RELAY CO-ORDINATION STUDY

1. Write The Case Id For Identify The Case From Multiple Cases
2. Write Remarks for corresponding study case to reflect it in the
summary report
3. Motor Contribution is based on motor status (i.e. Continuous or
Intermittent)
RELAY CO-ORDINATION STUDY

1
2

1. Choose Standard IEC


2. For RC Study case choose Min (Without Motor Contribution) so
that relay pick up for minimum short circuit current
3. Choose Calculation Method (Use Method-B)
RELAY CO-ORDINATION SUMMARY REPORT

 To make Summary report select report manger


TIME CURRENT CHARACTERISTICS (TCC) PLOTS
PROCEDURE:

 For TCC plots choose SC Base same as RC duty and choose ‘min’ short
circuit current in study case
 To plot TCC plots for RC choose ‘star protective device coordination
 First ‘Run/Update Min Short Circuit kA’ then select the path for the backup
protection for which you want to plot the TCC
 Then ‘Create Star View’

1 3

1. Choose Fault value as Sym. rms


2. Select from 3 Phase, LG, LL, LLLG fault type for protective device
sequence-of-operation study.
3. Choose the maximum bus level away from fault, which the
short circuit study will check for the operation
TCC PLOT OPTIONS

1. Keep the setting as shown below


1

1. Enter the remakes if there is any.


1

1. Take line width equals to two for better presentation of TCC.


EXAMPLE OF TCC CURVE