Professional Documents
Culture Documents
Nose #2
Nose #2
BOILER FRONT A7
CENTERLINE BOILER
A3
A1 A2
A6 A9
A5 A8
DIMENSIONAL RESULT
NO DESCRIPTION POINT NO.
DESIGN ACTUAL DEVIATION ACC REJECT
NOI No : CJP-M&E-JEL-
Report No : CJP-TPE-M-
Location : Boiler #2
LEFT SIDE
A4
BOILER FRONT
A8
Signature/Date: Signature/Date:
CENTRAL JAVA PROJECT
BOILER FRONT
A1
CENTERLINE BOILER
JT.05 JT.04
A2 (B2) A3 (B3)
OFFSET 100MM
DIMENSIONAL RESULT
NO DESCRIPTION POINT NO. NO DESCRIPTION
DESIGN ACTUAL DEVIATION ACC REJ
2 A2 100 ACC 2
3 A3 100 ACC 3
GAP CHECK
4 A4 100 ACC 4 BUCKSTAY DCC
5 A5 100 ACC 5 SEAL PLATE FRONT
SIDE (BOTTOM)
6 A6 100 ACC
7 B2 100 ACC
DIMENSIONAL
8 CHECK BUCKSTAY B3 100 ACC
DCC SEAL PLATE
9 FRONT SIDE B4 100 ACC
(BOTTOM)
10 B5 100 ACC
11 B6 100 ACC
NOI No : CJP-M&E-JEL-
Report No : CJP-TPE-M-
Location : Boiler #2
BOILER FRONT
GAP RESULT
POINT NO.
DESIGN ACTUAL DEVIATION ACC REJ
JT.01 ACC
JT.02 ACC
JT.03 ACC
JT.04 ACC
JT.05 ACC
Approved by Reviewed/Witnessed by
Signature/Date: Signature/Date: