Professional Documents
Culture Documents
2 F/S
PG TG
1' 1 EXPANSION
NOTES:
TANK 300 LTR.
AIR COOLED SCREW AIR COOLED SCREW
879
829
600 CHILLER -60 TR CHILLER -125 TR
Terrace Floor
906725
ø80 mm DRAIN
DRAIN & OVER FLOW LEGEND:-
3670
BLV
3000
RB BFV
TG PG
F/S BFV
BFV
1365
DV BLV
1200
DV
879
600
600
600
600
3580
3580
3400
3300
03 Terrace Floor
BFV
NRV
BFV
NRV
BFV
NRV
BFV
NRV
BFV
NRV
BFV
NRV C-CHANNEL SUPPORT 906725
PG PG PG PG PG PG
DV DV DV DV DV DV FOR PIPE
02 Ducting layout
First Floor Compressor
902225 Pipe 40mm Dia
50 TR ,18000 CFM
2000 Lt. AHU-01
3450
C/W PUMPS WITH VFD C/W PUMPS WITH VFD C/W PUMPS WITH VFD Reservoir BFV MBFV
BFV BFV
CAPACITY-120 GPM CAPACITY-200 GPM CAPACITY-300 GPM MBFV PRV PG PG
TG
BLV BFV
PP-05,06 (1W+1S) PP-03,04 (1W+1S) PP-01,02 (1W+1S) BLV PG
Y-STR NRV
40 TR ,13000 CFM Compressor PG
TG DV PG
DV
PG
TG
DV
CAHU
DV
Y-STR
Y_STR
02 Ducting layout
DV
DV First Floor
C-CHANNEL PURGE E/A DUCT
902225
SUPPORT Size-400x400
FOR DUCT
COMPRESSED
AIR PIPE
TG PG
BFV
40 TR ,13000 CFM MBFV
AHU-02 BLV
DV
2500
Y-STR
TG PG
RB
DV First Floor 01 Ducting layout
902225 Ground Floor
896725
SECTION A-A
REVISION DESCRIPTION:
SECTION B-B NO.
R0
DESCRIPTION
ISSUED FOR APPROVAL
DATE
17.02.2021
R1 ISSUED FOR APPROVAL 6.03.2021
R2 ISSUED FOR APPROVAL 8.03.2021
R3 ISSUED FOR APPROVAL 18.03.2021
R4 ISSUED FOR APPROVAL 01.04.2021
R5 ISSUED FOR APPROVAL 08.04.2021
R6 ISSUED FOR APPROVAL 12.08.2021
KEY PLAN:
PROJECT NAME:
SIDE VIEW SIDE VIEW HPCL
TOP VIEW Bangalore
TOP VIEW
CLIENT:
HORIBA HPCL
HVAC EPC:
FRONT VIEW FRONT VIEW COMFONOMICS DESIGN VENTURE LLP.
179-PHASE-1 UDYOG VIHAR, GURGAON
Email:- info@comfonomics.com
Website:-www.comfonomics.com
4xØ14mm HOLE SCALE: DRAWN BY:
As indicated SANDEEP
4xØ22mm HOLE SHEET SIZE: CHECKED BY:
MS BASE PLATE A2 VARUN
HPCL-02A
MOUNTING ARRANGEMENT FOR COMPRESSOR MOUNTING ARRANGEMENT FOR RECEIVER
STAMP AND SIGN: