausng projects To address the problems proved to be better housing level” of the settlement. services strategy. the self-help
urgency of the urban housing These problems are not associated with conventionally environments than planned Conversely, the duties of the element which is similar to the
problems in the developing rechniral but more fundamental olanned projects a new design hoasing projerts in terms of design team should be autonomous growth and the idea
countries, time is one luxury n ature and re do ely approach, radically different from satisfying user needs decreased to the level of a of progressive developmert are
which they can ill-afford If the associated with the way s tes a the to mal production of housing general regulator of the effectively used in the
urban migrants and poor services or formal housing proposed. It is called the “self A deslgn method that can settlement construction of individual homes
communities have to wait for five proJects are conceved arc selection’ design process. a term recreate the order. spatial (probably the most successful
years to get a plot they are mplemented borrowed from economics The standards and physical To achieve a greater degree of aspect of sites and services
bound to end up ir i iforma deas behind tI-c ‘self-se ection characteristics of unplanned user input in the housing projects) Instead of limiting the
settlements. The shelter The framework of ideas behnd design approach are discussed settlements. and follow their process. changes are required in idea of autonomous growth and
problems of the urban poor are sites and services and other n the next chapter development dynamics should the conventional design practice continuous development to the
so urgent that every effort should formally planned low-cost produce a better urban For example conventionally- ‘micro’ level or individual
e wiror ment It s proposed that planned settlements rely on homes it is proposed to apply
the development process of a blind’ methods for the allocation them at the “macro”
traditional or unplanned w’ban of plots, but the new approach neighborhood, or settlement
settlement should be adopted. will require an open ended plot- level
but in such a way that it would allocation system. Thus, project
also overcome the problems of participants are given the STRATEGIC
poor and inadequate freedom to choose (self-select). CONS1DERATIONS
infrastructure which are not only how they want to live
associatd with unplanned but also where they want to live For the new design approach to
ettl rrents and b w[om they are to be ‘ic ea e he user inp t the
s rou ‘ided fo lowing development strategic
THE PRINCIPLES are proposed. no pre-conceived
Continuous development: development plan: progressive
T pr pIe he tr h we nal ode ho ‘ig a v of iajor ast tur
pa irgpoc sot ior c err ar developed n a f s ctior plot ar a fr
se tlements are autonomous single or a few defnte stages choice n the selecton of different
growth and continuous Continuous development on the plot sizes and shapes. The
development The ncreased contrary assumes the aeveiopment strategies are suc
scott a etw cor ept r developrirttotak ace a bat they or Icr c each other
pa ninj ew oust cou urbrofr cyc of events This d wi I sustai th ew
Dcd:uce a better hvro orevent the settlement from approah.
erjDre. adoptrc an arttnia! or
U—
__ __ __ _ — — — — — _ — _ — _
— — — —
A NEW DESIGN MEtHOD
A NEW DESiGN METHOD
Progressive infrastructure
1991 (IDA. 1983) Thecityis studies The field work in connected to the city centre by Family Profiles speaking groups. one from informal settlements. To reflect
facing a rapidly growng
housing defct that has led to
an increasing number of slums
Indore has produced nteresting
nform atio on local housing
condtions, especially in the
public transport.
$
the actual number of occupants
Indore was ou fan harity with.
and knowlndge c t ty The
Vastu Shi pa F oundation whicu
dev lopmert plans. survey
rraoc ocal ndeconomic
urv’ys o the irformal
e middle and one towards the
ortb I informal settlements in India
have found that in low cost
urban housing, besides the
live next to those who come
from the same region (Brook
1988). To reflect this each
rather than assuming an
average family size Besides
the family type the total number
ias bee ol aborat ng with the s tt erie ts p tographs and physical needs of a family and linguistic group (except the last)
of occupants for each plot was
M mm r Cot Housing Group its linguistic and regional as divided into three four sub
lt v as assur ied that tie ocal also randomly generated
or rese reF n humar associations, it is also important groups, indicating the region
ettlerrertss cc 1983 as The Site gove irient the Indore to consider its survival strategy from which they came
designed 6 500 p ot sites and Develop iient Authority wrihed
-
(Brook. 1989’ Pandya, 1988). Tenants: If extra space is
services pro ect o th’ I dore A te I ated six kilometers t ac elop a small housing The survival strategy of a family Family Cluster: Traditional available it is common to see
-
Development A t o y This nor f ° ity centre. was o ect to accommodate 400 is complementary to the settlements in India have people making an extraordinary
sites and services project. choser or tF e experiment A 450 families. The project was definition of the family profile, developed around immediate effort to create this extra space -
developed under a state-wide major road. on the southern primarily aimed at families from as it represents the manner in family links, where people it is often rented to augment the
comprehensive urban boundary of the site, connects tne economically weaker sector which low-income urban related to one another live in family income. To reinforce this
develooment proeot. s the project to the urban core. In who earn less than $ 45 families manage to make a the same neighborhood practice, it was assumed that a
nanced ov the Wcrla Bank As terms of inks with the city and month). but not limited living. These economic (mohalla or a pole). A similar certain number of families would
a part of the coiiaboraton. proxmity to empioyment exclusively to that income activities, marginal to the formal preference also exists in have either one or two tenants.
mOore nas been made the opporturities. the ste is ideally group. Surveys of informal sector, are characteristic of the
mcus of the human settlement stuatea. It is also well settlements in Indore have so-called economically weaker
shown that the population of sector. and take many forms:
tnese settlements is not mited owning a small business or a
to a single income group shop adjacent to the house.
(Rybczynski et al., 1984) doing work at home renting out
a room or two, keeping animals
T pcal informal settlements mostly cows and water
N
-
Farnly Type TFe famhes w re Gomricrce Small shops are ligt € t de 1 y to keep when the settlement was fully uncles and so on, to form a who had assumed the role of the
d v ded into two groups iriporta t rcor e generators n nzislsard eyhadan developed, that the project specific household. Similarly, the heads of households completed
oxtended a d r uc a F amily Fs informal secto housing ard a ii a o t o t ir o ot would records were transferred to head of the household defined these facts sheets. This step
stru ture ye y mporta t r arc gcne al y located at street be ghy rt drawings Large photographs of the economic activities of the took a very short time, hardly ten
dettrn’ ni j hfIn ir,n r c o’g H’S ‘sre’ 1 ,rJn
‘he model ee us& as ba’e fay. To record a more minutes It was, however, an
should be orga 1 ze For w e e t e e is traffic and maps almost like aerial survey detailed family profile and make important step because it gave a
example, an c te Id d fam y expocure to passersby Bud g eoeererce photos) to make the final a reasoned selection of the plot sense of belonging and a greater
wh rc e eral ge e a ons € wcv, t salsocomnonto to bu ntyo ea drawings of the project location and shape the family understanding of the family being
toget r II phys ed d ‘one srlalle shops we s g or two storc dwel g heads were required to fill Out a accommodated
a ising out of co erisf r n de l’eneighb r ood o was &so ascertai ed. THE DESIGN PROCEDURE standard facts sheet. Students
privacy betwoen e olde er eloca needs Tor fec
ger ra io a. d yo r rar ed h s patt rr t was assumed °ot S Bas d o tre ra ge Using the computergenerated FAM NO 358: 3/40 100 FAM Th’PE EN #7 TEN YiN, #1, ANiMAL Y N #
couples wo d be tai y 1 tomc arriieswoudhavea a d oerce age o d fferer t plot ‘family profiles and the empty A BuSiNESS Y N LOOATiON iMPORTANT YIN, WORK V N, FLOORS 1/1 + 36
d fferer fr r a of ru lea bu n°ssath me or eo z ba edrtrnilfora model base as the starting
faTily Pa dv 98 wt ortanprefc’rør r cettlmp-tc n ihr rrtr points the design exoeriment
c w redivded rt fo r was conducted n four stages. B
br ad a egor e s ia I pots of drawing of cards development of
520M2 redur osof2o family profiles self selection of
OM aoepot o 30 40 M2 plots and desgring and building 01) FAMILY MUMBlE:
Yes’
Description,
We:
e
ov
at
j asa
raat 01
F’ g r
ues
age t[ r v rage o sz te g g pocs
N next step in tre de or o ocss
was the developmer t of detailed
family profiles
05) BUILDING
/ N)
Two Floor,,
wa u “ he rc pse St paro
10) GIVE REASONS FOE TNT FOLLOWING:
P t vo havea rf s urn a out locat The development of detailed Location of the Plot’
a’r4.
