LEVEL BPI AND TRANSFORMER BODY. IF NEEDED TRANSFORMER
SURGE ARRESTER MAY BE SHIFTED WITH PROPER ADJUSTMENT WITH LIGHTING
MAST LOCATION
6. BAY SHALL BE KEPT HORIZONTAL AS MUCH AS POSSIBLE BY
4500
ADJUSTING THE HEIGHT OF THE EQUIPMENT STRUCTURES.
CURRENT TRANSFORMER
7. CABLE TRENCH FOR LT POWER AND CONTROL CABLES SHALL BE
FINALISED DURING DUE COURSE OF ENGINEERING.
8. LOCATION OF TRANSFORMER OIL PIT SHALL BE DECIDED AS
4500
TRANSFORMER
PER SITE CONDITION.
8. LOCATION OF CAPACPTOR BANKS SHALL BE DECIDED AS
INSULATOR STRING
PER SITE CONDITION.
4500
CVT
4500
4500
4500
CULVERT
85000
4000 4000 5000 4500 4000 3250 3250 5000 4500 4500 4500 9000 4500 4500
4500 4500 4500 9000 LIGHTING MAST
5000
3250
3250
3750
23000
30000
4000
4000
3500
23000
30000
NOTE:
7488
7150
SINGLE TWIN
SUSPENSION ACSR TWIN
STRING MOOSE ACSR
7000
5000
SUSPENSION SINGLE SINGLE FOR TRANSFORMER R Y B ACSR ACSR
16500
MOOSE MOOSE
STRING
CLIENT:
5000
~
3'' IPS AL TUBE
3"IPS AL TUBE
10500
10500
10500
8000
8000
8000
5500
5500
5500
5500
5500
2500
2500
300 300
FGL FGL
5000 4000 4000 4500 4500 4000 3250 3250 5000 4500 4500 4500 4500 3150 5850 9000 12000 8000 3500 4000 4000 3250 3250 5000 4500 4500 4500 4500 3150 5850 9000 6000
STEEL LIMITED
CLIENT'S APPROVAL:
FOR PHASE
SUSPENSION
STRING
SINGLE SINGLE
3"IPS AL TUBE ACSR ACSR
MOOSE MOOSE
PROJECT DIRECTOR SIGNATURE & DATE
10500
PROJECT TITLE:
8000
2500
SHEET TITLE:
DRAWN BY : DSN
SECTION 3-3 (BUS COUPLER BAY) CHECKED BY : RBJ
SHEET SIZE
A1
(SCALE -1:300) APPROVED BY : SAL