Miscellaneous work at GBP T-A,T-C & T-D.

S. No. Particulars Unit Qty. Rate Total

1 P&L 3-5mm thick Self levelling compound including smoothing, base feather finish prepration, as required. Sft 160 100
2 Removing and refixing of carpet tiles as per requirement using existing material including necessary fixing Nos 160 415 66400=00
arrangements as required.
3 Replacement of leatheride/ fabric of sofa as per requirement. Per 6 5000 30000=00
seat
4 Replacement of leatheride/ fabric of chairs as per requirement. Nos 20 2500 50000=00
At T-C 4th floor(1-4)
5 Sun control film on external glass Sft 70 50 3500=00
At T-D 5th floor, window #16 side
6 Providing and Making of storage/ overhed storage made of commercial board , finished with laminate inside and Sft 20 980 19600=00
outside, with margins/pvc tape, 450/400 deep complete in all respect with locks, hardware as required as per
drawing.
CLC at T-A 4th floor
7 Providing and laying vitrified tile flooring/wall cladding of approved size, quality, shade in pattern over cement Sft 24 160 160
mortar 1:4/laticrete laid to patterns including necessary cutting, grouting of joints (Base Rate of tile 100 Rs./sft
including
At T-A 4thall taxes).
floor
8 Providing and Fixing Gypsum Board false ceiling (12.5 mm thick) with 600mm x 600mm G.I. Suspended Sft 350 110=00 38500=00
ceiling systems laid in grid with hanging frames etc. complete to hold the ceiling fixed with 25mm
gypsum screws to the underside of grid the G.I suspended complete, containing perimeter channel
and suspension members suspended from soffit of slab and beams with soffit cleat screwed and
plugged in to the slab soffit with metal expansion dash fasteners holding strap hanger with nuts and bolts.
tapered edge board to be taped and filled with putty to give smooth seamless finish as per manufactures
specification, to the satisfaction of the site engineer as per drawings including making apertures for light
fixtures, A/C Diffusers and trap doors, excluding painting complete in all respect including cutting of lights
and A/c diffusers. Circular patterns as per drawing to be considered extra @ 1.5 times the cost quoted. ( India
Gypsum board & channels)

At T-D 4&5th floor


9 P&F Frosted film on glass in design or pattern as per drawing. Sft 450 40=00 18000=00
At T-A 4th floor all meetings rooms outside
10 P&F New table top as per requirements Sft 23 400=00 9200=00
At T-C 1st floor (lunch pad) meeting room
11 Utility counter for photocopier/scanner/pantry/ any other area, 2' deep, 2'-6" high with laminate finished shutters Sft 10 950=00 9500=00
and one shelf inside.
At T-C 1st floor in cafeteria
12 Providing and fixing magnetic white board including duster, marker or Glass Writing Board on studs, backside Sft 8 390=00 3120=00
vinyle/duco/film.
At T-C 2nd floor
13 P/F Flush sliding door 35mm thick, finished with laminate including, handles, locks, latches, screws and door Nos 11500=00 11500=00
closure, margin etc. as per detail/design( Size 4'x1'6")
At T-C 2nd floor
14 wall painling tower c sf 52 300=00 15500=00
15 Tower d Almirah leg repair nos 6 1200=00 7200=00
16 toilet merrer cange sf 15 190=00 2850=00
17 glass film cange sf 32 70=00 2240=00
18 jipsum ciling sf 27 100=00 2700=00
19 urinal brakit change nos 9 300=00 2700=00
20 Geger 15ltr. nos 1 10700=00 10700=00
21 floor tiles cange 2 pes 1/1 nos 2 300=00 600=00
22 grenight stone top cangetower A SFT 24 300=00 7200=00
TOTAL 330850=00