t i family profiles A more detailed
a
I ron desc iptior of eac 1 tam ly and 25
‘3 M their reeds was develooed by Shape of the Plot’
ernad if th nd dual ‘1
N pu o’d fa’my
pro en ga or y t € tal
ur beroffa ily er ber but it MEET
N T
a e
le eamy
eayFadto
dtr et crpior
o’to
fre T 1 b onsad
N gt brte id ters
TFoqN PIMENtI
The seltselection of plots In immediate family and language between two plot faces was
an nformai sefflement the group. in a better business requred to be two to three
settler may go to a slum location either close to a main meters. depending on location.
aridlord and wit[ his help, road or on a corner of two
dertify an approonate site intersecting streets. where the The design and construction
stake out the plot according to business could prosper. The of houses: After selecting the
his f’nancial capability and settlers were required to justify plot at the beginning of a week,
needs, aid finally design and the location and shape of the the rest of the week was spent
build his house. Sirniarly. in plot selected, the justifications designing and building
this exercise, the heads of were also recorded on the fact individual homes. Instead of
ho set- ds ident fied the sheets planning the dwelling on the
des.red plot locations and drawing board the homes were
demarcated them on the model Once the location of the plot designed on the model. At the
base witt- the hep of the was chosen and approved by time of selecting the plot, the
des gne the planner t was marked on settlers were expected to make
the model with pins and tapes only a rough sketch design of
With a completed facts sheet. he. staked out) A small label the house Based on this
the fan- ily heads came to the with the fam ly number, family sketch they proceeded
planner to confirm the location assocation (language group. immediately to a model and
of their plots. It was considered clan, and family cluster), and designed their houses in three
mportai fo all p ts be nane o the student, was dimensions T ic house modals
located close to tt- e existing affixed on the plot The label were in block form, but it was
urban in rastructure. roads and worked as a guide to the required to show the
water taps. However the subsequent settlers giving them fenestration, stairs, balconies,
oca on vas also to be based c ues about neighbours. terraces, shops and other
on the specific characteristics of language groups and family ties house extensions to give a
the amty associatons it was and made the settlement better definition to the urban
assumed tha fam es speaking process simpler Depending on character of the project
the same language. coming the time available, at the Completed house models were
from the same region and beginning of each week. these added to the site model. The
navng the sane family three stages were repeated house designs were based on
backgro d wou Ike to I’ve about 10 to 15 times ft-c sqcial organ zation and
close to one another. When it economic capability of th
ch all three
was difficult to ma
t The heads of households were famiy, as described in the facts
a ables th ang age group md rectly responsible for sheet
was considered to be te designing the urban
dete minant for the location. environment because they were At different stages of the
When none o the family free to hoose the location of development. important public
ass ciat n could be n-atct-ed. the r plots. However to amen ties such as a primary
resu ting frors space saturation, maintain a certain degree of school, market areas and so on
use’s se’ected new areas in cortrol on the quality of the were introduced by the planner.
do orto t efa ly urban vir m r ar p blic The planne a so took care of
associaton ‘language group. amenities. the planner upgrading the open spaces b
—
ciar. and fan’ ly cljster. the remaned fl charge of buiIdng piattorms around trees
ur Jal rate y th intr d ng e ir ast uct C I a db Idrop cs uc res
sPocdted an- y ‘A 3s a o stages To o ga ize open sucn as te ip’s and shr es.
ons der d a moor’s t factor spaces wthn the sett’ement
whe selCctlrg thC pi0 iocator
-
several sim pie ru’e were Tr e s if-se’ection p ocess took
or st a mi a a us b Cd ba o ,ree ee w a co pica A
A Oho,jgrab slw!ng an early
r’ cop nd locanon as meters around pubtc water taos detaiea record of different
staae of the self select on process.
ons,ared “ o--tan’ tbC and nyc to seven meters stages of b deveicpment was rotice the in tial r Ira atm cture
cp r rd xi a eswas kpt. d de r
us s r ed vid ha i Me a p oup of
Li’st( th lo aw f’s h’s raoueJ M n- di tal cc ‘cxt c an e sP’—cfeo r).Qç
a _ — __ w— W ——
Li
THE DEVELOPMENT PROCESS
I
THE DEVELOPMENT PROCESS
STAGE ONE
The hypothetical settlement
PS STAGE ONE
SeIfseIection of Plots:
was developed in seven stages,
having two distinct parts,
corresponding to the
‘I The plots started to cluster to the
west of the access road, around
responsibilities of the two
parties involved in the design
process the planner and the
pm public water tap number 1 and
along the path leading to it.
Other plots began to locate on
heads of households and the access road and along the
related to two aspects of main road connecting the site to
design Infrastructure and Self the city, taking advantage of the
selection of Plots. good business location. Another
plot-cluster developed at the end
V
Infrastructure: of the access road around the
two existing trees, not too far
The initial infrastructure that from public water tap number 2.
was added to the settlement One smaller cluster, based on
consisted of an access road family association, developed
approximately 10 meters wide just north of public water tap
and 72 meters long Starting number 2, next to an existing
from the main road that links tree. Several other plots were
the settlement to the urban located in a haphazard way
core, a bus stop (A). was without any visible links.
placed along the main road However. two of these plots were
immediately west of the access located in anticipation of the
road. a convenient location for access road extension. The
all the residents. In front of the majority of the plots had a square
bus stop a strip of land B). 161 or rectangular shape
sq. meter in area. was
designated as a market to be
V
used by hawkers. The F—
V Initial Infrastructure:
‘ ved Man tc
egIno
PLb1
eetAddt
evec Ne v
Ope Soace
.OO ii
225 05 M
U
Pcc vvater TaDV
I -j
______
Infrastructure Additions:
3
THE DEVELOPMENT PROCESS THE DEVELOPMENT PROCESS
STAGE THREE
infrastructure:
N SelfseIection of Plots.
STAGE THREE
Two more public water taps, The main road and the acceis
numbers 4 and 5 each with a oad started to corsolidate Plots
path, were added. A path to the at strenit ntrcnictinns wPr
west of the central square was occupied first be ause of the
also added, its shape based on advantageous busi iess location
the location of existing plots. T i e southern par of the project
Another path connected public
water tap number 1 to the
access road and an adjoining
N got filled wit i plots Good
cluster ng took place around
trees public water taps and
paths leading to the publr’
square with a tree.
infrastructure Additions:
N amenit es Seve a rregular
paths emerged as a result f the
allocatior process in a eas where
is access to new plots was
Paved Mani Streets 152A0 M2
blocked by exist ng ones. Some
Length of Street Addtior 3810 M
family groups lad to leap frog to
Paved Narrow Lanes 29710 M2
other locations as the areas
Public Open Spaces 10730 M2
su rounding their kinsmer were
Pubic Water Taps 2
saturated There was no
clusterirg around stand pipe
urbc 5 wc couldb
because of its nortie n most
‘05
ocation and dative so io
from other amenities ie
es dents pr tsr ed b lo e
he man ty oad o rsueeasy
css o ie pla e
np oymer wo plot
t owever did b cak away frorr
the stabl s ed patto n d
N ocated nt[e o
ut io too r
w
er a
one
q re
N
o4
S
N
— — a —
IT DEVELOPMENT PROCESS
pI
THE DEVELOPMENT PROCESS
STAGE FOUR
Infrastructure:
pI STAGE FOUR
Self-selection of Plots:
The access road was extended
towards the north-west corner of
I Good clustering occurred
around the new extension of the
-
the site from the market square. access road and public water
Public water taps number 6 and
a path were added to the west of
the market square. Another
I tap number 7. This was largely
due to the arrival of a large
number of famtlies of the same
public water tap, number 7, was
introduced to the west of the new
section of the access road. A
I background, a mere
coincidence. The southern
edge of the settlement was
kindergarten (E), was inserted
just off of the access road
between public water taps
p. already saturated. so the new
group had to stake out plots to
the north The area between
numbers6andl. The the two new public water taps
kindergarten was carefully fitted numbers 6 and 7. also begun to
within the open space left by the fill up. New families got linked
surrounding plots. Finally, a with the two isolated plots
small square and a path were described in the third stage.
added to the street leading from
/L.
