CENTRAL JAVA PROJECT

Sub Contractor : PT.Jurong Engineering Lestari NOI No :C

Description : Nose Framing Report No :C

Code / Standard : AISC 303-10 Location :B

ITP No : 001/6.1 Date of Inspection : 06


Drawing Ref. : 17100-0140-1 Rev 0

FIT UP & ALIGNMENT CHECK FRAME ASSY NOSE F

RIGHT SIDE LEFT SIDE

BOILER FRONT A7

CENTERLINE BOILER

A3

A1 A2

A6 A9

A5 A8

CENTERLINE 2RY PASS RIGHT WALL

DIMENSIONAL RESULT
NO DESCRIPTION POINT NO.
DESIGN ACTUAL DEVIATION ACC REJECT

1 A1 15,775 15,750 -25 ACC

2 A2 15,775 15,750 -25 ACC


3 A3 15,775 15,750 -25 ACC

4 A4 15,775 15,750 -25 ACC

5 A5 5,418 5,419 +1 ACC

6 A6 5,418 5,416 -2 ACC

7 A7 5,418 5,428 +10 ACC


DIMENSIONAL
8 CHECK FRAME A8 5,418 5,433 +15 ACC

9 ASSY NOSE A9 5,418 5,406 -12 ACC


FRAMING

Prepared by Checked by Checked by

PT. TPE PT JEL SC BTG Construction


Name: Name: Name: Name:

Signature/Date: Signature/Date: Signature/Date: Signature/D

RESULT LEGENDS: ACC=ACCEPT, REJ=REJECT, NA=NOT APPLICABLE


AL JAVA PROJECT

NOI No : CJP-M&E-JEL-

Report No : CJP-TPE-M-

Location : Boiler #2

Date of Inspection : 06 July 2019

ECK FRAME ASSY NOSE FRAMING

LEFT SIDE

A4

BOILER FRONT
A8

CENTERLINE 2RY PASS LEFT WALL


Approved by Reviewed/Witnessed by

SC BTG QA/QC BPI


Name: Name:

Signature/Date: Signature/Date:
CENTRAL JAVA PROJECT

Sub Contractor : PT.Jurong Engineering Lestari NOI No :C

Description : DCC SEAL PLATE Report No :C

Code / Standard : AISC 303-10 Location :B

ITP No : 001/6.1 Date of Inspection : 06


Drawing Ref. : 17100-0140-1 Rev 0

FIT UP & ALIGNMENT CHECK BUCKSTAY DCC SEAL PLATE FR

BOILER FRONT

A1

CENTERLINE BOILER

JT.05 JT.04

A2 (B2) A3 (B3)
OFFSET 100MM

DIMENSIONAL RESULT
NO DESCRIPTION POINT NO. NO DESCRIPTION
DESIGN ACTUAL DEVIATION ACC REJ

1 A1 32,644 32,649 ACC 1

2 A2 100 ACC 2
3 A3 100 ACC 3
GAP CHECK
4 A4 100 ACC 4 BUCKSTAY DCC
5 A5 100 ACC 5 SEAL PLATE FRONT
SIDE (BOTTOM)
6 A6 100 ACC

7 B2 100 ACC
DIMENSIONAL
8 CHECK BUCKSTAY B3 100 ACC
DCC SEAL PLATE
9 FRONT SIDE B4 100 ACC
(BOTTOM)
10 B5 100 ACC

11 B6 100 ACC

Prepared by Checked by Checked by

PT. TPE PT JEL SC BTG Construction


Name: Name: Name: Name:

Signature/Date: Signature/Date: Signature/Date: Signature/D

RESULT LEGENDS: ACC=ACCEPT, REJ=REJECT, NA=NOT APPLICABLE


AL JAVA PROJECT

NOI No : CJP-M&E-JEL-

Report No : CJP-TPE-M-

Location : Boiler #2

Date of Inspection : 06 July 2019

TAY DCC SEAL PLATE FRONT SIDE (BOTTOM)

JT.03 JT.02 JT.01

A4 (B4) A5 (B5) A6 (B6)

BOILER FRONT

B2~B6 (OFFSET 100MM)

A2~A6 (OFFSET 100MM)

GAP RESULT
POINT NO.
DESIGN ACTUAL DEVIATION ACC REJ

JT.01 ACC

JT.02 ACC
JT.03 ACC

JT.04 ACC

JT.05 ACC

Approved by Reviewed/Witnessed by

SC BTG QA/QC BPI


Name: Name:

Signature/Date: Signature/Date: