You are on page 1of 2

FOR CONSTRUCTION

START DOCUMENT FLOW CHART

LOG
SHEET
RECORD

ENG ENG ENG


DESIGN DESIGN DESIGN
DWG SPEC STUDY CONSTR REQUEST
TO ENG IF
NEEDED

OWNER OWNER
APPV’D APPV’D
(A) (B) STAMP FOR INFORMATION
CONTROLLED (1)

STAMP IFC
INTERNAL W/
NOTE
IFC

CONTROLLED STATUS
(1,2,..DST) “A”
STAMP FOR UPDATE N
CONSTRUCTION
(CONTROLLED
NO.1,2,...DST) Y

ENGINEERING OBSOLOTE

N
DCR

Y
COST MARK UP DWG AS-BUILT FINISH
IMPACT
N
ENGINEERING DELIVERABLE
FLOW CHART
START

ENGINEERING

DESIGN RFQ PROCEDURE

EXTERNAL INTERNAL
PM APPROVAL
IFA

N N
Y PM APPROVAL
APPVD IFA
OWNER
N
SUBMISSION N
Y
Y
APPVD
N OWNER
SUBMISSION
APPVD IOM PROC Y
N
Y
APPVD
Y
IFI OWNER Y
SUBMISSION
REVISI
IFI OWNER
SUBMISSION

LOG
SHEET
RECORD

FINISH