The southern quarter of the
the main city road to public water settlement was now saturated
tap number 3. with plots and the opaces
around trees and public water
/ Infrastructure Additions: taps had acquired a distinct
character
Paved Main Streets 464,50 M2
/
Length of Street Addition 61.OOM
Paved Narrow Lanes 18290 M2
0
Public Open Spaces None added
4
Public Water Taps 2
Bo’
0
ri• y//
4
0
c\
4
0
r
Li
w — — — a_a —
THE DEVELOPMENT PROcESS
P1
THE DEVELOPMENT PROOESS
STAGE FIVE
Infrastructure:
S STAGE FIVE
Self-selection of Plots:
A rgschooiF, waaddedto
rthern sectio 0 Ie
Pm Plot allocation in the southern 2/3
of the settlement was completed
r entinco atngan and the space between the fork
e T e c oolalso
a da oeayarea
Pm of the access road started to fill
up. Clustering around pubhc
east / cinic H water tap number 5 was
dad ‘ust beyond the
m at square along the west pm completed and plots started to
expand to the north. The
sde of the access rcad A new introduction of the religious / 7
e a
seaton of road was adaed to the
western forK of the access road.
and the eastern flanne of the
p. structures consolidated the
spaces surrounding the two
squares described in the stage
access road was asc extended. four. The standard shape of the
To arge sqaares and J,, plots remained square or
a dad for reOgous purposes, rectangular, but plots with
veioped our d publsc irregular shapes were used to fill
numb a osc the the leftover spaces between
a ar a o d others,
igious a es we e
d m thea wo sauares.
Infrastructure Additions:
45000 M2
S:ree Adc%!cr P2.40 M
a;ec a”cw anpa 5020 M2
ac d o Open Space 580.70 M2
er Tpc N a added
N
-
_i T
T T
THE DEVELOPMENT PROCESS
I THE DEVELOPMENT fROCESS
The western and tne eastern The entire western side of the
forks of the access road were settlement was now saturated
extended. Four public water with good clustering around the
110
taps, numbers 8,9, 10 and 11, new stand pipes. The area
were added. Two small paths between the two forks of the
were also added to give the access road to the south of the
surrounding community access school got filled. Only about 1 8
to the school yard. of the settlement in the north
east corner remained vacant.
I Do Infrastructure Additions: This vacant area had only one
isolated plot resulting from
Paved Ma n Streets 261 30 M2
leapfrogging.
gt of St eet Add Oor 41 90 M
avod Narrow Lares 13 20 M2
Pubi Open Spaces N ne added
Bo Pubi Water Taps 4
3
/
— 0
N
N
N
N
[9PMT PROCESS THE DEVELOPMENT PROCESS
r oL
o13
j12
i ne iase stage of erie
infrastructure implementation
consisted of the addition of two
public water taps, numbers 12
ar d 13 one at the western fork
N
The remaining space got utilized
by plots. The leftover space,
space not used by the formal in
frastructure and plots, emerged
as informally allocated unpaved
paths and small squares. All cir
/7 and another at the eastern fork
of the access road. culation linkages not mentioned
earlier, were formalized.
