GENERAL NOTES:

1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN M.METERS


UNLESS NOTED OTHERWISE
2. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH
OTHER RELEVANT ARCHITECTURAL, STRUCTURAL, MECHANICAL
AND ELECTRICAL DRAWINGS AND ALL RELEVANT SECTIONS
OF THE SPECIFICATIONS.
3. CHARACTERISTIC CUBE STRENGTH OF REINFORCED CONCRETE
AFTER 28 DAYS IS 35MPa WITH MINIMUM CEMENT CONTENT
400 Kg/m 3 .
4. CHARACTERISTIC CUBE STRENGTH OF PLAIN CONCRETE AFTER
28 DAYS IS 20MPa WITH MINIMUM CEMENT CONTENT 250 Kg/m 3.
5. YIELD STRENGTH OF REINFORCED BARS IS 420 N/mm2.
6. THE CLEAR COVER FOR REINFORCEMENT SHALL BE

G F E J AS FOLLOWS, UNLESS OTHERWISE SHOWN ON THE DRAWINGS:


a.
b.
-- FOUNDATION COVER= 70 mm
--WALLS 50 mm
c. -- COLUMNS 30 mm
d. -- BEAMS AND SLABS 25 mm
7. FOUNDATIONS ARE DESIGNED BASED ON BEARING
CAPACITY IS 300 kPa AS PER GEOTECHNICAL REPORT
8. ALL RECOMMENDATIONS IN GEOTECHNICAL REPORT SHOULD BE
49000 IMPLEMENTED.
9. SOIL BELOW FOUNDATION (FORMATION LEVEL) TO BE COMPACTED
UP TO 95%.
10. ALL FIXATION DETAILS AND EMBEDDED PARTS SHOULD BE
COORDINATED WITH FINAL SUPPLIER DRAWINGS.
14200 1200 33600 11.
12.
203
SPLICE LENGTH CALCULATED AS PER ECP 2020 4-2-5-4-1 / C&D
BAR BENDING RADIUS CALCULATED AS PER DETAILS CODE 2001 203
3-3

8550 5650 30960 3850


Y Shape Length Mass % of
Mark [mm] [mm] [mm] QTY [kg] total Notes

500
1 Y16 11158 11634 258 4737.48 7.8% H.Z-O.F; H.Z-I.F

2 Y16 12000 12000 740 14015.66 23.1% H.Z-O.F; H.Z-I.F

500
3 Y16 7999 8475 40 535.08 0.9% HZ-OF

500

500
4 Y16 4433 102 713.73 1.2% H.Z-I.F
3481

5 Y16 12000 1601 12000~1601 42 450.81 0.7% H.Z-I.F

6 Y16 9823 12000 9823~12000 8 137.78 0.2% H.Z-I.F

700
7 Y16 2400 42 159.09 0.3% H.Z-I.F
1724

8 Y16 12000 12000 38 719.71 1.2% H.Z-I.F

500
10 Y16 11524 12000 102 1931.83 3.2% H.Z-I.F

513 513

499

500
11 Y16 2400 102 386.32 0.6% H.Z-I.F
470

12 Y16 3000 3000 102 482.97 0.8% H.Z-I.F

13 Y18 6000 6000 284 3403.73 5.6% VL-I.F

Starter bars Starter bars


FC1* FC1* 14 Y18 8000 8000 150 2396.95 4% VL-I.F

Starting at level (74.43) planted on R.C WALL 500mm Starting at level (75.43) 15 Y16 6000 6000 260 2462.16 4.1% VL-I.F

pier Started from level 74.43 planted on pier 106


16 Y16 12000 36 681.82 1.1%

800
TO level 79.03
11142 H.Z-I.F

( +75.430)

784
783
17 Y16 5000 36 284.12 0.5% H.Z-I.F
3481

33 30Y22 N=30 L=3000 STARTER BAR

1680mm

224
789

(+74.43)
33 30Y22 33 30Y22

470
18 Y16 2400 36 136.39 0.2% H.Z-I.F
789

N=30 N=30

224
L=3000 L=3000

3000
19 Y16 3500 3500 36 198.87 0.3% H.Z-I.F
STARTER BAR STARTER BAR 500
1680mm

1680mm

680 620

500
H.Z-I.F

380mm 1320mm
20 Y16 2000 8 25.25 0%

E=12.99m
21.71m

36 Y18/100

L=2400
1524
3000

3000

N=130
12.99m

1807
676

800
21 Y16 12000 38 719.74 1.2% HZ-OF
34 Y18/100

1080mm
11224
620mm 700mm

620mm 700mm

2347
N=218
1320mm

L=3000

1080mm

1080mm
22 Y16 9863 1343 9863~1343 38 336.03 0.6% HZ-OF

E=21.71m

27 Y18/100 N=130 L=6000 E=12.99m


26 Y16/100 N=143 L=5425~7928 E=14.21m
23 Y16 12000~2653 36 416.27 0.7% HZ-OF

Vairable EVERY STEP (17.60 mm)


12000 2653

14.20m
3351

24 Y16 8000 8000 150 1893.89 3.1% VL-O.F


35 Y18/100

E=14.2m
L=4000
N=142

14 Y18/100 N=75 L=8000 E=7.4m


25 Y16 5477 7905 5477~7905 286 3020.33 5% VL-O.F
1080mm

6000
26 Y16 5425 7928 5425~7928 286 3013.79 5% VL-I.F

14.20m 7.40m 14.21m 12.99m


27 Y18 6000 6000 260 3116.17 5.1% VL-I.F
8650

8000

10134
28 Y16 11186 16 282.48 0.5% HZ-OF

800
13 Y18/100

E=14.2m

300

(+68.31)
L=6000
N=142

1050

10640
29 Y16 11692~2102 36 391.89 0.6% HZ-OF

800
800
1090mm
300

300
6000

30 Y16 3684 1420 3684~1420 12 48.34 0.1% HZ-OF

140mm
Starter bars
1080mm

800
31 Y16 3000 36 170.45 0.3% HZ-OF
2224

Starter bars

500
32 Y16 5524
6000 102 965.98 1.6% HZ-OF

(+65.78) 33 Y22 3000 3000 180 1611.38 2.7% STARTER BAR


1080mm

120mm 1080mm

2347

34 Y18 3000 436 2612.81 4.3% VL-I.F

680
Starter bars

Starter bars

3351

35 Y18 4000 284 2269.24 3.7% VL-I.F

676
900

1807

36 Y18 2400 260 1246.32 2.1%

620
VL-I.F

37 Y16 6000 6000 284 2689.37 4.4% VL-O.F

2584

38 Y16 3000 284 1344.7 2.2% VL-O.F

440
1513

39 Y16 2000 2 6.31 0% VL-O.F

510
1037

40 Y16 1500 260 615.46 1% VL-O.F

487
Total mass = 60631 kg

21650 14350 15260


REFERENCE DRAWINGS:
DOCUMENT NO. DOCUMENT TITLE REV.
8550 5650 30960 3850

G F E J

Hydro . Envir & Infra str . Studies

Wall elevation - Wall NO 02


‫سا‬

VL.IF-Reniforcment PS (04)

NO = 2 00 FIRST ISSUE FOR APPROVAL/FOR CONSTRUCTION

N.T.S
PS04 - PUMP HOUSE
Wall reinforce detail-NO 02
9/30
1053-SHD-PUS-RF-005315 00