Notes:-

1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS


OTHERWISE NOTED.
2. THIS DRAWING IS NOT TO BE SCALED.
3. REFER TO DRAINAGE SCHEDULE FOR INVERT LEVELS
OF INCOMING AND OUTGOING PIPES.
4. CONCRETE CHAMBER AND WEIR WALL TO COMPLY
WITH BS EN 1917:2002 AND BS 5911-3.
C 5. CHAMBER INVERT TO BE 300 MIN TO 450 MAX BELOW
002021 OUTGOING PIPE.
6. GRADE ST4 CONCRETE BACKFILL IS USED WHERE
MECHANICAL COMPACTION IS IMPRACTICAL.
A 7. FOR DETAILS OF COVER TYPE REFER TO THE
002021 SPECIFICATION.
PRECAST CONCRETE WEIR WEIR WALL SIDES TO BE 8. NON-SHRINK CEMENT GROUT SHALL COMPLY WITH
WALL (SEE NOTE 4) 175 INSTALLED WITH LAYER OF THE REQUIREMENTS STIPULATED IN BS EN 1503-3
BUTYL SEALANT AND GROUTED CLASS R4 AND BS EN 1504-6.
UP WITH NON SHRINK CEMENT 9. MANHOLE CHAMBER, BENCHING, WEIR WALL AND
600 x 600 D400 OPENING, GROUT (SEE NOTE 8) FLOW CONTROL DEVICES TO BE INSTALLED IN
COVER AND FRAME TO BS ACCORDANCE WITH MANUFACTURERS
HYDROBRAKE OR

20
EN 124 (SEE NOTE 7) 214 INSTRUCTIONS.
ORIFICE PLATES
10.FOR CHAMBER DIAMETER, REFER TO DRAINAGE
BOLTED ONTO
SCHEDULES
WEIR WALL
175
PRECAST CONCRETE
CHAMBER
SE
EN
OT
DETAIL 'A'
E 10 (NTS)

B B
002021 002021

OUTGOING PIPE
(SEE NOTE 3) WEIR WALL BASE TO BE
INCOMING PIPE INSTALLED WITH LAYER OF
(SEE NOTE 3) 225 BUTYL SEALANT AND GROUTED
175 UP WITH NON SHRINK CEMENT
GROUT (SEE NOTE 8)

50
DOUBLE STEPS 250mm DETAIL 'B'
C/C VERTICALLY C (NTS)
002021

PLAN
CONNECTION FLOW CONTROL CHAMBER 1
(NTS)

P01.1 23/06/22 First Issue SG SB --- ---

Rev Date Description Prod. Chk. Rev. App.

600 x 600 D400 OPENING, COVER AND


FRAME TO BS EN 124 (SEE NOTE 7)
WHERE CONCRETE BACKFILL IS 600 x 600 D400 OPENING, COVER
USED (SEE NOTE 6 ) TOP OF AND FRAME TO BS EN 124
BACKFILL TO BE 10MIN BELOW (SEE NOTE 7)
MORTAR BED TO COVER UNDERSIDE OF COVER SLABS
AND FRAME
(10 MIN TO 20 MAX)

WHERE CONCRETE ACCESS


BACKFILL IS USED
200

(SEE NOTE 6 ) TOP OF ACCESS ACCESS OVERFLOW WEIR LEVEL AS SHOWN Project:
BACKFILL TO BE 10MIN ON DRAINAGE SCHEDULES
BELOW UNDERSIDE OF
COVER SLABS A320 HIF Scheme - North of Woking
AS PROVIDED FROM
PRECAST HEAVY DUTY COVER MANUFACTURE
SLAB WITH 2 No. ACCESS POINTS LIFTING ANCHOR
PRECAST CONCRETE AND 1No PENSTOCK ACCESS
CHAMBER (SEE NOTE 4) COVER
OVERFLOW WEIR LEVEL AS
SHOWN ON DRAINAGE SCHEDULES
ORIFICE PLATE 2
(MAY NOT BE REQUIRED) Registered office: Coordinating office:
80 Fenchurch The Surrey Research Park
Street 10 Medawar Road
London Guildford GU2 7AR
6mm THICK STAINLESS STEEL EC3M 4BY Tel: 44 (0)1483 803000
OUTGOING PIPE
ORIFICE PLATE
(SEE NOTE 3)
www.arcadis.com © Copyright reserved

PRECAST CONCRETE Drawing Title:

CHAMBER RINGS Drainage Layout Drawings


MIN.
300

SEE NOTE 5 (SEE NOTE 4)


INCOMING PIPE Flow Control Chamber-1
(SEE NOTE 3)
Sheet 1 of 1
185

ORIFICE PLATE 1 OR M12 STAINLESS STEEL BAR


300 HYDROBRAKE (OR CHEMICALLY ANCHORED INTO Designed: Signed Date
DETAIL B 300mm ST4 CONCRETE FILLET
EQUIVALENT APPROVED) WEIR WALL USING ORIFICE PLATE S.Gwynne Digitally Signed 30/06/22
AROUND OUTSIDE OF Produced: Signed Date
HELD IN PLACE WITH STAINLESS S.Gwynne Digitally Signed 30/06/22
150 MIN INSITU GRADE ST4 CHAMBER TO SEAL
STEEL NUT AND WASHER Checked: Signed Date
CONCRETE BLINDING SLAB BASE-BLINDING JOINT S.Brown Digitally Signed 30/06/22
Reviewed: Signed Date
--- Digitally Signed ---

B SECTION C SECTION
Approved:
---
Design Stage:
Signed
Digitally Signed
Date
---
002021 (NTS) Detailed Design
002021 (NTS) Original Size: Grid: Datum:
A1 OS AOD
Suitability Code: Scale: Project Number:
S3 NTS 10053900
Suitability Description:

Suitable for Review and Comment

Drawing Number: Revision:

10053900 - ARC - HDG P01.1


ZZZ - DR - HE - 00001
Print Date: 2022-07-11 11:33:15 C:\bms\arcadis-uk-09\dms41678\10053900-ARC-HDG-ZZZ-DR-HE-00001.dwg