Infrastructure Additions”
a
P d Ma r Streets
gtr of Street Acid t or
8710 M2
2290 M
N
eoN re anes
P bIcOpeiSpace
P Wtrlaps
38 10 M2
None added
2
N
N
•1
N
NI
N
N
N
N
THE DEVELOPMENT PBOCESS I
5. THE DESIGN APPRAISAL
T e self selection design Social and Cultural detail later on in this chapter,
process represented a radical Appropriateness of Design: contributed to the creation of a
N wo d a mistake. In order to
gaug ti overali success of
the approach the product of
phjT t I
eifse1ect,o I s was tme
& -ted ‘stce he d s nsa Plot all at on process
pp Ps
?flO S’.
characTrstcs
B A soda culturally aooroprate bait unvirosmer’t,
THE bESIGN APPRAISAL]
II
THE DESIGN APPRAISAL
II
that would not be based solely L Variety of Open Spaces:
j
1
--
on income, several factors such
as family background (size and
type of family), special needs
LJ Pm The SCuff selection pnncples in
the simulation have led to the
creat or a wide variety of
tenants business or animals) h
oper space vhich are rch and
P1
—
18 as c a el an 11 i- Thus eopo
21 3 F 29°c des o would s te as bought c-i-- of
31 36% less a aconve orde rnmodatrg va o
4 F12 prolect fe doree of family id guage group
EDESPRAJSAL
I
THE DESIGN APPRAISAL
The Physical Character sties Land Use Analysis by th° lrdore Development
I effe.
Hwe
y f the a
woo
se
d
ffere
utb
es Forn
s etotl
ovento planned s es Ir this analysis he land use Authority It is considered a acqu ru uals ap t is arkea as (an opiig
and services projects nay
produced settlements efficent in
c fic ency of the s mulation was
compared with a conventionally
model of effective planning by
two experienced financing
I occu d r the case
area was almost saturated,
crc the
‘1
0
sever
°aiae
ses ar
r 1 cc N ‘cccunte
adar
1 8T of [ otal
able
ca e.
a hatc ecial r attr c
lana usc ency of tb ed reside
ccect° Tc tFe ecc’c’mc
s tte S mjuno’ a A’mes.s roca Tu. was me
oart :at v aua° a basea or
a-c se cv DenCv vas
N p ro tIe cettleme’v
th the man road
:rr, ‘nth tue ‘‘.‘
r1 ‘,.‘
7
-_n’, -
combin d wit gardens, play
areas and other recreational
facilities to be used by the
0 a ap ct
Ret: e.r e n c es
CLOSING REMARKS proces encourages the users to economic approach for coping Bort ud M B r rd 0 W ght (1978)
develope a bu It ervironmen wit[ ifs growing hous ng jy igAj, ftvjjJran PwLn World Bank. Washington D C
Ts Sun atc, has u nunstratd [a’ a’c their rros’ pa”uar d and deveiop rig countries.
t at t ie seIfseIection des gn needs and supports a stronger B adM 98
process represents a v ab comrr u iity ntegration More The principles bet md the self r tQr ç Phy ica D&y World
alterrative f r p ov ding rrportanty, ttrough an se action design process make it Ba k Ws gt DC
appropr ate I ng en ironme its i icremen a upgrading of ho ses su tab e for the development of
N
for t e u bar poor ir deve op ng intrastruct re a id public new es dert a areas within the BattV 86
ountr s The elf se ection amenles tte slf selector cu rent formal hou1ng context of t4 ifrvi LLcJi Un publisred Report Scholarship Program Canadian
process has demo istrated tha p ocess offers the users the developirg countr es The self N lnenia o all v o er Agcn y Ottawa
canprodu cal eyarduser deve opme it of such a bui selectior proce s can be ideally
resporsveb te vronmer en ironme t accordi g to the r suited fo relocat on projects BokR 88
Repcjnf- xJ jcLt p b shed P por C ntre for Mm mum Col Housing McGill University
h a c b’ ast eective
ar tter fore offer appealing
eoromv’ rr h’ re rpga-’i9g may not be N Mor r
possible because of poor or
eatu es to b t artie rvolved For he f rr a to the self da ige ous locatio i Equally, the
HUG 8
in te formal p od ct or of low se e lior d ig process offer a elf se ectior process can be
QLII2LL Pad
c ctousng d lopng wer r tia rveirien or
-
AD 94
8 f -1 s ng id Urbar F rograns IDA Was i ngto )C
ss McGIll
‘a’
0
0
NI
N
N
N
NI